Att 3. Lakewood HVAC Construction Plans_WITH ALTERNATIVES 240528.pdf
PDF 11 MB Posted
- Solicitation number
- 12445524Q0044
- Issued by
-
Department of Agriculture Forest Service
About this file
This document appears to be the Construction Plans for the HVAC Replacement project at the Lakewood location of the Chequamegon-Nicolet National Forest, which is the subject of Solicitation Number 12445524Q0044. The Construction Plans outline the technical specifications and requirements for the HVAC system replacement, including system capacity, ductwork, controls, and alternative HVAC system options. The project is being solicited by the U.S. Department of Agriculture Forest Service. The document includes detailed drawings, equipment schedules, and installation instructions. No specific response dates, award information, pricing terms, or set-asides are provided in this attachment.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
mbeuning Text Box Plan set updated May 24, 2024 with Alternatives. See Sheet H2.0.
SECURE
OFFICE 4
OFFICE 3
STORAGE
CONFERENCE
LUNCH ROOM
MECH.
JAN.
OFFICE 1 OFFICE 2
HALL
STAIR A
STAIR BV
V
1/4" = 1'-0"1 BASEMENT PLAN - HVAC DEMOLITION
DRAWN
DESIGNER
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO. REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
Chequamegon-Nicolet National Forest
Ranger District
EASTERN DISTRICT
17 Applegate Court, Suite 200
Madison, WI 53713
Phone: (608) 288-9260 email: hein@heinengrp.com
ZONE 7BB & 4BB
Not functional Two Thermostats
7 DISCONNECT AND PATCH WALL
PATCH WALL IF NOT BEING
REPLACED
MEN
WOMEN
GENERAL OFFICE
GENERAL OFFICE
CORRIDOR
STAIR A
LOBBY
RANGERS OFFICE
GENERAL OFFICE
CLERKS
STAIR B
GENERAL OFFICE
1/4" = 1'-0"1 FIRST FLOOR PLAN - HVAC DEMOLITION
DESIGNER
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO. REVISION / ISSUE
OFSHEET
9 BASEBOARD THERMOSTAT TO REMAIN
6. CONTRACTOR MAY OPEN UP GABLE ENDS OF BUILDING TO REMOVE DUCT AND HVAC EQUIPMENT.
REPAIR IN KIND
OFFICE 4 OFFICE 3
STORAGE
CONFERENCE
LUNCH ROOM
MECH.
JAN.
OFFICE 1 OFFICE 2
HALL
STAIR A
STAIR BV
1/4" = 1'-0"1 BASEMENT PLAN - HVAC DUCTWORK
DESIGNER
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO. REVISION / ISSUE
OFSHEET
6. DETERMINE EXISTING BASE BOARD HEAT ZONES. USE INFORMATION TO DETERMINE WHICH
BASE BOARD HEATERS NEED TO BE ZONE WITH WHICH FAN COIL OR REMAIN INDEPENDENT
ZONES. WORK WITH COR TO DETERMINE ZONING.
RELOCATE THERMOSTAT
STORAGE
CONFERENCE
LUNCH ROOM
MECH.
JAN.
OFFICE 1 OFFICE 2
HALL
STAIR A
STAIR BV
1/4" = 1'-0"1 BASEMENT PLAN - HVAC PIPING
DESIGNER
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO. REVISION / ISSUE
OFSHEET
2 PROVIDE PUMP TO TWO NEW BASEBOARDS IN BATHROOMS. COMBINE BOTH BB TO MAKE SEPARATE ZONE2
GENERAL OFFICE
GENERAL OFFICE
CORRIDOR
STAIR A
LOBBY
RANGERS OFFICE
GENERAL OFFICE
CLERKS
STAIR B
GENERAL OFFICE
1/2" PLYWOOD-PAINTED WHITE
5 LAYERS OF 2" RIGID INSULATION
(R 50 MIN REQUIRED)
1X4 TRIM TO SUPPORT ACCESS HATCH
PAINTED WHITE
1/2" PLYWOOD
ADDED BLOWN-IN
INSULATION
EXISTING
BLOWN-IN
INSULATION
1/4" = 1'-0"1 FIRST FLOOR PLAN - HVAC
DESIGNER
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO. REVISION / ISSUE
OFSHEET
1/2" = 1'-0"3 FAN COIL FC-1 ELEVATION
1/2" = 1'-0"4 FAN COIL FC-2 ELEVATION
N.T.S.2 ATTIC HATCH DETAIL
6. DETERMINE EXISTING BASE BOARD HEAT ZONES. USE INFORMATION TO DETERMINE WHICH
BASE BOARD HEATERS NEED TO BE ZONE WITH WHICH FAN COIL OR REMAIN INDEPENDENT
ZONES. WORK WITH COR TO DETERMINE ZONING.
FC1 PROVIDE AVERAGING THERMOSTAT
FC2 PROVIDE THERMOSAT
151 TERMOSTAT FOR TWO BATHROOM BASEBOARD HEATERS151
151151 mbeuning Callout Move FC2 and all associated equipment to other side of closet (opposite as shown). Extend duct and pipe as necessary. Provide partition between FC2 and others side of closet.
VRF HEAT PUMP CONTROL SCHEMATIC REFRIGERANT PIPING SCHEMATIC
DESIGNER
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO. REVISION / ISSUE
OFSHEET
PROVIDE PUMP AND THERMOSTAT
mbeuning Rectangle mbeuning Typewritten Text
ALTERNATIVE 1 (BASE BID AND OPTIONAL BID ITEM)
Provide two heat pumps (3 ton and 2 ton) instead of one variable refrigerant flow heat pump for HP-1. Provide two heat pumps (2 ton and 1 ton) instead of one variable refrigerant flow heat pump for HP-2. Heat pumps shall meet same general requirements as HP-1 and HP-2 above but are NOT required to be variable refrigerant flow.
Variable speed compressor is required. Heat pump shall function down to 20 degrees F or colder. They may be placed on a pad versus wall hung. Provide pad. Provide two air handlers instead of two fan coil units for FC-1 and FC-2 (capacity to match heat pumps). Provide two air handlers instead of two fan coil units for FC-3 and FC-4 (capacity to match heat pumps). Air handlers shall meet same general requirements as FC-1 through FC-4 but are NOT required to be variable refrigerant flow. Air handlers shall have ECM motor and be variable speed. Provide hot water reheat coils. Provide additional electrical, ducting, piping, outdoor pads, and appurtenances to accommodate two heat pumps and two air handlers.
ALTERNATIVE 2 (OPTIONAL BID ITEM)
Provide one heat pump (2 ton) and matched air handler unit. In lieu of FC 4, duct 100 cfm to Office 3 and Secure Office 4. Provide no air to storage room. Provide supply air to other rooms as identified on plan. Heat pump shall be variable speed and air handler shall have ECM and be variable speed. Provide hot water reheat coil. Provide outdoor pad. Provide additional electrical, ducting, piping, outdoor pads, and appurtenances to accommodate one heat pump and air handler. Contractor shall verify duct can be installed to accommodate Alternative 2.
STORAGE
CONFERENCE
LUNCH ROOM
MECH.
JAN.
OFFICE 1 OFFICE 2
HALL
STAIR A
STAIR BV
1/4" = 1'-0"1 BASEMENT PLAN - ELECTRICAL
DESIGNER
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO. REVISION / ISSUE
OFSHEET
GENERAL OFFICE
GENERAL OFFICE
CORRIDOR
STAIR A
LOBBY
RANGERS OFFICE
GENERAL OFFICE
CLERKS
STAIR B
GENERAL OFFICE
1/4" = 1'-0"1 FIRST FLOOR PLAN - ELECTRICAL
DESIGNER
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO. REVISION / ISSUE
OFSHEET
| H1.0 - Basement Plan - HVAC Demolition |
| H1.1 - First Floor Plan - HVAC Demolition |
| H1.2 - Basement Plan - HVAC Ductwork |
| H1.3 - Basement Plan - HVAC Piping |
| H1.4 - First Floor Plan - HVAC |
| H2.0 - HVAC Schedules & Details |
| E1.0 - Basement Plan - Electrical |
| E1.1 - First Floor Plan - Electrical |