AMC-583-1B General Requirements for Liferaft Inspections _ December 1998.pdf

PDF 26 KB Posted

Attached to
FY2023 DOCKSIDE REPAIRS TO NOAA SHIP OREGON II
Solicitation number
1305M222RNMAN0017
Issued by

View the file

Other files

File Type Posted
GEM SENSORS CATALOG.pdf PDF
Columbia L-WL-CWH Series Boilers Installation Ops and Maintenance.pdf PDF
OT-S3801-14.pdf PDF
NOAA_Weight_Reporting_Spreadsheet.xlsx XLSX spreadsheet
Asbestos Survey Report 1998.docx DOCX document
NOAA Standard Specification S2906 Arc Welding on Waterborne Vessels _ June 1982.pdf PDF
Oregon II Hydraulic Hose List.xlsx XLSX spreadsheet
OT-S3801-101 (1).pdf PDF
NOAA Standard Specification S1600 Structural Access Cuts _ August 1994.pdf PDF
OT-S3801-1.pdf PDF
MOC-510-1B HVAC Cleaning.pdf PDF
OT-555-001 Rev - .pdf PDF
MOC-631-2D Coating Systems for Steel Surfaces.pdf PDF
OT-S3801-10.pdf PDF
AMC-631-4 Aluminum Coating Systems _ December 1992.pdf PDF
Att III - Past Perf Questionnaire.docx DOCX document
AMC-573-1C Weight Handling Gear Testing.pdf PDF
OR-S9-0-5 Rev A Booklet of General Plans.pdf PDF
ASHRAE Standard 151 - HVAC Balancing _ Testing.pdf PDF
OT-S3801-11.pdf PDF
AMC-000-1f General Requirements for Ship Repair Work on NOAA Ships.pdf PDF
NOAA General Technical Requirements 25 March 2014 .pdf PDF
Att V-DOL Employee Rights Jobsite Poster.pdf PDF
Att VI-NOAA AIRS PROCESS.docx DOCX document
Att 1-O2 FY23 DS Specification 06-24-22.pdf PDF
OT-S3801-13.pdf PDF
AMC-077-1A Asbestos Containing Materials.pdf PDF
Att IV-Schedule of supplies or services.xlsx XLSX spreadsheet
OT-S3801-12.pdf PDF
Att II-Past Perf Proposal.xlsx XLSX spreadsheet
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMC-583-1B

DECEMBER 1998

SUPERSEDING

AMC-583-1A

JULY 1995

NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION (NOAA)

ATLANTIC MARINE CENTER

STANDARD SPECIFICATION AMC-583-1B

GENERAL REQUIREMENTS FOR LIFERAFT INSPECTIONS

1. SCOPE. This specification contains the general requirements and procedures to be used for performing U.S. Coast Guard inspections on NOAA liferafts and hydraulic releases.

2. REFERENCE.

(a) Code of Federal Regulations Title 46, Part 160, section 151, "Inflatable Liferafts (SOLAS)"

(b) Code of Federal Regulations Title 46, Part 160, Section 062, "Releases. Lifesaving Equipment, Hydraulic, and Manual."

3. REQUIREMENTS.

3.1. General. The following requirements apply to all work.

3.1.1. Except as otherwise specified, the contractor shall

provide all labor, material, services, tools, supervision, and technical expertise needed to accomplish the work required by this specification.

3.1.2. All work shall be performed by an authorized service

facility of the liferaft manufacturer.

3.1.3. Provide and install parts and components during

servicing of the liferafts as required by this specification, the Detail Specification, and other procurement documents. Renewal of other parts and components determined to be needed, as a result of servicing the liferafts will be negotiated by the Contracting Officer as an additional cost to the purchase order or contract. Provide a list of renewal parts and components which have not reached their expiration date to the COTR for disposition.

3.1.4. The Contractor shall remove all the ocean liferafts and associated hydraulic releases from the ship to the contractors facility for inspection.

3.1.5. Service the liferaft in accordance with reference (a)

and this specification.

3.1.6. Stamp the metal inspection plate in accordance with

reference (a).

3.1.7. Reinstall all liferafts and hydraulic releases in their original locations.

3.2. Annual Inspection. Perform an annual U.S. Coast Guard

inspection on the required ocean liferafts in accordance with reference (a). Renew or provide the following items as part of the inspection:

3.2.1. All bands.

3.2.2. All clips.

3.2.3. All required instruction labels.

3.2.4. All certifications (including U.S. Coast Guard) for

inspected items.

3.2.5. Deleted.

3.2.6. All flashlight batteries.

3.2.7. All repair kit cement.

3.2.8. A report for each liferaft with a cost breakdown for

all renewed items and an inventory of all dated items with their expiration date.

3.3. Special Five-Year Inspection. In addition to the above

annual inspection, perform a five-year U.S. Coast Guard inspection on the required ocean liferafts in accordance with reference (a). In addition to all renewals identified in reference (a), provide a CO2 recharge of the inflation cylinder with certification of the cylinder’s weight prior to and after the two week stand period as part of the inspection.

3.4. Hydraulic Release Inspection. Perform an annual U.S. Coast Guard inspection on all hydraulic releases in accordance with reference (b).

4. NOTES.

4.1. The following information will be provided by the Detail Specification or other procurement document:

4.1.1. The quantity, capacity, and manufacturer of each

liferaft being serviced.

4.1.2. The location of each liferaft being services.

4.1.3. The type of servicing (annual inspection or special

five-year inspection) required for each of the liferafts being serviced.

4.1.4. The quantity and manufacturer of the hydraulic

releases being serviced.

END OF SPECIFICATION