ATT 3 - Create Cardiovascular Center BID CD Dwgs-VOLUME 2.pdf

PDF 30 MB Posted

Attached to
Y1DZ--675-103 Create Cardiovascular Center Minor Construction - Lake Nona, FL VAMC
Solicitation number
36C77625B0030
Issued by

About this file

This file is a comprehensive set of plumbing design drawings for the Create Cardiovascular Center project at Lake Nona VA Medical Center in Orlando, Florida. The document contains detailed plumbing plans, isometrics, schedules, and technical specifications for a new cardiovascular facility, covering both demolition and new work areas. The drawings include extensive details for gravity and pressure piping systems, medical gas installations, plumbing fixtures, storm drainage, and medical gas outlet and valve box configurations.

Key technical elements include medical gas systems with multiple gas types (oxygen, medical air, medical vacuum, nitrous oxide, carbon dioxide), medical gas zone valve boxes, alarm panels, and manifold systems. The project is phased, with specific instructions for connecting to existing infrastructure and coordinating work across different building areas. Plumbing systems are designed to meet VA design standards, NFPA codes, and include specialized components like thermostatic mixing valves, trap primers, and specific fixture types tailored for healthcare environments. The drawings are part of a 100% Construction Documents - Bid Set dated 03/07/2025, with the project number 675-103 and Kevin Glover listed as the Contracting Officer's Representative.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT OF SYSTEMS. PROVIDE COMPONENTS INDICATED IN DETAILS AND/OR RISER DIAGRAMS WHETHER OR NOT INDICATED ON PLANS AND VICE VERSA. WHERE A DISCREPANCY OR CONFLICT IS FOUND BETWEEN ONE DRAWING AND ANOTHER, OR BETWEEN A DRAWING AND APPLICABLE SPECIFICATIONS, NOTIFY THE ARCHITECT/ENGINEER IMMEDIATELY IN WRITTEN FORM. IN GENERAL, THE MOST STRINGENT REQUIREMENT SHALL GOVERN UNLESS THE DISCREPANCY CONFLICTS WITH APPLICABLE CODES OR OWNER'S DESIGN

STANDARDS, WHEREIN THE CODE OR OWNER'S DESIGN STANDARDS SHALL GOVERN.

2. LOCATE VALVES IN ACCESSIBLE AREAS WHERE NECESSARY. (12"X12" MIN.)

3. COORDINATE ACTUAL LOCATIONS OF MECHANICAL FLOOR DRAINS WITH FINAL EQUIPMENT LOCATIONS ON SHOP

DRAWINGS.

4. VENT PIPING SHOWN IS ONLY FOR DIAGRAMMATIC PURPOSES. COORDINATE VTRS WITH HVAC AIR INTAKES.

5. PROVIDE BACKWATER VALVES FOR CONDENSATE PIPING CONNECTIONS TO STORM SEWER.

6. PROVIDE PIPE MARKER FOR ALL PIPING ABOVE THE CEILING SPACES IN ACCORDANCE WITH DIVISION 22 SPECIFICATION

SECTION. "IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT".

7. LABEL VALVES ABOVE CEILINGS AND IN CONCEALED SPACES AT CEILING TILE WITH METAL CEILING TACKS INDICATING VALVE # AND TYPE OF WATER. (i.e.; BLUE= COLD WATER, LETTERING CW VLV1-001).

8. PROVIDE AND INSTALL WATER HAMMER ARRESTORS IN ACCORDANCE WITH PDI-WH201 IN ALL HW AND CW SUPPLY PIPING WITH QUICK CLOSING VALVES AS REQUIRED. AIR CHAMBERS ARE NOT ACCEPTABLE SUBSTITUTIONS.

9. PROVIDE THERMAL INSULATION FOR HOT WATER AND HOT WATER RETURN PIPING IN ACCORDANCE WITH THE ENERGY

EFFICIENCY CODE FOR BUILDING CONSTRUCTION AND PER SPECIFICATIONS.

10. PROVIDE CLEANOUTS AT THE BASE OF EACH SANITARY STACK. SIZE CLEANOUTS TO MATCH THE PIPING SERVED. SPACE FLOOR CLEANOUTS AT 100'-0" MAX. ALSO PROVIDE CLEANOUTS IN HORIZONTAL CHANGE OF DIRECTION > 45°.

11. THE MANUFACTURERS OF EQUIPMENT SHOWN ARE THE BASIS OF DESIGN. SEE SPECIFICATION FOR OTHER ACCEPTABLE

MANUFACTURERS.

12. FIRE CAULK AND SLEEVE PENETRATIONS THROUGH FIRE RATED ASSEMBLIES. REFER TO LIFE SAFETY PLANS FOR RATED ASSEMBLY LOCATIONS. REFER TO ARCHITECTURAL SHEETS FOR DETAILS AND UL ASSEMBLY NUMBERS.

13. REFER TO ARCHITECTURAL SHEETS FOR FIXTURE MOUNTING.

14. COORDINATE UNDERGROUND PIPING INVERT ELEVATIONS WITH STRUCTURAL FOOTING ELEVATIONS AND CIVIL INVERT

CONNECTIONS PRIOR TO ANY UNDERGROUND PIPING INSTALLATIONS.

15. COORDINATE CEILING PIPING AND ELEVATIONS IN SHOP DRAWINGS WITH ALL OTHER TRADES (I.E. HVAC, FIRE PROTECTION, ELECTRICAL, TELECOMM, STRUCTURAL, ETC.) PRIOR TO ANY INSTALLATION TO ENSURE PROPER

CLEARANCES AND PENETRATIONS.

16. SLOPE SANITARY PIPING 2-1/2" OR LESS AT 1/4" PER FOOT. SLOPE SANITARY PIPING 3" AND LARGER AT 1/8" PER FOOT.

17. VALVES AND FITTINGS SHALL BE THE SAME SIZE AS THE PIPING WHERE THEY ARE LOCATED UNLESS NOTED OTHERWISE.

18. PROVIDE ALL NECESSARY SUPPORTING DEVICES FOR FIXTURES PER MANUFACTURER INSTALLATION INSTRUCTIONS.

19. PROVIDE ALL FLOOR DRAINS, FLOOR SINKS AND HUB DRAINS WITH DEEP SEAL P-TRAPS. ALL DRAINS NOT RECEIVING CONTINUOUS DISCHARGE SHALL BE PROVIDED WITH TRAP PRIMER CONNECTIONS TO ENSURE TRAP SEAL PROTECTION.

20. ROUGH-IN WASTE AND WATER SUPPLIES FOR FIXTURES AND PERFORM FINAL CONNECTIONS PER MANUFACTURER

RECOMMENDATIONS.

21. THE CONTRACTOR SHALL BASE THEIR PROPOSAL UPON THE EQUIPMENT AS SCHEDULED USING THE MANUFACTURERS AND MODEL NUMBERS AS SCHEDULED ON THE DRAWINGS. IF THE CONTRACTOR WISHES TO USE EQUIPMENT NOT SCHEDULED, THEY MAY SUBMIT TO ENGINEER FOR REVIEW AND COMPLIANCE WITH CONTRACT DOCUMENTS.

22. ROUGH IN FLUSH VALVE WATER CLOSETS SO THAT THE FLUSH VALVE HANDLE IS TO THE WIDE SIDE OF THE ROOM.

23. COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) ACCESSIBILITY GUIDELINES FOR BUILDINGS AND FACILITIES.

24. ALL AUTOMATIC CONTROL, PROTECTIVE OR SIGNAL DEVICES REQUIRED FOR THE OPERATION SPECIFIED, SHALL BE

PROVIDED WITH ANY CONTROL WIRING AND INSTALLED PER MANUFACTURER'S REQUIREMENTS.

25. THE PRIMARY ROOF DRAIN SYSTEM HAVE BEEN DESIGNED TO HANDLE 100 YEAR FOR ONE HOUR AT 4.5" PER HOUR

RAINFALL RATE.

26. PROVIDE AN AIR GAP, WHEN REQUIRED BY CODE, SERVING INDIVIDUAL FIXTURES, DEVICES, APPLIANCES AND APPARATUS.

27. SHOP DRAWING SUBMITTALS SHALL BE FULLY COORDINATED PRIOR TO SUBMITTAL.

28. ALL CONNECTIONS OF NEW DOMESTIC COLD, HOT, AND HOT WATER PIPING TO EXISTING PIPING MAINS SHALL BE ACCOMPLISHED VIA A FREEZE-TAP AND SHALL NOT REQUIRE COMPLETE SHUTDOWNS OF THE SYSTEMS.

PLUMBING ABBREVIATIONSPLUMBING SYMBOL LEGEND

SYMBOL DESCRIPTION

NOTE: SOME SYMBOLS SHOWN ON THIS LEGEND MAY NOT PERTAIN TO THIS PROJECT

MEDICAL COMPRESSED AIR PIPINGMA

HOT WATER PIPINGHW

HOT WATER RETURN PIPINGHWR

STO STORM OVERFLOW (SECONDARY)

ST STORM (PRIMARY)

SANITARY DRAINAGE PIPING (UNDERGROUND)SAN U/G

SANITARY DRAINAGE PIPING (ABOVE SLAB)SAN

V VENT PIPING

GATE VALVE

PRESSURE GAUGE

CHECK VALVE

BALL VALVE

CIRCULATING PUMP

PIPE END CAP

PIPE TURNING DOWN

PIPE TURNING UP

PIPE TURNING DOWN (TEE)

NATURAL GAS PIPING

CLEANOUTS

CW COLD WATER PIPING

CD CONDENSATE PIPING

CIRCUIT SETTER VALVE

OR

PDI-"A" WATER HAMMER ARRESTER & SIZE

THERMOSTATIC MIXING VALVE

HB-1 OR WHY-1 HOSE BIBB / WALL HYDRANT

FLOW ARROW

P-TRAP

ROLL DOWN

PIPING TEE

ST U/G STORM PIPING (UNDERGROUND)

G

PRESSURE REGULATING VALVE

BUTTERFLY VALVE

A

B

SIM

A

SECTION SYMBOL:

A = IDENTIFYING LETTER

B = SHEET WHERE SECTION IS SHOWN

SIM =

(ONLY NOTED IF IT APPLIES)

PLUMBING RISER DESIGNATION:

A = RISER IDENTIFYING SYSTEM TYPE

1 =

REVISION CLOUD AND

REVISION NUMBER

SHEET NOTE CALLOUT

A TITLE SYMBOL ON SHEET WHERE SHOWN

A = IDENTIFYING NUMBER/LETTER

RISER IDENTIFYING SYSTEM NUMBER

SIMILAR

ABBR. DESCRIPTION ABBR. DESCRIPTION

PLUMBING GENERAL NOTES

WATER HAMMER ARRESTOR

SYMBOL

1/2"

PIPE SIZE PDI STANDARD FIXTURE UNIT CAP.

3/4"

1"

1-1/4"

A

B

C

D

1 TO 11

12 TO 32

33 TO 60

61 TO 113

DEMOLISH TO POINT INDICATED

CONNECT TO EXISTING

DEMOLISHED PIPING

EXISTING PIPING

NEW PIPING

AS ABOVE SLAB

ADA AMERICANS WITH DISABILITIES ACT

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

ANSI AMERICAN NATIONAL STANDARDS INSTITUTE

AP ACCESS PANEL

ASTM AMERICAN STANDARDS TESTING MATERIALS

AWWA AMERICAN WATER WORKS ASSOCIATION

BFP BACKFLOW PREVENTER

BS BELOW SLAB

BF BELOW FLOOR

BG BELOW GRADE

CA COMPRESSED AIR

CD CONDENSATE

CO CLEANOUT

CONN CONNECTION

CONT CONTINUOUS

CP CIRCULATING PUMP

CW COLD WATER

DF DRINKING FOUNTAIN

DFU DRAINAGE FIXTURE UNITS

DIA DIAMETER

DN DOWN

DWG DRAWING

DW DOMESTIC WATER

ECO EXTERIOR CLEANOUT

ELEV ELEVATION

EQUIP EQUIPMENT

EWC ELECTRIC WATER COOLER

EWH ELECTRIC WATER HEATER

EX EXISTING

EXIST EXISTING

ºF DEGREES FAHRENHEIT

FCO FLOOR CLEANOUT

FD FLOOR DRAIN

FIN FINISH

FL FLOOR

FPS FEET PER SECOND

FT FEET

FU FIXTURE UNITS

G NATURAL GAS

GAL GALLON(S)

GPM GALLONS PER MINUTE

GR GREASE WASTE

HB HOSE BIBB

HP HORSEPOWER

HR HOUR

HW HOT WATER

HWR HOT WATER RETURN

HZ HERTZ

IE INVERT ELEVATION

ID INTERNAL DIAMETER

IN INCHES

IPS INTERNATIONAL PIPE STANDARD

IRR IRRIGATION WATER

KW KILOWATT

LAV LAVATORY

LF LINEAR FEET

MAP MEDICAL GAS ALARM PANEL (AREA ALARM)

MAX MAXIMUM

MIN MINIMUM

MNTG MOUNTING

MS MOP SINK

NA NOT APPLICABLE

NC NORMALLY CLOSED

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NSF NATIONAL SANITATION FOUNDATION

NTS NOT TO SCALE

OD OUTSIDE DIAMETER

ORWL OVERFLOW RAIN WATER LEADER

PDI PLUMBING DRAINAGE INSTITUTE

PH PHASE

PPP PRECISION PLUMBING PRODUCTS

PSI POUNDS PER SQUARE INCH

RD ROOF DRAIN

RPM REVOLUTIONS PER MINUTE

RWL RAIN WATER LEADER

RX REMOVE EXISTING

S SANITARY

SAN SANITARY

SH SHOWER

SK SINK

SL SODA LINE

SPEC SPECIFICATION

SQ SQUARE

SS STAINLESS STEEL

STD STANDARD

ST STORM

TDH TOTAL DYNAMIC HEAD

TEMP TEMPERATURE

TET THERMAL EXPANSION TANK

TMV THERMOSTATIC MIXING VALVE

TOF TOP OF FOOTING

TP TRAP PRIMER

TYP TYPICAL

UL UNDERWRITER'S LABORATORY

U/G UNDERGROUND

UNO UNLESS NOTED OTHERWISE

UR URINAL

V VENT

VTR VENT THROUGH ROOF

VIV VALVE IN VERTICAL

VLV VALVE

VOL VOLUME

W WATTS

W/ WITH

WC WATER CLOSET

WCO WALL CLEANOUT

WHA WATER HAMMER ARRESTOR

WHY WALL HYDRANT

WFU WATER SUPPLY FIXTURE UNITS

ZVB MEDICAL GAS ZONE VALVE BOX

APPLICABLE CODES

1. VA PLUMBING DESIGN MANUAL 2023 EDITION

2. VA PULMONARY MEDICINE SERVICE DESIGN GUIDE 2011 EDITION

3. INTERNATIONAL BUILDING CODE: CONFORM IN STRICT COMPLIANCE TO THE FLORIDA BUILDING CODE (IBC) AND THE

AMENDMENTS WHICH ARE ENFORCED BY THE LOCAL AUTHORITY HAVING JURISDICTION.

A. INTERNATIONAL BUILDING CODE - PLUMBING (IPC) 2021 EDITION

B. INTERNATIONAL BUILDING CODE - FUEL GAS (IFGC) 2021 EDITION

C. INTERNATIONAL BUILDING CODE - ENERGY CONSERVATION (IECC) 2021 EDITION

4. NATIONAL FIRE PROTECTION ASSOCIATION (NFPA), INCLUDING (BUT NOT LIMITED TO):

A. COMPRESSED GASES AND CRYOGENIC FLUIDS CODE, NFPA 55 2023 EDITION

B. NATIONAL ELECTRICAL CODE (NEC) 2023 EDITION

C. HEALTH CARE FACILITIES CODE (NFPA 99) 2021 EDITION

D. LIFE SAFETY CODE (NFPA 101) 2021 EDITION

5. OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA)

6. ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARD (ABAAS)

7. AMERICAN SOCIETY OF TESTING AND MATERIALS (ASTM)

8. APPLICABLE STANDARDS, REGULATIONS, AND PRACTICES OF THE OWNER

SYMBOL DESCRIPTION

CONTROL VALVE

BUTTERFLY VALVE

CALIBRATING BALANCING VALVE

BALL VALVE

STRAINER

UNION

THERMOMETER

PSI REG.

FLOW SWITCH

CHECK VALVE

THREE-WAY CONTROL VALVE

FLEX CONNECTION

RELIEF VALVE

VALVE ON RISER

TEST PLUG

GLOBE VALVE

PSI REG.

FLOW SWITCH

PRESSURE SWITCH

AUTOMATIC AIR VENT

MEDICAL COMPRESSED AIR INTAKE PIPINGMAI

MEDICAL VACUUM PIPINGMV

MEDICAL VACUUM EXHAUST PIPINGMVE

WASTE ANESTHETIC GAS DISPOSAL PIPINGWAGD

WASTE ANESTHETIC GAS DISPOSAL EXHAUST PIPINGWAGDE

NITROGEN PIPINGN2

OXYGEN PIPINGO2

NITROUS OXIDE PIPINGNO

CARBON DIOXIDE PIPINGCO2

LABORATORY COMPRESSED AIR PIPINGLA

LABORATORY COMPRESSED AIR INTAKE PIPINGLAI

LABORATORY VACUUM PIPINGLV

LABORATORY VACUUM EXHAUST PIPINGLVE

PROCESS COMPRESSED AIR PIPINGPA

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

A u to d e s k D o c s

/F lo ri d a

O rl a n d o

V A

/0

V A

L a k e N o n a C a rd io lo g y

R

M

E P

F P

F A

T .r v t

/7

/2

:3

:1

A M

P-001

PLUMBING NOTES, LEGENDS, &

SYMBOLS

Create Cardiovascular Center at Lake Nona

Orlando, Florida

675-103

Kevin Glover - COR

03/07/2025 JMC AJZ

100% CONSTRUCTION

DOCUMENTS - BID SET

ALLEN D. LANTZ, P.E.

FL License #98984

SHEET LIST

SHEET NUMBER SHEET NAME

P-001 PLUMBING NOTES, LEGENDS, & SYMBOLS

PC101 PLUMBING PHASING PLANS

PC102 PLUMBING PHASING PLANS

PD101 PARTIAL UNDERSLAB PLAN - PLUMBING GRAVITY - DEMO - AREA A

PD102 PARTIAL UNDERSLAB PLAN - PLUMBING GRAVITY - DEMO - AREA B

PD111 PARTIAL LEVEL 1 PLAN - PLUMBING GRAVITY - DEMO - AREA A

PD112 PARTIAL LEVEL 1 PLAN - PLUMBING GRAVITY - DEMO - AREA B

PD113 PARTIAL LEVEL 1 PLAN - PLUMBING PRESSURE - DEMO - AREA A

PD114 PARTIAL LEVEL 1 PLAN - PLUMBING PRESSURE - DEMO - AREA B

PD121 PARTIAL LEVEL 1 INTERSTITIAL PLAN - PLUMBING GRAVITY - DEMO - AREA A

PD122 PARTIAL LEVEL 1 INTERSTITIAL PLAN - PLUMBING GRAVITY - DEMO - AREA B

PD123 PARTIAL LEVEL 1 INTERSTITIAL PLAN - PLUMBING PRESSURE - DEMO - AREA A

PD124 PARTIAL LEVEL 1 INTERSTITIAL PLAN - PLUMBING PRESSURE - DEMO - AREA B

PS101 PARTIAL UNDERSLAB PLAN - PLUMB. GRAVITY - NEW WORK - AREA A

PS102 PARTIAL UNDERSLAB PLAN - PLUMB. GRAVITY - NEW WORK - AREA B

PS111 PARTIAL LEVEL 1 PLAN - PLUMBING GRAVITY - NEW WORK - AREA A

PS112 PARTIAL LEVEL 1 PLAN - PLUMBING GRAVITY - NEW WORK - AREA B

PS112.D PARTIAL LEVEL 1 PLAN - PLUMBING GRAVITY - NEW WORK - AREA B DEDUCT

PS121 PARTIAL LEVEL 1 INTERSTITIAL PLAN - PLUMBING GRAVITY - NEW WORK - AREA A

PS122 PARTIAL LEVEL 1 INTERSTITIAL PLAN - PLUMBING GRAVITY - NEW WORK - AREA B

PS122.D PARTIAL LEVEL 1 INTERSTITIAL PLAN - PLUMBING GRAVITY - NEW WORK - AREA B DEDUCT

PS132 PARTIAL LEVEL1 - ROOF PLUMBING GRAVITY PLAN - NEW WORK - AREA B

PP111 PARTIAL LEVEL 1 PLAN - PLUMBING PRESSURE - NEW WORK - AREA A

PP112 PARTIAL LEVEL 1 PLAN - PLUMBING PRESSURE - NEW WORK - AREA B

PP112.D PARTIAL LEVEL 1 PLAN - PLUMBING PRESSURE - NEW WORK - AREA B DEDUCT

PP121 PARTIAL LEVEL 1 INTERSTITIAL PLAN - PLUMBING PRESSURE - NEW WORK - AREA A

PP122 PARTIAL LEVEL 1 INTERSTITIAL PLAN - PLUMBING PRESSURE - NEW WORK - AREA B

PP122.D PARTIAL LEVEL 1 INTERSTITIAL PLAN - PLUMBING PRESSURE - NEW WORK - AREA B DEDUCT

PG111 PARTIAL LEVEL 1 PLAN - PLUMBING MED GAS - NEW WORK - AREA A

PG112 PARTIAL LEVEL 1 PLAN - PLUMBING MED GAS - NEW WORK - AREA B

PG112.D PARTIAL LEVEL 1 PLAN - PLUMBING MED GAS - NEW WORK - AREA B DEDUCT

PG121 PARTIAL LEVEL 1 INTERSTITIAL PLAN - MED GAS - AREA A

PG122 PARTIAL LEVEL 1 INTERSTITIAL PLAN - MED GAS - AREA B

PG122.D PARTIAL LEVEL 1 INTERSTITIAL PLAN - MED GAS - AREA B DEDUCT

P-501 PLUMBING DETAILS

P-502 PLUMBING DETAILS

P-601 PLUMBING ISOMETRICS

P-602 PLUMBING ISOMETRICS

P-603 PLUMBING ISOMETRICS

P-604 PLUMBING ISOMETRICS

P-605 PLUMBING ISOMETRICS

P-606 PLUMBING ISOMETRICS

P-801 PLUMBING SCHEDULES

524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523 Revisions Date

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

A u to d e s k D o c s

/F lo ri d a

O rl a n d o

V A

/0

V A

L a k e N o n a C a rd io lo g y

R

M

E P

F P

F A

T .r v t

/7

/2

:3

:2

A M

PC101

PLUMBING PHASING PLANS Create Cardiovascular Center at Lake Nona

Orlando, Florida

675-103

Kevin Glover - COR

03/07/2025 JMC AJZ

100% CONSTRUCTION

DOCUMENTS - BID SET

ALLEN D. LANTZ, P.E.

FL License #98984

CODED NOTES:

CONNECT NEW SANITARY PIPING INTO EXISTING UNDERSLAB SANITARY PIPING AT THIS LOCATION AS SHOWN ON PS101.1

PHASING NOTES

1. REFER TO ARCHITECTURAL PHASING PLANS ON GC101 AND GC102 FOR MORE INFORMATION.

FIRST FLOOR:

• INSTALL ALL UNDERGROUND SANITARY IN PHASE 1 AREA OF WORK AS SHOWN ON PS101 AND PS102.

• INSTALL ALL VENT, CW, HW, AND HWR PIPING SERVING NEW PLUMBING FIXTURES IN PHASE 1 AREA OF WORK.

INTERSTITIAL:

• INSTALL ALL VENT, CW, HW, AND HWR PIPING AND EXTEND DOWN TO FIRST FLOOR PLUMBING FIXTURES.

• CONNECT TO EXISTING O2, MV, MA, AND WAGD PIPING AND EXTEND NEW MAINS IN INTERSTITIAL AREA. PROVIDE

VALVES AND CAPS AT TAPS TO AREAS IN FUTURE PHASES.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

A u to d e s k D o c s

/F lo ri d a

O rl a n d o

V A

/0

V A

L a k e N o n a C a rd io lo g y

R

M

E P

F P

F A

T .r v t

/7

/2

:3

:4

A M

PC102

PLUMBING PHASING PLANS Create Cardiovascular Center at Lake Nona

Orlando, Florida

675-103

Kevin Glover - COR

03/07/2025 JMC AJZ

100% CONSTRUCTION

DOCUMENTS - BID SET

ALLEN D. LANTZ, P.E.

FL License #98984

PHASING NOTES

1. REFER TO ARCHITECTURAL PHASING PLANS ON GC101 AND GC102 FOR MORE INFORMATION.

PHASE 2:

FIRST FLOOR:

• INSTALL ALL UNDERGROUND SANITARY PIPING IN PHASE 2 AREA OF WORK.

• INSTALL ALL VENT, CW, HW, AND HWR PIPING SERVING NEW PLUMBING FIXTURES.

INTERSTITIAL:

• INSTALL ALL VENT, CW, HW, AND HWR PIPING AND EXTEND DOWN TO FIRST FLOOR PLUMBING FIXTURES.

• CONNECT TO EXISTING O2, MV, MA, AND WAGD PIPING TAPS AND EXTEND TO SERVE ROOMS IN PHASE 2 AREA OF

WORK.

PHASE 3:

FIRST FLOOR:

• INSTALL ALL UNDERGROUND SANITARY PIPING IN PHASE 2 AREA OF WORK.

• INSTALL ALL VENT, CW, HW, AND HWR PIPING SERVING NEW PLUMBING FIXTURES.

INTERSTITIAL:

• INSTALL ALL VENT, CW, HW, AND HWR PIPING AND EXTEND DOWN TO FIRST FLOOR PLUMBING FIXTURES.

• CONNECT TO EXISTING O2, MV, MA, AND WAGD PIPING TAPS AND EXTEND TO SERVE ROOMS IN PHASE 2 AREA OF

WORK.

A.5

A.7

B.1

C.1

C.15

C.3

C.5

D.1

A.1

8.1 7.7 7.17.3 6.7 6.1 5.7 5.1 4.7

4.1

32.2

30.5

30.230

27.7

A732.532.4

J.12

RX 3"

RX 4"

RX 4"

M A

T C

H

LI

N E

R

E F

E R

T O

P

LA

N

/ P D

F O

R C

O N

T

IN

U A

T

IO

N

EX 8" ST UP

EX 15" ST U/G

EX 15" ST

RX 4"

RX 2"

RX 3" SAN U/G

RX 3" SAN U/G

EX 3" SAN U/G

UP TO EXISTING FCO

UP TO EXISTING FCO

RX 2" SAN U/G

EX INVERT ELEVATION -4'-6" AT THIS LOCATION.

COORDINATE WITH CIVIL FOR CONTINUATION.

LOCATION OF EXISTING PIPING IS PRESUMED

AND SHALL BE FULLY CONFIRMED PRIOR TO ANY

NEW WORK.

EX INVERT ELEVATION IS APPROXIMATELY -4'-8"

AT THIS LOCATION. COORDINATE WITH CIVIL FOR

CONTINUATION. LOCATION OF EXISTING PIPING

IS PRESUMED AND SHALL BE FULLY CONFIRMED

PRIOR TO ANY NEW WORK.

RX 8" SAN U/G

RX 4" SAN U/G

EX 3" SAN U/G

RX 4" SAN U/G

NO CONTINUATION

N O

C O

N T

IN

U

A T

IO

N

NO CONTINUATION

Area - BArea - A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

A u to d e s k D o c s

/F lo ri d a

O rl a n d o

V A

/0

V A

L a k e N o n a C a rd io lo g y

R

M

E P

F P

F A

T .r v t

/7

/2

:3

:4

A M

PD101

PARTIAL UNDERSLAB PLAN - PLUMBING

GRAVITY - DEMO - AREA A

Create Cardiovascular Center at Lake Nona

Orlando, Florida

675-103

Kevin Glover - COR

03/07/2025 JMC AJZ

100% CONSTRUCTION

DOCUMENTS - BID SET

ALLEN D. LANTZ, P.E.

FL License #98984

N 0 4' 8' 16' 24'

1/8" = 1'-0"

N 0 4' 8' 16' 24'

1/8" = 1'-0"

N 0 4' 8' 16' 24'

1/8" = 1'-0"

CODED NOTES:

DRAWING NOTES:

1. EXISTING PIPING SYSTEMS DRAWN ON PLANS ARE BASED ON LIMITED EXISTING DOCUMENTATION AND FIELD VERIFICATION. THE CONTRACTOR SHALL CONFIRM THE SIZE AND SYSTEM TYPE FOR PIPING LOCATED WITHIN AND ADJACENT TO THE PROJECT SCOPE BOUNDARY BEFORE FABRICATION OF ANY NEW PIPING SHOWN ON PLANS.

CONTRACTOR SHALL NOTIFY COR OF ANY DEVIATIONS.

REMOVE EXISTING SANITARY PIPING BACK TO MAIN.

EXISTING CONCRETE FLOOR SLAB TO BE REMOVED AND REPLACED IN THIS AREA TO ALLOW FOR MODIFICATION OF EXISTING UNDERSLAB SANITARY SEWER PIPING SYSTEM. REFER TO ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR FLOOR SLAB SCOPE OF WORK. COORDINATE PIPING CONNECTIONS AND ACCESS AT EDGES OF WORK TO PERMIT PLUMBING NEW WORK TO

BE COMPLETED.

REMOVE EXISTING CONCRETE SLAB THIS AREA IN PREPARATION FOR NEW WORK CONNECTIONS. CLEAN AND INSPECT EXISTING PIPING LATERAL BACK TO MAIN. NOTIFY COR IF ANY CONDITIONS ARE PRESENT TO NOT PERMIT THE COMPLETION

OF NEW WORK SHOWN ON SHEETS PS101 AND PS102.

EXISTING 15" STORM TO REMAIN. PROTECT PIPING DURING ALL CONSTRUCTION ACTIVITIES.

EXISTING 15" STORM UP TO INTERSTITIAL SPACE. SEE SHEET PD121 FOR CONTINUATION.

EXISTING STRUCTURAL FOOTINGS SHOWN FOR COORDINATION ONLY. TYPICAL.

EXISTING PLUMBING FIXTURES IN THIS AREA SHALL REMAIN. COORDINATE SHUTDOWN TIMES WITH UNDERSLAB WORK TO

MINIMIZE DISRUPTION.

REMOVE EXISTING 2" SANITARY RISER UP. REFER TO PD111 FOR CONTINUATION.

1/8" = 1'-0"

1 PARTIAL UNDERSLAB PLUMBING GRAVITY PLAN - DEMOLITION - AREA A

N.T.S.

Key Plan - Area A

REFER TO ARCHITECTURAL

DRAWING AND SHEETS

PC101 AND PC102 FOR

PHASING INFORMATION.

B.1

C.1

C.15

C.3

C.5

D.1

A.1

3.74.1 3.1 2.7 2.1 1.7 1.1

B.5

A.9

RX 3"

EX 8" ST

EX. INVERT

ELEV. -2'-2"

M A

T C

H

LI

N E

R

E F

E R

T O

P

LA

N

/ P D

F O

R C

O N

T

IN

U A

T

IO

N

EX 8" ST UP

Area - BArea - A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

A u to d e s k D o c s

/F lo ri d a

O rl a n d o

V A

/0

V A

L a k e N o n a C a rd io lo g y

R

M

E P

F P

F A

T .r v t

/7

/2

:3

:5

A M

PD102

PARTIAL UNDERSLAB PLAN - PLUMBING

GRAVITY - DEMO - AREA B

Create Cardiovascular Center at Lake Nona

Orlando, Florida

675-103

Kevin Glover - COR

03/07/2025 JMC AJZ

100% CONSTRUCTION

DOCUMENTS - BID SET

ALLEN D. LANTZ, P.E.

FL License #98984

N 0 4' 8' 16' 24'

1/8" = 1'-0"

N 0 4' 8' 16' 24'

1/8" = 1'-0"

N 0 4' 8' 16' 24'

1/8" = 1'-0"

CODED NOTES:

DRAWING NOTES:

1. EXISTING PIPING SYSTEMS DRAWN ON PLANS ARE BASED ON LIMITED EXISTING DOCUMENTATION AND FIELD VERIFICATION. THE CONTRACTOR SHALL CONFIRM THE SIZE AND SYSTEM TYPE FOR PIPING LOCATED WITHIN AND ADJACENT TO THE PROJECT SCOPE BOUNDARY BEFORE FABRICATION OF ANY NEW PIPING SHOWN ON PLANS.

CONTRACTOR SHALL NOTIFY COR OF ANY DEVIATIONS.

REMOVE EXISTING SANITARY PIPING BACK TO MAIN. SANITARY PIPING SERVES STAIRWELL FCU(S) CONDENSATE DRAINAGE.

REMOVE PIPING TO ABOVE FLOOR. REFER TO PD112 FOR CONTINUATION.

EXISTING CONCRETE FLOOR SLAB TO BE REMOVED AND REPLACED IN THIS AREA TO ALLOW FOR MODIFICATION OF EXISTING AND NEW UNDERSLAB SANITARY SEWER PIPING SYSTEM. REFER TO ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR FLOOR SLAB SCOPE OF WORK. COORDINATE PIPING CONNECTIONS AND ACCESS AT EDGES OF WORK TO PERMIT PLUMBING

NEW WORK TO BE COMPLETED.

1/8" = 1'-0"

1 PARTIAL UNDERSLAB PLUMBING GRAVITY PLAN - DEMOLITION - AREA B

N.T.S.

Key Plan - Area B

REFER TO ARCHITECTURAL

DRAWING AND SHEETS

PC101 AND PC102 FOR

PHASING INFORMATION.

B.1

C.1

C.15

C.3

C.5

D.1

A.1

8.1 7.7 7.17.3 6.7 6.1 5.7 5.1 4.7

4.1

32.2

30.5

30.2

27.7

A7

32.5 32.4

J.12

M A

T C

H

LI

N E

R

E F

E R

T O

P

LA

N

/ P D

F O

R C

O N

T

IN

U A

T

IO

N

Escort Services

1B703

Vre Office

1C902

Elevator

1BE01

Elevator

1BE02

Hac

1B604

Electric

1C102a

Job Lab

1C403

Storage

1C605

VRE File Room

1C804

VRE Office

1C603

VRE Office

1C904

VRE Office

1C903

VRE Office

1C905 VRE Office

1C907

VRE Office

1C909 VRE Office

1C911

VRE Office

1C908

VRE Office

1C910

Cubicles

1C602

Cubicles

1C606

Cubicles

1C802

Vre Supervisor

1C212

Interview

1C218

Vre Office

1C219

Interview

1C220

Public Tlt Male

1C287

Public Tlt Female

1C288

Office Of Decedent Affairs

1C289

Hearing Rm

1C290

Elevator

1C294

Elevator

1C295

Cubicles

1C345

Storage

1C348

Toilet-Staff

1C349

Toilet-Patient

1C350

Staff Lounge

1C351

Conference

1C352

Training

1C353

Mail

1C354

Testing

1C355

HAC

1C356

Closet

1C357

Closet

1C358

VRE Office

1C363

Waiting

1C375

EX FCO

EX 15" ST DOWNSPOUT

NOZZLE UP TO LOCATION

SHOWN ON PD121.

EX L EX U

EX WCEX WC

EX WC EX WC EX WC EX WC

EX L

EX MB

EX EWC

EX 12" ST UP/DN

EX 12" STO UP

EX U

EX 12" STO DOWNSPOUT

EX. INVERT ELEV. -4.50'

EX FCO

NO CONTINUATION

N O

C O

N T

IN

U

A T

IO

N

NO CONTINUATION

EX FCO

EX 15" ST UP

EX 8" SAN UP

RX FCO

EX 2" SAN UP/DN

Area - BArea - A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

A u to d e s k D o c s

/F lo ri d a

O rl a n d o

V A

/0

V A

L a k e N o n a C a rd io lo g y

R

M

E P

F P

F A

T .r v t

/7

/2

:3

:5

A M

PD111

PARTIAL LEVEL 1 PLAN - PLUMBING

GRAVITY - DEMO - AREA A

Create Cardiovascular Center at Lake Nona

Orlando, Florida

675-103

Kevin Glover - COR

03/07/2025 JMC AJZ

100% CONSTRUCTION

DOCUMENTS - BID SET

ALLEN D. LANTZ, P.E.

FL License #98984

N 0 4' 8' 16' 24'

1/8" = 1'-0"

N 0 4' 8' 16' 24'

1/8" = 1'-0"

N 0 4' 8' 16' 24'

1/8" = 1'-0"

1/8" = 1'-0"

1 PARTIAL LEVEL 1 PLUMBING GRAVITY PLAN - DEMOLITION - AREA A

CODED NOTES:

DRAWING NOTES:

1. EXISTING PIPING SYSTEMS DRAWN ON PLANS ARE BASED ON LIMITED EXISTING DOCUMENTATION AND FIELD VERIFICATION. THE CONTRACTOR SHALL CONFIRM THE SIZE AND SYSTEM TYPE FOR PIPING LOCATED WITHIN AND ADJACENT TO THE PROJECT SCOPE BOUNDARY BEFORE FABRICATION OF ANY NEW PIPING SHOWN ON PLANS.

CONTRACTOR SHALL NOTIFY COR OF ANY DEVIATIONS.

2. FIELD VERIFY ALL FIXTURES AND PIPING AFFECTED BY DEMOLITION.

3. CONTRACTOR SHALL COORDINATE ANY SYSTEM DOWNTIME WITH OWNER PRIOR TO START OF WORK.

REMOVE EXISTING PLUMBING FIXTURE, SANITARY PIPING, AND VENT PIPING BACK TO MAIN. CAP PIPING AT FITTING. 1

N.T.S.

Key Plan - Area A

REFER TO ARCHITECTURAL

DRAWING AND SHEETS

PC101 AND PC102 FOR

PHASING INFORMATION.

B.1

C.1

C.15

C.3

C.5

D.1

A.1

3.74.1 3.1 2.7 2.1 1.7 1.1

B.5

A.9

M A

T C

H

LI

N E

R

E F

E R

T O

P

LA

N

/ P D

F O

R C

O N

T

IN

U A

T

IO

N

Electric

1C924 Comm

1C926

Cubicles

1C125

Files

1C121a

Passage

1CC09a

Cubicles

1C921

Conference

1C339

Asst. Manager

1C340

Storage

1C341

EX ST FCO

EX 8" ST UP/DN EX 8" STO UP

RX FCO

EX 8" STO

DOWNSPOUT

Area - BArea - A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

A u to d e s k D o c s

/F lo ri d a

O rl a n d o

V A

/0

V A

L a k e N o n a C a rd io lo g y

R

M

E P

F P

F A

T .r v t

/7

/2

:3

:0

A M

PD112

PARTIAL LEVEL 1 PLAN - PLUMBING

GRAVITY - DEMO - AREA B

Create Cardiovascular Center at Lake Nona

Orlando, Florida

675-103

Kevin Glover - COR

03/07/2025 JMC AJZ

100% CONSTRUCTION

DOCUMENTS - BID SET

ALLEN D. LANTZ, P.E.

FL License #98984

N 0 4' 8' 16' 24'

1/8" = 1'-0"

N 0 4' 8' 16' 24'

1/8" = 1'-0"

N 0 4' 8' 16' 24'

1/8" = 1'-0"

1/8" = 1'-0"

1 PARTIAL LEVEL 1 PLUMBING GRAVITY PLAN - DEMOLITION - AREA B

CODED NOTES:

DRAWING NOTES:

1. EXISTING PIPING SYSTEMS DRAWN ON PLANS ARE BASED ON LIMITED EXISTING DOCUMENTATION AND FIELD VERIFICATION. THE CONTRACTOR SHALL CONFIRM THE SIZE AND SYSTEM TYPE FOR PIPING LOCATED WITHIN AND ADJACENT TO THE PROJECT SCOPE BOUNDARY BEFORE FABRICATION OF ANY NEW PIPING SHOWN ON PLANS.

CONTRACTOR SHALL NOTIFY COR OF ANY DEVIATIONS.

2. FIELD VERIFY ALL FIXTURES AND PIPING AFFECTED BY DEMOLITION.

3. CONTRACTOR SHALL COORDINATE ANY SYSTEM DOWNTIME WITH OWNER PRIOR TO START OF WORK.

REMOVE EXISTING SANITARY PIPING UP TO INTERSTITIAL LANDING ON STAIRWELL. SANITARY PIPING SERVES CONDENSATE

DRAINAGE FROM FCU'S IN STAIRWELL.

N.T.S.

Key Plan - Area B

REFER TO ARCHITECTURAL

DRAWING AND SHEETS

PC101 AND PC102 FOR

PHASING INFORMATION.

B.1

C.1

C.15

C.3

C.5

D.1

A.1

8.1 7.7 7.17.3 6.7 6.1 5.7 5.1 4.7

4.1

32.2

30.5

30.230

27.7

A732.532.4

J.12

M A

T C

H

LI

N E

R

E F

E R

T O

P

LA

N

/ P D

F O

R C

O N

T

IN

U A

T

IO

N

Escort Services

1B703

Vre Office

1C902

Elevator

1BE01

Elevator

1BE02

Hac

1B604

Electric

1C102a

Job Lab

1C403

Storage

1C605

VRE File Room

1C804

VRE Office

1C603

VRE Office

1C904

VRE Office

1C903

VRE Office

1C905 VRE Office

1C907

VRE Office

1C909 VRE Office

1C911

VRE Office

1C908

VRE Office

1C910

Cubicles

1C602

Cubicles

1C606

Cubicles

1C802

Vre Supervisor

1C212

Interview

1C218

Vre Office

1C219

Interview

1C220

Public Tlt Male

1C287

Public Tlt Female

1C288

Office Of Decedent Affairs

1C289

Hearing Rm

1C290

Elevator

1C294

Elevator

1C295

Cubicles

1C345

Storage

1C348

Toilet-Staff

1C349

Toilet-Patient

1C350

Staff Lounge

1C351

Conference

1C352

Training

1C353

Mail

1C354

Testing

1C355

HAC

1C356

Closet

1C357

Closet

1C358

VRE Office

1C363

Waiting

1C375

EX L EX U

EX WCEX WC

EX WC EX WC EX WC EX WC

EX L

EX MB

EX EWC

EX U

RX 1/2" CW AND 1/2"

HW UP.

RX 1/2" CW AND 1/2" HW UP.

RX 1/2" CW AND

1/2" HW UP.RX 1" CW UP.

RX 1" CW UP.

RX 1/2" CW AND

1/2" HW UP.

NO CONTINUATION

N O

C O

N T

IN

U

A T

IO

N

NO CONTINUATION

Area - BArea - A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

A u to d e s k D o c s

/F lo ri d a

O rl a n d o

V A

/0

V A

L a k e N o n a C a rd io lo g y

R

M

E P

F P

F A

T .r v t

/7

/2

:3

:0

A M

PD113

PARTIAL LEVEL 1 PLAN - PLUMBING

PRESSURE - DEMO - AREA A

Create Cardiovascular Center at Lake Nona

Orlando, Florida

675-103

Kevin Glover - COR

03/07/2025 JMC AJZ

100% CONSTRUCTION

DOCUMENTS - BID SET

ALLEN D. LANTZ, P.E.

FL License #98984

N 0 4' 8' 16' 24'

1/8" = 1'-0"

N 0 4' 8' 16' 24'

1/8" = 1'-0"

N 0 4' 8' 16' 24'

1/8" = 1'-0"

1/8" = 1'-0"

1 PARTIAL LEVEL 1 PLUMBING PRESSURE PLAN - DEMOLITION - AREA A

CODED NOTES:

DRAWING NOTES:

1. EXISTING PIPING SYSTEMS DRAWN ON PLANS ARE BASED ON LIMITED EXISTING DOCUMENTATION AND FIELD VERIFICATION. THE CONTRACTOR SHALL CONFIRM THE SIZE AND SYSTEM TYPE FOR PIPING LOCATED WITHIN AND ADJACENT TO THE PROJECT SCOPE BOUNDARY BEFORE FABRICATION OF ANY NEW PIPING SHOWN ON PLANS.

CONTRACTOR SHALL NOTIFY COR OF ANY DEVIATIONS.

2. FIELD VERIFY ALL FIXTURES AND PIPING AFFECTED BY DEMOLITION.

3. CONTRACTOR SHALL COORDINATE ANY SYSTEM DOWNTIME WITH COR PRIOR TO START OF WORK.

REMOVE EXISTING PLUMBING FIXTURE, CW, HW, & HWR PIPING BACK TO EXISTING MAIN LOCATED IN FIRST FLOOR

INTERSTITIAL SPACE.

N.T.S.

Key Plan - Area A

REFER TO ARCHITECTURAL

DRAWING AND SHEETS

PC101 AND PC102 FOR

PHASING INFORMATION.

B.1

C.1

C.15

C.3

C.5

D.1

A.1

3.74.1 3.1 2.7 2.1 1.7 1.1

B.5

A.9

Electric

1C924 Comm

1C926

Cubicles

1C125

Files

1C121a

Passage

1CC09a

Cubicles

1C921

Conference

1C339

Asst. Manager

1C340

Storage

1C341

Equipment

1C346

M A

T C

H

LI

N E

R

E F

E R

T O

P

LA

N

/ P D

F O

R C

O N

T

IN

U A

T

IO

N

EX HB

EX HB

EX 1/2" CW UP

EX 1/2" CW UP

Area - BArea - A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

A u to d e s k D o c s

/F lo ri d a

O rl a n d o

V A

/0

V A

L a k e N o n a C a rd io lo g y

R

M

E P

F P

F A

T .r v t

/7

/2

:3

:0

A M

PD114

PARTIAL LEVEL 1 PLAN - PLUMBING

PRESSURE - DEMO - AREA B

Create Cardiovascular Center at Lake Nona

Orlando, Florida

675-103

Kevin Glover - COR

03/07/2025 JMC AJZ

100% CONSTRUCTION

DOCUMENTS - BID SET

ALLEN D. LANTZ, P.E.

FL License #98984

N 0 4' 8' 16' 24'

1/8" = 1'-0"

N 0 4' 8' 16' 24'

1/8" = 1'-0"

N 0 4' 8' 16' 24'

1/8" = 1'-0"

1/8" = 1'-0"

1 PARTIAL LEVEL 1 PLUMBING PRESSURE PLAN - DEMOLITION - AREA B

DRAWING NOTES:

1. EXISTING PIPING SYSTEMS DRAWN ON PLANS ARE BASED ON LIMITED EXISTING DOCUMENTATION AND FIELD VERIFICATION. THE CONTRACTOR SHALL CONFIRM THE SIZE AND SYSTEM TYPE FOR PIPING LOCATED WITHIN AND ADJACENT TO THE PROJECT SCOPE BOUNDARY BEFORE FABRICATION OF ANY NEW PIPING SHOWN ON PLANS.

CONTRACTOR SHALL NOTIFY COR OF ANY DEVIATIONS.

2. FIELD VERIFY ALL FIXTURES AND PIPING AFFECTED BY DEMOLITION.

N.T.S.

Key Plan - Area B

REFER TO ARCHITECTURAL

DRAWING AND SHEETS

PC101 AND PC102 FOR

PHASING INFORMATION.

B.1

C.1

C.15

C.3

C.5

D.1

A.1

8.1 7.7 7.17.3 6.7 6.1 5.7 5.1 4.7

4.1

32.2

30.5

30.2

27.7

A7

32.5 32.4

J.12

EX 4" V

RX 2" V DN

RX 2" V

EX 15" STO DN

EX 12" STO UP

21,575 SQFT

1,015 GPM

EX 12" STO UP

23,176 SQFT

1,090 GPM

EX 12" ST UP

23,176 SQFT

1,090 GPM

EX 12" ST UP

21,575 SQFT

1,015 GPM

EX 12" ST

EX 12" ST

EX 15" ST DN

44751 SQFT

2105 GPM

EX 15" ST

EX 15" STO

EX 12" STO

EX 1 1/2" V DN RX 1 1/2" V RX 2" V DN

RX 1 1/2" V DN

RX 2" V

RX 1 1/2" V DN

EX 12" ST

EX 12" STO

EX 6" ST

EX 6" STO

EX 4" STO

EX 4" ST

EX 6" ST

EX 6" STO

EX 10" ST

EX 10" STO

EX 8" STO

EX 8" ST

EX 6" ST

EX 6" STO

EX 4" ST

EX 4" STO

EX 8" ST

EX 8" STO

EX 6" STO

EX 4" ST

EX 4" STO

EX 4" ST

EX 4" STO

EX 12" STO DN

24,110 SQFT

1,135 GPM

EX 12" ST DN

24,110 SQFT

1,135 GPM

EX 6" STO UP

EX 6" ST UP

EX 6" STO UP

EX 6" ST UP

EX 4" STO UP

EX 4" ST UP

EX 4" STO UP

EX 4" ST UP

M A

T C

H

LI

N E

R

E F

E R

T O

P

LA

N

/ P D

F O

R C

O N

T

IN

U A

T

IO

N

EX 4" STO UP

EX 4" ST UP

EX 4" STO UP

EX 4" ST UP

EX 4" V UP

EX 4" V

NO CONTINUATION

N O

C O

N T

IN

U

A T

IO

N

NO CONTINUATION

Area - BArea - A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

A u to d e s k D o c s

/F lo ri d a

O rl a n d o

V A

/0

V A

L a k e N o n a C a rd io lo g y

R

M

E P

F P

F A

T .r v t

/7

/2

:3

:1

A M

PD121

PARTIAL LEVEL 1 INTERSTITIAL PLAN -

PLUMBING GRAVITY - DEMO - AREA A

Create Cardiovascular Center at Lake Nona

Orlando, Florida

675-103

Kevin Glover - COR

03/07/2025 JMC AJZ

100% CONSTRUCTION

DOCUMENTS - BID SET

ALLEN D. LANTZ, P.E.

FL License #98984

N 0 4' 8' 16' 24'

1/8" = 1'-0"

N 0 4' 8' 16' 24'

1/8" = 1'-0"

N 0 4' 8' 16' 24'

1/8" = 1'-0"

DRAWING NOTES:

1. EXISTING PIPING SYSTEMS DRAWN ON PLANS ARE BASED ON LIMITED EXISTING DOCUMENTATION AND FIELD VERIFICATION. THE CONTRACTOR SHALL CONFIRM THE SIZE AND SYSTEM TYPE FOR PIPING LOCATED WITHIN AND ADJACENT TO THE PROJECT SCOPE BOUNDARY BEFORE FABRICATION OF ANY NEW PIPING SHOWN ON PLANS.

CONTRACTOR SHALL NOTIFY COR OF ANY DEVIATIONS.

2. FIELD VERIFY ALL FIXTURES AND PIPING AFFECTED BY DEMOLITION.

1/8" = 1'-0"

1 PARTIAL LEVEL 1 INTERSTITIAL PLUMBING GRAVITY PLAN - DEMOLITION - AREA A

N.T.S.

Key Plan - Area A

REFER TO ARCHITECTURAL

DRAWING AND SHEETS

PC101 AND PC102 FOR

PHASING INFORMATION.

B.1

C.1

C.15

C.3

C.5

D.1

A.1

3.74.1 3.1 2.7 2.1 1.7 1.1

B.5

A.9

EX 8" STO

M A

T C

H

LI

N E

R

E F

E R

T O

P

LA

N

/ P D

F O

R C

O N

T

IN

U A

T

IO

N EX 6" STO UP

EX 6" ST UP

EX 6" STO UP

EX 6" ST UP

EX 6" STO UP

EX 6" ST UP

EX 8" ST DN

5,787 SQFT

270 GPM

EX 8" STO DN

5,787 SQFT

270 GPM

EX 6" ST

EX 6" STO

EX 6" ST

EX 6" ST

EX 8" ST

RX 3" ST

Area - BArea - A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

A u to d e s k D o c s

/F lo ri d a

O rl a n d o

V A

/0

V A

L a k e N o n a C a rd io lo g y

R

M

E P

F P

F A

T .r v t

/7

/2

:3

:1

A M

PD122

PARTIAL LEVEL 1 INTERSTITIAL PLAN -

PLUMBING GRAVITY - DEMO - AREA B

Create Cardiovascular Center at Lake Nona

Orlando, Florida

675-103

Kevin Glover - COR

03/07/2025 JMC AJZ

100% CONSTRUCTION

DOCUMENTS - BID SET

ALLEN D. LANTZ, P.E.

FL License #98984

N 0 4' 8' 16' 24'

1/8" = 1'-0"

N 0 4' 8' 16' 24'

1/8" = 1'-0"

N 0 4' 8' 16' 24'

1/8" = 1'-0"

CODED NOTES:

DRAWING NOTES:

1. EXISTING PIPING SYSTEMS DRAWN ON PLANS ARE BASED ON LIMITED EXISTING DOCUMENTATION AND FIELD VERIFICATION. THE CONTRACTOR SHALL CONFIRM THE SIZE AND SYSTEM TYPE FOR PIPING LOCATED WITHIN AND ADJACENT TO THE PROJECT SCOPE BOUNDARY BEFORE FABRICATION OF ANY NEW PIPING SHOWN ON PLANS.

CONTRACTOR SHALL NOTIFY COR OF ANY DEVIATIONS.

2. FIELD VERIFY ALL FIXTURES AND PIPING AFFECTED BY DEMOLITION.

REMOVE EXISTING SANITARY PIPING AS INDICATED. SANITARY PIPING SERVES CONDENSATE DRAINAGE FROM FCU'S IN

STAIRWELL.

1/8" = 1'-0"

1 PARTIAL LEVEL 1 INTERSTITIAL PLUMBING PLAN - DEMOLITION - AREA B

N.T.S.

Key Plan - Area B

REFER TO ARCHITECTURAL

DRAWING AND SHEETS

PC101 AND PC102 FOR

PHASING INFORMATION.

B.1

C.1

C.15

C.3

C.5

D.1

A.1

8.1 7.7 7.17.3 6.7 6.1 5.7 5.1 4.7

4.1

32.2

30.5

30.2

27.7

A7

32.5 32.4

J.12

RX 1/2" HW

RX 1/2" CW

RX 2 1/2" CW

RX 1" HW

EX 1 1/4" HWR

M A

T C

H

LI

N E

R

E F

E R

T O

P

LA

N

/ P D

F O

R C

O N

T

IN

U A

T

IO

N

RX 1/2" HWR

RX 1/2" HWR

EX 3/4" HW

EX 3/4" CW

EX 1" CW

EX 2 1/2" CW

EX 1 1/4" HW

EX 3/4" CW

EX 2 1/2" CW

EX 1 1/4" HW

EX 4" CW

EX 3" HW

EX 2" HW

EX 2 1/2" CW

EX 4" CW

EX 2" HW

EX 3" HW

EX 1 1/4" HWR

EX 4" CW

RX 1/2" HWR

RX 2" CW

RX 1/2" HW

RX 1" CW

RX 1/2" CW

RX 1/2" HW

RX 1/2" CW

RX 1/2" HW

RX 1/2" HWR

RX 1/2" HW

RX 2" CW

1 2

1 2

3 3

EX 3/4" CW

EX 4" HW

EX 2" HWR

EX 6" CW

EX 3" HW

EX 2" HWR

EX 6" CW

EX 3" HW

EX 2" HWR

EX 6" CW

NO CONTINUATION

N O

C O

N T

IN

U

A T

IO

N

NO CONTINUATION

Area - BArea - A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

A u to d e s k D o c s

/F lo ri d a

O rl a n d o

V A

/0

V A

L a k e N o n a C a rd io lo g y

R

M

E P

F P

F A

T .r v t

/7

/2

:3

:2

A M

PD123

PARTIAL LEVEL 1 INTERSTITIAL PLAN -

PLUMBING PRESSURE - DEMO - AREA A

Create Cardiovascular Center at Lake Nona

Orlando, Florida

675-103

Kevin Glover - COR

03/07/2025 JMC AJZ

100% CONSTRUCTION

DOCUMENTS - BID SET

ALLEN D. LANTZ, P.E.

FL License #98984

N 0 4' 8' 16' 24'

1/8" = 1'-0"

N 0 4' 8' 16' 24'

1/8" = 1'-0"

N 0 4' 8' 16' 24'

1/8" = 1'-0"

CODED NOTES:

DRAWING NOTES:

1. EXISTING PIPING SYSTEMS DRAWN ON PLANS ARE BASED ON LIMITED EXISTING DOCUMENTATION AND FIELD VERIFICATION. THE CONTRACTOR SHALL CONFIRM THE SIZE AND SYSTEM TYPE FOR PIPING LOCATED WITHIN AND ADJACENT TO THE PROJECT SCOPE BOUNDARY BEFORE FABRICATION OF ANY NEW PIPING SHOWN ON PLANS.

CONTRACTOR SHALL NOTIFY COR OF ANY DEVIATIONS.

2. FIELD VERIFY ALL FIXTURES AND PIPING AFFECTED BY DEMOLITION.

EXISTING COLD WATER PIPING DOWN TO EXISTING FIXTURES TO REMAIN.

EXISTING HOT WATER PIPING DOWN TO EXISTING FIXTURES TO REMAIN.

REMOVE EXISTING COLD, HOT, AND HOT WATER RETURN PIPING BACK TO LOCATION SHOWN AND CAP.

1/8" = 1'-0"

1 PARTIAL LEVEL 1 INTERSTITIAL PLUMBING PRESSURE PLAN - DEMOLITION - AREA A

N.T.S.

Key Plan - Area A

REFER TO ARCHITECTURAL

DRAWING AND SHEETS

PC101 AND PC102 FOR

PHASING INFORMATION.

B.1

C.1

C.15

C.3

C.5

D.1

A.1

3.74.1 3.1 2.7 2.1 1.7 1.1

B.5

A.9

EX 1/2" CW

EX 1/2" CW

EX 1/2" CW

M A

T C

H

LI

N E

R

E F

E R

T O

P

LA

N

/ P D

F O

R C

O N

T

IN

U A

T

IO

N

EX 1/2" CW DN

EX 1/2" CW DN

Area - BArea - A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

A u to d e s k D o c s

/F lo ri d a

O rl a n d o

V A

/0

V A

L a k e N o n a C a rd io lo g y

R

M

E P

F P

F A

T .r v t

/7

/2

:3

:2

A M

PD124

PARTIAL LEVEL 1 INTERSTITIAL PLAN -

PLUMBING PRESSURE - DEMO - AREA B

Create Cardiovascular Center at Lake Nona

Orlando, Florida

675-103

Kevin Glover - COR

03/07/2025 JMC AJZ

100% CONSTRUCTION

DOCUMENTS - BID SET

ALLEN D. LANTZ, P.E.

FL License #98984

N 0 4' 8' 16' 24'

1/8" = 1'-0"

N 0 4' 8' 16' 24'

1/8" = 1'-0"

N 0 4' 8' 16' 24'

1/8" = 1'-0"

DRAWING NOTES:

1. EXISTING PIPING SYSTEMS DRAWN ON PLANS ARE BASED ON LIMITED EXISTING DOCUMENTATION AND FIELD VERIFICATION. THE CONTRACTOR SHALL CONFIRM THE SIZE AND SYSTEM TYPE FOR PIPING LOCATED WITHIN AND ADJACENT TO THE PROJECT SCOPE BOUNDARY BEFORE FABRICATION OF ANY NEW PIPING SHOWN ON PLANS.

CONTRACTOR SHALL NOTIFY COR OF ANY DEVIATIONS.

2. FIELD VERIFY ALL FIXTURES AND PIPING AFFECTED BY DEMOLITION.

1/8" = 1'-0"

1 PARTIAL LEVEL 1 INTERSTITIAL PLUMBING PRESSURE PLAN - DEMOLITION - AREA B

N.T.S.

Key Plan - Area B

REFER TO ARCHITECTURAL

DRAWING AND SHEETS

PC101 AND PC102 FOR

PHASING INFORMATION.

B.1

C.1

C.15

C.3

C.5

D.1

A.1

8.1 7.7 7.17.3 6.7 6.1 5.7 5.1 4.7

4.1

32.2

30.5

30.2

27.7

A7

32.5 32.4

J.12

M A

T C

H

LI

N E

R

E F

E R

T O

P

LA

N

/ P S

F O

R C

O N

T

IN

U A

T

IO

N

EX 8" SAN INVERT ELEVATION -4'-6" AT THIS

LOCATION. COORDINATE WITH CIVIL FOR

CONTINUATION. LOCATION OF EXISTING PIPING

IS PRESUMED AND SHALL BE FULLY CONFIRMED

PRIOR TO ANY NEW WORK.

6" ST UP

2" SAN UP

2" SAN UP

2" SAN UP

2" SAN UP 2" SAN UP

2" SAN UP

2" SAN UP

2" SAN UP 2" SAN UP

2" SAN UP 2" SAN UP 2" SAN UP 2" SAN UP 2" SAN UP 2" SAN UP

2" SAN UP

2" SAN UP 2" SAN UP

2" SAN UP

2" SAN UP

2" SAN UP

2" SAN UP

2" SAN UP

8" ST UP

4" SAN UP TO

FCO

4" SAN UP

4" SAN UP TO

FCO

4" SAN UP

4" SAN UP

3" SAN UP TO

FCO

4" SAN UP

EX 4" SAN UP

TO FCO

BACKWATER VALVE

2" SAN UP

INV. ELEV -3'-7"

INV. ELEV -3'-0"

INV. ELEV -1'-6"

2" SAN UP

EX 8" SAN INVERT ELEVATION IS

APPROXIMATELY -4'-8" AT THIS LOCATION.

COORDINATE WITH CIVIL FOR CONTINUATION.

LOCATION OF EXISTING PIPING IS PRESUMED

AND SHALL BE FULLY CONFIRMED PRIOR TO ANY

NEW WORK.

UP TO EXISTING FCO

3" SAN3" SAN UP TO

FCO

3" SAN

EX 4" SAN

INV. ELEV -3'-8"

INV. ELEV -3'-0"

INV. ELEV -2'-9"

INV. ELEV -2'-0"

2" SAN

2" SAN

4" SAN

4" SAN4" SAN

EX 4" SAN

EX 3" SAN

EX 4" SAN

EX 8" SAN

EX 8" SAN EX 8" SAN

EX 8" SAN

4" SAN

3" SAN

3" SAN

3" SAN

4" SAN

12" ST UP

4" SAN

2" SAN UP

EX 15" ST

EX 8" SAN

EX 15" ST INVERT ELEVATION IS

APPROXIMATELY -2'-7" AT THIS LOCATION.

COORDINATE WITH CIVIL FOR CONTINUATION.

LOCATION OF EXISTING PIPING IS PRESUMED

AND SHALL BE FULLY CONFIRMED PRIOR TO ANY

NEW WORK.

EX 12" ST INVERT ELEVATION IS

APPROXIMATELY -4'-6" AT THIS LOCATION.

COORDINATE WITH CIVIL FOR CONTINUATION.

LOCATION OF EXISTING PIPING IS PRESUMED

AND SHALL BE FULLY CONFIRMED PRIOR TO ANY

NEW WORK.

2" SAN

3" SAN UP

TO FCO

EX 2" SAN UP

2" SAN UP

3 INV. ELEV -3'-7"

INV. ELEV -1'-6"

2" SAN UP

3" SAN UP

TO FCO

6" ST

ST INV. ELEV. = -3'-0"

SEE CIVIL FOR CONTINUATION.

NO CONTINUATION

N O

C O

N T

IN

U

A T

IO

N

NO CONTINUATION

TWO-WAY COTG

3" V UP

Area - BArea - A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

A u to d e s k D o c s

/F lo ri d a

O rl a n d o

V A

/0

V A

L a k e N o n a C a rd io lo g y

R

M

E P

F P

F A

T .r v t

/7

/2

:3

:2

A M

PS101

PARTIAL UNDERSLAB PLAN - PLUMB.

GRAVITY - NEW WORK - AREA A

Create Cardiovascular Center at Lake Nona

Orlando, Florida

675-103

Kevin Glover - COR

03/07/2025 JMC AJZ

100% CONSTRUCTION

DOCUMENTS - BID SET

ALLEN D. LANTZ, P.E.

FL License #98984

N 0 4' 8' 16' 24'

1/8" = 1'-0"

N 0 4' 8' 16' 24'

1/8" = 1'-0"

N 0 4' 8' 16' 24'

1/8" = 1'-0"

1/8" = 1'-0"

1 PARTIAL UNDERSLAB PLUMBING GRAVITY PLAN - NEW WORK - AREA A

DRAWING NOTES:

1. MODIFY EXISTING PIPING AT POINTS OF CONNECTION INDICATED TO FACILITATE NEW PIPING CONNECTION AND

INSTALLATION AS REQUIRED.

2. CONTRACTOR SHALL COORDINATE ANY SYSTEM DOWNTIME WITH OWNER PRIOR TO START OF WORK.

CODED NOTES:

EXISTING 8" SANITARY RISER UP TO FLOORS ABOVE TO REMAIN.

EXISTING 15" STORM RISER UP TO FLOORS ABOVE TO REMAIN.

OFFSET SANITARY PIPING UP UTILIZING 1/16TH BENDS TO THE INVERT ELEVATIONS SHOWN TO PROVIDE CLEARANCE AND

NECESSARY SOIL COVER ABOVE FOOTING FOR PROPER COMPACTION.

OFFSET SANITARY PIPING UP UTILIZING 1/8TH BENDS TO THE INVERT ELEVATION SHOWN TO PROVIDE CLEARANCE AND

NECESSARY SOIL COVER ABOVE FOOTING FOR PROPER COMPACTION.

SANITARY PIPING TO ROUTE OFF TOP OF EX 8" MAIN TO ABOVE THE EX STRUCTURAL FOOTING TO PROVIDE CLEARANCE AND

NECESSARY SOIL COVER ABOVE FOOTING FOR PROPER COMPACTION.

ROUTE 2" SANITARY PIPING ABOVE EXISTING FOOTING AND CONNECT INTO TOP OF 3" SANITARY BRANCH AS SHOWN.

EXISTING CONCRETE FLOOR SLAB TO BE REMOVED AND REPLACED IN THIS AREA TO ALLOW FOR MODIFICATION OF EXISTING UNDERSLAB SANITARY SEWER PIPING SYSTEM. REFER TO ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR FLOOR SLAB SCOPE OF WORK. COORDINATE PIPING CONNECTIONS AND ACCESS AT EDGES OF WORK TO PERMIT PLUMBING NEW WORK

TO BE COMPLETED.

2" SANITARY PIPING ROUTED ABOVE TOF AND BETWEEN EXISTING COLUMNS. COORDINATE FULLY WITH STRUCTURAL.

N.T.S.

Key Plan - Area A

REFER TO ARCHITECTURAL

DRAWING AND SHEETS

PC101 AND PC102 FOR

PHASING INFORMATION.

B.1

C.1

C.15

C.3

C.5

D.1

A.1

3.74.1 3.1 2.7 2.1 1.7 1.1

B.5

A.9

M A

T C

H

LI

N E

R

E F

E R

T O

P

LA

N

/ P S

F O

R C

O N

T

IN

U A

T

IO

N

8" ST

-2'-6" INV

EX 8" ST

2" SAN UP

2" SAN UP

2" SAN UP

2" SAN UP2" SAN UP

2" SAN UP

2" SAN UP2" SAN UP

2" SAN UP

2" SAN UP

2" SAN UP

4" SAN UP

4" SAN UP

4" SAN UP TO

FCO

4" SAN UP

4" SAN UP

3" SAN UP TO

FCO

3" SAN UP TO

FCO

3" SAN UP

3" SAN UP

3" V UP

3" V UP

2" SAN UP

2" V UP

EX 8" ST UP

2" SAN UP

1 1/2" SAN UP

3" SAN UP TO

WCO

4" SAN UP TO

FCO

INV. ELEV -2'-10"

INV. ELEV -2'-0"

INV. ELEV -2'-7"

INV. ELEV -1'-11"

2" SAN UP

2" V UP

3" SAN

4" SAN

4" SAN

4" SAN

4" SAN

4" SAN

4" SAN

2" SAN

2" V UP

2" SAN UP

2" SAN UP

2" V UP

3" SAN UP

4" SAN UP TO FCO

3" SAN

2" V UP

3" SAN UP

BACKWATER VALVE

Area - BArea - A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

A u to d e s k D o c s

/F lo ri d a

O rl a n d o

V A

/0

V A

L a k e N o n a C a rd io lo g y

R

M

E P

F P

F A

T .r v t

/7

/2

:3

:3

A M

PS102

PARTIAL UNDERSLAB PLAN - PLUMB.

GRAVITY - NEW WORK - AREA B

Create Cardiovascular Center at Lake Nona

Orlando, Florida

675-103

Kevin Glover - COR

03/07/2025 JMC AJZ

100% CONSTRUCTION

DOCUMENTS - BID SET

ALLEN D. LANTZ, P.E.

FL License #98984

N 0 4' 8' 16' 24'

1/8" = 1'-0"

N 0 4' 8' 16' 24'

1/8" = 1'-0"

N 0 4' 8' 16' 24'

1/8" = 1'-0"

1/8" = 1'-0"

1 PARTIAL UNDERSLAB PLUMBING GRAVITY PLAN - NEW WORK - AREA B

DRAWING NOTES:

1. MODIFY EXISTING PIPING AT POINTS OF CONNECTION INDICATED TO FACILITATE NEW PIPING CONNECTION AND

INSTALLATION.

2. CONTRACTOR SHALL COORDINATE ANY SYSTEM DOWNTIME WITH OWNER PRIOR TO START OF WORK.

CODED NOTES:

EXTEND 6" ST AND CONNECT INTO EXISTING STORM SYSTEM. REFER TO CIVIL DRAWINGS FOR CONTINUATION.

ROUTE SANITARY PIPING OFF TOP OF SANITARY MAIN PIPING AND OVER TO FIXTURES AS SHOWN ABOVE FOOTINGS.

PROVIDE CLEARANCE AND NECESSARY SOIL COVER ABOVE FOOTING FOR PROPER COMPACTION.

SANITARY PIPING IS ROUTED ABOVE STRUCTURAL FOOTINGS. SEE STRUCTURAL FOR TOF. PROVIDE CLEARANCE AND

NECESSARY SOIL COVER ABOVE FOOTING FOR PROPER COMPACTION.

OFFSET SANITARY PIPING HORIZONTALLY AS SHOWN UNDERSLAB TO AVOID EXISTING STRUCTURAL FOOTINGS.

OFFSET SANITARY PIPING UP UTILIZING 1/16TH BENDS TO THE INVERT ELEVATIONS SHOWN TO PROVIDE PROPER DEPTH

FROM FIXTURE OUTLETS TO TRAP WEIR.

EXISTING CONCRETE FLOOR SLAB TO BE REMOVED AND REPLACED IN THIS AREA TO ALLOW FOR MODIFICATION OF EXISTING UNDERSLAB SANITARY SEWER PIPING SYSTEM. REFER TO ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR FLOOR SLAB SCOPE OF WORK. COORDINATE PIPING CONNECTIONS AND ACCESS AT EDGES OF WORK TO PERMIT PLUMBING NEW WORK

TO BE COMPLETED.

N.T.S.

Key Plan - Area B

REFER TO ARCHITECTURAL

DRAWING AND SHEETS

PC101 AND PC102 FOR

PHASING INFORMATION.

B.1

C.1

C.15

C.3

C.5

D.1

A.1

8.1 7.7 7.17.3 6.7 6.1 5.7 5.1 4.7

4.1

32.2

30.5

30.2

27.7

A7

32.5 32.4

J.12

P-418

P-418 P-418

P-418

P-101

P-114

P-114

P-101

P-528

P-404

P-404

P-404

P-404P-404

P-404P-404

P-404

P-404

P-404

P-404

P-404

P-404

P-404P-404P-404P-404P-404P-404P-404P-404

P-404

M A

T C

H

LI

N E

R

E F

E R

T O

P

LA

N

/ P S

F O

R C

O N

T

IN

U A

T

IO

N

4" FCO

WCO

3" FCO 4" FCO

3" FCO

PROVIDERS

1C171

DEVICE CLINIC

1C131

STRESS TEST

1C132

HOLTER

1C135

TECH SUPERVISOR

1C133

ECHO

1C136

ECHO

1C137

ECHO

1C138

ECHO

1C139

INPATIENT HOLDING

1C130

CORRIDOR-1

1CC04-1ECG

1C128

ECG

1C129

CLEAN

1C126

STAFF

TOILET

1C125

ECHO

1C127

CORRIDOR

1CC05

ECHO

1C140

STAFF LOUNGE

1C141

STAFF

TOILET

1C142

CARDIO CHIEF

1C145

NON-INV LEAD

1C146

EP LEAD

1C164

CVT

1C163

ASSIST. NURSE MANAGER

1C165

PATIENT TOILET

1C143

EXAM

1C117

EXAM

1C118

EXAM

1C119

EXAM

1C120

EXAM

1C121

EXAM

1C122

EXAM

1C123

EXAM

1C124

TOUCHDOWN WORKSTATION

1C116

EXAM

1C106

EXAM

1C110

EXAM

1C109

PATIENT

TOILET

1C108

CORRIDOR

1CC02

FELLOWS

1C103

WAITING

1C101

ELECTRIC

1C102C

Elevator

1BE04

Space

1BC10

PROVIDERS

1C104

CONFERENCE

1C105

EXAM

1C111

EXAM

1C112

CORRIDOR

1CC06

EXAM

1C114

CORRIDOR

1CC07

BIOMED

1C144

EX FCO

444444

4 4

2" V

6" STO DN TO

DOWNSPOUT. REFER

TO DETAIL

4" ST4" ST 6" ST

4" STO

CO

EX UEX L

EX U EX WC EX WC

EX WC EX WC EX WC EX WC

EX L

4" SAN DN

4" STO

P-404

6" STO

CO

4" ST & STO

UP TO RD

4" ST & STO

UP TO RD

EX 15" STO UP

21,575 SQFT

1,010 GPM

EX FCO

EX 12" ST UP/DN

EX 12" STO UP

P-404

P-608

EX 2" SAN

UP

P-404

2" SAN

3" FCO

2" V UP

2" V

2" V

2" V

P-404

3" V UP TO INTERSTITIAL

SPACE

3" V

3" V2" V 3" V3" V

3" V

2" V

3" V

CORRIDOR-2

1CC04-2

2" V

2" V

3" V UP TO INTERSTITIAL

SPACE

3" V

3" FCO

EX 12" STO DN TO

DOWNSPOUT.

NO CONTINUATION

N O

C O

N T

IN

U

A T

IO

N

NO CONTINUATION

EX L EX L

EX MS

EX L EX L

Area - BArea - A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

A u to d e s k D o c s

/F lo ri d a

O rl a n d o

V A

/0

V A

L a k e N o n a C a rd io lo g y

R

M

E P

F P

F A

T .r v t

/7

/2

:3

:4

A M

PS111

PARTIAL LEVEL 1 PLAN - PLUMBING

GRAVITY - NEW WORK - AREA A

Create Cardiovascular Center at Lake Nona

Orlando, Florida

675-103

Kevin Glover - COR

03/07/2025 JMC AJZ

100% CONSTRUCTION

DOCUMENTS - BID SET

ALLEN D. LANTZ, P.E.

FL License #98984

N 0 4' 8' 16' 24'

1/8" = 1'-0"

N 0 4' 8' 16' 24'

1/8" = 1'-0"

N 0 4' 8' 16' 24'

1/8" = 1'-0"

1/8" = 1'-0"

1 PARTIAL LEVEL 1 PLUMBING GRAVITY PLAN - NEW WORK - AREA A

DRAWING NOTES:

1. MODIFY EXISTING PIPING AT POINTS OF CONNECTION INDICATED TO FACILITATE NEW PIPING CONNECTION AND

INSTALLATION.

2. CONTRACTOR SHALL COORDINATE ANY SYSTEM DOWNTIME WITH OWNER PRIOR TO START OF WORK.

3. INSTALL ALL FIXTURES AND EQUIPMENT PER MANUFACTURER INSTALLATION INSTRUCTIONS.

4. VENT PIPING SHOWN ON PLAN IS LOCATED ABOVE CEILING AND BELOW INTERSTITIAL SPACE.

CODED NOTES:

CONNECT TO EXISTING 2" SAN RISER UP TO INTERSTITIAL SPACE. OFFSET AS SHOWN.

6" STORM PIPING DOWN IN CHASE AND OUT TO EXISTING STORM MAIN. REFER TO CIVIL DRAWINGS FOR CONTINUATION.

4" SAN DN, 3" VENT UP, 4" SAN TO FIXTURE

2" SAN DN, 2" VENT UP, 1-1/2" SAN TO FIXTURE. VENT PIPING SHOWN OFFSET FOR CLARITY.

N.T.S.

Key Plan - Area A

REFER TO ARCHITECTURAL

DRAWING AND SHEETS

PC101 AND PC102 FOR

PHASING INFORMATION.

B.1

C.1

C.15

C.3

C.5

D.1

A.1

3.74.1 3.1 2.7 2.1 1.7 1.1

B.5

A.9

P-101

P-418

P-418

P-101

P-114

P-418

P-418 P-418 P-418

P-418

P-418

P-404

P-519

P-519

P-502

M A

T C

H

LI

N E

R

E F

E R

T O

P

LA

N

/ P S

F O

R C

O N

T

IN

U A

T

IO

N

3" FCO

3" FCO

4" FCO

EX ST FCO

NURSE MANAGER

1C148

CASE MANAGER

1C150

HF PACT

1C151

HOLD / RECOVERY

1C152

HOLD / RECOVERY

1C153

HOLD / RECOVERY

1C155

STAIR

1C197

CORRIDOR

1CC08

HOLD / RECOVERY

1C157

HOLD / RECOVERY

1C158

CORRIDOR

1CC09NURSE STATION

1C159

PATIENT TOILET

1C160

HAC

1C168

CLEAN

1C169

MEDICATION

1C170

CORRIDOR

1CC10

MALE TOILET / SHOWER

1C177

TEE / CARDIO VERSION

1C174

EQUIPMENT

1C173

SOILED UTILITY

1C166

CLINICAL DIETICIAN

1C167

READING

1C161

COMM

1C926/C

ELECTRIC

1C924

ADVANCED IMAGING

1C162

HYBRID CATH LAB

1C186

EP LAB

1C191

STERILE SUPPLIES

1C189

CORRIDOR

1CC12

ICR

1C190

ICR

1C188

EP LAB CONTROL ROOM

1C192

HYBRID CATH LAB CONTROL ROOM

1C187

CORRIDOR

1CC11

FEMALE TOILET / SHOWER

1C179

FEMALE LOCKER ROOM

1C178

ANESTHESIA

1C180

Clean

1C183

GAS STORAGE

1C185

ANESTHESIA EQPT. STR.

1C184

2 2

4" FD-D

P-408

P-521

P-408

P-521

P-502

HAC

1C183

CARDIO PHARMACY

1C172

MALE LOCKER ROOM

1C176

TRANSITION AREA

1C175

3" SAN DN

2" VENT UP

2" VENT DN

3" VENT DN

P-6…