About this file
This is a structural calculations document prepared by ISE Structural Engineers, Inc. for San Bernardino County Fire Department's Fire Station 227 new construction project located at 180 W. 38th Street in San Bernardino, California. The document, dated March 7, 2025, contains comprehensive structural design calculations for a one-story Type V-B wood-framed fire station with wood sheathed shear walls and flexible diaphragms. The project incorporates seismic design in accordance with the 2022 California Building Code and ASCE 7-16, with a building risk category of IV reflecting the essential nature of the fire station facility. The design includes calculations for the main structure, site structures including a fuel tank/generator canopy, storage building, trash enclosure, retaining masonry walls, and a free-standing CMU wall, with foundation design based on recommendations from a geotechnical report by Inland Foundation Engineering, Inc. dated September 6, 2024.
The structural calculations establish design criteria including seismic parameters with spectral accelerations (Ss = 2.505g, S1 = 1.002g), soil site class D, and wind speeds of 125 mph. Foundation design utilizes conventional slab-on-grade with shallow grade beam footings and drilled pier footings for specific structures. The calculations demonstrate compliance with applicable code requirements through detailed analysis of gravity loads, lateral loads from seismic and wind forces, and vertical lateral resisting systems. Design components include roof framing with monoslope wood truss systems, CMU wall footing checks for the trash enclosure, fuel canopy structural analysis with steel ordinary moment frames, and stability calculations for free-standing masonry walls under both seismic and wind loading conditions. All calculations include load combinations per IBC 2018, deflection criteria, and material specifications with reinforcement details for concrete and masonry elements. The document indicates permit recommendation was issued following code compliance review by Bureau Veritas North America, Inc. on May 30, 2025.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
March 7, 2025 ISE Project # 24-8400.32
42095 Zevo Dr., Suite A15, Temecula, CA 92590-3780
Prepared by:
ISE Structural Engineers, Inc.
27369 Via Industria
Temecula, CA 92590
Engineer Seal
STK Architecture, Inc.
STRUCTURAL CALCULATIONS
Fire Station 227 180 W. 38th Street
San Bernardino, CA 92405
Prepared for:
San Bernardino County Fire Department
06/30/26
These plans and documents have been reviewed and found to be in compliance with the applicable code requirements of the jurisdiction. Issuance of a permit is recommended subject to approval by other departments and any noted conditions. The stamping of these plans shall not be held to permit or be an approval of any violation of applicable codes and standards to relieve the owner, design professional of record or contractor of compliance with the applicable codes and standards. Plan review of documents does not authorize construction to proceed in violation of any federal, state or local regulations.
BUREAU VERITAS NORTH AMERICA, INC.
REVIEWED FOR CODE COMPLIANCE
SIGNATURE:____________________
DATE:__________________________
Bureau Veritas
5/30/2025
Description Page Number
Project Design Criteria
Building Gravity Design
Building Lateral Design
Seismic Load Criteria
Wind Load Criteria
Vertical Lateral Resisting Elements - Shear Walls
Horizontal Lateral Resisting Elements - Diaphragms
Chord & Collector Calculations
Building Foundation Design
Grade Beam Calculations
Site Structures
Site Structure Design Criteria
Site Retaining Masonry Walls
Storage Building
Trash Enclosure
Fuel Generator/Tank Canopy
Free-standing CMU Wall 8C/A1.2
Plan Check
Connection Verification Detail 12/SD3
Awning Design
Light Pole Design
STRUCTURAL CALCULATIONS - TABLE OF CONTENTS
Project: San Bernardino County Fire Department
General
Governing Building Code(s):
Building Risk Category: IV (CBC Table 1604.5)
Construction Fire Resistance Type: (CBC Chapter 6)
Building Description:
Building System:
Roof Shape
Roof Framing System
Roof Diaphragm System
Wall Framing System
Build Method
Foundation System:
Slab on Grade
Footings/Grade Beams
Curbs/Stemwalls
Deep Foundation Members
Earth Retaining Systems
N/A
Concrete N/A
N/A N/A
Conventional Rebar
Conventional Rebar
Cant. Masonry
Engineer: Valeria Gallardo
STRUCTURAL DESIGN CRITERIA
Project: Fire Station 227
Project Manager Sandy Fong
Main Structure
Monoslope
Wood Truss
Secondary Structure
N/A
N/A
Wood Sheathed N/A
2022 California Building Code, ASCE 7-16
Type V-B
One-story Fire Station
Site Built N/A
Wood Stud N/A
N/A
N/A
STRUCTURAL DESIGN CRITERIA
Design Live Loads (CBC Table 1607.1)
Roofs:
Uniform load: 20 psf
Reducible? Yes (CBC 1607.13.2.1)
Deflection Criteria (CBC, Table 1604.3)
L/ 360 L/ 360 L/ 240
L/ 600 L/ 240
L/ 360
L/ 240
Load Combinations (CBC, Section 1605)
Strength Design or Load and Resistance Factor Design (LRFD) (CBC, Section 1605.2)
Alternate ASD Load Combinations (CBC, Section 1605.3.2)
Seismic Design Criteria (ASCE 7-16, Chapter 11 & 12)
Site Factors:
Spectral acceleration for short period buildings (Ss): 2.505 g
Spectral acceleration for 1-sec period buildings (S1): 1.002 g
Soil Site Class: D
Seismic Importance Factor: (IE) 1.50
Effective Seismic Weight: (ASCE 12.7.2)
Narrative of Design to resist Seismic Loads:
Lateral Resisting System Parameters: (ASCE Table 12.2-1, Table 12.12-1)
R Ωo Cd
6.5 3.0 4.0
Redundancy Factor, ρ: 1.00 With exceptions per ASCE 12.3.4
Seismic Analysis Procedure: (ASCE Table 12.6-1)
Interior Walls:
Floor:
Exterior Walls:
Equivalent Lateral Force Procedure, Section 12.8
Allowable Drift, Δa
Light Framed Wood Sheathed Shear Walls 0.025h
L E, S, W D+L
Roof:
Dead
Wood framed fire station with wood sheathed shear walls and wood sheathed flexible diaphragms. The respective diaphragms may be assumed flexible per ASCE 7-16, Section 12.3.
Description
Structural Irregularities:
Horizontal Structural Irregularities: (ASCE Table 12.3-1)
Type Description Location x
Vertical Structural Irregularities: (ASCE Table 12.3-2)
Type Description Location
Wind Design Criteria (ASCE 7-16, Chapter 26)
Basic Wind Speed: 125 mph (3s Gust) (ASCE 26.5)
Special Wind Region Yes
Surface Roughness Category: C (ASCE 26.7.2)
Exposure Category: C (ASCE 26.7.3)
Enclosure Classification (ASCE 26.12)
Type 2 Reentrant Corner Irregularity
Type 3 Diaphragm Discontinuity Irregularity
Design procedure for Component & Cladding Wind Loads (C&C):
Component & Cladding, Ch. 30
In-Plane Discontinuity VLFR Element
Type 1b Stiffness-Extreme Soft Story Irregularity
Discontinuity in Lateral - Weak Story
Type 5b Discont. in Lat. - Extreme Weak Story
Type 4
Type 2 Weight (Mass) Irregularity
Type 5 Nonparallel System Irregularity
Type 1a Stiffness-Soft Story Irregularity
Enclosed
Design procedure for Main Wind Force Resisting System (MWFRS):
Directional Procedure, Ch. 27
Type 5a
Type 1b Extreme Torsional Irregularity
Source: ASCE 7 Hazard Tool
Type 3 Vertical Geometry Irregularity
Type 4 Out-of-Plane Offset Irregularity
Type 1a Torsional Irregularity
Geotechnical Design Criteria & Foundation Type
Geotechnical Report:
Prepared by:
Report Number:
Date:
Expansive Soil:
Static Settlement:
Liquefaction Settlemnt:
Seismic Hazards:
Corrosive Soil:
Foundation Type:
Not significant
None
Not corrosive
Conventional slab on grade with Shallow grade beam footings
Inland Foundation Engineering, Inc.
S168-193
September 6, 2024
Non-expansive
<1"
ROOF TYPES
R1
5.0 psf
2.5 psf
3.0 psf
0.5 psf
2.5 psf
1.5 psf
0.0 psf
Total Dead Load = 15.0 psf
WALL TYPES
W1 W2
8.0 psf 1.5 psf
1.5 psf 1.5 psf
1.5 psf 0.5 psf
0.5 psf 6.0 psf
3.0 psf 0.5 psf
0.5 psf Total Dead Load = 10.0 psf
Total Dead Load = 15.0 psf
PROJECT DEAD LOAD ANALYSIS
Main Sloped Roof:
Lightweight Tile/Membrane:
15/32" Sheathing:
Roof Framing (Trusses at 24" o.c.):
Insulation (Batt):
(1) Layer 5/8" Drywall at Ceiling:
Mech/Elec/Plumbing:
Ceiling Framing:
2x4 Wood Stud Exterior Wall 2x4 Wood Stud Interior Wall
7/8" Plaster/Stucco 15/32" Sheathing:
15/32" Sheathing: Wall Framing (2x4 at 16" o.c.):
(1) Layer 5/8" Drywall: Mech/Elec/Plumbing:
Mech/Elec/Plumbing:
Wall Framing (2x4 at 16" o.c.): Insulation (Batt):
Insulation (Batt): (1) Layer 5/8" Drywall each side:
BUILDING GRAVITY DESIGN
ROOF
Member Name Results (Max UTIL %) Current Solution Comments (B1) - HEADER Passed (45% M) 1 piece(s) 2 x 6 DF No.2 (Plank) (B2) - HEADER Passed (101% M) 1 piece(s) 2 x 6 DF No.2 (Plank) (B3) - HEADER Passed (79% M) 1 piece(s) 4 x 6 DF No.2 (Plank) (B4) - HEADER Passed (100% M) 1 piece(s) 6 x 6 DF No.1 (B5) - HEADER Passed (101% M) 1 piece(s) 6 x 8 DF No.1 (B6) - HEADER Passed (69% V) 1 piece(s) 6 x 6 DF No.1 (B7) - HEADER Passed (45% M) 1 piece(s) 4 x 6 DF No.2 (Plank) (B8) - HEADER Passed (71% M) 1 piece(s) 2 x 6 DF No.2 (Plank) (B9) - FLUSH BEAM Passed (27% M) 1 piece(s) 6 x 6 DF No.1 (B10) - FLUSH BEAM Passed (25% R) 1 piece(s) 2 x 8 DF No.2 (B12) - HEADER Passed (45% M) 1 piece(s) 6 x 6 DF No.1 (B13) - HEADER Passed (57% M) 1 piece(s) 4 x 6 DF No.2 (B16) - HEADER Passed (88% M) 1 piece(s) 4 x 6 DF No.2 (Plank) (B17) - HEADER Passed (42% M) 1 piece(s) 4 x 6 DF No.2 (Plank) (B18) - HEADER Passed (89% M) 1 piece(s) 4 x 6 DF No.2 (Plank) (B20) - HEADER Passed (39% M) 1 piece(s) 6 x 6 DF No.1 (B22) - DROP BEAM Passed (60% M) 1 piece(s) 6 x 8 DF No.1 (B23) - HEADER Passed (67% ΔT) 1 piece(s) 6 x 6 DF No.1 (B24) - HEADER Passed (70% M) 1 piece(s) 6 x 6 DF No.1 (Plank) NU (B25) - HEADER Passed (87% M) 1 piece(s) 6 x 6 DF No.2 (B26) HEADER Passed (99% ΔT) 1 piece(s) 2 x 4 DF No.2 (Plank) (B27) HEADER Passed (35% M) 1 piece(s) 4 x 4 DF No.2 (Plank) (B28) HEADER Passed (96% B/C) 1 piece(s) 6 x 14 DF No.1 RJ1 - ELECTRICAL ROOM Passed (19% M) 1 piece(s) 2 x 8 DF No.2 @ 24" OC RJ2 - ENTRY Passed (70% M) 1 piece(s) 2 x 8 DF No.2 @ 24" OC RJ3 - APPARATUS Passed (13% M) 1 piece(s) 2 x 6 DF No.2 @ 24" OC RJ4 - APPARATUS Passed (26% M) 1 piece(s) 2 x 8 DF No.2 @ 24" OC RJ5 - APPARATUS Passed (17% M) 1 piece(s) 2 x 8 DF No.2 @ 24" OC RJ10 - LOCKER ROOM Passed (34% M) 1 piece(s) 2 x 6 DF No.2 @ 24" OC CJ1 - High/Clerestory, Roof Framing Plan - B/W Grids B&C - Kitchen Ceiling Joists
Passed (38% ΔT) 1 piece(s) 2 x 8 DF No.2 @ 16" OC
Wall: 2x8 Stud Passed (34% B/C) 1 piece(s) 2 x 8 DF No.2 @ 16" OC Tall Wall: 2x6 Stud Passed (72% ΔTₗₐₜ) 2 piece(s) 2 x 8 DF No.2 @ 16" OC Interior Wall: 2x6 Stud Passed (52% f꜀) 1 piece(s) 2 x 6 DF No.2 @ 16" OC
(B30) - FLUSH BEAM Passed (40% M) 1 piece(s) 6 x 6 DF No.1 Roof: Joist Passed (78% M) 1 piece(s) 2 x 10 DF No.2 @ 24" OC Tall Wall: 2x8 Stud Passed (97% ΔTₗₐₜ) 2 piece(s) 2 x 8 DF No.2 @ 16" OC Gravity Exterior Wall: 2x6 Stud Passed (42% f꜀) 1 piece(s) 2 x 6 DF No.2 @ 16" OC
Wind Exterior Wall: 2x6 Stud Passed (97% ΔTₗₐₜ) 1 piece(s) 2 x 6 DF No.2 @ 16" OC Day Room Exterior 2x6 Wall Passed (25% B/C) 1 piece(s) 2 x 6 DF No.2 @ 16" OC
Fire Station 227
JOB SUMMARY REPORT
ForteWEB Software Operator Job Notes 12/17/2024 4:47:26 PM UTC vALERIA GALLARDO ISE Engineers
(619) 600-8807 valeria@iseengineers.com
ForteWEB v3.8 File Name: Fire Station 227
Page 1 / 61
Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern)
Member Reaction (lbs) 233 @ 0 5156 (1.50") Passed (5%) -- 1.0 D + 1.0 Lr (All Spans) Shear (lbs) 181 @ 3" 1238 Passed (15%) 1.25 1.0 D + 1.0 Lr (All Spans) Moment (Ft-lbs) 131 @ 1' 1 1/2" 289 Passed (45%) 1.25 1.0 D + 1.0 Lr (All Spans) Vert Live Load Defl. (in) 0.023 @ 1' 1 1/2" 0.075 Passed (L/999+) -- 1.0 D + 1.0 Lr (All Spans) Vert Total Load Defl. (in) 0.048 @ 1' 1 1/2" 0.112 Passed (L/560) -- 1.0 D + 1.0 Lr (All Spans) Lat Member Reaction (lbs) 28 @ 2' 3" N/A Passed (N/A) 1.60 1.0 D + 0.6 W Lat Shear (lbs) 13 @ 7" 1584 Passed (1%) 1.60 1.0 D + 0.6 W Lat Moment (Ft-lbs) 16 @ mid-span 1148 Passed (1%) 1.60 1.0 D + 0.6 W Lat Deflection (in) 0.000 @ mid-span 0.112 Passed (L/999+) -- 1.0 D + 0.6 W Bi-Axial Bending 0.32 1.00 Passed (32%) 1.60 1.0 D + 0.45 W + 0.75 L + 0.75 Lr
Member Length : 2' 3" System : Wall Member Type : Header Building Use : Commercial Building Code : IBC 2021 Design Methodology : ASD
• Deflection criteria: LL (L/360) and TL (L/240).
• Lateral deflection criteria: Wind (L/240)
• Member has been designed in flat (plank) orientation.
• Applicable calculations are based on NDS.
Bearing Length Loads to Supports (lbs)
Supports Total Available Required Dead Roof Live Factored Accessories
1 - Trimmer - DF 1.50" 1.50" 1.50" 120 113 233 None
2 - Trimmer - DF 1.50" 1.50" 1.50" 120 113 233 None
Lateral Bracing Bracing Intervals Comments
Top Edge (Lu) End Bearing Points
Bottom Edge (Lu) End Bearing Points
Lateral Connections Supports Stud Size Stud Material Connector Type/Model Quantity Nailing
Left 2X Douglas Fir-Larch Nails 8d (0.113" x 2 1/2") (Toe) 2
Right 2X Douglas Fir-Larch Nails 8d (0.113" x 2 1/2") (Toe) 2
Dead Roof Live
Vertical Loads Location Tributary Width
(0.90) (1.25) Comments
0 - Self Weight (PLF) 0 to 2' 3" N/A 2.1 --
1 - Uniform (PSF) 0 to 2' 3" 5' 15.0 20.0 R1 - ROOF
2 - Uniform (PSF) 0 to 2' 3" 2' 15.0 - EXT WALL ABV
• ASCE/SEI 7 Sec. 30.4: Exposure Category (C), Mean Roof Height (26'), Topographic Factor (1.0), Wind Directionality Factor (0.85), Basic Wind Speed (125), Risk Category(IV), Wind Zone (4), GCpi (+/- 0.18), Effective Wind Area determined using full member span and trib. width.
• IBC Table 1604.3, footnote f: Deflection checks are performed using 42% of this lateral wind load.
Wind
Lateral Load Location Tributary Width (1.60) Comments
1 - Uniform (PSF) Full Length 1' 41.5
Drawing is Conceptual. All locations are measured from the outside face of left support (or left cantilever end). All dimensions are horizontal (typ.).
MEMBER REPORT PASSED
ROOF, (B1) - HEADER
1 piece(s) 2 x 6 DF No.2 (Plank)
ForteWEB Software Operator Job Notes 12/17/2024 4:47:26 PM UTC vALERIA GALLARDO ISE Engineers
(619) 600-8807 valeria@iseengineers.com
ForteWEB v3.8, Engine: V8.4.1.24, Data: V8.1.6.3 File Name: Fire Station 227
Page 2 / 61
Member Notes
B1 - HEADER ALONG GL-B CLERESTORY
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC-ES under evaluation reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/ document-library.
The product application, input design loads, dimensions and support information have been provided by ForteWEB Software Operator
Weyerhaeuser Notes
ForteWEB Software Operator Job Notes 12/17/2024 4:47:26 PM UTC vALERIA GALLARDO ISE Engineers
(619) 600-8807 valeria@iseengineers.com
ForteWEB v3.8, Engine: V8.4.1.24, Data: V8.1.6.3 File Name: Fire Station 227
Page 3 / 61
Member Reaction (lbs) 521 @ 0 5156 (1.50") Passed (10%) -- 1.0 D + 1.0 Lr (All Spans) Shear (lbs) 405 @ 3" 1238 Passed (33%) 1.25 1.0 D + 1.0 Lr (All Spans) Moment (Ft-lbs) 293 @ 1' 1 1/2" 289 Passed (101%) 1.25 1.0 D + 1.0 Lr (All Spans) Vert Live Load Defl. (in) 0.057 @ 1' 1 1/2" 0.075 Passed (L/473) -- 1.0 D + 1.0 Lr (All Spans) Vert Total Load Defl. (in) 0.108 @ 1' 1 1/2" 0.112 Passed (L/250) -- 1.0 D + 1.0 Lr (All Spans) Lat Member Reaction (lbs) 28 @ 2' 3" N/A Passed (N/A) 1.60 1.0 D + 0.6 W Lat Shear (lbs) 13 @ 7" 1584 Passed (1%) 1.60 1.0 D + 0.6 W Lat Moment (Ft-lbs) 16 @ mid-span 1148 Passed (1%) 1.60 1.0 D + 0.6 W Lat Deflection (in) 0.000 @ mid-span 0.112 Passed (L/999+) -- 1.0 D + 0.6 W Bi-Axial Bending 0.70 1.00 Passed (70%) 1.60 1.0 D + 0.45 W + 0.75 L + 0.75 Lr
Member Length : 2' 3" System : Wall Member Type : Header Building Use : Commercial Building Code : IBC 2021 Design Methodology : ASD
• Deflection criteria: LL (L/360) and TL (L/240).
• Lateral deflection criteria: Wind (L/240)
• Member has been designed in flat (plank) orientation.
• Applicable calculations are based on NDS.
Bearing Length Loads to Supports (lbs)
Supports Total Available Required Dead Roof Live Factored Accessories
1 - Trimmer - DF 1.50" 1.50" 1.50" 246 276 521 None
2 - Trimmer - DF 1.50" 1.50" 1.50" 246 276 521 None
Lateral Bracing Bracing Intervals Comments
Top Edge (Lu) End Bearing Points
Bottom Edge (Lu) End Bearing Points
Lateral Connections Supports Stud Size Stud Material Connector Type/Model Quantity Nailing
Left 2X Douglas Fir-Larch Nails 8d (0.113" x 2 1/2") (Toe) 2
Right 2X Douglas Fir-Larch Nails 8d (0.113" x 2 1/2") (Toe) 2
Dead Roof Live
Vertical Loads Location Tributary Width
(0.90) (1.25) Comments
0 - Self Weight (PLF) 0 to 2' 3" N/A 2.1 --
1 - Uniform (PSF) 0 to 2' 3" 12' 3" 15.0 20.0 R1 - ROOF
2 - Uniform (PSF) 0 to 2' 3" 2' 2" 15.0 - EXT WALL ABV
• ASCE/SEI 7 Sec. 30.4: Exposure Category (C), Mean Roof Height (26'), Topographic Factor (1.0), Wind Directionality Factor (0.85), Basic Wind Speed (125), Risk Category(IV), Wind Zone (4), GCpi (+/- 0.18), Effective Wind Area determined using full member span and trib. width.
• IBC Table 1604.3, footnote f: Deflection checks are performed using 42% of this lateral wind load.
Wind
Lateral Load Location Tributary Width (1.60) Comments
1 - Uniform (PSF) Full Length 1' 41.5
Drawing is Conceptual. All locations are measured from the outside face of left support (or left cantilever end). All dimensions are horizontal (typ.).
MEMBER REPORT PASSED
ROOF, (B2) - HEADER
1 piece(s) 2 x 6 DF No.2 (Plank)
ForteWEB Software Operator Job Notes 12/17/2024 4:47:26 PM UTC vALERIA GALLARDO ISE Engineers
(619) 600-8807 valeria@iseengineers.com
ForteWEB v3.8, Engine: V8.4.1.24, Data: V8.1.6.3 File Name: Fire Station 227
Page 4 / 61
B2 - HEADER ALONG 4.5 CLERESTORY
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC-ES under evaluation reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/ document-library.
The product application, input design loads, dimensions and support information have been provided by ForteWEB Software Operator
Weyerhaeuser Notes
ForteWEB Software Operator Job Notes 12/17/2024 4:47:26 PM UTC vALERIA GALLARDO ISE Engineers
(619) 600-8807 valeria@iseengineers.com
ForteWEB v3.8, Engine: V8.4.1.24, Data: V8.1.6.3 File Name: Fire Station 227
Page 5 / 61
Member Reaction (lbs) 922 @ 0 5156 (1.50") Passed (18%) -- 1.0 D + 1.0 Lr (All Spans) Shear (lbs) 765 @ 5" 2888 Passed (27%) 1.25 1.0 D + 1.0 Lr (All Spans) Moment (Ft-lbs) 1133 @ 2' 5 1/2" 1437 Passed (79%) 1.25 1.0 D + 1.0 Lr (All Spans) Vert Live Load Defl. (in) 0.079 @ 2' 5 1/2" 0.164 Passed (L/743) -- 1.0 D + 1.0 Lr (All Spans) Vert Total Load Defl. (in) 0.157 @ 2' 5 1/2" 0.246 Passed (L/376) -- 1.0 D + 1.0 Lr (All Spans) Lat Member Reaction (lbs) 212 @ 4' 11" N/A Passed (N/A) 1.60 1.0 D + 0.6 W Lat Shear (lbs) 162 @ 7" 3696 Passed (4%) 1.60 1.0 D + 0.6 W Lat Moment (Ft-lbs) 260 @ mid-span 2731 Passed (10%) 1.60 1.0 D + 0.6 W Lat Deflection (in) 0.010 @ mid-span 0.246 Passed (L/999+) -- 1.0 D + 0.6 W Bi-Axial Bending 0.61 1.00 Passed (61%) 1.60 1.0 D + 0.45 W + 0.75 L + 0.75 Lr
Member Length : 4' 11" System : Wall Member Type : Header Building Use : Commercial Building Code : IBC 2021 Design Methodology : ASD
• Deflection criteria: LL (L/360) and TL (L/240).
• Lateral deflection criteria: Wind (L/240)
• Member has been designed in flat (plank) orientation.
• Applicable calculations are based on NDS.
Bearing Length Loads to Supports (lbs)
Supports Total Available Required Dead Roof Live Factored Accessories
1 - Trimmer - DF 1.50" 1.50" 1.50" 454 467 922 None
2 - Trimmer - DF 1.50" 1.50" 1.50" 454 467 922 None
Lateral Bracing Bracing Intervals Comments
Top Edge (Lu) End Bearing Points
Bottom Edge (Lu) End Bearing Points
Lateral Connections Supports Stud Size Stud Material Connector Type/Model Quantity Nailing
Left 2X Douglas Fir-Larch Nails 8d (0.113" x 2 1/2") (Toe) 3
Right 2X Douglas Fir-Larch Nails 8d (0.113" x 2 1/2") (Toe) 3
Dead Roof Live
Vertical Loads Location Tributary Width
(0.90) (1.25) Comments
0 - Self Weight (PLF) 0 to 4' 11" N/A 4.9 --
1 - Uniform (PSF) 0 to 4' 11" 9' 6" 15.0 20.0 R1 - ROOF ELEC
AREA
2 - Uniform (PSF) 0 to 4' 11" 2' 6" 15.0 - EXT WALL ABV
• ASCE/SEI 7 Sec. 30.4: Exposure Category (C), Mean Roof Height (26'), Topographic Factor (1.0), Wind Directionality Factor (0.85), Basic Wind Speed (125), Risk Category(IV), Wind Zone (4), GCpi (+/- 0.18), Effective Wind Area determined using full member span and trib. width.
Wind
Lateral Load Location Tributary Width (1.60) Comments
1 - Uniform (PSF) Full Length 3' 7" 40.1
Drawing is Conceptual. All locations are measured from the outside face of left support (or left cantilever end). All dimensions are horizontal (typ.).
MEMBER REPORT PASSED
ROOF, (B3) - HEADER
1 piece(s) 4 x 6 DF No.2 (Plank)
ForteWEB Software Operator Job Notes 12/17/2024 4:47:26 PM UTC vALERIA GALLARDO ISE Engineers
(619) 600-8807 valeria@iseengineers.com
ForteWEB v3.8, Engine: V8.4.1.24, Data: V8.1.6.3 File Name: Fire Station 227
Page 6 / 61
• IBC Table 1604.3, footnote f: Deflection checks are performed using 42% of this lateral wind load.
B3 - HEADER AT ELECTRICAL ROOM
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC-ES under evaluation reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/ document-library.
The product application, input design loads, dimensions and support information have been provided by ForteWEB Software Operator
Weyerhaeuser Notes
ForteWEB Software Operator Job Notes 12/17/2024 4:47:26 PM UTC vALERIA GALLARDO ISE Engineers
(619) 600-8807 valeria@iseengineers.com
ForteWEB v3.8, Engine: V8.4.1.24, Data: V8.1.6.3 File Name: Fire Station 227
Page 7 / 61
Member Reaction (lbs) 2847 @ 0 5156 (1.50") Passed (55%) -- 1.0 D + 1.0 Lr (All Spans) Shear (lbs) 2427 @ 7" 4285 Passed (57%) 1.25 1.0 D + 1.0 Lr (All Spans) Moment (Ft-lbs) 3461 @ 1' 6" 3466 Passed (100%) 1.25 1.0 D + 1.0 Lr (All Spans) Vert Live Load Defl. (in) 0.024 @ 1' 7 3/8" 0.108 Passed (L/999+) -- 1.0 D + 1.0 Lr (All Spans) Vert Total Load Defl. (in) 0.046 @ 1' 7 7/16" 0.162 Passed (L/846) -- 1.0 D + 1.0 Lr (All Spans) Lat Member Reaction (lbs) 144 @ 3' 3" N/A Passed (N/A) 1.60 1.0 D + 0.6 W Lat Shear (lbs) 92 @ 7" 5485 Passed (2%) 1.60 1.0 D + 0.6 W Lat Moment (Ft-lbs) 117 @ mid-span 4437 Passed (3%) 1.60 1.0 D + 0.6 W Lat Deflection (in) 0.001 @ mid-span 0.162 Passed (L/999+) -- 1.0 D + 0.6 W Bi-Axial Bending 0.70 1.00 Passed (70%) 1.60 1.0 D + 0.45 W + 0.75 L + 0.75 Lr
Member Length : 3' 3" System : Wall Member Type : Header Building Use : Commercial Building Code : IBC 2021 Design Methodology : ASD
• Deflection criteria: LL (L/360) and TL (L/240).
• Lateral deflection criteria: Wind (L/240)
• Applicable calculations are based on NDS.
• This product has a square cross section. The analysis engine has checked both edge and plank orientations to allow for either installation.
Bearing Length Loads to Supports (lbs)
Supports Total Available Required Dead Roof Live Factored Accessories
1 - Trimmer - DF 1.50" 1.50" 1.50" 1374 1473 2847 None
2 - Trimmer - DF 1.50" 1.50" 1.50" 1272 1336 2608 None
Lateral Bracing Bracing Intervals Comments
Top Edge (Lu) End Bearing Points
Bottom Edge (Lu) End Bearing Points
Lateral Connections Supports Stud Size Stud Material Connector Type/Model Quantity Nailing
Left 2X Douglas Fir-Larch Nails 8d (0.113" x 2 1/2") (Toe) 2
Right 2X Douglas Fir-Larch Nails 8d (0.113" x 2 1/2") (Toe) 2
Dead Roof Live
Vertical Loads Location Tributary Width
(0.90) (1.25) Comments
0 - Self Weight (PLF) 0 to 3' 3" N/A 7.7 --
1 - Uniform (PSF) 0 to 3' 3" 7' 5" 15.2 20.0 R1 - ROOF Electrical Area
2 - Uniform (PSF) 0 to 3' 3" 10' 4" 15.0 - EXT WALL ABV
3 - Point (lb) 1' 6" N/A 1335 1780 TRUSS POINT
LOAD
4 - Uniform (PSF) 0 to 3' 3" 8' 5" 15.2 20.0 2x8 Roof Rafters Apparatus
Drawing is Conceptual. All locations are measured from the outside face of left support (or left cantilever end). All dimensions are horizontal (typ.).
MEMBER REPORT PASSED
ROOF, (B4) - HEADER
1 piece(s) 6 x 6 DF No.1
ForteWEB Software Operator Job Notes 12/17/2024 4:47:26 PM UTC vALERIA GALLARDO ISE Engineers
(619) 600-8807 valeria@iseengineers.com
ForteWEB v3.8, Engine: V8.4.1.24, Data: V8.1.6.3 File Name: Fire Station 227
Page 8 / 61
• ASCE/SEI 7 Sec. 30.4: Exposure Category (C), Mean Roof Height (26'), Topographic Factor (1.0), Wind Directionality Factor (0.85), Basic Wind Speed (125), Risk Category(IV), Wind Zone (4), GCpi (+/- 0.18), Effective Wind Area determined using full member span and trib. width.
• IBC Table 1604.3, footnote f: Deflection checks are performed using 42% of this lateral wind load.
Wind
Lateral Load Location Tributary Width (1.60) Comments
1 - Uniform (PSF) Full Length 3' 7" 41.1
Member Notes
B4 - HEADER ALONG GL-A
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC-ES under evaluation reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/ document-library.
The product application, input design loads, dimensions and support information have been provided by ForteWEB Software Operator
Weyerhaeuser Notes
ForteWEB Software Operator Job Notes 12/17/2024 4:47:26 PM UTC vALERIA GALLARDO ISE Engineers
(619) 600-8807 valeria@iseengineers.com
ForteWEB v3.8, Engine: V8.4.1.24, Data: V8.1.6.3 File Name: Fire Station 227
Page 9 / 61
Member Reaction (lbs) 3970 @ 0 5156 (1.50") Passed (77%) -- 1.0 D + 1.0 Lr (All Spans) Shear (lbs) 3428 @ 9" 5844 Passed (59%) 1.25 1.0 D + 1.0 Lr (All Spans) Moment (Ft-lbs) 6495 @ 2' 6422 Passed (101%) 1.25 1.0 D + 1.0 Lr (All Spans) Vert Live Load Defl. (in) 0.052 @ 2' 7 7/8" 0.183 Passed (L/999+) -- 1.0 D + 1.0 Lr (All Spans) Vert Total Load Defl. (in) 0.102 @ 2' 8" 0.275 Passed (L/644) -- 1.0 D + 1.0 Lr (All Spans) Lat Member Reaction (lbs) 235 @ 5' 6" N/A Passed (N/A) 1.60 1.0 D + 0.6 W Lat Shear (lbs) 185 @ 7" 7480 Passed (2%) 1.60 1.0 D + 0.6 W Lat Moment (Ft-lbs) 324 @ mid-span 6050 Passed (5%) 1.60 1.0 D + 0.6 W Lat Deflection (in) 0.007 @ mid-span 0.275 Passed (L/999+) -- 1.0 D + 0.6 W Bi-Axial Bending 0.73 1.00 Passed (73%) 1.60 1.0 D + 0.45 W + 0.75 L + 0.75 Lr
Member Length : 5' 6" System : Wall Member Type : Header Building Use : Commercial Building Code : IBC 2021 Design Methodology : ASD
• Deflection criteria: LL (L/360) and TL (L/240).
• Lateral deflection criteria: Wind (L/240)
• A 0.4% decrease in the moment capacity has been added to account for lateral stability.
• Applicable calculations are based on NDS.
Bearing Length Loads to Supports (lbs)
Supports Total Available Required Dead Roof Live Factored Accessories
1 - Trimmer - DF 1.50" 1.50" 1.50" 1967 2004 3970 None
2 - Trimmer - DF 1.50" 1.50" 1.50" 1603 1518 3121 None
Lateral Bracing Bracing Intervals Comments
Top Edge (Lu) End Bearing Points
Bottom Edge (Lu) End Bearing Points
Lateral Connections Supports Stud Size Stud Material Connector Type/Model Quantity Nailing
Left 2X Douglas Fir-Larch Nails 8d (0.113" x 2 1/2") (Toe) 3
Right 2X Douglas Fir-Larch Nails 8d (0.113" x 2 1/2") (Toe) 3
Dead Roof Live
Vertical Loads Location Tributary Width
(0.90) (1.25) Comments
0 - Self Weight (PLF) 0 to 5' 6" N/A 10.4 --
1 - Uniform (PSF) 0 to 5' 6" 7' 5" 15.2 20.0 R1 - ROOF Electrical Area
2 - Uniform (PSF) 0 to 5' 6" 10' 4" 15.0 - EXT WALL ABV
3 - Point (lb) 2' N/A 1335 1780 TRUSS POINT
LOAD
4 - Uniform (PSF) 0 to 5' 6" 8' 5" 15.2 20.0 2x8 Roof Rafters Apparatus
Drawing is Conceptual. All locations are measured from the outside face of left support (or left cantilever end). All dimensions are horizontal (typ.).
MEMBER REPORT PASSED
ROOF, (B5) - HEADER
1 piece(s) 6 x 8 DF No.1
ForteWEB Software Operator Job Notes 12/17/2024 4:47:26 PM UTC vALERIA GALLARDO ISE Engineers
(619) 600-8807 valeria@iseengineers.com
ForteWEB v3.8, Engine: V8.4.1.24, Data: V8.1.6.3 File Name: Fire Station 227
Page 10 / 61
• ASCE/SEI 7 Sec. 30.4: Exposure Category (C), Mean Roof Height (26'), Topographic Factor (1.0), Wind Directionality Factor (0.85), Basic Wind Speed (125), Risk Category(IV), Wind Zone (4), GCpi
• IBC Table 1604.3, footnote f: Deflection checks are performed using 42% of this lateral wind load.
Wind
Lateral Load Location Tributary Width (1.60) Comments
1 - Uniform (PSF) Full Length 3' 7" 39.8
Member Notes
B5 - HEADER ALONG GL-A
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC-ES under evaluation reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/ document-library.
The product application, input design loads, dimensions and support information have been provided by ForteWEB Software Operator
Weyerhaeuser Notes
ForteWEB Software Operator Job Notes 12/17/2024 4:47:26 PM UTC vALERIA GALLARDO ISE Engineers
(619) 600-8807 valeria@iseengineers.com
ForteWEB v3.8, Engine: V8.4.1.24, Data: V8.1.6.3 File Name: Fire Station 227
Page 11 / 61
Member Reaction (lbs) 3479 @ 0 5156 (1.50") Passed (67%) -- 1.0 D + 1.0 Lr (All Spans) Shear (lbs) 2971 @ 7" 4285 Passed (69%) 1.25 1.0 D + 1.0 Lr (All Spans) Moment (Ft-lbs) 1829 @ 9 3/8" 3466 Passed (53%) 1.25 1.0 D + 1.0 Lr (All Spans) Live Load Defl. (in) 0.012 @ 1' 5 9/16" 0.108 Passed (L/999+) -- 1.0 D + 1.0 Lr (All Spans) Total Load Defl. (in) 0.027 @ 1' 6" 0.162 Passed (L/999+) -- 1.0 D + 1.0 Lr (All Spans)
Member Length : 3' 3" System : Wall Member Type : Header Building Use : Commercial Building Code : IBC 2021 Design Methodology : ASD
• Deflection criteria: LL (L/360) and TL (L/240).
• Applicable calculations are based on NDS.
• This product has a square cross section. The analysis engine has checked both edge and plank orientations to allow for either installation.
Bearing Length Loads to Supports (lbs)
Supports Total Available Required Dead Roof Live Factored Accessories
1 - Trimmer - DF 1.50" 1.50" 1.50" 1772 1707 3479 None
2 - Trimmer - DF 1.50" 1.50" 1.50" 873 511 1384 None
Lateral Bracing Bracing Intervals Comments
Top Edge (Lu) End Bearing Points
Bottom Edge (Lu) End Bearing Points
Dead Roof Live
Vertical Loads Location Tributary Width
(0.90) (1.25) Comments
0 - Self Weight (PLF) 0 to 3' 3" N/A 7.7 --
1 - Uniform (PSF) 0 to 3' 3" 5' 15.2 20.0 R1 - ROOF
2 - Uniform (PSF) 0 to 3' 3" 18' 10" 15.0 - EXT WALL ABV
3 - Point (lb) 6 1/2" N/A 1335 1780 TRUSS POINT
LOAD
4 - Point (lb) 1' 6" N/A 120 113 Linked from: (B1) - HEADER, Support
Member Notes
B6 - HEADER ALONG GL-B
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC-ES under evaluation reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/ document-library.
The product application, input design loads, dimensions and support information have been provided by ForteWEB Software Operator
Weyerhaeuser Notes
Drawing is Conceptual. All locations are measured from the outside face of left support (or left cantilever end). All dimensions are horizontal (typ.).
MEMBER REPORT PASSED
ROOF, (B6) - HEADER
1 piece(s) 6 x 6 DF No.1
ForteWEB Software Operator Job Notes 12/17/2024 4:47:26 PM UTC vALERIA GALLARDO ISE Engineers
(619) 600-8807 valeria@iseengineers.com
ForteWEB v3.8, Engine: V8.4.1.24, Data: V8.1.6.3 File Name: Fire Station 227
Page 12 / 61
Member Reaction (lbs) 465 @ 0 5156 (1.50") Passed (9%) -- 1.0 D + 1.0 Lr (All Spans) Shear (lbs) 303 @ 5" 2079 Passed (15%) 0.90 1.0 D (All Spans) Moment (Ft-lbs) 461 @ 2' 6 1/2" 1035 Passed (45%) 0.90 1.0 D (All Spans) Vert Live Load Defl. (in) 0.019 @ 2' 6 1/2" 0.169 Passed (L/999+) -- 1.0 D + 1.0 Lr (All Spans) Vert Total Load Defl. (in) 0.087 @ 2' 6 1/2" 0.254 Passed (L/698) -- 1.0 D + 1.0 Lr (All Spans) Lat Member Reaction (lbs) 219 @ 5' 1" N/A Passed (N/A) 1.60 1.0 D + 0.6 W Lat Shear (lbs) 168 @ 7" 3696 Passed (5%) 1.60 1.0 D + 0.6 W Lat Moment (Ft-lbs) 278 @ mid-span 2731 Passed (10%) 1.60 1.0 D + 0.6 W Lat Deflection (in) 0.012 @ mid-span 0.254 Passed (L/999+) -- 1.0 D + 0.6 W Bi-Axial Bending 0.38 1.00 Passed (38%) 1.60 1.0 D + 0.45 W + 0.75 L + 0.75 Lr
Member Length : 5' 1" System : Wall Member Type : Header Building Use : Commercial Building Code : IBC 2021 Design Methodology : ASD
• Deflection criteria: LL (L/360) and TL (L/240).
• Lateral deflection criteria: Wind (L/240)
• Member has been designed in flat (plank) orientation.
• Applicable calculations are based on NDS.
Bearing Length Loads to Supports (lbs)
Supports Total Available Required Dead Roof Live Factored Accessories
1 - Trimmer - DF 1.50" 1.50" 1.50" 363 102 465 None
2 - Trimmer - DF 1.50" 1.50" 1.50" 363 102 465 None
Lateral Bracing Bracing Intervals Comments
Top Edge (Lu) End Bearing Points
Bottom Edge (Lu) End Bearing Points
Lateral Connections Supports Stud Size Stud Material Connector Type/Model Quantity Nailing
Left 2X Douglas Fir-Larch Nails 8d (0.113" x 2 1/2") (Toe) 3
Right 2X Douglas Fir-Larch Nails 8d (0.113" x 2 1/2") (Toe) 3
Dead Roof Live
Vertical Loads Location Tributary Width
(0.90) (1.25) Comments
0 - Self Weight (PLF) 0 to 5' 1" N/A 4.9 --
1 - Uniform (PSF) 0 to 5' 1" 2' 15.2 20.0 R1 - ROOF
2 - Uniform (PSF) 0 to 5' 1" 7' 2" 15.0 - EXT WALL ABV
• ASCE/SEI 7 Sec. 30.4: Exposure Category (C), Mean Roof Height (26'), Topographic Factor (1.0), Wind Directionality Factor (0.85), Basic Wind Speed (125), Risk Category(IV), Wind Zone (4), GCpi (+/- 0.18), Effective Wind Area determined using full member span and trib. width.
• IBC Table 1604.3, footnote f: Deflection checks are performed using 42% of this lateral wind load.
Wind
Lateral Load Location Tributary Width (1.60) Comments
1 - Uniform (PSF) Full Length 3' 7" 40.0
Drawing is Conceptual. All locations are measured from the outside face of left support (or left cantilever end). All dimensions are horizontal (typ.).
MEMBER REPORT PASSED
ROOF, (B7) - HEADER
1 piece(s) 4 x 6 DF No.2 (Plank)
ForteWEB Software Operator Job Notes 12/17/2024 4:47:26 PM UTC vALERIA GALLARDO ISE Engineers
(619) 600-8807 valeria@iseengineers.com
ForteWEB v3.8, Engine: V8.4.1.24, Data: V8.1.6.3 File Name: Fire Station 227
Page 13 / 61
B7 - HEADER ALONG GL-C
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC-ES under evaluation reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/ document-library.
The product application, input design loads, dimensions and support information have been provided by ForteWEB Software Operator
Weyerhaeuser Notes
ForteWEB Software Operator Job Notes 12/17/2024 4:47:26 PM UTC vALERIA GALLARDO ISE Engineers
(619) 600-8807 valeria@iseengineers.com
ForteWEB v3.8, Engine: V8.4.1.24, Data: V8.1.6.3 File Name: Fire Station 227
Page 14 / 61
Member Reaction (lbs) 367 @ 0 5156 (1.50") Passed (7%) -- 1.0 D + 1.0 Lr (All Spans) Shear (lbs) 286 @ 3" 1238 Passed (23%) 1.25 1.0 D + 1.0 Lr (All Spans) Moment (Ft-lbs) 207 @ 1' 1 1/2" 289 Passed (71%) 1.25 1.0 D + 1.0 Lr (All Spans) Vert Live Load Defl. (in) 0.022 @ 1' 1 1/2" 0.075 Passed (L/999+) -- 1.0 D + 1.0 Lr (All Spans) Vert Total Load Defl. (in) 0.076 @ 1' 1 1/2" 0.112 Passed (L/355) -- 1.0 D + 1.0 Lr (All Spans) Lat Member Reaction (lbs) 70 @ 2' 3" N/A Passed (N/A) 1.60 1.0 D + 0.6 W Lat Shear (lbs) 34 @ 7" 1584 Passed (2%) 1.60 1.0 D + 0.6 W Lat Moment (Ft-lbs) 39 @ mid-span 1148 Passed (3%) 1.60 1.0 D + 0.6 W Lat Deflection (in) 0.001 @ mid-span 0.112 Passed (L/999+) -- 1.0 D + 0.6 W Bi-Axial Bending 0.54 1.00 Passed (54%) 1.60 1.0 D + 0.45 W + 0.75 L + 0.75 Lr
Member Length : 2' 3" System : Wall Member Type : Header Building Use : Commercial Building Code : IBC 2021 Design Methodology : ASD
• Deflection criteria: LL (L/360) and TL (L/240).
• Lateral deflection criteria: Wind (L/240)
• Member has been designed in flat (plank) orientation.
• Applicable calculations are based on NDS.
Bearing Length Loads to Supports (lbs)
Supports Total Available Required Dead Roof Live Factored Accessories
1 - Trimmer - DF 1.50" 1.50" 1.50" 262 105 367 None
2 - Trimmer - DF 1.50" 1.50" 1.50" 262 105 367 None
Lateral Bracing Bracing Intervals Comments
Top Edge (Lu) End Bearing Points
Bottom Edge (Lu) End Bearing Points
Lateral Connections Supports Stud Size Stud Material Connector Type/Model Quantity Nailing
Left 2X Douglas Fir-Larch Nails 8d (0.113" x 2 1/2") (Toe) 2
Right 2X Douglas Fir-Larch Nails 8d (0.113" x 2 1/2") (Toe) 2
Dead Roof Live
Vertical Loads Location Tributary Width
(0.90) (1.25) Comments
0 - Self Weight (PLF) 0 to 2' 3" N/A 2.1 --
1 - Uniform (PSF) 0 to 2' 3" 4' 8" 15.2 20.0 R1 - ROOF
2 - Uniform (PSF) 0 to 2' 3" 10' 8" 15.0 - EXT WALL ABV
• ASCE/SEI 7 Sec. 30.4: Exposure Category (C), Mean Roof Height (26'), Topographic Factor (1.0), Wind Directionality Factor (0.85), Basic Wind Speed (125), Risk Category(IV), Wind Zone (4), GCpi (+/- 0.18), Effective Wind Area determined using full member span and trib. width.
• IBC Table 1604.3, footnote f: Deflection checks are performed using 42% of this lateral wind load.
Wind
Lateral Load Location Tributary Width (1.60) Comments
1 - Uniform (PSF) Full Length 2' 6" 41.5
Drawing is Conceptual. All locations are measured from the outside face of left support (or left cantilever end). All dimensions are horizontal (typ.).
MEMBER REPORT PASSED
ROOF, (B8) - HEADER
1 piece(s) 2 x 6 DF No.2 (Plank)
ForteWEB Software Operator Job Notes 12/17/2024 4:47:26 PM UTC vALERIA GALLARDO ISE Engineers
(619) 600-8807 valeria@iseengineers.com
ForteWEB v3.8, Engine: V8.4.1.24, Data: V8.1.6.3 File Name: Fire Station 227
Page 15 / 61
B8 - HEADER ALONG GL-D
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC-ES under evaluation reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/ document-library.
The product application, input design loads, dimensions and support information have been provided by ForteWEB Software Operator
Weyerhaeuser Notes
ForteWEB Software Operator Job Notes 12/17/2024 4:47:26 PM UTC vALERIA GALLARDO ISE Engineers
(619) 600-8807 valeria@iseengineers.com
ForteWEB v3.8, Engine: V8.4.1.24, Data: V8.1.6.3 File Name: Fire Station 227
Page 16 / 61
Member Reaction (lbs) 677 @ 3 1/2" 5156 (1.50") Passed (13%) -- 1.0 D + 1.0 Lr (All Spans) Shear (lbs) 566 @ 8 15/16" 4285 Passed (13%) 1.25 1.0 D + 1.0 Lr (All Spans) Moment (Ft-lbs) 931 @ 3' 1/2" 3466 Passed (27%) 1.25 1.0 D + 1.0 Lr (All Spans) Live Load Defl. (in) 0.016 @ 3' 1/2" 0.186 Passed (L/999+) -- 1.0 D + 1.0 Lr (All Spans) Total Load Defl. (in) 0.043 @ 3' 1/2" 0.279 Passed (L/999+) -- 1.0 D + 1.0 Lr (All Spans)
Member Length : 5' 7 13/16" System : Roof Member Type : Flush Beam Building Use : Commercial Building Code : IBC 2021 Design Methodology : ASD Member Pitch : 2/12
• Deflection criteria: LL (L/360) and TL (L/240).
• Applicable calculations are based on NDS.
• This product has a square cross section. The analysis engine has checked both edge and plank orientations to allow for either installation.
• At hanger supports, the Total Bearing dimension is equal to the width of the material that is supporting the hanger
• ¹ See Connector grid below for additional information and/or requirements.
Bearing Length Loads to Supports (lbs)
Supports Total Available Required Dead Roof Live Factored Accessories
1 - Hanger on 5 1/2" DF beam 3.50" Hanger¹ 1.50" 467 279 746 See note ¹
2 - Hanger on 5 1/2" DF beam 3.50" Hanger¹ 1.50" 467 279 746 See note ¹
•Dimensions for lateral bracing intervals are measured along the length of the member for sloped conditions.
Lateral Bracing Bracing Intervals Comments
Top Edge (Lu) End Bearing Points
Bottom Edge (Lu) End Bearing Points
Connector: Simpson Strong-Tie Support Model Seat Length Top Fasteners Face Fasteners Member Fasteners Accessories
1 - Face Mount Hanger HUC66X SLU9 2.50" N/A 8-10dx1.5 4-10d
2 - Face Mount Hanger HUC66X SLD9 2.50" N/A 8-10dx1.5 4-10d
• Refer to manufacturer notes and instructions for proper installation and use of all connectors.
• Side loads are assumed to not induce cross-grain tension.
Dead Roof Live
Vertical Loads Location (Side) Tributary Width
(0.90) (1.25) Comments
0 - Self Weight (PLF) 3 1/2" to 5' 9 1/2" N/A 7.7 --
1 - Uniform (PSF) 0 to 6' 1" 4' 7" 15.2 20.0 R1 - ROOF
2 - Uniform (PSF) 0 to 6' 1" 5' 15.0 - EXT WALL ABV
Member Notes
B9 - FLUSH BEAM - ALONG GL-E
Drawing is Conceptual. All locations are measured from the outside face of left support (or left cantilever end). All dimensions are horizontal (typ.).
MEMBER REPORT PASSED
ROOF, (B9) - FLUSH BEAM
1 piece(s) 6 x 6 DF No.1
ForteWEB Software Operator Job Notes 12/17/2024 4:47:26 PM UTC vALERIA GALLARDO ISE Engineers
(619) 600-8807 valeria@iseengineers.com
ForteWEB v3.8, Engine: V8.4.1.24, Data: V8.1.6.3 File Name: Fire Station 227
Page 17 / 61
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC-ES under evaluation reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/ document-library.
The product application, input design loads, dimensions and support information have been provided by ForteWEB Software Operator
Weyerhaeuser Notes
ForteWEB Software Operator Job Notes 12/17/2024 4:47:26 PM UTC vALERIA GALLARDO ISE Engineers
(619) 600-8807 valeria@iseengineers.com
ForteWEB v3.8, Engine: V8.4.1.24, Data: V8.1.6.3 File Name: Fire Station 227
Page 18 / 61
Member Reaction (lbs) 358 @ 3 1/2" 1406 (1.50") Passed (25%) -- 1.0 D + 1.0 Lr (All Spans) Shear (lbs) 250 @ 10 3/4" 1631 Passed (15%) 1.25 1.0 D + 1.0 Lr (All Spans) Moment (Ft-lbs) 358 @ 2' 3 1/2" 1478 Passed (24%) 1.25 1.0 D + 1.0 Lr (All Spans) Live Load Defl. (in) 0.008 @ 2' 3 1/2" 0.133 Passed (L/999+) -- 1.0 D + 1.0 Lr (All Spans) Total Load Defl. (in) 0.014 @ 2' 3 1/2" 0.200 Passed (L/999+) -- 1.0 D + 1.0 Lr (All Spans)
Member Length : 4' System : Roof Member Type : Flush Beam Building Use : Commercial Building Code : IBC 2021 Design Methodology : ASD Member Pitch : 0/12
• Deflection criteria: LL (L/360) and TL (L/240).
• Applicable calculations are based on NDS.
• At hanger supports, the Total Bearing dimension is equal to the width of the material that is supporting the hanger
• ¹ See Connector grid below for additional information and/or requirements.
Bearing Length Loads to Supports (lbs)
Supports Total Available Required Dead Roof Live Factored Accessories
1 - Hanger on 7 1/4" LVL beam 3.50" Hanger¹ 1.50" 180 229 409 See note ¹
2 - Hanger on 7 1/4" LVL beam 3.50" Hanger¹ 1.50" 180 229 409 See note ¹
Lateral Bracing Bracing Intervals Comments
Top Edge (Lu) Continuous
Bottom Edge (Lu) End Bearing Points
Connector: Simpson Strong-Tie Support Model Seat Length Top Fasteners Face Fasteners Member Fasteners Accessories
1 - Face Mount Hanger LU26 1.50" N/A 6-10dx1.5 4-10dx1.5
2 - Face Mount Hanger LU26 1.50" N/A 6-10dx1.5 4-10dx1.5
• Refer to manufacturer notes and instructions for proper installation and use of all connectors.
• Side loads are assumed to not induce cross-grain tension.
Dead Roof Live
Vertical Loads Location (Side) Tributary Width
(0.90) (1.25) Comments
0 - Self Weight (PLF) 3 1/2" to 4' 3 1/2" N/A 2.8 --
1 - Uniform (PSF) 0 to 4' 7" (Front) 5' 15.2 20.0 R1 - ROOF
Member Notes
B10 - FLUSH BEAM AT APPARATUS ROOF
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC-ES under evaluation reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/ document-library.
The product application, input design loads, dimensions and support information have been provided by ForteWEB Software Operator
Weyerhaeuser Notes
Drawing is Conceptual. All locations are measured from the outside face of left support (or left cantilever end). All dimensions are horizontal (typ.).
MEMBER REPORT PASSED
ROOF, (B10) - FLUSH BEAM
1 piece(s) 2 x 8 DF No.2
ForteWEB Software Operator Job Notes 12/17/2024 4:47:26 PM UTC vALERIA GALLARDO ISE Engineers
(619) 600-8807 valeria@iseengineers.com
ForteWEB v3.8, Engine: V8.4.1.24, Data: V8.1.6.3 File Name: Fire Station 227
Page 19 / 61
Member Reaction (lbs) 1484 @ 0 5156 (1.50") Passed (29%) -- 1.0 D + 1.0 Lr (All Spans) Shear (lbs) 1076 @ 7" 4285 Passed (25%) 1.25 1.0 D + 1.0 Lr (All Spans) Moment (Ft-lbs) 1576 @ 2' 1 1/2" 3466 Passed (45%) 1.25 1.0 D + 1.0 Lr (All Spans) Vert Live Load Defl. (in) 0.022 @ 2' 1 1/2" 0.142 Passed (L/999+) -- 1.0 D + 1.0 Lr (All Spans) Vert Total Load Defl. (in) 0.042 @ 2' 1 1/2" 0.213 Passed (L/999+) -- 1.0 D + 1.0 Lr (All Spans) Lat Member Reaction (lbs) 106 @ 4' 3" N/A Passed (N/A) 1.60 1.0 D + 0.6 W Lat Shear (lbs) 77 @ 7" 5485 Passed (1%) 1.60 1.0 D + 0.6 W Lat Moment (Ft-lbs) 112 @ mid-span 4437 Passed (3%) 1.60 1.0 D + 0.6 W Lat Deflection (in) 0.002 @ mid-span 0.213 Passed (L/999+) -- 1.0 D + 0.6 W Bi-Axial Bending 0.33 1.00 Passed (33%) 1.60 1.0 D + 0.45 W + 0.75 L + 0.75 Lr
Member Length : 4' 3" System : Wall Member Type : Header Building Use :…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .