This document is a set of specifications for the HVAC replacement design project at the Lakewood Office of the Chequamegon Nicolet National Forest. The key details are:
The project consists of replacing the existing HVAC equipment at the Lakewood Office, including upper and optional lower level air handlers, with a variable refrigerant flow (VRF) heat pump system. The work includes installing new multi-zone VRF fan coil units, air-cooled heat pumps, hydronic piping, ductwork, air ionization units, exhaust fans, and new controls. The project will also add insulation to the attic. The work must comply with the Buy American Act and use USDA bio-preferred products where applicable. Proposals are due by a date to be specified in a future solicitation, and the work must be completed within a timeframe directed by the owner. The government will provide the project drawings, and the contractor is responsible for reproducing and distributing construction documents as required.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REVISED
CHEQUAMEGON NICOLET NATIONAL FOREST SUMMARY OF THE WORK
HVAC REPLACEMENT DESIGN PROJECT – LAKEWOOD OFFICE
Project No. 21017 01 1000 - 1
SECTION 01 1000 – SUMMARY OF THE WORK
PART 1 - GENERAL
1.1 PROJECT LOCATION
A. The Project Site is located at 15085 State Highway 32, Lakewood, Wisconsin.
1.2 DESCRIPTION OF THE WORK
A. The Work of this Project consists, in general, of replacing existing upper level air handlers with two(2) new multi-zone VRF fan coils with 5-ton outdoor air-cooled heat pump and hot water reheat coils at ducted fan coils. Units to be located at existing location(FC-1) and at existing closet(FC-2) with fresh air ducted to the return air plenum with a motorized damper. Providing MERV 13 filters and air ionization units at supply air plenums. Modifying fresh air intake location from area way to duct-mounted above grade; painted galvanized exposed duct with louver mounted below soffit. Moving boiler venting 10 ft from fresh air intake. Replacing existing exhaust fans. Replacing existing electric wall heaters. Replacing electric baseboard heaters at toilets with hydronic baseboards. Routing new insulated ductwork for upper level in attic space with overhead air distribution, while reusing existing ductwork where size complies with new ductwork requirements. Adding door grilles as necessary for proper return air to central return grilles. Removing existing attic exhaust fan in Clerks room and cap opening at ceiling. Providing new controls for reheat discharge control, perimeter radiation and fan coil interface. Balance and commission fan coil-heat pump units.
The scope of the project includes adding attic insulation and modifying the attic access hatch, along with rough and finish work as shown on the plans and described within the specifications.
Optional Bid Items include replacing existing lower level air handler with two(2)new multi-zone fan coils with 3-ton outdoor air-cooled heat pump and hot water reheat coils at ducted fan coils along with fresh air ducted to the return air plenum with a motorized damper. Providing new controls for reheat discharge control, perimeter radiation and fan coil interface. Balance and commission fan coil-heat pump units.
B. Products used for this Work are subject to the Buy American Act and compliance with USDA Bio-Preferred Products.
C. Work shall be complete, including appurtenances, all as shown on the Project Drawings and specified in the Project Manual.
Labor, materials, products, equipment, transportation, services and the like shall be provided in quantities to complete the Project. Singular specifications shall be considered plural where they apply.
1.3 TYPE OF CONTRACT
A. The Work embraced by the Contract Documents shall be constructed under a single prime contract.
1.4 WORK BY OTHERS
A. Items indicated “N.I.C.” on the Project Drawings will be furnished and installed by others not a party to the Prime Contract.
1.5 SUSTAINABLE DESIGN
A. The project will be constructed using cost effective sustainable design and construction practices. Practices such as recycling, separate of waste material, high-efficiency equipment, and use of low-emitting (low VOC) materials and adhesives will be required in the base specification.
Project No. 21017 01 1000 - 2
1.6 WORKING DAY
A. Work on the Project shall be done during normal working hours. If at any time during construction it becomes necessary to accelerate the Work in order to meet completion dates for portions or all of the Work, all trades shall work overtime at no additional cost to the Owner.
1.7 TIME FOR COMPLETION
A. Date of Commencement of the Work: Date to be established by Owner’s written notice to proceed.
B. Date of Substantial Completion: As directed by Owner.
C. Final Completion: The completion of all Work according to the contract Documents, approved by the AE and accepted by the
Owner shall be within 30 days after the Date of Substantial Completion.
D. Exceptions: The only exceptions to the above completion dates are delay or termination because of a national emergency and/or extension of time for completion claimed and allowed according to the General Conditions and/or Supplementary Conditions.
1.8 CLEANING
A. Keep premises free of accumulation of surplus materials and rubbish resulting from operations. Remove all rubbish from premises. No burning of rubbish on premises allowed. Do not throw rubbish from windows or roof. The Contractor shall be responsible for supplying dumpsters, including required recycling dumpsters for waste like cardboard and shall maintain dumpsters throughout the project, until directed by A/E for their removal.
B. Accomplish rubbish removal weekly and additionally as directed by the AE. Keep interior of building free of unattended combustible rubbish at all times. Each sub-contractor shall remove the rubbish generated by his own activities to the dumpsters provided.
C. Remove all tools, equipment, scaffolding and temporary facilities immediately when no longer required for execution of the
Work.
D. Broom clean all floors as construction progresses as necessary to eliminate dirt and trash accumulation. Coordinate and direct the overall cleanliness of the premises.
E. Additionally, immediately prior to final inspection:
1. Clean all surfaces to condition acceptable for immediate occupancy by the Owner.
2. Remove all marks, stains, fingerprints, paint droppings and other foreign matter from all finished surfaces.
3. Clean and polish all hardware.
4. Wash and polish all glass, including mirrors. Replace cracked, scratched or damaged glass items.
5. Vacuum all carpeting.
F. Leave premises clean in all respects, ready for use and occupancy by the Owner without additional work.
G. As used herein, the term “premises” shall include all areas within and outside the construction limits which have been soiled, littered or disturbed in any manner by the Work of the Project.
Project No. 21017 01 1000 - 3
1.9 CONTRACT LIMITS AND PROTECTION OF EXISTING CONDITIONS
A. Use of Site: Limit use of Project site to areas within the Contract limits indicated or implied. Do not disturb portions of Project site beyond areas in which the Work is indicated.
B. Existing property, buildings, walks, curbs, trees, shrubs, lawns, boulevards and the Work of other Contractors, which are damaged or disturbed outside the contract limits, shall be restored to original condition or better. Contractor shall be responsible for the damage or disturbance and shall restore disturbed lawn areas with sod and replace damaged trees and shrubs.
1.10 COORDINATION WITH OCCUPANTS
A. Full Owner Occupancy: Owner will occupy site and building during entire construction period. Cooperate with Owner during construction operations to minimize conflicts and facilitate Owner and public use. Perform the Work so as not to interfere with Owner’s day-to-day operations. Maintain all exits.
1. The Owner will occupy the existing building and site during construction. Use care and caution to protect the safety and welfare of the building occupants. Maintain building exits at all times.
2. Use of Site: Limit use of Project site to work in areas as directed by Owner. Minimize disturbances to portions of Project site beyond areas in which the Work is indicated.
3. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities.
4. Maintain portions of the existing building affected by construction operations in a weather-tight condition throughout construction period. Repair damage caused by construction operations.
5. Notify Owner not less than 72 hours in advance of activities that will affect Owner’s operations.
6. Renovations to the existing building and utility disruptions should be coordinated with the Owner to minimize the impact on Owner’s operations and building occupants.
1.11 WORK RESTRICTIONS
A. On-Site Work Hours: Limit work in the building to normal business working hours of 7:00 a.m. to 5:00 p.m., Monday through Friday, unless otherwise indicated.
B. Nonsmoking Building: Smoking is not permitted within the building or within 25 feet of entrances, operable windows, or outdoor air intakes.
C. Controlled Substances: Use of tobacco products and other controlled substances, within the building or on the work site, is not permitted.
1.12 PROTECTION OF FINISHED EXPOSED FLOORS AND WALKS
D. Exercise care to prevent damage to exposed, finished floor and walk surfaces during the course of construction of the Project.
Remove all spills or smears immediately and sweep floors frequently.
E. Instruct all workmen and deliverymen to exercise caution against accidental damage to the floors and walks by actions such as dropping heavy objects like tools and products, or scratching by sliding objects, or scoring by vibration from metal legs of stand mounted power tools, or permanent discoloration from oil dripping from pipe thread cutting machine, or the like.
F. Avoid using areas with exposed floors and walks as workshops or in any other way which would damage the finished surfaces.
When rooms or areas must be so used, cover floor with 5/8 inch thick plywood panels fastened together and underlain with a protective membrane.
G. Assume responsibility for the floors and walks being in like new condition upon completion of the Project.
1.13 EXPLOSIVES
A. Use of explosives, for any purpose, is prohibited.
Project No. 21017 01 1000 - 4
1.14 CONSTRUCTION DOCUMENTS REQUIRED FOR THE WORK
A. The General Contractor shall be responsible for the costs of plan and project manual reproduction and distribution as required for construction, including those required by the subcontractors and suppliers. Plans and project manual printing can be done by BPI or Advantage Copying & Printing, or PDFs can be downloaded from BPI’s or Advantage Copying & Printing’s webpages by the General Contractor for reproduction at the General Contractor’s expense.
B. The General Contractor shall be responsible for the costs of reproduction and distribution of Construction Bulletins (CBs) issued during the course of construction. The A/E will provide CBs in PDF format to the General Contractor.
C. The General Contractor is not responsible for printing construction document plans, project manuals, or CBs for use by the owner or A/E.
END OF SECTION 01 1000
CHEQUAMEGON NICOLET NATIONAL FOREST SELECTIVE DEMOLITION
Project No. 21017 02 4119 - 1
SECTION 02 4119 – SELECTIVE DEMOLITION
1.1 SUMMARY
A. This Section includes the following:
1. Demolition and removal of selected portions of building or structure.
2. Demolition and removal of selected site elements.
3. Salvage of existing items to be reused or recycled.
1.2 DEFINITIONS
A. Remove: Detach items from existing construction and legally dispose of them off-site, unless indicated to be removed and salvaged or removed and reinstalled.
B. Remove and Salvage: Detach items from existing construction and deliver them to Owner ready for reuse.
C. Remove and Reinstall: Detach items from existing construction, prepare them for reuse, and reinstall them where indicated.
D. Existing to Remain: Existing items of construction that are not to be removed and that are not otherwise indicated to be removed, removed and salvaged, or removed and reinstalled.
1.3 SUBMITTALS
A. Schedule of Selective Demolition Activities: Indicate detailed sequence of selective demolition and removal work, with starting and ending dates for each activity, interruption of utility services, use of elevator and stairs, and locations of temporary partitions and means of egress.
B. Predemolition Photographs or Videotapes: Show existing conditions of adjoining construction and site improvements, including finish surfaces that might be misconstrued as damage caused by selective demolition operations.
C. Landfill Records: Indicate receipt and acceptance of hazardous wastes by a landfill facility licensed to accept hazardous wastes.
1.4 QUALITY ASSURANCE
A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.
B. Standards: Comply with ANSI A10.6 and NFPA 241.
C. Predemolition Conference: Conduct conference at Project site.
Project No. 21017 02 4119 - 2
1.5 PROJECT CONDITIONS
A. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.
B. Notify Architect of discrepancies between existing conditions and Drawings before proceeding with selective demolition.
C. If materials suspected of containing hazardous materials are encountered, do not disturb; immediately notify Owner.
Owner will remove hazardous materials under a separate contract.
D. Storage or sale of removed items or materials on-site is not permitted.
E. Conduct demolition activities so Owner’s occupancy of the building will not be disrupted. Provide Owner with not less than 48 hours notice of activities that may affect the Owner’s operations.
F. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.
1. Maintain fire-protection facilities in service during selective demolition operations.
1.6 WARRANTY
A. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or damaged during selective demolition, by methods and with materials so as not to void existing warranties. Work on existing roofing will be performed by the original installing contractor.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verify that utilities have been disconnected and capped.
B. Survey existing conditions and correlate with requirements indicated to determine extent of selective demolition required.
C. Inventory and record the condition of items to be removed and reinstalled and items to be removed and salvaged.
D. When unanticipated mechanical, electrical, or structural elements that conflict with intended function or design are encountered, investigate and measure the nature and extent of conflict. Promptly submit a written report to Architect.
E. Survey of Existing Conditions: Record existing conditions by use of measured drawings, preconstruction photographs, preconstruction videotapes and templates.
F. Perform surveys as the Work progresses to detect hazards resulting from selective demolition activities.
3.2 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS
A. Existing Services/Systems: Maintain services/systems indicated to remain and protect them against damage during selective demolition operations.
Project No. 21017 02 4119 - 3
B. Service/System Requirements: Locate, identify, disconnect, and seal or cap off indicated utility services and mechanical/electrical systems serving areas to be selectively demolished.
1. Arrange to shut off indicated utilities with utility companies.
2. If services/systems are required to be removed, relocated, or abandoned, before proceeding with selective demolition provide temporary services/systems that bypass area of selective demolition and that maintain continuity of services/systems to other parts of building.
3. Cut off pipe or conduit in walls or partitions to be removed. Cap, valve, or plug and seal remaining portion of pipe or conduit after bypassing.
3.3 PREPARATION
A. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.
B. Temporary Facilities: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.
C. Temporary Shoring: Provide and maintain shoring, bracing, and structural supports as required to preserve stability and prevent movement, settlement, or collapse of construction and finishes to remain, and to prevent unexpected or uncontrolled movement or collapse of construction being demolished.
3.4 SELECTIVE DEMOLITION
A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:
1. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction. Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping, to minimize disturbance of adjacent surfaces.
Temporarily cover openings to remain.
2. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.
3. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations. Maintain fire watch and portable fire-suppression devices during flame-cutting operations.
4. Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.
5. Dispose of demolished items and materials promptly. Comply with requirements in Division 1 Section "Construction Waste Management."
B. Removed and Salvaged Items:
1. Coordinate salvage with Drawings.
2. Clean salvaged items.
3. Pack or crate items after cleaning. Identify contents of containers.
4. Store items in a secure area until delivery to Owner.
5. Transport items to Owner's storage area designated by Owner.
6. Protect items from damage during transport and storage.
C. Removed and Reinstalled Items:
1. Clean and repair items to functional condition adequate for intended reuse. Paint equipment to match new equipment.
Project No. 21017 02 4119 - 4
2. Pack or crate items after cleaning and repairing. Identify contents of containers.
3. Protect items from damage during transport and storage.
4. Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.
D. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by Architect, items may be removed to a suitable, protected storage location during selective demolition and cleaned and reinstalled in their original locations after selective demolition operations are complete.
3.5 DISPOSAL OF DEMOLISHED MATERIALS
A. General: Except for items or materials indicated to be recycled, reused, salvaged, reinstalled, or otherwise indicated to remain Owner's property, remove demolished materials from Project site and legally dispose of them in an EPA-approved landfill.
B. Burning: Do not burn demolished materials.
C. Disposal: Transport demolished materials off Owner's property and legally dispose of them.
3.6 CLEANING
A. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations.
Return adjacent areas to condition existing before selective demolition operations began.
END OF SECTION 02 4119
CHEQUAMEGON NICOLET NATIONAL FOREST ROUGH CARPENTRY
Project No. 21017 06 1000 - 1
SECTION 06 1000 - ROUGH CARPENTRY
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Framing with dimension lumber.
2. Framing with engineered wood products.
3. Wood blocking, cants, and nailers.
4. Wood furring and grounds.
5. Plywood backing panels.
6. Miscellaneous wood blocking.
1.2 DEFINITIONS
A. Boards or Strips: Lumber of less than 2 inches nominal size in least dimension.
B. Dimension Lumber: Lumber of 2 inches nominal size or greater but less than 5 inches nominal size in least dimension.
C. Exposed Framing: Framing not concealed by other construction.
D. OSB: Oriented strand board.
1.3 ACTION SUBMITTALS
A. Product Data: For each type of process and factory-fabricated product. Indicate component materials and dimensions and include construction and application details.
1. Include data for wood-preservative treatment from chemical treatment manufacturer and certification by treating plant that treated materials comply with requirements. Indicate type of preservative used and net amount of preservative retained.
2. Include data for fire-retardant treatment from chemical treatment manufacturer and certification by treating plant that treated materials comply with requirements. Include physical properties of treated materials based on testing by a qualified independent testing agency.
3. For fire-retardant treatments, include physical properties of treated lumber both before and after exposure to elevated temperatures, based on testing by a qualified independent testing agency according to ASTM D 5664.
4. For products receiving a waterborne treatment, include statement that moisture content of treated materials was reduced to levels specified before shipment to Project site.
B. Fastener Patterns: Full-size templates for fasteners in exposed framing.
1.4 INFORMATIONAL SUBMITTALS
A. Material Certificates: For dimension lumber specified to comply with minimum allowable unit stresses. Indicate species and grade selected for each use and design values approved by the ALSC Board of Review.
B. Evaluation Reports: For the following, from ICC-ES:
Project No. 21017 06 1000 - 2
1. Wood-preservative-treated wood.
2. Fire-retardant-treated wood.
3. Engineered wood products.
4. Power-driven fasteners.
5. Post-installed anchors.
6. Metal framing anchors.
1.5 QUALITY ASSURANCE
A. Testing Agency Qualifications: For testing agency providing classification marking for fire-retardant treated material, an inspection agency acceptable to authorities having jurisdiction that periodically performs inspections to verify that the material bearing the classification marking is representative of the material tested.
1.6 DELIVERY, STORAGE, AND HANDLING
A. Stack wood products flat with spacers beneath and between each bundle to provide air circulation. Protect wood products from weather by covering with waterproof sheeting, securely anchored. Provide for air circulation around stacks and under coverings.
PART 2 - PRODUCTS
2.1 WOOD PRODUCTS, GENERAL
A. Lumber: DOC PS 20 and applicable rules of grading agencies indicated. If no grading agency is indicated, comply with the applicable rules of any rules-writing agency certified by the ALSC Board of Review. Grade lumber by an agency certified by the ALSC Board of Review to inspect and grade lumber under the rules indicated.
1. Factory mark each piece of lumber with grade stamp of grading agency.
2. For exposed lumber indicated to receive a stained or natural finish, mark grade stamp on end or back of each piece or omit grade stamp and provide certificates of grade compliance issued by grading agency.
3. Dress lumber, S4S, unless otherwise indicated.
B. Maximum Moisture Content of Lumber: 19 percent
C. Engineered Wood Products: Acceptable to authorities having jurisdiction and for which current model code research or evaluation reports exist that show compliance with building code in effect for Project.
1. Allowable design stresses, as published by manufacturer, shall meet or exceed those indicated. Manufacturer's published values shall be determined from empirical data or by rational engineering analysis and demonstrated by comprehensive testing performed by a qualified independent testing agency.
2.2 WOOD-PRESERVATIVE-TREATED LUMBER
A. Preservative Treatment by Pressure Process: AWPA U1; Use Category UC2 for interior construction not in contact with ground, Use Category UC3b for exterior construction not in contact with ground, and Use Category UC4a for items in contact with ground.
1. Preservative Chemicals: Acceptable to authorities having jurisdiction and containing no arsenic or chromium. Do not use inorganic boron (SBX) for sill plates.
Project No. 21017 06 1000 - 3
2. For exposed items indicated to receive a stained or natural finish, chemical formulations shall not require incising, contain colorants, bleed through, or otherwise adversely affect finishes.
B. Kiln-dry lumber after treatment to a maximum moisture content of 19 percent. Do not use material that is warped or that does not comply with requirements for untreated material.
C. Mark lumber with treatment quality mark of an inspection agency approved by the ALSC Board of Review.
1. For exposed lumber indicated to receive a stained or natural finish, mark end or back of each piece or omit marking and provide certificates of treatment compliance issued by inspection agency.
D. Application: Treat items indicated on Drawings, and the following:
1. Wood cants, nailers, curbs, equipment support bases, blocking, stripping, and similar members in connection with roofing, flashing, vapor barriers, and waterproofing.
2. Wood sills, sleepers, blocking, furring, stripping, and similar concealed members in contact with masonry or concrete.
3. Wood framing and furring attached directly to the interior of below-grade exterior masonry or concrete walls.
4. Wood framing members that are less than 18 inches above the ground in crawlspaces or unexcavated areas.
5. Wood floor plates that are installed over concrete slabs-on-grade.
2.3 FIRE-RETARDANT-TREATED MATERIALS
A. General: Where fire-retardant-treated materials are indicated, use materials complying with requirements in this article, that are acceptable to authorities having jurisdiction, and with fire-test-response characteristics specified as determined by testing identical products per test method indicated by a qualified testing agency.
B. Fire-Retardant-Treated Lumber and Plywood by Pressure Process: Products with a flame spread index of 25 or less when tested according to ASTM E 84, and with no evidence of significant progressive combustion when the test is extended an additional 20 minutes, and with the flame front not extending more than 10.5 feet beyond the centerline of the burners at any time during the test.
1. Exterior Type: Treated materials shall comply with requirements specified above for fire-retardant-treated lumber and plywood by pressure process after being subjected to accelerated weathering according to ASTM D 2898. Use for exterior locations and where indicated.
2. Interior Type A: Treated materials shall have a moisture content of 28 percent or less when tested according to ASTM D 3201 at 92 percent relative humidity. Use where exterior type is not indicated.
C. Kiln-dry lumber after treatment to a maximum moisture content of 19 percent. Kiln-dry plywood after treatment to a maximum moisture content of 15 percent.
D. Identify fire-retardant-treated wood with appropriate classification marking of qualified testing agency.
E. Application: Treat items indicated on Drawings, and the following:
1. Framing for raised platforms.
2. Framing for stages.
3. Concealed blocking.
4. Framing for non-load-bearing partitions.
5. Framing for non-load-bearing exterior walls.
6. Roof construction.
7. Plywood backing panels.
Project No. 21017 06 1000 - 4
2.4 DIMENSION LUMBER FRAMING
A. Non-Load-Bearing Interior Partitions: Construction or No. 2 grade of any species.
B. Framing Other Than Non-Load-Load-Bearing Interior Partitions: Construction or No. 2 grade of any of the following species.
1. Hem-fir (north); NLGA.
2. Southern pine; SPIB.
3. Douglas fir-larch; WCLIB or WWPA.
4. Mixed southern pine; SPIB.
5. Spruce-pine-fir; NLGA.
6. Douglas fir-south; WWPA.
7. Hem-fir; WCLIB or WWPA.
8. Douglas fir-larch (north); NLGA.
9. Spruce-pine-fir (south); NeLMA, WCLIB, or WWPA.:
C. Framing Other Than Non-Load-Bearing Interior Partitions: Any species and grade with a modulus of elasticity of at least 1,400,000 psi and an extreme fiber stress in bending of at least 850 psi for 2-inch nominal thickness and 12-inch nominal width for single-member use.
D. Exposed Framing Indicated to Receive a Stained or Natural Finish: Hand-select material for uniformity of appearance and freedom from characteristics, on exposed surfaces and edges, that would impair finish appearance, including decay, honeycomb, knot-holes, shake, splits, torn grain, and wane.
1. Species and Grade: As indicated above.
2.5 ENGINEERED WOOD PRODUCTS
A. Source Limitations: Obtain each type of engineered wood product from single source from a single manufacturer.
B. Laminated-Veneer Lumber: Structural composite lumber made from wood veneers with grain primarily parallel to member lengths, evaluated and monitored according to ASTM D 5456 and manufactured with an exterior-type adhesive complying with ASTM D 2559.
1. Extreme Fiber Stress in Bending, Edgewise: 2600 psi for 12-inch nominal-depth members.
2. Modulus of Elasticity, Edgewise: 1,800,000 psi.
C. Parallel-Strand Lumber: Structural composite lumber made from wood strand elements with grain primarily parallel to member lengths, evaluated and monitored according to ASTM D 5456 and manufactured with an exterior-type adhesive complying with ASTM D 2559.
1. Extreme Fiber Stress in Bending, Edgewise: 1700 psi for 2x6 or smaller; 2250 psi for 2x8.
2. Modulus of Elasticity, Edgewise: 1,300,000 psi for 2x6 or smaller; 1,500,000 psi for 2x8.
2.6 MISCELLANEOUS LUMBER
A. General: Provide miscellaneous lumber indicated and lumber for support or attachment of other construction, including the following:
1. Blocking.
2. Nailers.
3. Utility shelving.
B. Dimension Lumber Items: Construction or No. 2
Project No. 21017 06 1000 - 5
C. Utility Shelving: Lumber with 19 percent maximum moisture content of any of the following species and grades:
1. Eastern white pine, Idaho white, lodgepole, ponderosa, or sugar pine; Standard or No. 3 Common grade;
NeLMA, NLGA, WCLIB, or WWPA.
2. Mixed southern pine or southern pine; No. 1 grade; SPIB.
3. Hem-fir or hem-fir (north); Select Merchantable or No. 1 Common grade; NLGA, WCLIB, or WWPA.
4. Spruce-pine-fir (south) or spruce-pine-fir; Select Merchantable or No. 1 Common grade; NeLMA, NLGA, WCLIB, or WWPA.
D. Concealed Boards: 19 percent maximum moisture content and any of the following species and grades:
1. Mixed southern pine or southern pine; No. 2 grade; SPIB.
2. Hem-fir or hem-fir (north); Construction or No. 2 Common grade; NLGA, WCLIB, or WWPA.
3. Spruce-pine-fir (south) or spruce-pine-fir; Construction or No. 2 Common grade; NeLMA, NLGA, WCLIB, or
WWPA.
E. For blocking not used for attachment of other construction, Utility, Stud, or No. 3 grade lumber of any species may be used provided that it is cut and selected to eliminate defects that will interfere with its attachment and purpose.
F. For blocking and nailers used for attachment of other construction, select and cut lumber to eliminate knots and other defects that will interfere with attachment of other work.
G. For furring strips for installing plywood or hardboard paneling, select boards with no knots capable of producing bent-over nails and damage to paneling.
2.7 PLYWOOD BACKING PANELS
A. Equipment Backing Panels: Plywood, DOC PS 1, Exterior, A-C in thickness indicated or, if not indicated, not less than 1/2-inch nominal thickness.
2.8 FASTENERS
A. General: Fasteners shall be of size and type indicated and shall comply with requirements specified in this article for material and manufacture.
1. Where rough carpentry is exposed to weather, in ground contact, pressure-preservative treated, or in area of high relative humidity, provide fasteners with hot-dip zinc coating complying with ASTM A 153/A 153M or Type 304 stainless steel.
B. Nails, Brads, and Staples: ASTM F 1667.
C. Power-Driven Fasteners: Fastener systems with an evaluation report acceptable to authorities having jurisdiction, based on ICC-ES AC70.
D. Post-Installed Anchors: Fastener systems with an evaluation report acceptable to authorities having jurisdiction, based on ICC-ES AC193 or ICC-ES AC308 as appropriate for the substrate.
1. Material: Carbon-steel components, zinc plated to comply with ASTM B 633, Class Fe/Zn 5.
2. Material: Stainless steel with bolts and nuts complying with ASTM F 593 and ASTM F 594, Alloy Group 1 or 2.
Project No. 21017 06 1000 - 6
2.9 METAL FRAMING ANCHORS
A. Allowable design loads, as published by manufacturer, shall meet or exceed those of products of indicated.
Manufacturer's published values shall be determined from empirical data or by rational engineering analysis and demonstrated by comprehensive testing performed by a qualified independent testing agency. Framing anchors shall be punched for fasteners adequate to withstand same loads as framing anchors.
B. Galvanized-Steel Sheet: Hot-dip, zinc-coated steel sheet complying with ASTM A 653/A 653M, G60 coating designation.
1. Use for interior locations unless otherwise indicated.
C. Hot-Dip, Heavy-Galvanized Steel Sheet: ASTM A 653/A 653M; structural steel (SS), high-strength low-alloy steel Type A (HSLAS Type A), or high-strength low-alloy steel Type B (HSLAS Type B); G185 coating designation; and not less than 0.036 inch thick.
1. Use for wood-preservative-treated lumber and where indicated.
D. Hold-Downs: Brackets for bolting to wall studs and securing to foundation walls with anchor bolts or to other hold-downs with threaded rods and designed with first of two bolts placed seven bolt diameters from reinforced base as indicated.
2.10 MISCELLANEOUS MATERIALS
A. Sill-Sealer Gaskets: Closed-cell neoprene foam, 1/4 inch thick, selected from manufacturer's standard widths to suit width of sill members indicated.
B. Flexible Flashing: Composite, self-adhesive, flashing product consisting of a pliable, butyl rubber or rubberized-asphalt compound, bonded to a high-density polyethylene film, aluminum foil, or spunbonded polyolefin to produce an overall thickness of not less than 0.025 inch.
C. Adhesives for Gluing Furring and Sleepers to Concrete or Masonry: Formulation complying with ASTM D 3498 that is approved for use indicated by adhesive manufacturer.
1. Use adhesives that have a VOC content of 70 g/L or less when calculated according to 40 CFR 59, Subpart D
(EPA Method 24).
D. Water-Repellent Preservative: NWWDA-tested and -accepted formulation containing 3-iodo-2-propynyl butyl carbamate, combined with an insecticide containing chloropyrifos as its active ingredient.
PART 3 - EXECUTION
3.1 INSTALLATION, GENERAL
A. Framing Standard: Comply with AF&PA's WCD 1, "Details for Conventional Wood Frame Construction," unless otherwise indicated.
B. Framing with Engineered Wood Products: Install engineered wood products to comply with manufacturer's written instructions.
C. Set rough carpentry to required levels and lines, with members plumb, true to line, cut, and fitted. Fit rough carpentry accurately to other construction. Locate furring, nailers, blocking, grounds, and similar supports to comply with requirements for attaching other construction.
Project No. 21017 06 1000 - 7
D. Install plywood backing panels by fastening to studs; coordinate locations with utilities requiring backing panels. Install fire-retardant-treated plywood backing panels with classification marking of testing agency exposed to view.
E. Install metal framing anchors to comply with manufacturer's written instructions. Install fasteners through each fastener hole.
F. Install sill sealer gasket to form continuous seal between sill plates and foundation walls.
G. Do not splice structural members between supports unless otherwise indicated.
H. Provide blocking and framing as indicated and as required to support facing materials, fixtures, specialty items, and trim.
1. Provide metal clips for fastening gypsum board or lath at corners and intersections where framing or blocking does not provide a surface for fastening edges of panels. Space clips not more than 16 inches o.c.
I. Provide fire blocking in furred spaces, stud spaces, and other concealed cavities as indicated and as follows:
1. Fire block furred spaces of walls, at each floor level, at ceiling, and at not more than 96 inches o.c. with solid wood blocking or noncombustible materials accurately fitted to close furred spaces.
2. Fire block concealed spaces of wood-framed walls and partitions at each floor level, at ceiling line of top story, and at not more than 96 inches o.c. Where fire blocking is not inherent in framing system used, provide closely fitted solid wood blocks of same width as framing members and 2-inch nominalthickness.
3. Fire block concealed spaces between floor sleepers with same material as sleepers to limit concealed spaces to not more than 100 sq. ft. and to solidly fill space below partitions.
4. Fire block concealed spaces behind combustible cornices and exterior trim at not more than 20 feeto.c.
J. Sort and select lumber so that natural characteristics do not interfere with installation or with fastening other materials to lumber. Do not use materials with defects that interfere with function of member or pieces that are too small to use with minimum number of joints or optimum joint arrangement.
K. Comply with AWPA M4 for applying field treatment to cut surfaces of preservative-treated lumber.
1. Use inorganic boron for items that are continuously protected from liquid water.
2. Use copper naphthenate for items not continuously protected from liquid water.
L. Where wood-preservative-treated lumber is installed adjacent to metal decking, install continuous flexible flashing separator between wood and metal decking.
M. Securely attach rough carpentry work to substrate by anchoring and fastening as indicated, complying with the following:
1. Table 2304.9.1, "Fastening Schedule," in ICC's International Building Code (IBC).
N. Use steel common nails unless otherwise indicated. Select fasteners of size that will not fully penetrate members where opposite side will be exposed to view or will receive finish materials. Make tight connections between members. Install fasteners without splitting wood. Drive nails snug but do not countersink nail heads unless otherwise indicated.
O. For exposed work, arrange fasteners in straight rows parallel with edges of members, with fasteners evenly spaced, and with adjacent rows staggered.
1. Use finishing nails unless otherwise indicated. Countersink nail heads and fill holes with wood filler.
Project No. 21017 06 1000 - 8
3.2 WOOD BLOCKING, AND NAILER INSTALLATION
A. Install where indicated and where required for attaching other work. Form to shapes indicated and cut as required for true line and level of attached work. Coordinate locations with other work involved.
B. Attach items to substrates to support applied loading. Recess bolts and nuts flush with surfaces unless otherwise indicated.
3.3 WOOD FURRING INSTALLATION
A. Install level and plumb with closure strips at edges and openings. Shim with wood as required for tolerance of finish work.
3.4 WALL AND PARTITION FRAMING INSTALLATION
A. General: Provide single bottom plate and double top plates using members of 2-inch nominal thickness whose widths equal that of studs, except single top plate may be used for non-load-bearing partitions. Fasten plates to supporting construction unless otherwise indicated.
B. Construct corners and intersections with three or more studs, except that two studs may be used for interior non-load-bearing partitions.
C. Frame openings with multiple studs and headers. Provide nailed header members of thickness equal to width of studs.
Support headers on jamb studs.
1. For non-load-bearing partitions, provide double-jamb studs and headers not less than 4-inch nominaldepth for openings 36 inches and less in width, 6-inch nominal depth for openings 36 to 72 inches in width, 8-inch nominal depth for openings 72 to 120 inches in width, and not less than 10-inch nominal depth for openings 10 to 12 feet in width.
2. For load-bearing walls, as indicated.
3.5 PROTECTION
A. Protect wood that has been treated with inorganic boron (SBX) from weather. If, despite protection, inorganic boron-treated wood becomes wet, apply EPA-registered borate treatment. Apply borate solution by spraying to comply with EPA-registered label.
B. Protect rough carpentry from weather. If, despite protection, rough carpentry becomes wet enough that moisture content exceeds that specified apply EPA-registered borate treatment. Apply borate solution by spraying to comply with EPA-registered label.
END OF SECTION 06 1000
CHEQUAMEGON NICOLET NATIONAL FOREST THERMAL INSULATION
Project No. 21017 07 2100 - 1
SECTION 07 2100 – THERMAL INSULATION
1.1 SUMMARY
A. This Section includes the following:
1. Glass-fiber blanket insulation.
2. Loose-fill insulation.
1.2 SUBMITTALS
A. Product Data: For each type of product indicated.
B. Product test reports.
C. Research/Evaluation Reports: For foam-plastic insulation.
1.3 QUALITY ASSURANCE
A. Retain ASTM test method below based on product and kind of fire-resistance characteristic specified for each product in Part 2. Fire-Test-Response Characteristics: Provide insulation and related materials with the fire-test-response characteristics indicated, as determined by testing identical products per ASTM E 84 for surface-burning characteristics, by UL or another testing and inspecting agency acceptable to authorities having jurisdiction. Identify materials with appropriate markings of applicable testing and inspecting agency.
B. Recycled Content: Provide glass-fiber insulation with recycled content so postconsumer recycled content plus one-half of preconsumer recycled content constitutes a minimum of 25 percent by weight.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. In other Part 2 articles where titles below introduce lists, the following requirements apply to product selection:
1. Manufacturers: Subject to compliance with requirements, provide products by one of the manufacturers specified.
2.2 GLASS-FIBER BLANKET INSULATION
A. Products must meet the Buy American Act requirements and comply with USDA Bio-Preferred Products.
1. Basis-of-Design Product: Owens Corning Eco Touch fiberglass blanket insulation.
2. Or Approved Equal.
CHEQUAMEGON NICOLET NATIONAL FOREST THERMAL INSULATION
Project No. 21017 07 2100 - 2
B. Unfaced, Glass-Fiber Batt Insulation: ASTM C665, Type I (blankets without membrane facing): consisting of fibers;
with maximum flame-spread and smoke-developed indexes of 25 and 50, respectively; passing ASTM E 136 for combustion characteristics.
C. Unfaced, Glass-Fiber Sound Attenuation Batt Insulation: ASTM C 665, Type 1, with maximum flame spread and smoke developed indexes of 25 and 50 respectively, when tested in accordance with ASTM E 84, passing ASTM E 136 for combustion characteristics.
D. Foil-faced, Glass-Fiber Blanket Insulation: ASTM C 665, Type III, Class B; consisting of fibers; with maximum flame-spread and smoke-developed indexes of 25 and 50, respectively; passing ASTM E 136 for combustion characteristics.
2.3 LOOSE-FILL INSULATION
A. Glass-Fiber Loose-Fill Insulation: ASTM C 764, Type I for pneumatic application or Type II for poured application; with maximum flame-spread and smoke-developed indexes of 5, per ASTM E 84.
B. Products must meet the Buy American Act requirements and comply with USDA Bio-Preferred Products.
1. Basis-of-Design Product: Thermolok loosefill cellulose insulation.
2. Or approved equal
2.1 AUXILIARY INSULATING MATERIALS
A. Single-Component Nonsag Urethane Sealant: ASTM C 920, Type I, Grade NS, Class 25, Use NT related to exposure, and Use O related to vapor-retarder-related substrates.
B. Adhesive for Bonding Insulation: Product with demonstrated capability to bond insulation securely to substrates indicated without damaging insulation and substrates.
C. Impaling Pins: Impaling pins shall be self-adhering wire pins with sheet metal retaining clips and protective rubber tips.
Adhesive for pins shall be as recommended by the pin manufacturer.
D. Joint Tape: Compatible for type of insulation board facing used.
2.2 INSULATION FASTENERS
A. Adhesively Attached, Spindle-Type Anchors: Plate formed from perforated galvanized carbon-steel sheet, 0.030 inch thick by 2 inches square, welded to projecting copper-coated steel spindle 0.105 inch in diameter and of length capable of holding insulation of thickness indicated securely in position with 1-1/2-inch square or diameter self-locking washers complying with the following requirements:
1. Insulation-Retaining Washers: Self-locking washers formed from 0.016-inch thick galvanized steel sheet, with beveled edge for increased stiffness.
2. Where anchors are located in attic spaces Insert location, protect ends with capped self-locking washers incorporating a spring steel insert to ensure permanent retention of cap.
B. Anchor Adhesive: Product with demonstrated capability to bond insulation anchors securely to substrates indicated without damaging insulation, fasteners, and substrates.
CHEQUAMEGON NICOLET NATIONAL FOREST THERMAL INSULATION
Project No. 21017 07 2100 - 3
PART 3 - EXECUTION
3.1 INSTALLATION, GENERAL
A. Comply with insulation manufacturer's written instructions applicable to products and application indicated.
B. Install insulation that is undamaged, dry, and unsoiled and that has not been left exposed at any time to ice, rain, and snow.
C. Extend insulation in thickness indicated to envelop entire area to be insulated. Cut and fit tightly around obstructions and fill voids with insulation. Remove projections that interfere with placement.
D. Water-Piping Coordination: If water piping is located within insulated exterior walls, coordinate location of piping to ensure that it is placed on warm side of insulation and insulation encapsulates piping.
E. For preformed insulating units, provide sizes to fit applications indicated and selected from manufacturer's standard thicknesses, widths, and lengths. Apply single layer of insulation units to produce thickness indicated unless multiple layers are otherwise shown or required to make up total thickness.
3.2 INSTALLATION OF GENERAL BUILDING INSULATION
A. Apply insulation units to substrates by method indicated, complying with manufacturer's written instructions. If no specific method is indicated, bond units to substrate with adhesive or use mechanical anchorage to provide permanent placement and support of units.
B. Glass-Fiber Insulation: Install insulation in cavities formed by framing members according to the following requirements:
1. Use insulation widths and lengths that fill the cavities formed by framing members. If more than one length is required to fill cavity, provide lengths that will produce a snug fit between ends.
2. Place insulation in cavities formed by framing members to produce a friction fit between edges of insulation and adjoining framing members.
3. Maintain 3-inch clearance of insulation around recessed lighting fixtures.
4. Install eave ventilation troughs between roof framing members in insulated attic spaces at vented eaves.
5. For metal-framed wall cavities where cavity heights exceed 96 inches, support unfaced blankets mechanically and support faced blankets by taping flanges of insulation to flanges of metal studs.
6. For wood framed construction, install blankets according to ASTM C 1320 and as follows:
a. With faced blankets having stapling flanges, secure insulation by inset, stapling flanges to sides of framing members.
b. With faced blankets having staling flanges, lap blanket flange over flange of adjacent blanket to maintain continuity of vapor retarder once finish material is installed over it.
C. Install blown insulation by machine blowing, to comply with ASTM C 1015. Level horizontal applications to uniform thickness as indicated, lightly settle to uniform density, but do not compact excessively.
D. Miscellaneous Voids: Install insulation in miscellaneous voids and cavity spaces where required to prevent gaps in insulation using the following materials:
1. Loose-Fill Insulation: Compact to approximately 40 percent of normal maximum volume equaling a density of approximately 2.5 lb/cu. ft.
END OF SECTION 07 2100
CHEQUAMEGON NICOLET NATIONAL FOREST THERMAL INSULATION
Project No. 21017 07 2100 - 4
THIS PAGE INTENTIONALLY LEFT BLANK
CHEQUAMEGON NICOLET NATIONAL FOREST HVAC
Project No. 21017 23 0000 - 1
SECTION 23 00 00 – HEATING, VENTILATING AND AIR CONDITIONING
1.01 DESCRIPTION
A. Work Included: Provide heating, ventilating, and air conditioning systems where shown on the Drawings, as specified herein, and as needed for a complete and proper installation including, but not necessarily limited to:
1. Variable refrigerant flow(VRF) heat pump system.
2. Indoor Fan coil units, controls, and related items;
3. Air-cooled VRF heat pump condensing units;
4. Bi-polar air ionization units;
5. Hydronic hot water piping, condensate and refrigerant piping;
7. Supply, return and fresh air ductwork system with grilles, diffusers, registers, and ductwork accessories;
8. Exhaust systems including dampers, grilles, registers, louvers, controls, and related items;
9. Temperature control systems including low-voltage wiring, relays, network controls, controllers, thermostats, control dampers and damper operators, and related items;
10. Acoustical and thermal insulation of ductwork and piping;
11. Electric Heat;
12. Demolition and Remodeling;
13. Test, adjust, and balance air and water systems;
14. O&M manuals, warranty work and Owner instructions.
B. Related Work:
1. Documents affecting work of this Section include, but are not necessarily limited to, General Conditions, Supplementary Conditions, and Sections in Division 1 of these Specifications.
2. Equipment structural supports, insulated curbs etc.
3. Condensate piping from condensate pans and collection legs to open site drains.
4. Roofing, exterior wall and related exterior HVAC openings shall be caulked, sealed and patched by the General
Construction Trade.
5. Cutting and patching openings for HVAC work in existing walls, floors, roof, ceiling, etc., will be provided by the
General Construction Trades.
C. Work of Other Sections:
1. Electrical line voltage wiring (110 volts and greater). The HVAC trade will furnish wiring diagrams to Electrical trade.
2. Motor starters not provided integral with HVAC equipment shall be provided by the Electrical trade.
3. Floor drains and open site drains by Plumbing trade.
4. Painting HVAC equipment will be the responsibility of General…