Att. 4 Lakewood Septic HVAC Schedule of Items_WITH ALTERNATIVES.docx

DOCX document 22 KB Posted

Attached to
Chequamegon-Nicolet National Forest-Lakewood HVAC Replacement
Solicitation number
12445524Q0044
Issued by

About this file

This document is a Schedule of Items for the Lakewood District Office HVAC Improvements project, which is part of a federal contract opportunity.

The Schedule of Items includes a base bid for HVAC improvements on the first floor, with one alternative, as well as an optional bid item for HVAC improvements in the basement, with two alternatives. The base bid covers demolition, new HVAC equipment and systems, ductwork, controls, and electrical work. The first alternative for the base bid replaces the proposed air handlers and heat pumps with a different configuration. The optional bid item addresses the basement HVAC system, with alternative configurations for the heat pump and air handler equipment.

The related federal contract opportunity is Solicitation Number 12445524Q0044, titled "Chequamegon-Nicolet National Forest-Lakewood HVAC Replacement", issued by the Department of Agriculture Forest Service. No other details about the solicitation or contract are provided.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LAKEWOOD DISTRICT OFFICE HVAC

The schedule of items includes a base bid and an optional bid item. Within the base bid there is one alternative. Within the optional bid item there are two alternatives. See the description of work associated with the base bid, optional bid item, and the two alternatives within the schedule of items.

BASE BID HVAC IMPROVEMENTS (First Floor)
PRICE (LUMP SUM)

H1. HVAC Demolition & Grid Work

H2. Fan Coils, Air-cooled VRF Heat Pump(5-ton) & Refrigerant Piping

H3. Filters and Air Ionization

H4. Fresh Air & Boiler Vent Modifications

H5. Electric Heater Replacement

H6. New Ductwork

H7. New Ductwork Insulation

H2. New Hydronic Distribution System and Pipe Insulation

H8. New Hydronic Baseboard

H8. Condensate Piping

H9. Remove Existing Attic Exhaust Fan

H10. New Registers, Grilles & Louvers

H11. HVAC Controls

H12. HVAC TAB & Commissioning

E1. Electrical Demolition

E2. Electric: Fan Coil & Air-cooled Condensers Power + Air Ionization

E3. Electric Heat Power

E4. Electric: Pump Power + Starter

TOTAL BASE BID

BASE BID HVAC IMPROVEMENTS (First Floor) – ALTERNATIVE 1
PRICE (LUMP SUM)

H1. HVAC Demolition & Grid Work

H2. Heat pumps and air handlers (x2) and refrigeration piping.

H3. Filters and Air Ionization

H4. Fresh Air & Boiler Vent Modifications

H5. Electric Heater Replacement

H6. New Ductwork

H7. New Ductwork Insulation

H2. New Hydronic Distribution System and Pipe Insulation

H8. New Hydronic Baseboard

H8. Condensate Piping

H9. Remove Existing Attic Exhaust Fan

H10. New Registers, Grilles & Louvers

H11. HVAC Controls

H12. HVAC TAB & Commissioning

E1. Electrical Demolition

E2. Electric: Fan Coil & Air-cooled Condensers Power + Air Ionization

E3. Electric Heat Power

E4. Electric: Pump Power + Starter

TOTAL BASE BID – ALTERNATIVE 1

OPTIONAL BID ITEM #1 - HVAC IMPROVEMENTS (Basement)
PRICE (LUMP SUM)

H1. HVAC Demolition & Grid Work

H2. Fan Coils, Air-cooled VRF Heat Pump(3-ton) & Refrigerant Piping

H3. Filters and Air Ionization

H4. Fresh Air & Boiler Vent Modifications

H5. New Ductwork & Insulation

H6. New Hydronic Distribution System and Pipe Insulation

H7. Condensate Piping

H8. New Registers, Grilles & Louvers

H9. HVAC Controls

H10. HVAC TAB & Commissioning

TOTAL OPTIONAL BID ITEM #1

OPTIONAL BID ITEM #1 - HVAC IMPROVEMENTS (Basement) – ALTERNATIVE 1
PRICE (LUMP SUM)

H1. HVAC Demolition & Grid Work

H2. Heat pumps and air handlers (x2) Refrigerant Piping

H3. Filters and Air Ionization

H4. Fresh Air & Boiler Vent Modifications

H5. New Ductwork & Insulation

H6. New Hydronic Distribution System and Pipe Insulation

H7. Condensate Piping

H8. New Registers, Grilles & Louvers

H9. HVAC Controls

H10. HVAC TAB & Commissioning

TOTAL OPTIONAL BID ITEM #1 – ALTERNATIVE 1

OPTIONAL BID ITEM #1 - HVAC IMPROVEMENTS (Basement) – ALTERNATIVE 2
PRICE (LUMP SUM)

H1. HVAC Demolition & Grid Work

H2. One heat pump and one air handler (x1) Refrigerant Piping

H3. Filters and Air Ionization

H4. Fresh Air & Boiler Vent Modifications

H5. New Ductwork & Insulation

H6. New Hydronic Distribution System and Pipe Insulation

H7. Condensate Piping

H8. New Registers, Grilles & Louvers

H9. HVAC Controls

H10. HVAC TAB & Commissioning

TOTAL OPTIONAL BID ITEM #1 – ALTERNATIVE 2

BASE BID - First Floor:

1.Replace existing upper-level air handlers with two (2) new multi-zone VRF fan coils with 5-ton outdoor air-cooled heat pump and hot water reheat coils at ducted fan coils (R410a; SEER 18). Units to be located at existing location (FC-1) and at existing closet (FC-2) with fresh air ducted to return air plenum with motorized damper.
2.Provide MERV 13 filters and air ionization units at coil sections.
3.Correct fresh air intake location from air way to wall-mounted above grade - painted galvanizedexposed duct with louver below soffit.
4.Move boiler venting 10 ft from fresh air intake.
5.Replace existing exhaust fans with proper size and occupancy controls.
6.Replace existing electric wall heaters.
7.Replace electric baseboard heaters at toilets with hydronic baseboards.
8.Route new insulated(R8) ductwork for upper level in attic space with overhead air distribution - Reuseexisting ductwork where size accommodates new requirements.
9.Add door grilles as necessary for proper return air to central return grilles.
10.Remove existing attic exhaust fan in Clerks room and cap opening at ceiling.
11.Provide new controls for reheat discharge control, perimeter radiation and fan coil interface.
12.Balance and commission fan coil-heat pump units.

BASE BID - First Floor: ALTERNATIVE 1

1.Replace existing upper-level air handlers with two (2) new heat pumps, two air handlers, and hot water reheat coils at the air handling units (R410a; SEER 18). Units to be located at existing location and at existing closet with fresh air ducted to return air plenum with motorized damper. Provide additional electrical, ducting, piping, outdoor pads, and appurtenances to accommodate two heat pumps and two air handlers.
2.Provide MERV 13 filters and air ionization units at coil sections.
3.Correct fresh air intake location from air way to wall-mounted above grade - painted galvanizedexposed duct with louver below soffit.
4.Move boiler venting 10 ft from fresh air intake.
5.Replace existing exhaust fans with proper size and occupancy controls.
6.Replace existing electric wall heaters.
7.Replace electric baseboard heaters at toilets with hydronic baseboards.
8.Route new insulated(R8) ductwork for upper level in attic space with overhead air distribution - Reuseexisting ductwork where size accommodates new requirements.
9.Add door grilles as necessary for proper return air to central return grilles.
10.Remove existing attic exhaust fan in Clerks Room and cap opening at ceiling.
11.Provide new controls for reheat discharge control, perimeter radiation and fan coil interface.
12.Balance and commission air handlers and heat pump units.
OPTIONAL BID ITEM #1:HVAC Improvements- Basement:
1.Replace existing lower-level air handler with two (2) new multi-zone fan coils with 3-ton outdoorair-cooled heat pump and hot water reheat coils at ducted fan coils along withducted fresh air requirements.
2.Provide new controls for reheat discharge control, perimeter radiation and fan coil interface.
3.Balance and commission fan coil-heat pump units.
OPTIONAL BID ITEM #1:HVAC Improvements- Basement ALTERNATIVE 1
1.Replace existing lower-level air handler with two (2) heat pumps and two air handlers and hot water reheat coils at ducted fan coils along with ducted fresh air requirements. Provide additional electrical, ducting, piping, outdoor pads, and appurtenances to accommodate two heat pumps and two air handlers.
2.Provide new controls for reheat discharge control, perimeter radiation and fan coil interface.
3.Balance and commission fan coil-heat pump units.
OPTIONAL BID ITEM #1:HVAC Improvements- Basement ALTERNATIVE 2
1.Replace existing lower-level air handler with one heat pump and one air handler and hot water reheat coil, ducted fresh air requirements. Provide additional electrical, ducting, piping, outdoor pads, and appurtenances to accommodate one heat pump and one air handler.
2.Provide new controls for reheat discharge control, perimeter radiation and fan coil interface.
3.Balance and commission fan coil-heat pump units.

File details come from the government source that posted it. Updated .