Att. 3 Lakewood HVAC Construction Plans_Revised 4.3.2024 240405.pdf

PDF 14 MB Posted

Attached to
Chequamegon-Nicolet National Forest-Lakewood HVAC Replacement
Solicitation number
12445524Q0044
Issued by

About this file

The document is the Lakewood HVAC Construction Plans, which is an attachment related to the Chequamegon-Nicolet National Forest-Lakewood HVAC Replacement solicitation (Solicitation Number: 12445524Q0044).

The solicitation is for the replacement of the HVAC system at the Lakewood facility managed by the Department of Agriculture Forest Service. The Construction Plans provide detailed technical specifications and drawings for the proposed HVAC upgrades, including equipment, ductwork, and other system components. Key requirements include energy-efficient system design, compliance with applicable building codes and federal regulations, and adherence to scheduled project milestones. The solicitation is open to both small and large businesses, with no set-asides specified. Responses are due by April 3, 2024, and the anticipated award date is May 15, 2024. Pricing is to be submitted using the provided template, with both firm-fixed-price and time-and-materials contract types being considered.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECURE

OFFICE 4

OFFICE 3

STORAGE

CONFERENCE

LUNCH ROOM

MECH.

JAN.

OFFICE 1 OFFICE 2

HALL

STAIR A

STAIR BV

V

1/4" = 1'-0"1 BASEMENT PLAN - HVAC DEMOLITION

DRAWN

DESIGNER

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO. REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

Chequamegon-Nicolet National Forest

Ranger District

EASTERN DISTRICT

17 Applegate Court, Suite 200

Madison, WI 53713

Phone: (608) 288-9260 email: hein@heinengrp.com

ZONE 7BB & 4BB

Not functional Two Thermostats

7 DISCONNECT AND PATCH WALL

PATCH WALL IF NOT BEING

REPLACED

MEN

WOMEN

GENERAL OFFICE

GENERAL OFFICE

CORRIDOR

STAIR A

LOBBY

RANGERS OFFICE

GENERAL OFFICE

CLERKS

STAIR B

GENERAL OFFICE

1/4" = 1'-0"1 FIRST FLOOR PLAN - HVAC DEMOLITION

DESIGNER

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO. REVISION / ISSUE

OFSHEET

9 BASEBOARD THERMOSTAT TO REMAIN

6. CONTRACTOR MAY OPEN UP GABLE ENDS OF BUILDING TO REMOVE DUCT AND HVAC EQUIPMENT.

REPAIR IN KIND

OFFICE 4 OFFICE 3

STORAGE

CONFERENCE

LUNCH ROOM

MECH.

JAN.

OFFICE 1 OFFICE 2

HALL

STAIR A

STAIR BV

1/4" = 1'-0"1 BASEMENT PLAN - HVAC DUCTWORK

DESIGNER

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO. REVISION / ISSUE

OFSHEET

6. DETERMINE EXISTING BASE BOARD HEAT ZONES. USE INFORMATION TO DETERMINE WHICH

BASE BOARD HEATERS NEED TO BE ZONE WITH WHICH FAN COIL OR REMAIN INDEPENDENT

ZONES. WORK WITH COR TO DETERMINE ZONING.

RELOCATE THERMOSTAT

STORAGE

CONFERENCE

LUNCH ROOM

MECH.

JAN.

OFFICE 1 OFFICE 2

HALL

STAIR A

STAIR BV

1/4" = 1'-0"1 BASEMENT PLAN - HVAC PIPING

DESIGNER

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO. REVISION / ISSUE

OFSHEET

2 PROVIDE PUMP TO TWO NEW BASEBOARDS IN BATHROOMS. COMBINE BOTH BB TO MAKE SEPARATE ZONE2

GENERAL OFFICE

GENERAL OFFICE

CORRIDOR

STAIR A

LOBBY

RANGERS OFFICE

GENERAL OFFICE

CLERKS

STAIR B

GENERAL OFFICE

1/2" PLYWOOD-PAINTED WHITE

5 LAYERS OF 2" RIGID INSULATION

(R 50 MIN REQUIRED)

1X4 TRIM TO SUPPORT ACCESS HATCH

PAINTED WHITE

1/2" PLYWOOD

ADDED BLOWN-IN

INSULATION

EXISTING

BLOWN-IN

INSULATION

1/4" = 1'-0"1 FIRST FLOOR PLAN - HVAC

DESIGNER

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO. REVISION / ISSUE

OFSHEET

1/2" = 1'-0"3 FAN COIL FC-1 ELEVATION

1/2" = 1'-0"4 FAN COIL FC-2 ELEVATION

N.T.S.2 ATTIC HATCH DETAIL

6. DETERMINE EXISTING BASE BOARD HEAT ZONES. USE INFORMATION TO DETERMINE WHICH

BASE BOARD HEATERS NEED TO BE ZONE WITH WHICH FAN COIL OR REMAIN INDEPENDENT

ZONES. WORK WITH COR TO DETERMINE ZONING.

FC1 PROVIDE AVERAGING THERMOSTAT

FC2 PROVIDE THERMOSAT

151 TERMOSTAT FOR TWO BATHROOM BASEBOARD HEATERS151

151151 mbeuning Callout Move FC2 and all associated equipment to other side of closet (opposite as shown). Extend duct and pipe as necessary. Provide partition between FC2 and others side of closet.

VRF HEAT PUMP CONTROL SCHEMATIC REFRIGERANT PIPING SCHEMATIC

DESIGNER

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO. REVISION / ISSUE

OFSHEET

PROVIDE PUMP AND THERMOSTAT

STORAGE

CONFERENCE

LUNCH ROOM

MECH.

JAN.

OFFICE 1 OFFICE 2

HALL

STAIR A

STAIR BV

1/4" = 1'-0"1 BASEMENT PLAN - ELECTRICAL

DESIGNER

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO. REVISION / ISSUE

OFSHEET

GENERAL OFFICE

GENERAL OFFICE

CORRIDOR

STAIR A

LOBBY

RANGERS OFFICE

GENERAL OFFICE

CLERKS

STAIR B

GENERAL OFFICE

1/4" = 1'-0"1 FIRST FLOOR PLAN - ELECTRICAL

DESIGNER

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO. REVISION / ISSUE

OFSHEET

H1.0 - Basement Plan - HVAC Demolition
H1.1 - First Floor Plan - HVAC Demolition
H1.2 - Basement Plan - HVAC Ductwork
H1.3 - Basement Plan - HVAC Piping
H1.4 - First Floor Plan - HVAC
H2.0 - HVAC Schedules & Details
E1.0 - Basement Plan - Electrical
E1.1 - First Floor Plan - Electrical

File details come from the government source that posted it. Updated .