ATT0007.pdf
PDF 659 KB Posted
- Solicitation number
- W56HZV-21-R-0169
About this file
This document is a request form for a federal contractor to seek approval for using prohibited materials on an upcoming Enhanced Heavy Equipment Transport System (EHETS) trailer contract. The Army Contracting Command - Detroit Arsenal plans to release a solicitation for 466 EHETS trailers over five years. The draft solicitation and attachments in the notice provide additional contract details. Interested vendors can submit comments on the draft solicitation by the closing date. The request form requires the contractor to identify the prohibited materials for use, explain any health hazards, analyze alternatives considered and why they cannot be used, provide technical justification for the materials, describe associated program risks if denied, and identify a get well plan for integrating alternatives later. The government will then evaluate the request and make a recommendation, with concurrence from engineering and approval by the project manager if accepted.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ATT0002 rev 5Oct.xlsx | XLSX spreadsheet | |
| Draft RFP W56HZV21R0169 rev 6Oct.pdf | ||
| ATT0040.xlsx | XLSX spreadsheet | |
| ATT0002.xlsx | XLSX spreadsheet | |
| ATT0038.xlsx | XLSX spreadsheet | |
| ATT0026.pdf | ||
| ATT0036.xlsx | XLSX spreadsheet | |
| ATT0041.pdf | ||
| ATT0048.pdf | ||
| ATT0009.xlsx | XLSX spreadsheet | |
| ATT0043.pdf | ||
| ATT0019.pdf | ||
| ATT0047.pdf | ||
| ATT0020.pdf | ||
| ATT0030.pdf | ||
| ATT0037.xlsx | XLSX spreadsheet | |
| ATT0027.pdf | ||
| ATT0028.pdf | ||
| ATT0049.pdf | ||
| EXHA.pdf | ||
| Draft RFP W56HZV21R0169.pdf | ||
| ATT0046.xlsx | XLSX spreadsheet | |
| ATT0042.docx | DOCX document | |
| ATT0008.XLSX | XLSX spreadsheet |
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNCLASSIFIED
Attachment 0007
Request for Use of Prohibited Materials
04 November 2014
Distribution Statement A – Approved for Public Release; distribution unlimited
(*Distribution Statement A only applies when form is not filled in. Once filled check the Security Class Guide for proper distribution statement/markings)
1. General Information Requesting Company Date of Request Point of Contact
Prohibited material for which waiver is requested
2. Explanation of Use Instructions: Provide a description of the parts/processes where the prohibited material will be used. Identify all components/parts that will contain the prohibited materials upon vehicle delivery including quantities of these parts. Indicate the specific variant and/or trailer the components/parts are on. Identify whether or not the material will be required for operation or maintenance (including during vehicle rebuild). A separate spreadsheet may be attached listing the specific parts/processes, if needed.
3. Health Hazard Instructions: Provide an explanation of any health hazards associated with the use or presence of the prohibited material. Include likely routes of exposure to both the operator and the maintainer. Identify if any personal protective equipment (PPE) that would be required as a result of using this material. Include the type of PPE and under what circumstances it would be required (manufacturing, operation, maintenance, etc.).
4. Analysis of Alternatives Instructions: Identify all alternatives that were considered for the prohibited material. If the alternative is only for specific applications, identify what type of parts it is a potential alternative for. Include explanation as to why each cannot be implemented.
5. Technical Justification
Instructions: Provide technical justification for the use of prohibited material. Explain why it is necessary and why it cannot be eliminated.
6. Program Risk Instructions: Describe the program risk(s) (cost, schedule, and performance) associated with denial of this request by the Government.
7. Get Well Plan Instructions: Identify which parts where an alternative may be integrated at a later date.
Provide a get well plan explaining how this will be accomplished. Also, indicate which parts you will not be able to eliminate and provide a brief explanation.
The following Sections will be filled in by the Government
8. Environmental Safety and Occupational Health Working Group (ESOH WG) Evaluation/ Recommendation
Instructions: Government ESOH WG will to provide evaluation of the above information and a recommendation to the Product Director/Project Manager regarding approval/disapproval of the prohibited material request.
{Name1} {Date1} JPO XXXX, ESOH WG Date
9. Concurrence I concur that use of {prohibited material} as described above under the {Contractor Name} Contract –{Contract Number} is acceptable and justified:
{Name2} {Date2} JPO XXXX, CHIEF ENGINEER Date
{Name3} {Date3} Lead Engineer, XXXX Date
{Name4} {Date4} Product Director, XXXX Date
10. Approval Upon the basis of the findings above, I hereby determine that use of {prohibited material} in the parts identified in Section 1 for {Contractor Name} Contract {Contract Number}is acceptable and justified.
{Name5} {Date5}
Project Manager, XXXX Date
File details come from the government source that posted it. Updated .