This is an Addendum No. 1 to the technical specifications for Section 33 4230 Stormwater Drains for Fire Station 227, prepared by STK Architecture, Inc., dated August 2025. The specification details the materials, installation standards, and quality requirements for precast concrete catch basins, drop inlet catch basins, frames, and grates for the stormwater drain system. The project requires all catch basins to meet an H-20 load rating per AASHTO specifications and comply with ASTM C478/C478M standards for precast reinforced concrete manhole sections. Products must include proper wall and base thickness according to manufacturer specifications and joint sealants meeting ASTM C990 requirements. Frames and grates must be constructed of steel or cast iron, be ADA compliant, and maintain the H-20 rating. Installation must follow manufacturer instructions and industry standards including ACI SPEC-301 and ACI CODE-318, with proper hand-trimmed excavation, accurate elevation establishment, plumb and level placement of frames, and secure grate installation.

The specification establishes manufacturer and installer qualification requirements, mandating that suppliers have at least three years of documented experience in manufacturing and installing similar products, with installer approval from the manufacturer required. All submittals must include product data sheets detailing weight ratings, manufacturer qualification statements, installer qualification statements, and manufacturer certificates confirming compliance with specified requirements. Contractors are permitted to submit approved equal products that meet or exceed the specified performance, material, load, and dimensional requirements outlined in the drawings and technical specifications. The execution requirements include hand-trimmed excavation for accurate placement, backfilling with cover fill compaction, grade adjustments using precast risers or masonry units as needed, and installation of joint sealants uniformly around section lips in accordance with referenced standards.

View the file

Other files

File Type Posted
ATT-PFMD-102125-Fire Permit-CF Station 227 New Build.pdf PDF
Addendum No. 1 - FS 227 48 1400 - Photovoltaic System enclosure 17-36.pdf PDF
ATT Prevailing Wage Document 6.17.25.pdf PDF
Addendum No. 1 - FS 227 33 3113 Site Sanitary Sewerage Gravity Piping Enclosure 49-50.pdf PDF
ATT-PFMD-102125-Compliant Grading Plans-CF Station 227.pdf PDF
ATT-PFMD-102125-Building Grading Permit-CF Station 227 New Build.pdf PDF
Prevailing Wage - September 2025 Packet.pdf PDF
Addendum No. 1 - FS 227 Responsibility Matrix.pdf PDF
Addendum No. 1 - FS 227 Sheet A5.2 Toilet Accessories Enclosure 6.pdf PDF
Addendum No. 1 - FS 227 Sheet L-1 and L-3 Enclosure 61 and 62.pdf PDF
ATT-PFMD-102125-Water Quality Management Report-CF Station 227 New Build.pdf PDF
Addendum No. 1 - FS 227 Table of Contents Enclosure 1-5.pdf PDF
Addendum No. 1 - FS 227 33 4211 Stormwater Gravity Piping Enclosure 51.pdf PDF
ATT-PFMD-102125- Bid Documents - CF Station 227 New Build.pdf PDF
ATT-PFMD-102125-Drawings-CF Station 227 New Build.pdf PDF
Addendum No. 1 - FS 227 Project Sign Enclosure 60.pdf PDF
Addendum No. 1 - FS 227 Sheet A1.0 Demo Site Plan Enclosure 59.pdf PDF
ATT-PFMD-102125-Geotechnical Study-CF Station 227 New Build.pdf PDF
ATT-PFMD-102125-Compliant Drainage Study-CF Station 227 New Build.pdf PDF
Addendum No. 1 - FS 227 21 1300 Fire Protection System Enclosure 7-16.pdf PDF
ATT-PFMD-102125-SCE Final Map-CF Station 227 New Build.pdf PDF
Addendum No. 1 - San Bernardino Fire Station 227_Final AMTP_110425_Signed.pdf PDF
Addendum No. 1 - FS 227 33 0110.58 Disinfection of Water Utility Piping Systems Enclosure 44.pdf PDF
ATT-PFMD-102125-Initial Study_Mitigated Negative Declaration-CF Station 227.pdf PDF
Addendum No. 1 - FS 227 Sheet SN1 Concrete Strength Table Enclosure 38.pdf PDF
Addendum No. 1 - FS 227 Sheet A1.1 Enclosure 37.pdf PDF
Addendum No. 1 - FS 227 33 4923 Storm Drainage Water Retention Structures Enclosure 54-58.pdf PDF
ATT-PFMD-102125-SWPPP Report-CF Station 227.pdf PDF
ATT-PFMD-102125-Appendix 7 Mitigation Monitoring Reporting Program-CF Station 227 New Build.pdf PDF
1202 - Addendum No 1 - Narrative.pdf PDF
ATT-PFMD-102125-Structural Calculations-CF Station 227 New Build.pdf PDF
ATT-PFMD-102125-Technical Specifications-CF Station 227 New Build_.pdf PDF
Addendum No. 1 - FS 227 33 1416 Site Water Utility Distribution Piping Enclosure 45-48.pdf PDF
Addendum No. 1 - FS 227 21 1100 Facility Fire-Suppression Water-Service Piping Enclosure 39-43.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STK Architecture, Inc. August 2025

SBC Fire Station 227 33 4230-1 Stormwater Drains

SECTION 33 4230

STORMWATER DRAINS

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Precast concrete catch basins.

B. Frames and grates.

1.02 RELATED REQUIREMENTS

A. Section 03 3000 - Cast-in-Place Concrete.

B. Section 31 2316 - Excavation.

C. Section 31 2323 - Fill and Backfill.

D. Section 33 4211 - Stormwater Gravity Piping.

1.03 REFERENCE STANDARDS

A. ACI CODE-318 - Building Code Requirements for Structural Concrete and Commentary; 2019

(Reapproved 2022).

B. ACI PRC-211.1 - Selecting Proportions for Normal-Density and High Density-Concrete - Guide;

2022.

C. ACI PRC-304 - Guide for Measuring, Mixing, Transporting, and Placing Concrete; 2000

(Reapproved 2009).

D. ACI PRC-305 - Guide to Hot Weather Concreting; 2020.

E. ACI SPEC-301 - Specifications for Concrete Construction; 2020.

F. ASTM C94/C94M - Standard Specification for Ready-Mixed Concrete; 2018.

G. ASTM C478/C478M - Standard Specification for Circular Precast Reinforced Concrete Manhole

Sections; 2020.

H. ASTM C990 - Standard Specification for Joints for Concrete Pipe, Manholes and Precast Box

Sections Using Preformed Flexible Joint Sealants; 2009 (Reapproved 2014).

1.04 ADMINISTRATIVE REQUIREMENTS

A. Coordination: Installation of stormwater drains with piping and other structures.

1. See Section 33 4211 for stormwater gravity piping.

B. Sequencing: Ensure that utility connections are achieved in an orderly and expeditious manner.

1.05 SUBMITTALS

A. See Section 01 3000 - Administrative Requirements for submittal procedures.

B. Product Data: Weight rating for catch basins, drop inlets, trench drains, and frame and grates.

C. Manufacturer's qualification statement.

D. Installer's qualification statement.

E. Manufacturer's Certificate: Certify that products meet or exceed specified requirements.

1.06 QUALITY ASSURANCE

A. Manufacturer Qualifications: Company specializing in manufacturing products specified in this section, with at least three years of documented experience.

B. Installer Qualifications: Company specializing in installing work of the type specified in this section, and with at least three years of documented experience and approved by manufacturer.

C. Perform work of this section in accordance with ACI SPEC-301 and ACI CODE-318.

D. Follow recommendations of ACI PRC-305 when concreting during hot weather.

Enclosure #52 Fire Station #227 11/17/25

STK Architecture, Inc. August 2025

SBC Fire Station 227 33 4230-2 Stormwater Drains

PART 2 PRODUCTS

2.01 MANUFACTURERS

A. Drop Inlets:

1. Pre-cast concrete Drop Inlet Catch Basins, sizes as shown on the construction plans.

Products must be approved equal and meet or exceed H-20 load rating, ASTM C478/C478M compliance, wall and base thickness, and joint sealant requirements (ASTM C990).

2. Substitutions: See Section 01 6000 - PRODUCT REQUIREMENTS. Products must be approved equal and meet or exceed the performance, material, load, and dimensional requirements indicated on the drawings and in these specifications.

2.02 CATCH BASINS

A. Weight Rating: H-20 according to AASHTO HB.

B. Precast Concrete Catch Basins: Comply with ASTM C478/C478M.

1. Wall Thickness: According to manufacturer’s specifications.

2. Base Thickness: According to manufacturer’s specifications.

3. Joint Sealant: Comply with ASTM C990.

C. Frames and Grates: Steel or cast iron grate, ADA compliant, H-20 rated.

PART 3 EXECUTION

3.01 EXCAVATION AND FILL

A. Hand trim excavation for accurate placement to indicated elevations.

B. Backfill with cover fill, tamp in place and compact, then complete backfilling.

3.02 INSTALLATION

A. Establish elevations and pipe inverts for inlets and outlets as indicated in drawings.

B. Precast Concrete Catch Basins:

1. Install joint sealant uniformly around section lip.

2. Install according to manufacturer’s instructions and in accordance with ASTM

C478/C478M and ASTM C990, ensuring plumb, alignment, and elevation per drawings.

C. Grade Adjustments:

1. Grade adjustments may use precast risers or masonry units, per manufacturer’s recommendations, to achieve final elevation.

2. Place adjacent materials tight and smooth following design grades.

D. Frames and Grates:

1. Place frame plumb and level.

2. Mount frame on prefabricated drop inlets or trench drains according to manufacturer's instructions.

3. Place grate in frame securely.

END OF SECTION

Enclosure #53 Fire Station #227 11/17/25

PART 1 GENERAL
1.01 Section Includes
A. Precast concrete catch basins.
B. Frames and grates.
1.02 Related Requirements
A. Section 03 3000 - Cast-in-Place Concrete.
B. Section 31 2316 - Excavation.
C. Section 31 2323 - Fill and Backfill.
D. Section 33 4211 - Stormwater Gravity Piping.
1.03 Reference Standards
A. ACI CODE-318 - Building Code Requirements for Structural Concrete and Commentary; 2019 (Reapproved 2022).
B. ACI PRC-211.1 - Selecting Proportions for Normal-Density and High Density-Concrete - Guide; 2022.
C. ACI PRC-304 - Guide for Measuring, Mixing, Transporting, and Placing Concrete; 2000 (Reapproved 2009).
D. ACI PRC-305 - Guide to Hot Weather Concreting; 2020.
E. ACI SPEC-301 - Specifications for Concrete Construction; 2020.
F. ASTM C94/C94M - Standard Specification for Ready-Mixed Concrete; 2018.
G. ASTM C478/C478M - Standard Specification for Circular Precast Reinforced Concrete Manhole Sections; 2020.
H. ASTM C990 - Standard Specification for Joints for Concrete Pipe, Manholes and Precast Box Sections Using Preformed Flexible Joint Sealants; 2009 (Reapproved 2014).
1.04 Administrative Requirements
A. Coordination: Installation of stormwater drains with piping and other structures.
1. See Section 33 4211 for stormwater gravity piping.

B. Sequencing: Ensure that utility connections are achieved in an orderly and expeditious manner.

1.05 Submittals
A. See Section 01 3000 - Administrative Requirements for submittal procedures.
B. Product Data: Weight rating for catch basins, drop inlets, trench drains, and frame and grates.
C. Manufacturer's qualification statement.
D. Installer's qualification statement.
E. Manufacturer's Certificate: Certify that products meet or exceed specified requirements.
1.06 Quality Assurance
A. Manufacturer Qualifications: Company specializing in manufacturing products specified in this section, with at least three years of documented experience.
B. Installer Qualifications: Company specializing in installing work of the type specified in this section, and with at least three years of documented experience and approved by manufacturer.
C. Perform work of this section in accordance with ACI SPEC-301 and ACI CODE-318.
D. Follow recommendations of ACI PRC-305 when concreting during hot weather.
PART 2 PRODUCTS
2.01 Manufacturers
A. Drop Inlets:
1. Pre-cast concrete Drop Inlet Catch Basins, sizes as shown on the construction plans. Products must be approved equal and meet or exceed H-20 load rating, ASTM C478/C478M compliance, wall and base thickness, and joint sealant requirements (ASTM C990).
2. Substitutions: See Section 01 6000 - PRODUCT REQUIREMENTS. Products must be approved equal and meet or exceed the performance, material, load, and dimensional requirements indicated on the drawings and in these specifications.
2.02 Catch Basins
A. Weight Rating: H-20 according to AASHTO HB.
B. Precast Concrete Catch Basins: Comply with ASTM C478/C478M.
1. Wall Thickness: According to manufacturer’s specifications.
2. Base Thickness: According to manufacturer’s specifications.
3. Joint Sealant: Comply with ASTM C990.

C. Frames and Grates: Steel or cast iron grate, ADA compliant, H-20 rated.

PART 3 EXECUTION
3.01 Excavation and Fill
A. Hand trim excavation for accurate placement to indicated elevations.
B. Backfill with cover fill, tamp in place and compact, then complete backfilling.
3.02 Installation
A. Establish elevations and pipe inverts for inlets and outlets as indicated in drawings.
B. Precast Concrete Catch Basins:
1. Install joint sealant uniformly around section lip.
2. Install according to manufacturer’s instructions and in accordance with ASTM C478/C478M and ASTM C990, ensuring plumb, alignment, and elevation per drawings.
C. Grade Adjustments:
1. Grade adjustments may use precast risers or masonry units, per manufacturer’s recommendations, to achieve final elevation.
2. Place adjacent materials tight and smooth following design grades.
D. Frames and Grates:
1. Place frame plumb and level.
2. Mount frame on prefabricated drop inlets or trench drains according to manufacturer's instructions.
3. Place grate in frame securely.