This document contains questions asked during a site visit walkthrough and subsequent email amendment for a design-build federal contract opportunity. The U.S. Fish and Wildlife Service is seeking a contractor to complete the design and construction of a new visitors center and headquarters building at the Tule Lake National Wildlife Refuge in California within 540 days of receiving a notice to proceed. The solicitation requires a 20% bid bond and 100% performance and payment bonds. It does not specify pricing terms or a response due date. Geotechnical analysis of the site has already been conducted by the engineering firm that assisted with initial design phases. Records of any asbestos or hazardous materials testing on the existing building are not available but the structure is believed to contain no asbestos or lead paint.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions Asked at the Site Visit Walkthrough on 6/3/21 and via Email Amendment 1

Question: Who or which authority will be responsible to approve the project plans?

Answer: The COR will be responsible for approving the project plans.

Question: What is the % of Payment and Performance Bonds required on this job? Is there any requirement of a Bid Bond too?

Answer: Per the solicitation, a 20% bid bond is required and 100% performance bond and 100% payment bond.

Question: Is there any idea for the Permit as well as the Plan Check fees for this very project?

Answer: We do not have an estimate for any permit or plan check fees. Refer to the project narrative for anticipated permits.

Question: As the Building is less than 5,000 SF and the building is a masonry one, then do we need to have a fire sprinkler system in this?

Answer: fire sprinklers are a FWS requirement if not by code (note that the new building is bigger than 5,000 sf)

Question: Which one is the Power company in this area and how much is the fee? Where can I check for this?

Answer: Pacific Power. Try their website for information regarding fees.

Question: If we have to design the project then from whom we have to get it designed? The Architect‐ Engineer who already did these 50% plans or it will be my organization? Just needed some clarification.

Answer: It will be the responsibility of the contractor’s team to complete the design.

Question: Are there hazardous materials in the existing VC/HQ building?

Answer: There are fluorescent lightbulbs in the existing building which likely contain mercury in the ballasts.

There is no other hazmat information available.

Question: Will the sign in sheet be part of the contracting package?

Answer: The sign in sheet is just to have contact information for those who visited the site.

Question: Where does the water to the current VC/HQ building come from?

Answer: We have a well and water treatment system.

Question: Was asbestos testing conducted on the current building? Will those records be included in the contracting package and be available?

Answer: We are not aware of any hazmat testing, however the building was built in the 80s and we believe there to be no asbestos or lead paint.

Question: Is this still a design‐build contract?

Answer: Yes, this is a design‐build contract.

Question: Does Part 2 of the proposal have a due date yet?

Answer: No.

Questions Asked at the Site Visit Walkthrough on 6/3/21 and via Email Amendment 1

Question: Is there power to Education Center (Duck Hospital)?

Answer: The Ed Center is powered by a generator.

Question: What is the construction schedule?

Answer: Construction will need to be completed within 540 days after receipt of the NTP per page 4 of the Statement of Work.

Question: Was there Geo Tech work conducted?

Answer: Yes the engineering firm that assisted with the first phase of the design conducted some geo‐tech work and soil testing.

Question: Will the geo tech analysis be provided to us (meaning contractors)?

Answer: The final Geotech report was provided in the attachments to the solicitation. (Attachment 5)