Att 1-O2 FY23 DS Specification 06-24-22.pdf
PDF 375 KB Posted
- Attached to
- FY2023 DOCKSIDE REPAIRS TO NOAA SHIP OREGON II
- Solicitation number
- 1305M222RNMAN0017
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOAA Ship Oregon II FY23 Dockside
May 2022
NOAA SHIP Oregon II
FY 2023 DOCKSIDE REPAIR SPECIFICATION
Marine Engineering Division
Kell Bruner Written By Date
Reviewed/Approved By Date
TABLE OF CONTENTS
DESCRIPTION/TITLE
1.0 SCOPE
2.0 GENERAL
3.0 BASIC ITEMS
3.1 Hydraulic Hose Renewals
3.2 Annual Lifesaving Appliances Survey
3.3 Annual Fire Inspection
3.4 Miranda Davit and FRB Maintenance
3.5 ABS Load Line Survey
3.6 Miscellaneous Repairs
3.7 Annual Lifting Equipment Load Test & Inspection
3.8 Boiler Inspection
3.9 Gauge Calibration
3.10 AC & Reefer Plant Groom
4.0 ADDITIONAL WORK
4.1 Additional Work
5.0 OPTION ITEMS
5.1 Ventilation Duct Cleaning
1.0 SCOPE. These Detail Specifications contain the
requirements for dockside repairs to NOAA Ship Oregon II.
The National Oceanic and Atmospheric Administration (NOAA) operates a fleet of research vessels that supports research and mapping for the National Fisheries Service, National Ocean Service, Office of Atmospheric Research and the National Weather Service, as well as provides support to other Federal agencies.
These research missions are time sensitive and therefore the data must be collected at specific times during the sailing season to be meaningful. At the end of each sailing season the vessels enter a repair period (drydock or dockside) to address repairs that have been previously identified, perform upgrades to mission systems or ship systems that either extend the life of the ship or provide new data collection capabilities or for safer operations of ships systems as well as address any emergent work that would adversely affect the ships ability to safely perform its mission on schedule, while meeting all regulatory body requirements (American Bureau of Shipping and United States Coast Guard) and all habitability requirements, including any that may be required as a result of contracts for personnel to augment ship staff.
2.0 GENERAL.
2.1. References
2.1.1. NOAA Standard Specification AMC-000-1F, “General
Requirements for Ship Repair Work on NOAA Ships”
2.1.2. NOAA Standard Specification AMC-077-1A, “Asbestos
Containing Materials
2.1.3. NOAA Ship Oregon II, “Asbestos Survey Report”
2.1.4. NOAA Standard Specification S1600, “Structural Access
Cuts”
2.1.5. NOAA Standard Specification S2906, “Arc Welding on
Waterborne Vessels”
2.1.6. NOAA Standard Specification MOC-631-2D, “Coating
Systems for Steel Surfaces”
2.1.7. NOAA Standard Specification AMC-631-4, “Coating
Systems for Aluminum Surfaces”
2.1.8. NOAA Drawing Number OR-S9-0-5, Rev A, “Booklet of
General Plans”
2.1.9. NOAA General Technical Requirements (GTR) Dated 25
March 2014
2.1.10. Code of Federal Regulation (CFR) Title 46 Shipping
2.2. Requirements
2.2.1. References 2.1.1 through 2.1.10 form a part of these
Detail Specifications. All provisions and requirements contained therein are applicable to all work items, including all additional work items which are authorized by the
Contracting Officer.
2.2.2. Some asbestos-containing materials are known to exist
on the ship and generally identified in Reference 2.1.3. The original asbestos survey was performed in 1992. Other report documents have been added based on other asbestos abatement jobs which had been performed on the ship since the original survey.
A copy of the asbestos survey report may be reviewed on board the ship and at the Gulf Marine Support Facility, Port Engineer’s Office, 151 Watts Avenue, Pascagoula, MS. The contractor shall be responsible for all removal, handling, repair, and disposal of Asbestos Containing Materials (ACM) that are identified as ACM, or presumed to contain ACM based on the test results of samples analyzed in the asbestos survey reports.
ACM abatement and removal necessary to perform other contract work in these specifications shall be in compliance with reference 2.1.2.
2.2.3. On a weekly basis (on the day preceding the Weekly
Progress Meeting) provide revised and updated copies of the Production Schedule to the COTR, to reflect the actual work progress.
2.2.4. Schedule, provide and maintain a status report of all
American Bureau of Shipping (ABS) surveyor inspections and technical reviews required by ABS, during the course of the contract to ensure the ship’s ABS Load Line Certification requirements are in compliance. An ABS field surveyor is required to be on site for work items requiring ABS inspections and technical reviews. NOAA will pay ABS directly for their services under a separate purchase agreement.
2.2.5. All Welding, visual examination, hydrostatic testing, air testing, and non-destructive testing shall be in compliance with ABS Rules for Building and Classing Steel Vessels, Surveys After Construction, Part 7, and the ABS Load Line Technical Manual. All contractors performing NDT and hull gauging shall be certified under the ABS external specialists program.
2.2.6. Unless otherwise stated in the individual work items, prepare and coat all new steel, all existing steel surfaces identified to be cleaned and painted, and any paint system disturbed while accomplishing work items, in accordance with Reference 2.1.6. Finish coat colors shall match those of the surrounding, unmodified area. Prepare and coat all new aluminum, all existing aluminum surfaces identified to be cleaned and painted, and any aluminum paint system disturbed while accomplishing work items, in accordance with Reference 2.1.7.
2.2.7. Drawings shall be updated only when specified in the
individual work item. All CAD drawings shall be updated in AutoCad 2000. All paper drawings shall be red-lined. The red-line and CAD updates shall include a complete list of new parts used, to the level of detail shown on existing parts lists on the referenced drawings. The Government shall provide either a full size copy of the drawing to be redlined or a copy of the CAD drawing. The updated drawings shall be returned to the COTR prior to the completion of the performance period. Ship’s drawings and technical publications may be borrowed during the performance period. All reference materials borrowed by the contractor shall be signed for, and then returned to the COTR after no further use of the reference materials are required.
2.2.8. All new equipment and furnishings purchased by the
Contractor for installation on the ship shall be provided with four sets of factory supplied technical manuals, or data sheets, complete with parts listings. Faxed copies of this information are not acceptable. This documentation shall be turned over to the COTR after installation is completed and prior to completion of performance period. Equipment technical manuals shall provide detailed information necessary to operate, maintain, troubleshoot, and repair the equipment. The manuals shall include detailed procedures for disassembly of equipment, parts lists, drawings, inspection criteria, troubleshooting, and test procedures.
2.2.9. All new and disturbed machinery and services shall be
operated for a period sufficient to indicate satisfactory performance, but not less than one hour, after all adjustments and deficiency corrective actions have been made, without further adjustment. All operational testing of equipment shall be performed dockside (Dock Trials) prior to any scheduled sea trial.
2.2.10. Provide manufacturer’s technical representatives where required in the individual work items to witness and to provide technical guidance during operational testing of equipment and systems.
2.2.11. All tests and trials of equipment and systems shall be witnessed by the COR, Ship Representatives, ABS as applicable, to ensure compliance with regulatory body requirements to maintain the ship’s ABS Load Line Certification, and to complete all requirements of these specifications.
2.2.12. These Detail Specifications are a combination of
“performance specifications“ and “design specifications. “ Whenever possible, the Government has provided performance specifications, giving the Contractor the opportunity to accomplish the work requirements as best as he or she sees fit, while providing a fully functional repair and/or equipment/system installation in accordance with all the work requirements. When specific details are required, the Government will provide design/detail specifications; this will be more the exception than the rule.
2.2.13. Frame numbers and space names are derived from ship’s drawings. All equipment changes and space modifications over the ship’s life span may not all be reflected in the referenced drawings. Contractors are encouraged to review all referenced drawings which will be issued in .pdf format with the solicitation. Contractors are advised to perform a field inspection prior to submitting a bid offer. Copies of other ship’s drawings and technical manuals that are not issued with the solicitation will be made available for review during scheduled pre-bid inspections, at the Port Engineer’s office at the Gulf Marine Support Facility, 151 Watts Ave., Pascagoula, MS and during the performance period as needed.
2.2.14. General Paint Requirements
2.2.14.1. In addition to the requirements of the references;
paint applications shall meet the following. This is intended to clarify the minimum prep and paint required when prep and paint is stated in the specs.
2.2.14.2. Paint Types Required
2.2.14.2.1. Steel surfaces
1st Coat - International Intersheild 300 HS 2nd Coat – International Intertuf 262 3rd Coat – International Inerthane 990
2.2.14.2.2. Aluminum surfaces
1st & 2nd Coat - International Intertuf 262 3rd Coat – International Inerthane 990
2.2.14.2.3. Surface Preparation
SP-11 Power Tool Clean to bare metal SP-1 Solvent wipe immediately before paint application.
2.2.15. Contractor services
2.2.15.1. Contractor shall provide portable restroom facilities and an off ship break area. Restroom & Break area location will be determined at start of availability.
2.2.15.2. Contractor shall set up and maintain sanitary hand-washing stations; one near the ships brow and one near the restroom and break area. Handwashing stations shall include running water (ship’s water may be utilized if available), soap, sanitizer, hand towels, and trash receptacles. These stations shall be cleaned daily.
2.2.15.3. Contractor is responsible for providing all PPE, personal cleaning agents, and personal cleaning stations.
2.3. Notes
2.3.1. The following descriptive data of NOAA Ship Oregon II
is provided for information:
Overall length - 170 feet- 0 inches
Length BP - 158 feet- 0 inches
Beam,(Molded) - 34 feet- 0 inches
Draft, Baseline to DWL - 14 feet- 0 inches
Draft, above molded keel at midships to DWL -12 feet- 6 inches
Displacement, to DWL - 893 LTSW (Saltwater)
Displacement, normal full load departure - 974 LTSW Displacement, lightship - 694.58 LT
Propulsion - Diesel, Single Screw, Bird- Johnson/Kamewa CPP, Twin Cat 3512 DITA JW Propulsion Engines. Lufkin CSQ8414 Reduction Gear, Hundested SFT 5 Bow Thruster.
Generators - Twin Caterpillar 3408B/SR4 DG sets; 245 KW, 450-480 VAC, 4 wire, 3 phase, 60 Hz.
Electric Service - 450 VAC, 3 Phase, 300 Amp Normal Service Load (Note: without deck machinery and cargo refrigeration loads)
Speed Sustained - 10 Knots
Officers & Crew - 19
2.4. Government Furnished Equipment (GFE)
ITEM QTY DESCRIPTION EST. COST
See individual items.
3.0 BASIC ITEMS
3.1. Hydraulic Hose Renewal
3.1.1. References
3.1.1.1. Oregon II Hydraulic Hose List
3.1.2. Government Furnished Materials
3.1.2.1. None
3.1.3. Requirements.
3.1.3.1. Renew all of the flexible hose assemblies on the
following pieces of equipment and all of flexible hose assemblies on their respective controllers:
3.1.3.1.1. Aft HPU
3.1.3.1.2. J-Frame
3.1.3.1.3. Miranda Davit
3.1.3.2. Disconnect and cap the hydraulic lines. Ensure
containment is provided to prevent spillage of oil. Hydraulic lines and inlet/outlet ports shall be capped or plugged with threaded fittings to prevent leakage or contamination of the system.
3.1.3.3. Install new stainless steel fittings on the new
hydraulic hoses. New hydraulic hoses shall be pressure tested to 125% of the rated maximum hose assembly pressure and tagged with engraved or embossed aluminum tags indicating test pressure, date and the contractor or facility that performed the tests. Provide and install protective nylon sleeves over each hydraulic hose and secure the sleeves in place.
3.1.3.4. Install chaffing material at all areas where chafing on the hoses is evident.
3.1.3.5. After leak checks are complete, install Denzell Tape on all metal fittings.
3.1.3.6. Update reference 3.1.1.1 with hose length, diameter, fitting type and date tested and test pressure of all new hoses.
3.1.4. Quality Assurance
3.1.4.1. No additional requirements
3.1.5. Notes
3.1.5.1. Sizes and lengths of hoses shall be determined by
prospective bidders during ship check.
End of Item
3.2. Annual Lifesaving Appliances Survey
3.2.1. References
3.2.1.1. NOAA Standard Specification AMC-583-1b, General
Requirements for Life raft Inspections
3.2.1.2. CFR Title 46 Part 199
3.2.2. Government Furnished Equipment
3.2.2.1. None
3.2.3. Requirements
3.2.3.1. Remove two (2) Elliot and four (4) Viking 16 person
SOLAS style MK I liferafts from ship to shop for annual inspections.
3.2.3.2. Inspect liferafts in accordance with reference 3.2.1.1 using an ABS approved service provider.
3.2.3.3. Affix a weatherproof label that reads as, “Radar
Reflector Not Included” on life rafts that do not have radar reflectors.
3.2.3.4. Inspect 30 survival suits
3.2.3.5. Inspect 30 Life Vest
3.2.3.6. Provide a condition report to identify deficiencies.
3.2.3.7. Provide certificates of annual inspection for all
lifesaving equipment inspected.
3.2.4. Quality Assurance
3.2.4.1. In accordance with reference 3.2.1.1
3.2.5. Notes
3.2.5.1. None
3.3. Annual Fire Inspection
3.3.1. References
3.3.1.1. Drawing OT-555-001 Rev - “Fire Control Plan”
3.3.2. Government Furnished Material
3.3.2.1. None
3.3.3. Requirements
3.3.3.1. Perform the annual fire inspection to include:
3.3.3.1.1. Inspection of all fixed CO2 extinguishing systems.
3.3.3.1.2. Inspection of 55 portable fire extinguishers.
3.3.3.1.3. Inspection and test of the fire alarm system.
3.3.3.1.4. Inspection and test of 11 fire alarm heat sensors.
3.3.3.1.5. Visual inspection and hydrostatic testing of 9 SCBA cylinders.
3.3.3.1.6. Hydrostatic testing of one SKA-PAK emergency escape cylinder.
3.3.3.1.7. Flow testing of 9 SCBA respirators.
3.3.3.1.8. Inspection and test of the Galley Gaylord Hood
including replacement of fusible links.
3.3.3.1.9. Recharge portable fire extinguishers that are found to be under charged.
3.3.3.1.10. Hydrostatic test all portable fire extinguishers that require it.
3.3.3.1.11. Hydrostatic test and refill two Oxygen bottles.
3.3.3.1.12. Inspect and Hydrostatic Test all Fire Hoses.
3.3.4. Quality Assurance
3.3.4.1. Provide a report to the Port Engineer documenting
results of item inspections and tests.
3.4. Miranda Davit and FRB Maintenance
3.4.1. References
3.4.1.1. No additional references
3.4.2. Government Furnished Equipment
3.4.2.1. None
3.4.3. Requirements
3.4.3.1. Provide the services of a Palfinger technical
representative to conduct the annual davit inspection / service.
3.4.3.2. Provide the services of a Norsafe / Viking technical representative to conduct the annual FRB inspection / service.
3.4.3.3. Service and inspection shall include all regulatory
and OEM maintenance requirements.
3.4.4. Quality Assurance
3.4.4.1. Provide report to the Port Engineer documenting the
Davit Inspection Results 3.4.4.2.
3.4.5. Notes
3.4.5.1. Palfinger Marine Contact Information:
912 Highway 90 East New Iberia, LA 70560 1-337-365-5451 Service.americas@palfingermarine.com
3.4.5.2. Viking / Norsafe Contact Information:
668 Distributors Row New Orleans, LA 70123 1-504-733-0722 NewOrleansService@viking-life.com
3.5. ABS Load Line Survey
3.5.1. References
3.5.1.1. None
3.5.2. Government Furnished Material
3.5.3. None.
3.5.4. Requirements
3.5.4.1. Provide assistance to ship’s force as needed to
complete the Annual ABS Load Line Survey.
3.5.4.2. For bidding purposes, assume 100 man hours of labor
and $5000.00 in material.
3.5.5. Quality Assurance
3.5.5.1. As required by the ABS Surveyor.
3.5.6. Notes
3.5.6.1. The COR will arrange and pay for the ABS Surveyor.
The contractor shall assist with scheduling and tracking ABS items.
3.6. Miscellaneous Repairs
3.6.1. References
3.6.1.1. Drawing OT1003-4 “General Arrangement Upper Deck, Focsle Deck and Above”
3.6.2. Government Furnished Material
3.6.2.1. None
3.6.3. Requirements
3.6.4. Lounge Window Preservation
3.6.4.1. Remove each of the 4 lounge windows one at a time.
3.6.4.2. Prepare and paint the structure where the window was removed.
3.6.4.3. Disassemble the window and remove old paint, sealant and gaskets.
3.6.4.4. Renew the window paint, sealant and gaskets.
3.6.4.5. Reinstall windows using new gaskets.
3.6.4.6. Provide temporary protection from the weather in the case of a window being removed at the end of each work day.
3.6.4.7. Perform a water hose test to test for leaks.
3.6.5. Miscellaneous Paint Repairs
3.6.5.1. Provide labor and materials to prep and paint up to
200 square feet of deteriorated paint as directed by the COR / Port Engineer.
3.6.5.2. The repairs areas will be varying sizes and locations.
3.6.6. Habitability Modifications
3.6.6.1. More to Come
3.6.7. Quality Assurance
3.6.7.1. No additional requirements
3.7. Annual Lifting Equipment Load Test
3.7.1. References
3.7.1.1. NOAA Standard Specification AMC-573-1C “Testing of
Davits and Weight Handling Equipment”
3.7.2. Government Furnished Equipment
3.7.2.1. None
3.7.2.2. Provide the services of an OSHA accredited inspector and all necessary equipment (weights, load cell) and labor to weight test the following deck equipment in accordance with reference 3.14.1.1.
3.7.2.3. Inspect each lifting device for any deficiencies.
3.7.2.4. Provide a report for any discrepancies found and
recommendations for repairs.
3.7.2.5. Perform 125% load test of each lifting device.
3.7.2.5.1. Forward Crane - 3000lb rating
3.7.2.5.2. Aft Crane – 8000lb rating
3.7.2.5.3. J - Frame – 1950lb rating
3.7.2.6. Provide certificates of annual inspection / test for each lifting device.
3.7.3. Quality Assurance
3.7.3.1. No additional requirements
3.8. Boiler Inspection
3.8.1. References
3.8.1.1. Columbia L / WL / CWH Series Boilers: Installation, Operation and Maintenance Manual.
3.8.2. Government Furnished Equipment
3.8.2.1. None
3.8.3. Requirements
3.8.3.1. Provide a Columbia Boiler authorized technician to
inspect, test and service the boiler in accordance with reference 3.8.1.1.
3.8.4. Quality Assurance
3.8.4.1. None
3.9. Gauge Calibration
3.9.1. References
3.9.1.1. None
3.9.2. Government Furnished Equipment
3.9.2.1. None
3.9.3. Requirements
3.9.3.1. Calibrate the following gauges in the Engine room
Operating Station (EOS).
3.9.3.1.1. CPP
- Main Pump Discharge Pressure
- Oil Pressure to Hub
- Oil Pressure to Auxiliary Servo
- Oil Pressure from Hub
- Standby Pump Discharge Pressure
3.9.3.1.2. Shaft RPM
3.9.3.1.3. Propulsion Pitch
3.9.3.1.4. Port/Starboard Main Freshwater/Seawater Pressure
3.9.3.1.5. Generator Gauges
- Port Generator Fuel
- Port Generator Scavenger Air Pressure
- Starboard Generator Scavenger Air Pressure
- Starboard Generator Fuel
- Port Generator FW/SW
- Port Generator Lube Oil
- Starboard Generator FW/SW
- Starboard Generator Lube Oil
3.9.4. Quality Assurance
3.9.4.1. Provide a 2 year calibration sticker for each gauge, with the calibration date, and expiration date.
3.9.5. Notes
3.9.5.1. Gauge Calibration Source:
Mobile Instrument Co.
745 Lakeside Dr Mobile, AL 36693 251-660-7474
3.10. AC & Reefer Plant Groom
3.10.1. References
3.10.2. None
3.10.3. Government Furnished Material
3.10.3.1. None
3.10.4. Requirements
3.10.4.1. Provide the services of an authorized Carrier
Representative to Inspect, test and adjust the AC & Reefer Plants.
3.10.4.2. This shall include replacing all filters and dryers.
3.10.5. Quality Assurance
3.10.5.1. None
END OF ITEM
4.0 ADDITIONAL WORK
4.1. Additional Work
4.1.1. References
4.1.1.1. No additional references
4.1.2. Government-Furnished Equipment
4.1.2.1. None
4.1.3. Requirements
4.1.3.1. The rate for all man-hours of labor, to be used for
emergent work if ordered by the Contracting Officer pursuant to the “Changes – Ship Repair” clause (Section H) or mutually agreed upon by the parties by supplemental agreement to accomplish additional work not required elsewhere in the work items, shall be established using this item. For bidding purposes estimate 833 man-hours worth of emergent work for this item.
4.1.3.2. Indicate in the “Bid Schedule” (Section B) the total man-hour rate to be used in evaluation of the proposal and also to be used for negotiating changes as required by the “Changes – Ship Repair” clause. This rate shall be a flat rate to cover the entire effort and shall be burdened to include:
4.1.3.3. Production man-hours shall be for skilled labor at the journeyman level expended in direct production as exemplified by the following functions: Abrasive Cleaning/Blasting, Blacksmithing, Boilermaking, Carpentry, Crane Operation, Electrical/Electronics Work, Engineering (Production), Insulating/Lagging, Machining (inside and outside), Painting, Pipe Fitting, Rigging, Sheet-metal Work, Shipfitting, Shipwrights, Staging/Scaffolding, Tank Cleaning, and Welding/Burning/Brazing.
4.1.3.4. Non-production man-hours (whether charged as direct
labor or indirect labor by the contractors accounting system) shall be for labor in support of production functions.
Necessary support functions should be priced into the burdened rate for production man-hours. Examples of support functions include: Engineering (support), Estimating, General Labor, Firewatch, Material Handling, Planning, Quality Assurance, Security (General), Supervision, Surveying, Testing, and Transportation.
4.1.3.5. Other indirect charges including but not limited to
the following: overhead, general and administrative, support functions, facilities, and capital cost of money and profit for the contractor and any subcontractors selected by the prime contractor. The hourly rate will not be used to price work which may be directed to a subcontractor by name in the work specifications.
4.1.3.6. All material costs shall be paid based on the
contractor’s return cost plus the markup identified in the “Bid Schedule”. For bidding purposes estimate $50,000 worth of additional material for this item.
4.1.3.7. Take into account full award of this item during the development of the Production Schedule. Award of any portion of this item does not in itself justify an extension to the original contract completion date.
4.1.3.8. The man-hours and material cost estimates specified
herein are for evaluation of proposals only. The provided burdened man-hour rates and material cost rates shall remain in effect for the entire life of the contract. Pursuant to the “Changes – Ship Repair” clause, the Government reserves the right to award or not award any portion up to or beyond the estimates set forth herein.
4.1.4. Quality Assurance
4.1.4.1. No additional requirements.
4.1.5. Notes
4.1.5.1. The man-hours of labor contained within this item are in addition to those required to accomplish work specified within the remaining specifications.
4.1.5.2. By definition, there are 8 hours in a man-day.
Therefore, the estimated 833 man-hours equates to 104 man-days.
5.0 OPTION ITEMS
5.1. Ventilation Duct Cleaning
5.1.1. References
5.1.1.1. NOAA MOC Standard Specification MOC-510-1B “HVAC
Cleaning”
5.1.1.2. American Society of Heating, Refrigeration and Air
Conditioning Engineers (ASHRAE) Standard 151 “Practices for Measuring, Testing, Adjusting and Balancing Shipboard HVAC & R Systems.”
5.1.1.3. NOAA Ship Oregon II Drawing Number OT-S3801-1 Rev A
“Heating & Cooling Load Calculations”
5.1.1.4. NOAA Ship Oregon II Drawing Number OT-S3801-10 Rev A “Wet Lab Ventilation System Modification”
5.1.1.5. NOAA Ship Oregon II Drawing Number OT-S3801-11 Rev A “Dry Lab Heat Load Calculations”
5.1.1.6. NOAA Ship Oregon II Drawing Number OT-S3801-12 Rev – “Foredeck Modifications, Ventilation Modifications”
5.1.1.7. NOAA Ship Oregon II Drawing Number OT-S3801-13 Rev – “Bow Thruster Installation Ventilation Modifications”
5.1.1.8. NOAA Ship Oregon II Drawing Number OT-S3801-14 Rev A “Ventilation System”
5.1.1.9. NOAA Ship Oregon II Drawing Number OT-S3801-101
“Ventilation General Notes and Typical Details”
5.1.2. Government-Furnished Material (GFM)
5.1.2.1. None
5.1.3. Requirements
5.1.3.1. Furnish all equipment, materials and labor to clean
the Supply and Return HVAC duct work in accordance with reference 5.2.1.1.
5.1.3.2. Clean the Supply and Return HVAC duct work system that services the Cabin areas.
5.1.3.3. Clean the bathroom exhaust system, clean the HVAC
supply and return for the Galley area, Bridge and Lounge/Library area.
5.1.3.4. Clean the laundry room exhaust duct work.
5.1.3.5. Re-insulate and paint areas which were disturbed
during the duct cleaning process.
5.1.3.6. Furnish all equipment, materials and labor to balance the HVAC System in accordance with reference 5.2.1.2.
5.1.3.7. Prior to testing the HVAC system as a complete system, check all fans, motors, coils, filters, compressors, pumps, all control devices, and dampers, etc., for satisfactory operation, adjusted for full load operating conditions; such components shall not be readjusted during tests. All related companion heating, ventilation and common trunk systems, whether intakes or discharges, shall be in simultaneous operation and all doors closed while these tests are in progress.
5.1.3.8. Operate the entire air conditioning plant for at least 72 hours with the entire connected load at approximately the maximum design operating conditions, to verify the ability of the system to develop design load at specified temperature and pressure. Check all controls, regulating, modulating and expansion valves, thermostats, dampers, etc. for proper operation.
5.1.3.9. Begin the air balancing procedure by measuring the air flow rate at each fan in the main ductwork before doing any branch duct takeoffs. Determine air flow rate by a duct traverse.
5.1.3.10. Set the airflow at the fan to 100% to 110% of design or within limits of the system. Notify the COR if the system is not providing design flow.
5.1.3.11. Traverse each branch duct and set flow starting with the branch closest to the fan. The last branch or branch with highest resistance shall have the damper full open at the design flow. Measure the average velocity of the air passing through each supply and exhaust terminal and through the entire system and compare measurements with design conditions. Record Barometer and psychrometer readings at the system intake and discharge.
5.1.3.12. Correct all data for standard air and compare with
design criteria for adequacy.
5.1.3.13. Balance all terminals to deliver between 95% and 110% of the designed volume.
5.1.3.14. Permanently mark and pin, using stainless steel cotter pins or bolts, damper position final settings.
5.1.4. Quality Assurance
5.1.4.1. All internal duct work cleaning to be performed by
standard shipyard practice that ensures all debris has been removed from affected duct sections and systems. Make a video recording of each section of ducting to document final cleaned state.
5.1.4.2. Verify that all instruments used to conduct
ventilation and system tests have been calibrated within the preceding six months.
5.1.5. Notes
5.1.5.1. None.
File details come from the government source that posted it. Updated .