This document contains draft specifications for physical access control, intrusion detection, and video surveillance systems for a new visitors center and headquarters building at Tule Lake National Wildlife Refuge.

The specifications require an access control system to integrate card readers, door hardware, motion detectors and interface with the video surveillance and intrusion detection systems. The intrusion detection system must provide audible and visual annunciation of alarms to the main panel and central monitoring station. A video surveillance system of IP cameras, network video recorder, switches and other equipment is specified along with related installation, cabling and testing requirements. Acceptable manufacturers are listed for each system component. The work must be performed by a qualified contractor and meet various quality standards and warranty terms. Training is also specified.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

February 2021 Physical Access Control System- 1 DRAFT SPEC TEMPLATE

SECTION 28 13 16

PHYSICAL ACCESS CONTROL SYSTEM

PART 1 GENERAL

1.1 SECTION INCLUDES

1. Access control.

2. Control and monitoring of indicated equipment.

1.2 RELATED REQUIREMENTS

1.3 INFORMATIONAL SUBMITTALS

1. Manufacturer’s technical data/cut sheets on each product to be used.

2. Technical data/cut sheets showing device type, manufacturer, model number, mounting style and means of connection for each electronic door strike and other automated locking device being used for access control functions.

1. Point-to-Point device location wiring diagrams with all system device locations accurately shown on scaled architectural floor plans. No other system(s) shall be included on these plans.

2. Detailed schematic wiring diagrams for all system devices. Wiring information shall include cable type, conductor routings, quantities and complete termination/connection details for all devices utilized with system.

3. Typical elevations for each type door and locking device:

a. Scaled, dimensioned detail drawings showing exact location of device, mounting style to be used and means provided for electrical connection including location of associated conduit, raceway, or power supply.

b. Scaled, dimensioned detail drawings showing exact location and size of any holes, openings or cut outs required in door or frame for device mounting or electrical connection including location of associated conduit, raceway, or power supply.

4. Sealed, dimensional detail drawings showing strike and hinge side of door.

1. Sequence of operations: Descriptive statement and single-line block diagram showing how related equipment interface and operate as complete system.

2. Complete documentation of inspections and tests performed, including any applicable certifications. Documentation shall note replacement of any system component or devices failing during initial testing. Record of system field tests.

3. List of recommended spare parts.

4. Warranty data.

February 2021 Physical Access Control System- 2 DRAFT SPEC TEMPLATE

1.4 CLOSEOUT SUBMITTALS

1.5 QUALITY ASSURANCE

1. Access Control hardware and software, including peripheral devices, shall be manufactured

100% by U.S. manufacturers and each component shall display manufacturer’s name.

2. Access Control hardware and software shall be listed as a product of U.S. manufacturer under appropriate category by UL, and shall bear UL label. Partial listing is not acceptable.

3. Manufacturer of equipment shall have produced similar equipment for minimum period of 5 years.

4. Manufacturer’s authorized service representative: Competent, factory-trained Engineer or certified technician shall be present on site to guide final checkout and to ensure system’s integrity.

1. Contractor shall be a local installation and service organization, currently recognized as factory authorized representative by manufacturer of specified system.

2. Minimum of 5 years documented installations of similar scope to requirements of this specification.

3. Able to provide parts and labor to expand system specified, if so requested, for period of 5 years from date of acceptance.

4. Provide minimum of 3 references whose access control systems are of similar complexity and have been installed and maintained by Contractor in last 5 years.

5. At time of Bid, Contractor shall be licensed by state or local jurisdiction to perform security work within state. Contractors with security licenses or permits pending shall not be considered acceptable for bidding on this project.

6. Assure personnel working on project are registered with state or local jurisdiction systems licensing board as provided for by current state statutes.

1.6 DELIVERY, STORAGE AND HANDLING

February 2021 Physical Access Control System- 3 DRAFT SPEC TEMPLATE

1.7 PROJECT CONDITIONS

1.8 WARRANTY

PART 2 PRODUCTS

2.1 MANUFACTURERS

1. Telecommunications equipment produced by Huawei Technologies Company or ZTE Corporation, or any of their subsidiaries or affiliates;

2. For the purposes of public safety, security of Government facilities, physical security surveillance of critical infrastructure, and other national security procedures, video surveillance and telecommunications equipment produced by Hytera Communications Corporation, Hangzhou Hikvision Digital Technology Company, or Dahua Technology Company, or any subsidiary or affiliate of such entities;

3. Telecommunications or video surveillance equipment or services produced or provided by an entity that the Secretary of Defense, in consultation with the Director of National Intelligence or the Director of the Federal Bureau of Investigation, reasonably believes to be an entity owned or controlled by, or otherwise connected to, the government of a covered foreign country.

February 2021 Physical Access Control System- 4 DRAFT SPEC TEMPLATE

1. Von Duprin (For electric Strikes)

2. HID (For Card Readers)

3. Bosch Security Systems

4. Or Approved Equal

2.2 SYSTEM DESCRIPTION

1. Access Control hardware, software and control panels for access control including necessary power supplies.

2. Card readers.

3. Request to exit devices.

4. Door position contacts.

5. Latch monitoring contacts.

6. Interface with and control of door operators associated with system doors.

7. Vehicle access and parking gate operators.

8. Elevators.

9. Programming of all initial users and permissions into the system by the Contractor.

2.3 ACCESS CONTROL SYSTEM

1. System shall integrate third party proximity card readers and biometric readers as well as any proprietary readers from the same manufacturer.

2. System shall monitor door slab position via magnetic contacts.

3. System shall monitor latch position via latch bolt monitoring contacts.

4. System shall utilize request to exit functionality from built in door hardware contacts or via

PIR (passive infrared) motion detectors to shunt alarm signals for an adjustable period of time.

5. System shall be capable of integrating ADA door operator switch signals with the card reader functionality to avoid having the door operator attempt to physically open the door when the lack of a valid credential does not allow the door hardware to unlock.

6. System shall be capable of controlling access for calling of elevator cabs and selecting floor destination based on the presentation of valid credentials.

7. System shall be capable of full integration with video surveillance systems.

February 2021 Physical Access Control System- 5 DRAFT SPEC TEMPLATE

8. Full integration of the IDS system and PACS, will require the PACS to “shunt” alarms to the IDS system upon a valid card scan for entry at all PACS readers.

9. Acceptable Manufacturers:

a. Genetec Synergis Access Control – Pro Level Software

b. Pre-approved equal

1. Control server shall be specified and sized to accommodate all access control needs plus be fully functional as the control server for the video surveillance system.

2. Acceptable Manufacturers:

a. Genetec Certified BLD server

1. Proximity card readers shall utilize Open Supervised Device Protocol (OSDP) communications protocol.

2. Proximity card readers shall be black in color.

3. Proximity card readers shall be available to mount onto and fully cover a single gang device box.

4. Proximity card readers shall be available in small form factor to mount onto narrow door frames.

5. Proximity card readers shall provide audible and visual indicators for reader status and credential presentation status (accepted or denied access).

6. Acceptable Manufacturers:

a. HID

1. Acceptable Manufacturers:

a. HID

1. Motion detectors shall allow PIR sensor aiming both vertically and horizontally.

2. Motion detectors shall allow include audible alarm for activation by controlling system if desired.

3. Motion detectors shall include Sequential Logic Input (SLI), allowing connection of a second request-to-exit sensor to require sequential detection, eliminating possibility of object being slid through or under door to activate detector.

4. Acceptable Manufacturers:

a. Bosch DS-160

1. Reed switch technology.

2. Triple-biased contacts, making defeat of switch with external magnet virtually impossible.

3. Surface and recessed mounting available.

4. Models available for overhead doors, gates and high security applications.

5. Roller plunger models available.

February 2021 Physical Access Control System- 6 DRAFT SPEC TEMPLATE

1. Self-contained indoor audible alarm:

a. 85 dB minimum.

1. Generally used as code compliant alternative door opening method backing up a motion detector on the safe side of a door with magnetic lock. When operated, pushbutton device shall result in direct interruption of power to locking hardware, independent of access control system electronics.

2. Unlock secured door in direction of egress.

3. Door shall remain unlocked for not less than 30 seconds.

4. Readily accessible and clearly identified by minimum 1/2” high, red letters reading: “PUSH

TO EXIT.”

5. Red, 1-5/8” diameter.

6. 12 or 24 volts dc.

7. Locate 48” above finished floor and within 60” of associated secured door.

1. Access control system cabling (composite cabling) from the head end devices to each system door.

a. Cable from the head end electronics shall be dedicated run for each door. Conductors for the card readers, door position contacts, latch bolt monitor contacts, request to exit device, and hardware unlocking power (or power used to trip field located relay – same power) shall all be combined into one plenum rated yellow jacket (a composite cable assembly) with footage numbering on it and labeling stating manufacturer, part number, and “ACCESS CONTROL”.

b. For doors with two leaves – if both leaves are powered to unlock, then a dedicated composite cable listed above shall be installed for each leaf.

c. For doors with two leaves – if only one leaf is powered to unlock and the other leaf is only monitored, a yellow composite cable from the same manufacturer that provides adequate conductors for the monitoring may be used. This cable shall still be plenum rated, yellow in color, and state “ACCESS CONTROL” on the jacket.

2. Acceptable Manufacturers of the Access Control Composite Cabling:

a. Windy City Wire part number 4461230

b. Pre-approved equal

3. Data Patch Cords:

a. The Communications Contractor shall provide RJ-45 to RJ-45 patch cords to match the

UTP system for the purpose of connecting the control server, IP cloud device, and any other network panels to the network within the telecom rooms.

PART 3 EXECUTION

3.1 EXAMINATION

February 2021 Physical Access Control System- 7 DRAFT SPEC TEMPLATE

3.2 INSTALLATION

3.3 TESTING AND COMMISSIONING

1. Verify hardware components are properly installed, connected, communicating, and operating correctly.

2. Verify system software is installed, configured, and complies with specified functional requirements.

1. Submit documented test plan to Owner at least 14 days in advance of acceptance test, inspection, and check-off.

2. Conduct final acceptance tests in presence of Owner’s Representative, verifying each device point and sequence is operating correctly and properly reporting back to control panel and control center.

3. Acceptance by Owner is contingent on successful completion of check-off; if check-off is not completed due to additional work required, reschedule and perform complete check-off until complete in one pass, unless portions of system can be verified as not adversely affected by need for additional work.

4. System shall not be considered accepted until all acceptance tests have been successfully checked-off. Beneficial use of part or all of system shall not be considered as acceptance.

5. Correct any and all deficiencies observed during final check-off at no cost to Owner until equipment and system components operate properly.

February 2021 Physical Access Control System- 8 DRAFT SPEC TEMPLATE

3.4 TRAINING

1. Owner will designate personnel to be trained.

2. Provide printed training materials for each trainee including product manuals, course outline, workbook or student guides. Electronic only documentation is acceptable if the Owner allows.

3. Provide hands-on training with operational equipment.

4. Training shall be oriented to specific system being installed under this Contract as designed and specified.

3.5 MAINTENANCE

1. Length of Contract shall be for a period of 5 years after expiration of initial warranty.

2. Submit payment terms and conditions with Bid.

February 2021 Physical Access Control System- 9 DRAFT SPEC TEMPLATE

DATA SHEETS

ACCESS CONTROL SYSTEM

Equipment Name:

Tag No.: Rev.

DESCRIPTION UNITS SPEC DATA VENDOR DATA

Manufacturer - By Manufacturer Catalog/Serial No. - By Manufacturer

SITE ENVIRONMENTAL CONDITIONS

Ambient Temperature F Altitude Ft Hazardous Area Y/N

CONTROL SERVER

Is server as specified Y/N

FIELD DEVICES

Card Reader Doors Y (#)/N

Reader Doors with:

Electrified Exit Device Y/N

Electric Mortise Lock Y/N

Electric Strike Y/N

Electromagnetic Lock Y/N

Door Position Switch / Contact Y/N

Latch Bolt Monitor Contact Y/N

REX Motion Detector Y/N

Door Release Pushbutton Y/N

Local Audible Door Alarm Sounder Y/N

OTHER SYSTEM FEATURES

Automatic Doors and Operators Y (#)/N Vehicle Access and Parking Gate Operators Y (#)/N Elevators Y (#)/N

INTERFACE TO OTHER RELATED SYSTEMS

Video Surveillance System Y/N Intrusion Detection System Y/N

END OF SECTION 281316

February 2021 Intrusion Detection System- 1 DRAFT SPEC TEMPLATE

SECTION 28 16 00

INTRUSION DETECTION SYSTEM

1.2 WORK BY OTHERS

1. Manufacturer’s technical data/cut sheets on each product to be used.

2. Technical data/cut sheets showing device type, manufacturer, model number, mounting style and means of connection for each alarm contact(magnetic or inductive) used for intrusion detection functions.

1. Point-to-point device location wiring diagrams with all system device locations accurately plans.

2. Detailed schematic wiring diagrams for all system devices. Wiring information shall include cable type, conductor routings, quantities, and complete termination/connection details for all devices utilized with system.

3. Typical elevations for each type door and locking device:

a. Scaled, dimensioned detail drawings showing exact location of device, mounting style to be used and means provided for electrical connection including location of associated conduit, raceway, or power supply.

b. Scaled, dimensioned detail drawings showing exact location and size of any holes, openings or cut outs required in door or frame for device mounting or electrical connection including location of associated conduit, raceway, or power supply.

1. Complete documentation of inspections and tests performed, including any applicable certifications. Documentation shall note replacement of any system component or devices failing during initial testing. Record of system field tests.

2. List of recommended spare parts.

3. Warranty data.

4. Sequence of operations: Descriptive statement and single-line block diagram showing how related equipment shall interface and operate as an integrated intrusion detection system.

5. Equipment list, itemizing all major system components. Each item shall be identified by manufacturer and model number, brief description of its function within the system, and quantity provided.

February 2021 Intrusion Detection System- 2 DRAFT SPEC TEMPLATE

1.4 CLOSEOUT SUBMITTALS

1. System and its components shall be listed under appropriate UL testing standard as listed herein for intrusion detection system and installation shall be in compliance with UL listing.

2. Standards of foreign organizations shall not be used without prior written approval from

Engineer.

1. Intrusion detection system equipment, including peripheral devices, shall be manufactured

100% by single U.S. manufacturer (or division thereof) and each component shall display manufacturer’s name.

2. Manufacturer of equipment shall have produced similar equipment for minimum period of 5 years.

3. Intrusion detection system equipment, including peripheral devices, shall be listed as product of single U.S. manufacturer under appropriate category by UL, and shall bear UL label.

Partial listing not acceptable.

4. Intrusion detection system head end and peripheral devices shall be manufactured 100% by a single ISO certified U.S. manufacturer (or division thereof).

5. Manufacturer’s authorized service representative: Competent, factory-trained engineer or certified technician shall be present on site to guide final checkout and to ensure system’s integrity.

1. Contractor shall be local installation and service organization, currently recognized as factory-authorized representative by manufacturer of specified intrusion detection system.

2. Minimum of 5 years documented intrusion detection system installations of similar scope to requirements of this specification.

3. Provide minimum of 3 references whose electrically supervised intrusion detection systems are of similar complexity and have been installed and maintained by Contractor in last 5 years.

4. Able to provide parts and labor to expand system specified, if so requested, for period of 5 years from date of acceptance.

February 2021 Intrusion Detection System- 3 DRAFT SPEC TEMPLATE

5. At time of Bid, Contractor shall be licensed by state or local jurisdiction to perform intrusion detection system work within state. Contractors who have licenses or permits pending shall not be considered acceptable for bidding on this project.

1.7 SITE CONDITIONS

1.8 PROJECT CONDITIONS

1.9 WARRANTY

February 2021 Intrusion Detection System- 4 DRAFT SPEC TEMPLATE

2.1 MANUFACTURERS

Telecommunications equipment produced by Huawei Technologies Company or ZTE Corporation, or any of their subsidiaries or affiliates;

For the purposes of public safety, security of Government facilities, physical security surveillance of critical infrastructure, and other national security procedures, video surveillance and telecommunications equipment produced by Hytera Communications Corporation, Hangzhou Hikvision Digital Technology Company, or Dahua Technology Company, or any subsidiary or affiliate of such entities;

Telecommunications or video surveillance equipment or services produced or provided by an entity that the Secretary of Defense, in consultation with the Director of National Intelligence or the Director of the Federal Bureau of Investigation, reasonably believes to be an entity owned or controlled by, or otherwise connected to, the government of a covered foreign country.

1. Honeywell (Ademco) model numbers: Vista 128 and 250 series (commercial)

2. Radionics model numbers 7412G and 9412G series (commercial).

3. CADDx model number NX8E

4. DMP model XR100 and XR500 (commercial)

February 2021 Intrusion Detection System- 5 DRAFT SPEC TEMPLATE

1. Determine operations requirements for implementation.

2. Install intrusion detection system.

3. Test intrusion detection system operations based on point-by-point walk through inspection.

4. Perform end-user training.

2.3 DESIGN REQUIREMENTS

2.4 INTRUSION DETECTION SYSTEM

1. Audible system annunciators, either horns or sirens, shall sound.

2. Centrally located visual annunciation shall take place at the main panel showing the point in alarm.

3. Provide dedicated telephone line for communication to Owner-approved central monitoring station.

1. Honeywell (Ademco) model numbers- Vista 128 and 250 series

2. Radionics/Bosch model numbers 7412G & 9412G series.

3. CADDx model number NX8E

4. DMP models XR100 & XR500

5. Or pre-approved equal

1. Honeywell 6160

2. Bosch D1260 White

3. Or pre-approved equal

February 2021 Intrusion Detection System- 6 DRAFT SPEC TEMPLATE

1. Bosch Commercial Series TriTech AM Motion Detector with anti-mask and optional wall mount bracket

a. Bosch detector part number ISC-CDL1-WA15

b. Bosch wall mount bracket part number B328

2. Or pre-approved equal

1. Bosch Long Range Motion Detector with Motion Analyzer II processing with optional wall mount bracket

a. Bosch detector part number DS778

b. Bosch wall mount bracket part number B328

2. Or pre-approved equal

1. 360-degree ceiling Mounted-Wired Photo Infrared Motion Detector(s)-- Honeywell IS335

Hardwired PIR Motion Detector where shown in the drawings.

2. 360 degree ceiling Mounted-Wired Photo Infrared Motion Detector(s)-- Honeywell IS335

Hardwired PIR Motion Detector where shown in the drawings.

3. Bosch Commercial Series TriTech AM Motion Detector with anti-mask and optional ceiling mount bracket

a. Bosch detector part number ISC-CDL1-WA15

b. Bosch ceiling mount part number B338

4. Or pre-approved equal

1. Honeywell 5853

2. Bosch Glassbreak Detector with Microprocessor based sound analysis technology (SAT).

Contractor shall also purchase one optional glassbreak tester to assist in locating proper installation location for the glass being protected, and then give/leave tester with Owner at end of project.

a. Bosch detector part number DS1101i

b. Bosch Glassbreak Tester (for proper mounting location) part number DS1110i

1. Recessed Magnetic contact- Honeywell Ademco 951WG-WH 3/8" Diam Min Press Mag Fit

2. Bosch Compact Contacts (1”) with Standard Magnet

a. Bosch part number ISN-CSD80-W

2.5 CONDUIT AND WIRE

1. Copper.

2. Locate in conduit or raceway. Conduit fill shall not exceed 40%.

3. In accordance with local, state, and national codes and as recommended by manufacturer.

4. Number, size and type of conductors shall be as recommended by manufacturer and as shown on Drawings.

5. 120 volts ac power circuits: No. 12 AWG minimum, 600-volt insulation.

6. Wiring run in underground conduits: Suited for wet locations.

February 2021 Intrusion Detection System- 7 DRAFT SPEC TEMPLATE

3.2 INTEGRATION

3.3 INSTALLATION

February 2021 Intrusion Detection System- 8 DRAFT SPEC TEMPLATE

3.4 TESTING AND COMMISSIONING

inspection, and check-off.

2. Conduct final acceptance tests in presence of Owner’s Representative, verifying each system component is operating correctly.

3. Acceptance by Owner is contingent on successful completion of check-off; if check-off is not completed due to additional work required, reschedule and perform complete check-off until complete in one pass, unless portions of system can be verified as not adversely affected by need for additional work.

4. Electrically supervised intrusion detection system shall not be considered accepted until acceptance tests have been successfully checked-off. Beneficial use of part or all of system shall not be considered as acceptance.

5. Correct deficiencies observed during final check-off at no cost to Owner until equipment and system components operate properly.

3.5 TRAINING

workbook or student guides. Electronic PDF format is acceptable if approved by the Owner in advance.

3. Provide hands-on training with operational equipment.

4. Training shall be oriented to specific system being installed under this Contract as designed and specified.

5. The contractor must provide a minimum of 2 hours of end-user training to facility staff and 4 hours of training to agency administrators prior to acceptance.

3.6 MAINTENANCE

February 2021 Intrusion Detection System- 9 DRAFT SPEC TEMPLATE

1. Length of Contract shall be for a period of 5 years after expiration of initial warranty.

DATA SHEET

ELECTRICALLY SUPERVISED INTRUSION

DETECTION SYSTEM

Equipment Name:

Tag No.: Rev.

DESCRIPTION UNITS SPEC DATA VENDOR DATA

Manufacturer - By Manufacturer Catalog/Serial No. - By Manufacturer

SITE ENVIRONMENTAL CONDITIONS

Ambient Temperature F Altitude Ft Hazardous Area Y/N

ELECTRICALLY SUPERVISED INTRUSION DETECTION SYSTEM EQUIPMENT

Main Panel Y/N

Motion Detectors

Standard Y/N

Long Range Y/N

Glassbreak Detectors

Wall Mount Y/N

Ceiling Mount Y/N

Door Contacts

Standard Door Y/N

Overhead Door Floor Mount Contact Y/N

Overhead Door Track Mount Contact Y/N

END OF SECTION 281600

February 2021 Video Surveillance - 1 DRAFT SPEC TEMPLATE

SECTION 28 23 00

VIDEO SURVEILLANCE

1. Head end equipment, cameras, lenses, camera enclosures and miscellaneous accessories.

2. Network Video Recorder (NVR)

3. Monitoring equipment

4. Power over Ethernet Switches

5. Power Supplies

6. Mounting brackets and miscellaneous mounting materials.

7. Mounting racks and consoles.

8. Peripheral control equipment

9. Cables Category 6e and accessories.

10. Conduit for VSS cabling,

11. Remote monitoring.

1.2 WORK BY OTHERS

1. Point-to-point device location wiring diagrams with system device locations accurately plans.

2. Detailed schematic wiring diagrams for system devices. Wiring information shall include cable type, conductor routings, quantities and complete termination/connection details for devices used with system.

1. Complete documentation of inspections and tests performed, including any applicable certifications. Documentation shall note replacement of any system component or devices that failed during initial testing. Record of system field tests.

2. List of recommended spare parts.

3. Warranty data.

February 2021 Video Surveillance - 2 DRAFT SPEC TEMPLATE

1.4 CLOSEOUT SUBMITTALS:

1. System and components shall be listed under appropriate UL testing standard for video surveillance applications and installation shall be in compliance with UL listing.

2. Standards of foreign organizations shall not be used without prior written approval from

Engineer.

1. Video Surveillance System head end and peripheral devices shall be manufactured 100% by single ISO certified U.S. manufacturer (or division thereof).

2. Manufacturer of equipment shall have produced similar equipment for minimum period of 5 years.

3. Manufacturer’s authorized service representative: Competent, factory- trained engineer or certified technician: present on site to guide final checkout and to ensure system integrity.

4. System hardware, software, control, monitoring and recording equipment and peripheral devices shall be listed as product of single U.S. manufacturer under appropriate category by UL and shall bear UL label. Partial listing not acceptable; and shall be manufactured 100% by single U.S. manufacturer (or division thereof) and each component shall display manufacturer’s name.

1. Employ technicians on site to guide final checkout and to ensure system integrity.

2. Technician shall be factory trained, authorized representative of equipment manufacturer.

1. Local installation and service organization currently recognized as factory authorized representative by manufacturer of specified system.

2. Minimum of 5 years documented video surveillance system installations of similar scope to requirements.

3. Provide minimum of 3 references whose Video Surveillance Systems are of similar complexity and have been installed and maintained by Contractor in last 5 years.

4. Able to provide parts and labor to expand system specified, if so requested, for period of 5 years from date of acceptance.

February 2021 Video Surveillance - 3 DRAFT SPEC TEMPLATE

5. At time of Bid, Contractor shall be licensed by state or local jurisdiction to perform security work within state. Contractors with security licenses or permits pending shall not be considered acceptable for bidding on Project.

1.7 PROJECT CONDITIONS

1.8 WARRANTY

2.1 MANUFACTURERS

Federal Acquisition Regulation (FAR) case 2018-017 is an interim rule, which became effective on August 13, 2019. It prohibits the purchase of “covered telecommunications equipment or services” which means:

1. Telecommunications equipment produced by Huawei Technologies Company or ZTE Corporation, or any of their subsidiaries or affiliates;

2. For the purposes of public safety, security of Government facilities, physical security surveillance of critical infrastructure, and other national security procedures, video surveillance and telecommunications equipment produced by Hytera Communications

February 2021 Video Surveillance - 4 DRAFT SPEC TEMPLATE

Corporation, Hangzhou Hikvision Digital Technology Company, or Dahua Technology Company, or any subsidiary or affiliate of such entities;

3. Telecommunications or video surveillance equipment or services produced or provided by an entity that the Secretary of Defense, in consultation with the Director of National Intelligence or the Director of the Federal Bureau of Investigation, reasonably believes to be an entity owned or controlled by, or otherwise connected to, the government of a covered foreign country.

In addition to the purchase prohibition, the FAR case requires contractors to provide a representation addressing whether or not they are providing covered telecommunications under contracts and orders with the Federal government.

Acceptable Manufacturers as listed but NOT limited to these manufacturers only, contractor may provide a list of proposed equipment that lists manufacturer and models as substitution /equivalent and coordinate with FWS-OEMPS to determine if the equipment provides the needed coverage and capability. VSS equipment used in this project shall be compatible with one another regardless of manufacturer/ model and shall function properly as one complete system.

1. Axis Communications.

2. Bosch Security Systems

3. Cisco

4. Or FWS-OEMPS approved equal

1. Fully functional Video Surveillance System.

2. Network Capable and Internet Protocol (IP) based system

1. Determine hardware, software and operations requirements for implementation.

2. Install hardware and software.

3. Setup and configure communications between head end control equipment, cameras, a monitor and recording devices.

4. Setup and configure system application and database.

5. Test system operations based on point-by- point walk through inspection.

6. Perform end-user training.

2.3 DESIGN REQUIREMENTS

February 2021 Video Surveillance - 5 DRAFT SPEC TEMPLATE

1. A minimum of ¾” conduit shall be provided.

2. Where multiple cables run in same conduit, contractor shall not exceed 40 % conduit fill.

3. Each conduit shall contain a minimum of two tags lines

4. Conduits containing VSS cabling shall l be 12 inches away minimum from any electrical systems that over 24Vdc.

5. Provide additional conduit and cabling from IT room to exterior corner of the visitor center/maintenance building.

1. Provide indoor and outdoor rated cameras as shown in the drawings.

2. Mounting: Provide ceiling and soffit cameras as shown in the drawings

3. Image Sensor: 4 x 1/2.5” progressive scan RGB CMOS

4. Lens:

a. Varifocal, 3–6 mm, F1.8–2.6

b. 4 x 1440p capture mode:

1) Horizontal field of view: 101°–49°

2) Vertical field of view: 54°–29°

3) Diagonal field of view: 116°–58° Motorized focus, motorized zoom

5. Day and Night: Automatically removable infrared-cut filter.

6. Minimum Illumination:

a. Color: 0.20 lux at 50 IRE F1.8

b. B/W: 0.04 lux at 50 IRE F1.8, 0 lux with IR illumination on

7. Shutter Time: 1/66500 s to 1/5 s with 50/60 Hz

8. Camera angle adjustment: Pan ±90°, tilt +25 to +95°, rotation –5 to +95°, twist ±20°

9. Video: H.264 (MPEG-4 Part 10/AVC) Main and High Profiles H.265 (MPEG-H Part

2/HEVC):

a. Resolution: 4 x 2560x1440 (4 x QHD 1440p) to 80x60

b. Frame Rate: 25/30 fps with power line frequency 50/60 Hz

10. Casing: IP66-, IP67-, (NEMA 4X-rated for outdoor cameras only), IK09 impact-resistant, aluminum and plastic casing with polycarbonate hard-coated dome, sunshield (PC/ASA).

11. Operating Conditions: 30 °C to 50°C (-22 °F to 122 °F) Humidity 10–100% RH (condensing) Maximum temperature according to NEMA TS 2 (2.2.7): 74 °C (165 °F)

February 2021 Video Surveillance - 6 DRAFT SPEC TEMPLATE

1. Provide indoor and outdoor rated cameras as shown in the drawings.

2. Mounting: Provide ceiling and soffit cameras as shown in the drawings

3. Image Sensor: Fixed Focus, fixed iris 1/3” progressive scan RGB CMOS

4. Lens: 2.8 mm, F2.0

a. Horizontal field of view: 106°

b. Vertical field of view: 59°

5. Minimum Illumination: 0.25 lux at 50 IRE F2.0

6. Shutter Time: 1/32500 s to 1/5 s

7. Camera angle adjustment: Pan: ±105° Tilt: ±85° Rotate: ±175°

8. Video: H.264 (MPEG-4 Part 10/AVC) Main and High Profiles H.265 (MPEG-H Part

2/HEVC) Main Profile:

a. Resolution: 1920x1080 (1080p) to 320x240

b. Frame Rate: 25/30 fps with power line frequency 50/60 Hz

9. Audio input/output:

a. Two-way audio connectivity via optional AXIS T61 Audio and I/O Interfaces with portcast technology

b. 30 W midspan or higher between AXIS T61 Audio and I/O Interfaces and camera is required

10. Operating Conditions: 0 °C to 45 °C (32 °F to 113 °F) Humidity 15-85% RH (non-condensing).

3.2 INSTALLATION

February 2021 Video Surveillance - 7 DRAFT SPEC TEMPLATE

3.3 TESTING AND COMMISSIONING

1. Verify hardware components are properly installed, connected, communicating, and operating correctly.

2. Verify system software is installed, configured, and complies with specified functional requirements.

inspection and check-off.

2. Conduct final acceptance tests in presence of Owner’s Representative, verifying each device point and sequence is operating correctly and properly reporting back to control panel and control center.

3. Acceptance by Owner is contingent on successful completion of check-off. If check-off is not completed due to additional work required, re-schedule and perform complete check-off until complete in one pass, unless portions of system can be verified as not adversely affected by need for additional work.

4. System shall not be considered accepted until acceptance tests have been successfully checked-off. Beneficial use of part or all of system shall not be considered as acceptance.

February 2021 Video Surveillance - 8 DRAFT SPEC TEMPLATE

5. Correct any and all deficiencies observed during final check-off at no cost to Owner until equipment and system components operate properly.

3.4 MANUFACTURER’S FIELD SERVICES

3.5 TRAINING

workbook or student guides and written examinations for certification.

3. Provide hands-on training with operational equipment.

4. Training: Orient to specific system being installed under this Contract as designed and specified.

3.6 MAINTENANCE

1. Length of Contract: For period of 5 years after expiration of initial warranty.

END OF SECTION 282300