Att IV-Schedule of supplies or services.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
FY2023 DOCKSIDE REPAIRS TO NOAA SHIP OREGON II
Solicitation number
1305M222RNMAN0017
Issued by

View the file

Other files

File Type Posted
GEM SENSORS CATALOG.pdf PDF
Columbia L-WL-CWH Series Boilers Installation Ops and Maintenance.pdf PDF
OT-S3801-14.pdf PDF
NOAA_Weight_Reporting_Spreadsheet.xlsx XLSX spreadsheet
Asbestos Survey Report 1998.docx DOCX document
NOAA Standard Specification S2906 Arc Welding on Waterborne Vessels _ June 1982.pdf PDF
Oregon II Hydraulic Hose List.xlsx XLSX spreadsheet
OT-S3801-101 (1).pdf PDF
NOAA Standard Specification S1600 Structural Access Cuts _ August 1994.pdf PDF
OT-S3801-1.pdf PDF
MOC-510-1B HVAC Cleaning.pdf PDF
OT-555-001 Rev - .pdf PDF
MOC-631-2D Coating Systems for Steel Surfaces.pdf PDF
OT-S3801-10.pdf PDF
AMC-631-4 Aluminum Coating Systems _ December 1992.pdf PDF
Att III - Past Perf Questionnaire.docx DOCX document
AMC-573-1C Weight Handling Gear Testing.pdf PDF
OR-S9-0-5 Rev A Booklet of General Plans.pdf PDF
ASHRAE Standard 151 - HVAC Balancing _ Testing.pdf PDF
OT-S3801-11.pdf PDF
AMC-000-1f General Requirements for Ship Repair Work on NOAA Ships.pdf PDF
NOAA General Technical Requirements 25 March 2014 .pdf PDF
Att V-DOL Employee Rights Jobsite Poster.pdf PDF
Att VI-NOAA AIRS PROCESS.docx DOCX document
Att 1-O2 FY23 DS Specification 06-24-22.pdf PDF
OT-S3801-13.pdf PDF
AMC-077-1A Asbestos Containing Materials.pdf PDF
OT-S3801-12.pdf PDF
AMC-583-1B General Requirements for Liferaft Inspections _ December 1998.pdf PDF
Att II-Past Perf Proposal.xlsx XLSX spreadsheet
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Schedule of Prices

PRICE SCHEDULE
BASE ITEMS
CLINSPEC WORK ITEMSPECIFICATION WORK ITEM TITLEUNITQTYUNIT PRICEEXTENDED PRICE
301HYDRAULIC HOSE RENEWALS1JB
302ANNUAL LIFESAVING APPLIANCES SURVEY1JB
303ANNUAL FIRE INSPECTION1JB
304MIRANDA DAVIT AND FRB MAINTENANCE1JB
305ABS LOAD LINE SURVEY1JB
306MISCELLANEOUS REPAIRS1JB
307ANNUAL LIFTING EQUIPMENT LOAD TEST & INSPECTION1JB
308BOILER INSPECTION1JB
309GAUGE CALIBRATION1JB
310AC & REEFER PLANT GROOM1JB
Total Base Items$0.00
ADDITIONAL ITEMS - GROWTH
ADDITIONAL ITEM REQUESTS (AIRs) These items relate to Growth Work. The Unit Price Column will be used throughout the life of the contract if growth work is added to the scope of the contract. If Additional Item Requests (AIRs) are issued, these items will be awarded at the quantities needed via a contract modification. The quantity shown is an estimate only and may be exceeded at the unit prices offered.
CLINSPEC WORK ITEMSPECIFICATION WORK ITEM TITLEUNITQTYUNIT PRICEEXTENDED PRICE
401AIRS/Growth (estimated)

**Provide breakdown, as follows:

AIRs/Growth Labor Rate Unit Price: $________; Quantity: 833; Unit of Issue: Hour; Extended Price: $____________

HRSEST. 833
401AIRs/Growth Material Markup/Handling Fee

Unit Price: $50,000.00; Quantity: 1; Unit of Issue: Percent ________%;

Extended Price: [$50,000.00 X percentage quoted]: $______________

%EST. $50,000
Total Growth$0.00
OPTION ITEMS
Note: These items may be exercised in accordance with FAR Clause 52.217-7 “OPTION FOR INCREASED QUANTITY-SEPARATELY PRICED LINE ITEMS”.
CLINSPEC WORK ITEMSPECIFICATION WORK ITEM TITLEUNITQTYUNIT PRICEEXTENDED PRICE
501VENTILATION DUCT CLEANINGJB1
Total Option Items$0.00
BASE + OPTIONS$0.00
BASE + OPTIONS +GROWTH$0.00

&KFF0000REGION 4, TORFP 1305M222RNMAN0017