About this file

This is a Cost Proposal Attachment D for RFP 27-88516, Statewide Pharmacy Services for the Indiana Department of Correction. Respondents must complete this Excel-based cost proposal template by populating all yellow-shaded cells with pricing information across six cost components: Clinical Management Costs (excluding Staffing & Personnel), Pharmacy Operations, Staffing & Personnel Costs, Technology/EHR Integration/Reporting & Equipment, Education Costs, and Optional Value-Add Services. The initial contract term is three years, with two optional two-year renewal periods available. Cost proposals will be evaluated based on the Total Bid Amount for the three-year initial contract period; optional renewal years are excluded from the evaluation but will be used to calculate approximate continuation costs. All prices must be submitted for every component and are required to be all-inclusive with no additional costs accepted by the State.

Respondents must not alter cell formatting or add caveats to pricing, as doing so may result in disqualification of the cost score. Detailed line-item breakdowns are required for each cost category, with separate tabs provided for Staffing, Technology, Optional Value-Add Services, Clinical Management, Pharmacy Operations, and Education Costs. For subcontractor commitments, respondents must reference the Total Bid Amount when calculating commitment percentages. Year-over-year cost submissions are required for Years 1, 2, and 3 of the initial contract period, as well as combined two-year totals for each optional renewal period.

View the file

Other files

File Type Posted
Facility Addresses.docx DOCX document
Att F - Tech Proposal Pharmacy svcs - rtp.docx DOCX document
Att A - IVOSB Commitment Form - rtp.docx DOCX document
Att I - Pre-Proposal Network Form - rtp.docx DOCX document
Att E - Business Proposal - RTP.docx DOCX document
RFP Boilerplate - rtp.docx DOCX document
Indiana DOC Formulary 08.28.26.pdf PDF
IDOC Facility Bed Counts 9-2-2025.pdf PDF
Att H - Reference Check Form - rtp.docx DOCX document
Att K - Scope of Work - rtp.docx DOCX document
Facility Security Levels 3-2023.pdf PDF
Att B - Sample Contract.docx DOCX document
Att L-Artificial Intelligence - Technical Proposal Questions.docx DOCX document
Att B3 - IOT-SaaS.docx DOCX document
Att C- IN performance measures - rtp.xlsx XLSX spreadsheet
Pharm RFP Med Staff 09-15-26.xlsx XLSX spreadsheet
Att M-Infrastructure Overview.docx DOCX document
Att G - Q&A Template - rtp.xlsx XLSX spreadsheet
Att B2 - IOT-PaaS.docx DOCX document
Att B1 - IOT-IaaS.docx DOCX document
Att J - Attestation Form - rtp.docx DOCX document
Att A1 - INSBP Commitment Form - rtp.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cost Proposal

Attachment D Cost Proposal - 27-88516
Statewide Pharmacy Services for Indiana Dept of Correction
RESPONDENT NAME
Instructions
(Initial 3-year Contract Period)
Please populate ALL cells shaded in YELLOW. Please do NOT alter the formatting of the cells or add caveats to your pricing or to the cells -- as this may potentially put your cost score at risk of disqualification. The GREEN shaded boxes will be a pull through from the tabs below. The TOTAL BID AMOUNT will be the sum on which your cost proposal will be evaluated. This amount will be automatically calculated based on the amounts entered for years 1, 2 & 3. The Optional years will not be included within the total bid amount however they will be used for calculating approximate continuation of services in 2 year intervals.
Prices must be submitted for all components.
Listed prices must be all-inclusive. No additional costs will be accepted by the State.
Each component has a separate tab for you to specify what is included within that field. The totqal from each tab should be brought forward into Yearly column.
Cost Proposals will be evaluated based on the 3-year initial contract term, or Total Bid Amount.
For Subcontractor commitments, Respondents should use the Total Bid Amount in cell D26 when figuring the commitment percentage.
Respondent Cost Proposal
ComponentComponent DescriptionYear 1Year 2Year 3
Optional 2 year renewal
(2 yr totals to be entered)Additional Optional 2 year renewal (2 yr totals to be entered)
Clinical Management Cost(s) excluding Staffing & PersonnelPlease break out the cost(s) that will be associated with Clinical Managemnt of this RFP$0.00$0.00$0.00$0.00$0.00
Pharmacy Operations$0.00$0.00$0.00$0.00$0.00
Staffing & Personnel CostsPlease use the tab labeled Staffing to list out each position and cost seperately$0.00$0.00$0.00$0.00$0.00
Technology, EHR Integration, Reporting & EquipmentPlease use the tab labeled Technology to breakdown each cost associated within this category$0.00$0.00$0.00$0.00$0.00
Education Cost(s)$0.00$0.00$0.00$0.00$0.00
Optional Value-Add ServicesPlease use the tab labeled Optional Value-Add Services to breakdown any items that would be at an additional cost.$0.00$0.00$0.00$0.00$0.00
Total Cost Per Year$0.00$0.00$0.00$0.00$0.00
TOTAL BID AMOUNT
(3 year initial term)$0.00

Clinical Management

Clinical Management line item nameClinical Management line item descriptionCost for year 1Cost for year 2Cost for year 3
Combined cost for optional 2 years (should reflect 2 yrs cost)Combined cost for optional 2 years (should reflect 2 yrs cost)

Total Cost per column: $0.00 $0.00 $0.00 $0.00 $0.00

Total Cost for 3 year contract: $0.00

Pharmacy Operations

Pharmacy Operations line item namePharmacy Operations line item descriptionCost for year 1Cost for year 2Cost for year 3
Combined cost for optional 2 years (should reflect 2 yrs cost)Combined cost for optional 2 years (should reflect 2 yrs cost)

Total Cost per column: $0.00 $0.00 $0.00 $0.00 $0.00

Total Cost for 3 year contract: $0.00

Staffing

Staffing line item nameStaffing line item descriptionCost for year 1Cost for year 2Cost for year 3
Combined cost for optional 2 years (should reflect 2 yrs cost)Combined cost for optional 2 years (should reflect 2 yrs cost)

Total Cost per column: $0.00 $0.00 $0.00 $0.00 $0.00

Total Cost for 3 year contract: $0.00

Technology

Technology item nameTechnology item descriptionCost for year 1Cost for year 2Cost for year 3
Combined cost for optional 2 years (should reflect 2 yrs cost)Combined cost for optional 2 years (should reflect 2 yrs cost)

Total Cost per column: $0.00 $0.00 $0.00 $0.00 $0.00

Total Cost for 3 year contract: $0.00

Education Cost(s)

Education Cost(s) item nameEducation Cost(s) item descriptionCost for year 1Cost for year 2Cost for year 3
Combined cost for optional 2 years (should reflect 2 yrs cost)Combined cost for optional 2 years (should reflect 2 yrs cost)

Total Cost per column: $0.00 $0.00 $0.00 $0.00 $0.00

Total Cost for 3 year contract: $0.00

Value Add options

Value Add Options item nameValue Add Options item descriptionCost for year 1Cost for year 2Cost for year 3
Combined cost for optional 2 years (should reflect 2 yrs cost)Combined cost for optional 2 years (should reflect 2 yrs cost)

Total Cost per column: $0.00 $0.00 $0.00 $0.00 $0.00

Total Cost for 3 year contract: $0.00