Att. 3 Lakewood HVAC Construction Plans_Revised 4.3.2024 240405.pdf
PDF 14 MB Posted
- Solicitation number
- 12445524Q0044
- Issued by
-
Department of Agriculture Forest Service
About this file
The document is the Lakewood HVAC Construction Plans, which is an attachment related to the Chequamegon-Nicolet National Forest-Lakewood HVAC Replacement solicitation (Solicitation Number: 12445524Q0044).
The solicitation is for the replacement of the HVAC system at the Lakewood facility managed by the Department of Agriculture Forest Service. The Construction Plans provide detailed technical specifications and drawings for the proposed HVAC upgrades, including equipment, ductwork, and other system components. Key requirements include energy-efficient system design, compliance with applicable building codes and federal regulations, and adherence to scheduled project milestones. The solicitation is open to both small and large businesses, with no set-asides specified. Responses are due by April 3, 2024, and the anticipated award date is May 15, 2024. Pricing is to be submitted using the provided template, with both firm-fixed-price and time-and-materials contract types being considered.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECURE
OFFICE 4
OFFICE 3
STORAGE
CONFERENCE
LUNCH ROOM
MECH.
JAN.
OFFICE 1 OFFICE 2
HALL
STAIR A
STAIR BV
V
1/4" = 1'-0"1 BASEMENT PLAN - HVAC DEMOLITION
DRAWN
DESIGNER
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO. REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
Chequamegon-Nicolet National Forest
Ranger District
EASTERN DISTRICT
17 Applegate Court, Suite 200
Madison, WI 53713
Phone: (608) 288-9260 email: hein@heinengrp.com
ZONE 7BB & 4BB
Not functional Two Thermostats
7 DISCONNECT AND PATCH WALL
PATCH WALL IF NOT BEING
REPLACED
MEN
WOMEN
GENERAL OFFICE
GENERAL OFFICE
CORRIDOR
STAIR A
LOBBY
RANGERS OFFICE
GENERAL OFFICE
CLERKS
STAIR B
GENERAL OFFICE
1/4" = 1'-0"1 FIRST FLOOR PLAN - HVAC DEMOLITION
DESIGNER
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO. REVISION / ISSUE
OFSHEET
9 BASEBOARD THERMOSTAT TO REMAIN
6. CONTRACTOR MAY OPEN UP GABLE ENDS OF BUILDING TO REMOVE DUCT AND HVAC EQUIPMENT.
REPAIR IN KIND
OFFICE 4 OFFICE 3
STORAGE
CONFERENCE
LUNCH ROOM
MECH.
JAN.
OFFICE 1 OFFICE 2
HALL
STAIR A
STAIR BV
1/4" = 1'-0"1 BASEMENT PLAN - HVAC DUCTWORK
DESIGNER
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO. REVISION / ISSUE
OFSHEET
6. DETERMINE EXISTING BASE BOARD HEAT ZONES. USE INFORMATION TO DETERMINE WHICH
BASE BOARD HEATERS NEED TO BE ZONE WITH WHICH FAN COIL OR REMAIN INDEPENDENT
ZONES. WORK WITH COR TO DETERMINE ZONING.
RELOCATE THERMOSTAT
STORAGE
CONFERENCE
LUNCH ROOM
MECH.
JAN.
OFFICE 1 OFFICE 2
HALL
STAIR A
STAIR BV
1/4" = 1'-0"1 BASEMENT PLAN - HVAC PIPING
DESIGNER
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO. REVISION / ISSUE
OFSHEET
2 PROVIDE PUMP TO TWO NEW BASEBOARDS IN BATHROOMS. COMBINE BOTH BB TO MAKE SEPARATE ZONE2
GENERAL OFFICE
GENERAL OFFICE
CORRIDOR
STAIR A
LOBBY
RANGERS OFFICE
GENERAL OFFICE
CLERKS
STAIR B
GENERAL OFFICE
1/2" PLYWOOD-PAINTED WHITE
5 LAYERS OF 2" RIGID INSULATION
(R 50 MIN REQUIRED)
1X4 TRIM TO SUPPORT ACCESS HATCH
PAINTED WHITE
1/2" PLYWOOD
ADDED BLOWN-IN
INSULATION
EXISTING
BLOWN-IN
INSULATION
1/4" = 1'-0"1 FIRST FLOOR PLAN - HVAC
DESIGNER
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO. REVISION / ISSUE
OFSHEET
1/2" = 1'-0"3 FAN COIL FC-1 ELEVATION
1/2" = 1'-0"4 FAN COIL FC-2 ELEVATION
N.T.S.2 ATTIC HATCH DETAIL
6. DETERMINE EXISTING BASE BOARD HEAT ZONES. USE INFORMATION TO DETERMINE WHICH
BASE BOARD HEATERS NEED TO BE ZONE WITH WHICH FAN COIL OR REMAIN INDEPENDENT
ZONES. WORK WITH COR TO DETERMINE ZONING.
FC1 PROVIDE AVERAGING THERMOSTAT
FC2 PROVIDE THERMOSAT
151 TERMOSTAT FOR TWO BATHROOM BASEBOARD HEATERS151
151151 mbeuning Callout Move FC2 and all associated equipment to other side of closet (opposite as shown). Extend duct and pipe as necessary. Provide partition between FC2 and others side of closet.
VRF HEAT PUMP CONTROL SCHEMATIC REFRIGERANT PIPING SCHEMATIC
DESIGNER
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO. REVISION / ISSUE
OFSHEET
PROVIDE PUMP AND THERMOSTAT
STORAGE
CONFERENCE
LUNCH ROOM
MECH.
JAN.
OFFICE 1 OFFICE 2
HALL
STAIR A
STAIR BV
1/4" = 1'-0"1 BASEMENT PLAN - ELECTRICAL
DESIGNER
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO. REVISION / ISSUE
OFSHEET
GENERAL OFFICE
GENERAL OFFICE
CORRIDOR
STAIR A
LOBBY
RANGERS OFFICE
GENERAL OFFICE
CLERKS
STAIR B
GENERAL OFFICE
1/4" = 1'-0"1 FIRST FLOOR PLAN - ELECTRICAL
DESIGNER
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO. REVISION / ISSUE
OFSHEET
| H1.0 - Basement Plan - HVAC Demolition |
| H1.1 - First Floor Plan - HVAC Demolition |
| H1.2 - Basement Plan - HVAC Ductwork |
| H1.3 - Basement Plan - HVAC Piping |
| H1.4 - First Floor Plan - HVAC |
| H2.0 - HVAC Schedules & Details |
| E1.0 - Basement Plan - Electrical |
| E1.1 - First Floor Plan - Electrical |
File details come from the government source that posted it. Updated .