Att 3. Lakewood HVAC Construction Plans_WITH ALTERNATIVES 240528.pdf

PDF 11 MB Posted

Attached to
Chequamegon-Nicolet National Forest-Lakewood HVAC Replacement
Solicitation number
12445524Q0044
Issued by

About this file

This document appears to be the Construction Plans for the HVAC Replacement project at the Lakewood location of the Chequamegon-Nicolet National Forest, which is the subject of Solicitation Number 12445524Q0044. The Construction Plans outline the technical specifications and requirements for the HVAC system replacement, including system capacity, ductwork, controls, and alternative HVAC system options. The project is being solicited by the U.S. Department of Agriculture Forest Service. The document includes detailed drawings, equipment schedules, and installation instructions. No specific response dates, award information, pricing terms, or set-asides are provided in this attachment.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

mbeuning Text Box Plan set updated May 24, 2024 with Alternatives. See Sheet H2.0.

SECURE

OFFICE 4

OFFICE 3

STORAGE

CONFERENCE

LUNCH ROOM

MECH.

JAN.

OFFICE 1 OFFICE 2

HALL

STAIR A

STAIR BV

V

1/4" = 1'-0"1 BASEMENT PLAN - HVAC DEMOLITION

DRAWN

DESIGNER

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO. REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

Chequamegon-Nicolet National Forest

Ranger District

EASTERN DISTRICT

17 Applegate Court, Suite 200

Madison, WI 53713

Phone: (608) 288-9260 email: hein@heinengrp.com

ZONE 7BB & 4BB

Not functional Two Thermostats

7 DISCONNECT AND PATCH WALL

PATCH WALL IF NOT BEING

REPLACED

MEN

WOMEN

GENERAL OFFICE

GENERAL OFFICE

CORRIDOR

STAIR A

LOBBY

RANGERS OFFICE

GENERAL OFFICE

CLERKS

STAIR B

GENERAL OFFICE

1/4" = 1'-0"1 FIRST FLOOR PLAN - HVAC DEMOLITION

DESIGNER

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO. REVISION / ISSUE

OFSHEET

9 BASEBOARD THERMOSTAT TO REMAIN

6. CONTRACTOR MAY OPEN UP GABLE ENDS OF BUILDING TO REMOVE DUCT AND HVAC EQUIPMENT.

REPAIR IN KIND

OFFICE 4 OFFICE 3

STORAGE

CONFERENCE

LUNCH ROOM

MECH.

JAN.

OFFICE 1 OFFICE 2

HALL

STAIR A

STAIR BV

1/4" = 1'-0"1 BASEMENT PLAN - HVAC DUCTWORK

DESIGNER

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO. REVISION / ISSUE

OFSHEET

6. DETERMINE EXISTING BASE BOARD HEAT ZONES. USE INFORMATION TO DETERMINE WHICH

BASE BOARD HEATERS NEED TO BE ZONE WITH WHICH FAN COIL OR REMAIN INDEPENDENT

ZONES. WORK WITH COR TO DETERMINE ZONING.

RELOCATE THERMOSTAT

STORAGE

CONFERENCE

LUNCH ROOM

MECH.

JAN.

OFFICE 1 OFFICE 2

HALL

STAIR A

STAIR BV

1/4" = 1'-0"1 BASEMENT PLAN - HVAC PIPING

DESIGNER

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO. REVISION / ISSUE

OFSHEET

2 PROVIDE PUMP TO TWO NEW BASEBOARDS IN BATHROOMS. COMBINE BOTH BB TO MAKE SEPARATE ZONE2

GENERAL OFFICE

GENERAL OFFICE

CORRIDOR

STAIR A

LOBBY

RANGERS OFFICE

GENERAL OFFICE

CLERKS

STAIR B

GENERAL OFFICE

1/2" PLYWOOD-PAINTED WHITE

5 LAYERS OF 2" RIGID INSULATION

(R 50 MIN REQUIRED)

1X4 TRIM TO SUPPORT ACCESS HATCH

PAINTED WHITE

1/2" PLYWOOD

ADDED BLOWN-IN

INSULATION

EXISTING

BLOWN-IN

INSULATION

1/4" = 1'-0"1 FIRST FLOOR PLAN - HVAC

DESIGNER

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO. REVISION / ISSUE

OFSHEET

1/2" = 1'-0"3 FAN COIL FC-1 ELEVATION

1/2" = 1'-0"4 FAN COIL FC-2 ELEVATION

N.T.S.2 ATTIC HATCH DETAIL

6. DETERMINE EXISTING BASE BOARD HEAT ZONES. USE INFORMATION TO DETERMINE WHICH

BASE BOARD HEATERS NEED TO BE ZONE WITH WHICH FAN COIL OR REMAIN INDEPENDENT

ZONES. WORK WITH COR TO DETERMINE ZONING.

FC1 PROVIDE AVERAGING THERMOSTAT

FC2 PROVIDE THERMOSAT

151 TERMOSTAT FOR TWO BATHROOM BASEBOARD HEATERS151

151151 mbeuning Callout Move FC2 and all associated equipment to other side of closet (opposite as shown). Extend duct and pipe as necessary. Provide partition between FC2 and others side of closet.

VRF HEAT PUMP CONTROL SCHEMATIC REFRIGERANT PIPING SCHEMATIC

DESIGNER

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO. REVISION / ISSUE

OFSHEET

PROVIDE PUMP AND THERMOSTAT

mbeuning Rectangle mbeuning Typewritten Text

ALTERNATIVE 1 (BASE BID AND OPTIONAL BID ITEM)

Provide two heat pumps (3 ton and 2 ton) instead of one variable refrigerant flow heat pump for HP-1. Provide two heat pumps (2 ton and 1 ton) instead of one variable refrigerant flow heat pump for HP-2. Heat pumps shall meet same general requirements as HP-1 and HP-2 above but are NOT required to be variable refrigerant flow.

Variable speed compressor is required. Heat pump shall function down to 20 degrees F or colder. They may be placed on a pad versus wall hung. Provide pad. Provide two air handlers instead of two fan coil units for FC-1 and FC-2 (capacity to match heat pumps). Provide two air handlers instead of two fan coil units for FC-3 and FC-4 (capacity to match heat pumps). Air handlers shall meet same general requirements as FC-1 through FC-4 but are NOT required to be variable refrigerant flow. Air handlers shall have ECM motor and be variable speed. Provide hot water reheat coils. Provide additional electrical, ducting, piping, outdoor pads, and appurtenances to accommodate two heat pumps and two air handlers.

ALTERNATIVE 2 (OPTIONAL BID ITEM)

Provide one heat pump (2 ton) and matched air handler unit. In lieu of FC 4, duct 100 cfm to Office 3 and Secure Office 4. Provide no air to storage room. Provide supply air to other rooms as identified on plan. Heat pump shall be variable speed and air handler shall have ECM and be variable speed. Provide hot water reheat coil. Provide outdoor pad. Provide additional electrical, ducting, piping, outdoor pads, and appurtenances to accommodate one heat pump and air handler. Contractor shall verify duct can be installed to accommodate Alternative 2.

STORAGE

CONFERENCE

LUNCH ROOM

MECH.

JAN.

OFFICE 1 OFFICE 2

HALL

STAIR A

STAIR BV

1/4" = 1'-0"1 BASEMENT PLAN - ELECTRICAL

DESIGNER

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO. REVISION / ISSUE

OFSHEET

GENERAL OFFICE

GENERAL OFFICE

CORRIDOR

STAIR A

LOBBY

RANGERS OFFICE

GENERAL OFFICE

CLERKS

STAIR B

GENERAL OFFICE

1/4" = 1'-0"1 FIRST FLOOR PLAN - ELECTRICAL

DESIGNER

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO. REVISION / ISSUE

OFSHEET

H1.0 - Basement Plan - HVAC Demolition
H1.1 - First Floor Plan - HVAC Demolition
H1.2 - Basement Plan - HVAC Ductwork
H1.3 - Basement Plan - HVAC Piping
H1.4 - First Floor Plan - HVAC
H2.0 - HVAC Schedules & Details
E1.0 - Basement Plan - Electrical
E1.1 - First Floor Plan - Electrical

File details come from the government source that posted it. Updated .