This document is an Addendum (No. 01) dated July 30, 2025, for the Create Cardiovascular Center project at the Orlando VA Healthcare System located at 13800 Veterans Way, Orlando, FL 32827. The addendum revises the project phasing, reducing the original three phases to two phases: the previous Phases 1 & 2 have been combined into Phase 1, while the previous Phase 3 has been renamed as Phase 2. Key changes include constructing a 2-hour fire-rated temporary egress corridor with ceiling, emergency/egress lighting, and sprinkler system, which must be completed prior to starting construction of the new building expansion shell area adjacent to the stair exit door.
The addendum also addresses specific technical requirements for the project, including maintaining access to an existing toilet room during Phase 1 with temporary construction partitions, and handling distributed antenna system (DAS) and wireless access point (WAP) devices. For DAS devices, contractors must move them above the ceiling, protect them during construction, and reinstall them at the same location in the new ceiling. WAP devices are to be turned over to the VA Contracting Officer's Representative (COR), with the contractor responsible for installing new cabling and the VA to reinstall the devices at new locations indicated in the contract documents. The document includes revised phasing plans and narratives across multiple drawing sheets to reflect these changes.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
524 Fernwood Drive, Altamonte Springs, Florida 32701 | rdcjpa.com | 800.362.1523
Addendum No. 01
Date: July 30, 2025
Project: 675-103
Create Cardiovascular Center at Lake Nona
Orlando VA Healthcare System
13800 Veterans Way
Orlando, FL 32827
To: David Mark, VA CO
William Klotzbach, VA CS
Kevin Glover, VA COR
This Addendum supplements and amends the original Drawings and Specifications for the above referenced project. This Addendum shall be forwarded to all Prime Bidders and all appropriate building code authorities. This Addendum shall be taken into account in the preparation of bids and shall become a part of the Contract Documents.
Receipt of this Addendum must be acknowledged on the Bid Form.
This addendum consists of the following items:
1. Project Phasing has been revised to reduce the project into two phases. Previous Phases
1 & 2 have been combined into Phase 1 while previous Phase 3 has been renamed as
Phase 2.
- Revised Phase 1 requires a 2-hr fire rated temporary egress corridor to be constructed with ceiling, emergency / egress lighting and sprinkler to be installed. The temporary corridor must be completed prior to the start of construction of the new building expansion shell area adjacent to the Stair exit door. The temporary corridor may be removed upon the reopening and safe exit discharge from the exterior Stair door.
- Project Phasing Plans and narrative have been revised to reflect this change per VA direction.
2. An existing Toilet room to be removed shall remain in Phase 1 and temporary construction partitions shall be installed to maintain access for patient use. See keynote
1.13 on sheet GC102.
3. Existing distributed antenna system (DAS) and wireless access point (WAP) devices were added to clarify scope for these devices to the contractor.
- DAS devices are to be moved above ceiling and protected during construction; re-installed at same location in new ceiling.
- WAP devices are to be turned over the VA COR. Contractor to install new cabling;
VA to re-install WAP devices at new locations indicated on contract documents.
Drawings
1. Sheet GC101 – Phasing Plan – Reissued.
a. Revised Project Phasing Plan, updated Project Phasing narrative & added the Existing
Floor Plan for reference.
2. Sheet GC102 – Phasing Plans – Reissued.
a. Revised Project Phasing Plan, updated Project Phasing narrative.
3. Sheet FPC101 – Fire Protection Phasing Plans – Reissued
a. Revised Project Phasing Plan and revised fire protection notes to correspond to the new phasing plans.
4. Sheet FPC102 – Fire Protection Phasing Plans – Reissued
a. Revised Project Phasing Plan and revised fire protection notes to correspond to the new phasing plans.
5. Sheet PC101 – Plumbing Phasing Plans – Reissued
a. Revised Project Phasing Plan and revised plumbing notes to correspond to the new phasing plans.
6. Sheet PC102 – Plumbing Phasing Plans – Reissued
a. Revised Project Phasing Plan and revised plumbing notes to correspond to the new phasing plans.
7. Sheet MC101 – Mechanical Phasing Plans – Reissued
a. Revised Project Phasing Plan and revised mechanical notes to correspond to the new phasing plans.
8. Sheet MC102 – Mechanical Phasing Plans – Reissued
a. Revised Project Phasing Plan and revised mechanical notes to correspond to the new phasing plans.
9. Sheet EC101 – Phasing Plan – Reissued.
a. Revised Project Phasing Plan and revised electrical notes to correspond to the new phasing plans. Enlarged electrical rooms provided for reference.
10. Sheet EC102 – Phasing Plans – Reissued.
a. Revised Project Phasing Plan and revised electrical notes to correspond to the new phasing plans. Enlarged electrical rooms provided for reference.
11. Sheet T-001 – Technology Legend, Abbreviations, & General Notes – Reissued.
a. Revised Technology Legend to delineate WAP and DAS devices and revised telecommunications abbreviations to correspond to the changes.
12. Sheet TC101 – System Phasing Plans – Reissued.
a. Revised Systems Phasing Plan and revised telecommunications notes to correspond to the new phasing plans.
13. Sheet TC102 – System Phasing Plans – Reissued.
a. Revised Systems Phasing Plan and revised telecommunications notes to correspond to the new phasing plans.
14. Sheet TD101 – Partial Level 1 Plan - Technology - Demo - Area A – Reissued.
a. Revised Technology Demo Plan indicating existing WAP and DAS devices and revised telecommunications notes to correspond to the changes.
15. Sheet TD102 – Partial Level 1 Plan - Technology - Demo - Area B – Reissued.
a. Revised Technology Demo Plan indicating existing WAP and DAS devices and revised telecommunications notes to correspond to the changes.
16. Sheet TN101 – Partial Level 1 Plan - Data/Access Control/CCTV - New Work - Area A –
Reissued.
a. Revised Technology New Work Plan indicating existing DAS devices and revised telecommunications notes to correspond to the changes.
17. Sheet TN102 – Partial Level 1 Plan - Data/Access Control/CCTV - New Work - Area B –
Reissued.
a. Revised Technology New Work Plan indicating existing DAS devices and revised telecommunications notes to correspond to the changes.
End of Addendum No.1
PHASE 1
PHASE 1
PHASE 2
Temporary Construction Barrier.
Existing Area not in project Scope
Construction Area included in current Phase
Construction Area completed in previous Phase(s)
Construction Area in future Phase(s)
Egress Path during Phase
Temporary Exit Signs
Existing Exit Signs
Temporary 2-Hour Fire Rated Egress Corridor with Emergency / Egress Lighting, Ceiling and Sprinklers
PHASING LEGEND
T
E
New East Building Expansion
New South Building Expansion
S T A
T E
OF FLO
R
I D A
R E G
IS
TERED ARC
H
IT
E C T
J A S
ON
H. RO
S S
AR101907
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
03-07-2025
/2
/2
:5
:1
P
M
Create Cardiovascular Center at Lake Nona
03/07/2025
PHASING PLAN
GC101
NSCV
675-103
Orlando, Florida
Kevin Glover - COR
100% CONSTRUCTION
DOCUMENTS - BID SET
22040.00
N Scale: 1/16" = 1'-0"
Project Phasing Plan
A. Verify all conditions in the field prior to fabrication, erection and construction.
B. For temporay partition locations see Demolition Plans. Temporary partitions are suggested locations. Coordinate final location in field with COR.
C. All Temporary partitions to be 1 hour rated wall type T1.0 and shall extend to structural deck above unless noted otherwise. See dwg.
AE001 for temporary partition details.
D. Where temporary partitions are installed against existing walls, ceiling and / or wall finishes to remain, do not mechanically attached walls to prevent damage to those surfaces.
E. Temporary door locations and sizes are as required by the Contractor. Doors shall interfere with daily operations as little as possible. Confirm all locations with the COR. Construction doors are to use VA standard door hardware and to be keyed alike with VA standard locksets.
F. All Temporary doors installed in 1 hour rated construction partitions shall be 45 min. door unless otherwise noted.
G. Construct one section of temporary walls at a time to minimize congestion in corridor. Egress path must be maintained at all times.
H. Coordinate sequence construction with COR so that only one side of any corridor in use is obstructed at any one time.
I. Contractor to provide and install temporary wayfinding and egress signage during constuction. Coordinate sign depictions with COR and Physical Security.
J. Coordinate phase completion and start-up with requirements as set forth by the COR to maintain daily operations to near as normal as possible.
K. Coordinate location of job dumpster with the COR so as to disrupt daily operations as little as possible.
L. Coordinate access to all phases of construction, deliveries, and debris removal with the COR. See General Requirements.
M. Existing HVAC, medical gases, sprinklers and water supply to be maintained throughout as required during each phase of construction.Coordinate phasing with Mechanical and Plumbing contractor. Support and protect all lines during each phase of construction. See MEP Drawings.
N. Provide and maintain negative air pressure at all construction.
Coordinate with HVAC contractor. See HVAC plans for temporary venting requirements and duct locations.
O. Existing power must be maintained throughout as required during each phase of construction.Coordinate phasing with Electrical Contractor. Coordinate power turnover with requirements as dictated by the COR See Electrical Drawings.
P. Coordinate sequence construction with COR so that only one side of any corridor in use is obstructed at any one time.
R. Coordinate all work involving the generation of excessive noise so as to occur during non-peak operating hours, 1000 to 1600 daily.
Activities to occur during this time include, but are not limited to saw cutting, jack hammering, hammer drilling and core drilling. If there is any question as to whether an operation should occur during this time the Contractor will contact the COR.
S. Firestop all penetrations by the end of the shift. All Contractors shall have the Life Safety Plan that identifies each barrier. All Contractors shall be authorized and trained to perform firestopping.
T. All work requiring the use of a crane must be performed after hours.
U. Work to take place after hours shall be scheduled between 1700 to 600 Monday - Friday. Contractor shall coordinate and scheudule all after hours and weekend work with COR.
GENERAL PHASING NOTESPROJECT PHASING
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523 Revisions Date
1 Addendum No. 1 07/30/2025
N Scale: 1/16" = 1'-0"
Existing Plan
Note:
Refer to drawings FPC101 fire protection, PC101 plumbing, MC101 mechanical, EC101 electrical, TC101 technology & FAC101 fire alarm for additional phasing information and details.
Phase 1:
- Owner to vacate existing area defined in Phase 1.
- Construction fire rated temporary partitions.
- Demo & construct new interior renovation of Admin. & Holding rooms.
- Complete site work for new building expansion.
- Construct new East building expansion.
- Construction fire rated tempoary partitions including Stair and Interstitial Floor.
- Demo portion of existing exterior walls required for new construction.
- Construct recessed alcove in corridor wall for Police digital message board.
- Prior to commencing new building expansion shell construction adjacent to existing exterior Stair exit door, a tempoprary fire rated egress path back through the building must be completed.
- Construct temporary fire rated egress corridor walls & fire rated door with door swing oriented in the direction of egress from stair.
- Install ceiling along with emergency / egress lighting & directional exit signs along egress path.
- Install/modify suppression system to provide sprinklers in temporary corridor.
- Interior walls of temporary corridor shall be finished and painted.
- Remove & salvage existing interior exit door into Stair. Protect and store door to be reinstalled.
- Lock & install signage at existing exterior Stair exit door to prevent occupants from exiting into active construction area of building expansion.
- Upon completion of building expansion shell portion adjacent to the Stair exit door and approved by VA COR & Safety, reinstall interior stair exit door and reopen exterior stair exit discharge door.
- Temporary fencing to be in place to allow safe exiting from Stair door to beyond construction zone.
- Remove temporary fire rated egress corridor walls, fire rated door & ceiling.
- Remove temporary egress lighting & exit signs.
- Remove existing exterior exit door used for temporary stair egress & fill in with new pre-cast wall panel.
- Complete wall, floor & ceiling construction where temporary corridor was removed.
Phase 2:
- Owner to relocate existing Clinic operations into Phase 1 areas temporarily to maintain patient service & vacate Phase 2 area.
- Remove existing exit light, vestibule exit doors and install new doors to secure construction area.
- Construction fire rated temporary partitions.
- Demo & construct new interior renovation of Clinic rooms.
- Demo portion of existing exterior walls & interior vestibule required for new construction.
- Construct new South building expansion.
- Complete wall, floor & ceiling finishes in areas where temporary partitions were removed upon completion of Phase 2.
- Install casework in Providers office (Temp Waiting) once new Waiting Area is completed and in use.
T1.0
T1.0
T1.0
T1.0
T1.0
T1.0
Temporary Clinic Waiting & Check-in
Temporary Clinic Rooms for Echo, ECG, Holter & Stress
1.15
1.14
1.06
M in.
5'-0"
Common Path of Travel:
Max. Allowable = 100' Actual = 14'
Common Path of Travel:
Max. Allowable = 200' Actual = 55'
Common Path of Travel:
Max. Allowable = 100' Actual = 27'
Common Path of Travel:
Max. Allowable = 100' Actual = 41'
Travel Distance to Exit:
Max. Allowable = 200' Actual = 100'
Travel Distance to Exit:
Max. Allowable = 200' Actual = 98'
Travel Distance to Exit:
Max. Allowable = 200' Actual = 131'
Travel Distance to Exit:
Max. Allowable = 200' Actual = 153'
1.20
1.20
1.19
T .0
Travel Distance to Exit:
Max. Allowable = 200' Actual = 111'
Travel Distance to Exit:
Max. Allowable = 200' Actual = 98'
Common Path of Travel:
Max. Allowable = 100' Actual = 25'
Common Path of Travel:
Max. Allowable = 100' Actual = 97'
E
E
T E
EE
E
E
T1.0
T1.0
E E
E
E E
E
5'-0"
E
T1.0
5'-0"
T
T2.0
1.05
1.03
1.04
1.09
T2.0
T
TT
T T
T
1.10
Travel Distance to Exit:
Max. Allowable = 200' Actual = 94'
T2.0
1.06
1.12
1.12
T1.0
5'-0"
T2.0
T2.0
T2.0
T2.0
'-0
8'-0"
'-0
T2.0
1.17 1.10
1.11
1.13
Temporary Construction Barrier.
Existing Area not in project Scope
Construction Area included in current Phase
Construction Area completed in previous Phase(s)
Construction Area in future Phase(s)
Egress Path during Phase
Temporary Exit Signs
Existing Exit Signs
Temporary 2-Hour Fire Rated Egress Corridor with Emergency / Egress Lighting, Ceiling and Sprinklers
PHASING LEGEND
T
E
MECHANICAL
1E201
T1.0
T1.0
3'-0"
T1.0
1.16
New South Building Expansion
1.181.18
N Scale: 1/16" = 1'-0"1.2 Phase 1 Plan - Mechanical Floor
S T A
T E
OF FLO
R
I D A
R E G
IS
TERED ARC
H
IT
E C T
J A S
ON
H. RO
S S
AR101907
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
03-07-2025
/2
/2
:4
:4
P
M
Create Cardiovascular Center at Lake Nona
03/07/2025
PHASING PLANS
GC102
DesignerApprover
675-103
Orlando, Florida
Kevin Glover - COR
100% CONSTRUCTION
DOCUMENTS - BID SET
22040.00
N Scale: 1/16" = 1'-0"2 Phase 2 Plan
N Scale: 1/16" = 1'-0"1.1 Phase 1 Plan
1.03 Remove and salvage existing door only, frame to remain.
Protect and store door to be reinstalled upon completion of adjacent building expansion.
1.04 VA to provide temporary signage to indicate existing exit door is not an exit and designate new exit through temporary egress pathway. Reopen exit door upon completion of building expansion shell at exit discharge and when deemed safe by
COR.
1.05 Provide 1-1/2 hour rated HM frame and door for temporary egress. Hardware shall be fail safe including closer, panic bar and gasketing around jambs & head.
1.06 Remove existing exit signs prior to start of construction.
1.09 Temporary 2-hr rated horizontal egress pathway to exit door.
Corridor inside walls to be painted and concrete floor sealed.
1.10 Ensure lighting along temporary egress pathway is connected to emergency power and lighting value provides a minimum of 1 ft-candle measured at the floor surface.
1.11 Remove temporary corridor after it is no longer required for building exit egress and complete room construction and finishes along temporary corridor area.
1.12 Do not install casework in Phase 1. All other room finishes shall be completed in Phase 1 to allow room to be temporarily used for another use during construction Phase 2.
1.13 Maintain access to Toilet Room for patient use during Phase 1.
1.14 Upon completion of Phase 2 and use of new Waiting room, install countertops and wall cabinets.
1.15 Apply temporary covering completely over storefront windows and doors on the inside face of the glazing.
1.16 Coordinate work for new opening in existing stair wall and installation of new door to minimize time for temporary partition in stair. Remove partition immediately upon completion of new door. Schedule work with COR.
1.17 Remove exit door and install new pre-cast panel in opening after temporary corridor is no longer required for building exit egress.
1.18 Demo existing walls and floor finishes as necessary to allow access for below slab work to connect new sanitary plumbing to existing sanitary lines in Phase 1 work. Interior renovations in this area to take place in Phase 2 work.
1.19 Install doors along construction barrier walls at end of Phase 2.
Install temporary barriers around doors or complete after hours to not interfere VA clinic operations during normal business hours.
1.20 Remove temporary construction barriers at end of Phase 2.
Path walls, floors, ceiling as required and complete installation of finishes.
A. Verify all conditions in the field prior to fabrication, erection and construction.
B. For temporay partition locations see Demolition Plans. Temporary partitions are suggested locations. Coordinate final location in field with COR.
C. All Temporary partitions to be 1 hour rated wall type T1.0 and shall extend to structural deck above unless noted otherwise. See dwg.
AE001 for temporary partition details.
D. Where temporary partitions are installed against existing walls, ceiling and / or wall finishes to remain, do not mechanically attached walls to prevent damage to those surfaces.
E. Temporary door locations and sizes are as required by the Contractor. Doors shall interfere with daily operations as little as possible. Confirm all locations with the COR. Construction doors are to use VA standard door hardware and to be keyed alike with VA standard locksets.
F. All Temporary doors installed in 1 hour rated construction partitions shall be 45 min. door unless otherwise noted.
G. Construct one section of temporary walls at a time to minimize congestion in corridor. Egress path must be maintained at all times.
H. Coordinate sequence construction with COR so that only one side of any corridor in use is obstructed at any one time.
I. Contractor to provide and install temporary wayfinding and egress signage during constuction. Coordinate sign depictions with COR and Physical Security.
J. Coordinate phase completion and start-up with requirements as set forth by the COR to maintain daily operations to near as normal as possible.
K. Coordinate location of job dumpster with the COR so as to disrupt daily operations as little as possible.
L. Coordinate access to all phases of construction, deliveries, and debris removal with the COR. See General Requirements.
M. Existing HVAC, medical gases, sprinklers and water supply to be maintained throughout as required during each phase of construction.Coordinate phasing with Mechanical and Plumbing contractor. Support and protect all lines during each phase of construction. See MEP Drawings.
N. Provide and maintain negative air pressure at all construction.
Coordinate with HVAC contractor. See HVAC plans for temporary venting requirements and duct locations.
O. Existing power must be maintained throughout as required during each phase of construction.Coordinate phasing with Electrical Contractor. Coordinate power turnover with requirements as dictated by the COR See Electrical Drawings.
P. Coordinate sequence construction with COR so that only one side of any corridor in use is obstructed at any one time.
R. Coordinate all work involving the generation of excessive noise so as to occur during non-peak operating hours, 1000 to 1600 daily.
Activities to occur during this time include, but are not limited to saw cutting, jack hammering, hammer drilling and core drilling. If there is any question as to whether an operation should occur during this time the Contractor will contact the COR.
S. Firestop all penetrations by the end of the shift. All Contractors shall have the Life Safety Plan that identifies each barrier. All Contractors shall be authorized and trained to perform firestopping.
T. All work requiring the use of a crane must be performed after hours.
U. Work to take place after hours shall be scheduled between 1700 to 600 Monday - Friday. Contractor shall coordinate and scheudule all after hours and weekend work with COR.
GENERAL PHASING NOTESPROJECT PHASING
Note:
Refer to drawings FPC101 fire protection, PC101 plumbing, MC101 mechanical, EC101 electrical, TC101 technology & FAC101 fire alarm for additional phasing information and details.
Phase 1:
- Owner to vacate existing area defined in Phase 1.
- Construction fire rated temporary partitions.
- Demo & construct new interior renovation of Admin. & Holding rooms.
- Complete site work for new building expansion.
- Construct new East building expansion.
- Construction fire rated tempoary partitions including Stair and Interstitial Floor.
- Demo portion of existing exterior walls required for new construction.
- Construct recessed alcove in corridor wall for Police digital message board.
- Prior to commencing new building expansion shell construction adjacent to existing exterior Stair exit door, a tempoprary fire rated egress path back through the building must be completed.
- Construct temporary fire rated egress corridor walls & fire rated door with door swing oriented in the direction of egress from stair.
- Install ceiling along with emergency / egress lighting & directional exit signs along egress path.
- Install/modify suppression system to provide sprinklers in temporary corridor.
- Interior walls of temporary corridor shall be finished and painted.
- Remove & salvage existing interior exit door into Stair. Protect and store door to be reinstalled.
- Lock & install signage at existing exterior Stair exit door to prevent occupants from exiting into active construction area of building expansion.
- Upon completion of building expansion shell portion adjacent to the Stair exit door and approved by VA COR & Safety, reinstall interior stair exit door and reopen exterior stair exit discharge door.
- Temporary fencing to be in place to allow safe exiting from Stair door to beyond construction zone.
- Remove temporary fire rated egress corridor walls, fire rated door & ceiling.
- Remove temporary egress lighting & exit signs.
- Remove existing exterior exit door used for temporary stair egress & fill in with new pre-cast wall panel.
- Complete wall, floor & ceiling construction where temporary corridor was removed.
Phase 2:
- Owner to relocate existing Clinic operations into Phase 1 areas temporarily to maintain patient service & vacate Phase 2 area.
- Remove existing exit light, vestibule exit doors and install new doors to secure construction area.
- Construction fire rated temporary partitions.
- Demo & construct new interior renovation of Clinic rooms.
- Demo portion of existing exterior walls & interior vestibule required for new construction.
- Construct new South building expansion.
- Complete wall, floor & ceiling finishes in areas where temporary partitions were removed upon completion of Phase 2.
- Install casework in Providers office (Temp Waiting) once new Waiting Area is completed and in use.
PLAN NOTES
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523 Revisions Date
1 Addendum No. 1 07/30/2025
Area - BArea - A
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s
/F lo ri d a
O rl a n d o
V A
/0
V A
L a k e N o n a C a rd io lo g y
R
M
E P
F P
F A
T .r v t
/2
/2
:5
:1
A
M
FPC101
FIRE PROTECTION PHASING PLANS Create Cardiovascular Center at Lake Nona
Orlando, Florida
675-103
Kevin Glover - COR
03/07/2025 JMC AJZ
100% CONSTRUCTION
DOCUMENTS - BID SET
ALLEN D. LANTZ, P.E.
FL License #98984
PHASING NOTES
1. REFER TO ARCHITECTURAL PHASING PLANS ON GC101 AND GC102 FOR MORE INFORMATION.
N 0 8' 16' 32' 48'
1/16" = 1'-0"
N.T.S.
Key Plan - Overall
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523 Revisions Date
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s
/F lo ri d a
O rl a n d o
V A
/0
V A
L a k e N o n a C a rd io lo g y
R
M
E P
F P
F A
T .r v t
/2
/2
:5
:1
A
M
FPC102
FIRE PROTECTION PHASING PLANS Create Cardiovascular Center at Lake Nona
Orlando, Florida
675-103
Kevin Glover - COR
03/07/2025 JMC AJZ
100% CONSTRUCTION
DOCUMENTS - BID SET
ALLEN D. LANTZ, P.E.
FL License #98984
PHASING NOTES
1. REFER TO ARCHITECTURAL PHASING PLANS ON GC101 AND GC102 FOR MORE INFORMATION.
PHASE 1:
FIRST FLOOR:
• PROVIDE SPRINKLERS ACCORDING TO FP111.
INTERSTITIAL:
• INSTALL NEW FIRE MAINS FROM EXISTING STANDPIPE AND EXTEND PIPING TO SPRINKLER ZONES.
• RECONNECT TO EXISTING FIRE MAINS TO SERVE AREAS TO BE RENOVATED IN FUTURE PHASES.
PHASE 2:
FIRST FLOOR:
• PROVIDE SPRINKLERS ACCORDING TO FP111.
INTERSTITIAL:
• CONNECT TO EXISTING FIRE MAIN AND EXTEND TO SERVE ZONE.
CODED NOTES:
INSTALL FIRE SPRINKLER DRAIN.
INSTALL FIRE MAIN AND FHV.
N 0 8' 16' 32' 48'
1/16" = 1'-0"
N.T.S.
Key Plan - Overall
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523 Revisions Date
1 Addendum No. 1 07/30/2025
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s
/F lo ri d a
O rl a n d o
V A
/0
V A
L a k e N o n a C a rd io lo g y
R
M
E P
F P
F A
T .r v t
/2
/2
:5
:2
A
M
PC101
PLUMBING PHASING PLANS Create Cardiovascular Center at Lake Nona
Orlando, Florida
675-103
Kevin Glover - COR
03/07/2025 JMC AJZ
100% CONSTRUCTION
DOCUMENTS - BID SET
ALLEN D. LANTZ, P.E.
FL License #98984
PHASING NOTES
1. REFER TO ARCHITECTURAL PHASING PLANS ON GC101 AND GC102 FOR MORE INFORMATION.
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523 Revisions Date
1 Addendum No. 1 07/30/2025
N 0 8' 16' 32' 48'
1/16" = 1'-0"
N.T.S.
Key Plan - Overall
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s
/F lo ri d a
O rl a n d o
V A
/0
V A
L a k e N o n a C a rd io lo g y
R
M
E P
F P
F A
T .r v t
/2
/2
:5
:3
A
M
PC102
PLUMBING PHASING PLANS Create Cardiovascular Center at Lake Nona
Orlando, Florida
675-103
Kevin Glover - COR
03/07/2025 JMC AJZ
100% CONSTRUCTION
DOCUMENTS - BID SET
ALLEN D. LANTZ, P.E.
FL License #98984
PHASING NOTES
1. REFER TO ARCHITECTURAL PHASING PLANS ON GC101 AND GC102 FOR MORE INFORMATION.
FIRST FLOOR:
• INSTALL ALL UNDERGROUND SANITARY IN PHASE 1 AREA OF WORK AS SHOWN ON PS101 AND PS102.
• INSTALL ALL VENT, CW, HW, AND HWR PIPING SERVING NEW PLUMBING FIXTURES IN PHASE 1 AREA OF WORK.
INTERSTITIAL:
• INSTALL ALL VENT, CW, HW, AND HWR PIPING AND EXTEND DOWN TO FIRST FLOOR PLUMBING FIXTURES.
• CONNECT TO EXISTING O2, MV, MA, AND WAGD PIPING AND EXTEND NEW MAINS IN INTERSTITIAL AREA. PROVIDE
VALVES AND CAPS AT TAPS TO AREAS IN FUTURE PHASES.
PHASE 2:
FIRST FLOOR:
• INSTALL ALL UNDERGROUND SANITARY PIPING IN PHASE 2 AREA OF WORK.
• INSTALL ALL VENT, CW, HW, AND HWR PIPING SERVING NEW PLUMBING FIXTURES.
INTERSTITIAL:
• INSTALL ALL VENT, CW, HW, AND HWR PIPING AND EXTEND DOWN TO FIRST FLOOR PLUMBING FIXTURES.
• CONNECT TO EXISTING O2, MV, MA, AND WAGD PIPING TAPS AND EXTEND TO SERVE ROOMS IN PHASE 2 AREA OF
WORK.
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523 Revisions Date
1 Addendum No. 1 07/30/2025
CODED NOTES:
CONNECT NEW SANITARY PIPING INTO EXISTING UNDERSLAB SANITARY PIPING AT THIS LOCATION AS SHOWN ON PS101.1
N 0 8' 16' 32' 48'
1/16" = 1'-0"N.T.S.
Key Plan - Overall
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s
/F lo ri d a
O rl a n d o
V A
/0
V A
L a k e N o n a C a rd io lo g y
R
M
E P
F P
F A
T .r v t
/2
/2
:4
:2
A
M
MC101
MECHANICAL PHASING PLANS Create Cardiovascular Center at Lake Nona
Orlando, Florida
675-103
Kevin Glover - COR
03/07/2025 JMC AJZ
100% CONSTRUCTION
DOCUMENTS - BID SET
ALLEN D. LANTZ, P.E.
FL License #98984
PHASING NOTES
1. REFER TO ARCHITECTURAL PHASING PLANS ON GC101 AND GC102 FOR MORE INFORMATION.
N 0 8' 16' 32' 48'
1/16" = 1'-0"
N.T.S.
Key Plan - Overall
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523 Revisions Date
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s
/F lo ri d a
O rl a n d o
V A
/0
V A
L a k e N o n a C a rd io lo g y
R
M
E P
F P
F A
T .r v t
/2
/2
:4
:3
A
M
MC102
MECHANICAL PHASING PLANS Create Cardiovascular Center at Lake Nona
Orlando, Florida
675-103
Kevin Glover - COR
03/07/2025 JMC AJZ
100% CONSTRUCTION
DOCUMENTS - BID SET
ALLEN D. LANTZ, P.E.
FL License #98984
PHASING NOTES
1. REFER TO ARCHITECTURAL PHASING PLANS ON GC101 AND GC102 FOR MORE INFORMATION.
FIRST FLOOR:
• PROVIDE ALL DIFFUSERS, GRILLES, AND THERMOSTATS FOR SPACES SERVED BY H-AHU-1 FOR SPACES WITHIN
THE PHASE 1 AREA OF WORK.
• PROVIDE ALL DIFFUSERS, GRILLES, AND THERMOSTATS FOR SPACES SERVED BY H-AHU-31 AND H-AHU-32.
• BALANCE H-AHU-31 AND H-AHU-32
• REBALANCE H-AHU-1 TO PHASE 1 CFMS.
INTERSTITIAL:
• PROVIDE H-AHU-31 AND H-AHU-32 AND ALL ASSOCIATED DUCTWORK, PIPING, AND CONTROLS. PROVIDE ALL
TERMINAL UNITS, HHWS/R PIPING, CHWS/R PIPING, CONTROLS, AND DUCTWORK AS SHOWN ON MH121, MH122, MP121, AND MP122 FOR THE PHASE 1 AREA OF WORK.
• PROVIDE VALVES AND CAPS FOR ALL PIPING BRANCHES TO SERVE FUTURE PHASES.
PHASE 2:
FIRST FLOOR:
• PROVIDE ALL DIFFUSERS, GRILLES, AND THERMOSTATS FOR SPACES SERVED BY H-AHU-1 IN PHASE 2 AREA OF
WORK.
• REBALANCE H-AHU-1 TO PHASE 2 CFMS.
INTERSTITIAL:
• PROVIDE ALL TERMINAL UNITS, HHWS/R PIPING, CHWS/R PIPING, CONTROLS, AND DUCTWORK AS SHOWN ON
MH121, MH122, MP121, AND MP122 FOR THE PHASE 2 AREA OF WORK.
N 0 8' 16' 32' 48'
1/16" = 1'-0"N.T.S.
Key Plan - Overall
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523 Revisions Date
A7 32.4
H1E2LS2
H1E2LN3
H1E2LN4
H1E2LC3
H1E2LC4
H1E2HC2
H1E2HN2
H1E2HS2
T-H1E2LS2
ELECTRIC
1C102C
ECB-H1E2HS2
T-H1E2LC3
T-H1E2LN3
ECB-H1E2HN2
ECB-H1E2HC2
B.1
C.1
3.7
H1E3HN1
T-H1E3LN1
H1E3LC1
H1E3HC1
H1E3LN1
H1E3LN2
ELECTRIC
1C924
T-H1E3LC1
H1E3HS1
H1E3LN1-14
H1E3LN1-14
ECB-H1E3HN1
ECB-H1E3HC1
LIGHTING CONTROL PANEL
EXISTING 15kV
CONDUITS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s
/F lo ri d a O rl a n d o V
A /0
V
A L a k e N o n a C a rd io lo g y
R
M E
P F
P F
A T
.r v t
/2
/2
:3
:2
P
M
EC101
ELECTRICAL PHASING PLANS Create Cardiovascular Center at Lake Nona
Orlando, Florida
675-103
Kevin Glover - COR
03/07/2025 CJM IMW
100% CONSTRUCTION
DOCUMENTS - BID SET
BRANDON M. SARGENT, P.E.
FL License #92822524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523 Revisions Date
1 Addendum No. 1 07/30/2025
N 0 8' 16' 32' 48'
1/16" = 1'-0"
ELECTRICAL ROOM 1C102C
ELECTRICAL ROOM 1C924
1/4" = 1'-0"
1 ELECTRIC 1C102C ENLARGED ELECTRICAL EQUIPMENT
0 2' 4' 8' 12'
1/4" = 1'-0"
1/4" = 1'-0"
2 ELECTRIC 1C924 ENLARGED ELECTRICAL EQUIPMENT
1REVISED PHASING
A7 32.4
H1E2LS2
H1E2LN3
H1E2LN4
H1E2LC3
H1E2LC4
H1E2HC2
H1E2HN2
H1E2HS2
T-H1E2LS2
ELECTRIC
1C102C
ECB-H1E2HS2
T-H1E2LC3
T-H1E2LN3
ECB-H1E2HN2
ECB-H1E2HC2
B.1
C.1
3.7
H1E3HN1
T-H1E3LN1
H1E3LC1
H1E3HC1
H1E3LN1
H1E3LN2
ELECTRIC
1C924
T-H1E3LC1
H1E3HS1
H1E3LN1-14
H1E3LN1-14
ECB-H1E3HN1
ECB-H1E3HC1
LIGHTING CONTROL PANEL
EXISTING 15kV
CONDUITS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s
/F lo ri d a O rl a n d o V
A /0
V
A L a k e N o n a C a rd io lo g y
R
M E
P F
P F
A T
.r v t
/2
/2
:3
:2
P
M
EC102
ELECTRICAL PHASING PLANS Create Cardiovascular Center at Lake Nona
Orlando, Florida
675-103
Kevin Glover - COR
03/07/2025 CJM IMW
100% CONSTRUCTION
DOCUMENTS - BID SET
BRANDON M. SARGENT, P.E.
FL License #92822524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523 Revisions Date
1 Addendum No. 1 07/30/2025
N 0 8' 16' 32' 48'
1/16" = 1'-0"
1/4" = 1'-0"
1 ELECTRIC 1C102C ENLARGED ELECTRICAL EQUIPMENT
1/4" = 1'-0"
2 ELECTRIC 1C924 ENLARGED ELECTRICAL EQUIPMENT
ELECTRICAL ROOM 1C102C
ELECTRICAL ROOM 1C924
ELECTRICAL NOTES:
- INSTALL AND CONNECT ALL NEW ELECTRICAL EQUIPMENT IN ELECTRICAL ROOM 1C924 AS REQUIRED. EXTEND THE EXISTING 800A BUS DUCT FROM ELECTRICAL ROOM 1C924 TO COMPLETE THE INSTALLATION OF ECB-H1E3HC1. COORDINATE AND MINIMIZE ANY REQUIRED POWER SHUTDOWNS AND OUTAGES REQUIRED WITH THE VA (4) WEEKS IN ADVANCE.
- PROVIDE LOW VOLTAGE SWITCHES AT EITHER END OF THE TEMPORARY CORRIDOR AND OCCUPANCY SENSORS SPACED AT 20 FEET FOR LIGHTING CONTROLS. LIGHTING SHALL BE AUTOMATIC ON TO 50% LIGHT LEVEL UPON OCCUPANCY, AND 100% MANUAL ON. VACANCY SENSOR TIMEOUT DELAY SHALL BE 20 MINUTES.
- PROVIDE (9) TYPE 'C1' LIGHTING FIXTURES AND (5) TYPE 'X' EXIT SIGNS (PER THE LIFE SAFETY PLAN) MOUNTED TO THE CEILING OF THE TEMPORARY CORRIDOR. ALL LIGHTING FIXTURES SHALL BE CIRCUITED TO A SPARE CIRCUIT IN THE NEW LIFE SAFETY PANELBOARD H1E3HS1 LOCATED IN ELECTRICAL ROOM 1C924 (AS PART OF PHASE 1).
- PROVIDE (1) TYPE 'W' FIXTURE MOUNTED AT 8 FEET AFG ON THE EXTERIOR OF THE BUILDING FOR EMERGENCY EGRESS LIGHTING. THIS LIGHTING FIXTURE SHALL BE CIRCUITED TO A SPARE CIRCUIT IN THE NEW LIFE SAFETY PANELBOARD H1E3HS1 LOCATED IN ELECTRICAL ROOM 1C924 (AS PART OF PHASE 1). COORDINATE AND MINIMIZE ANY REQUIRED
POWER SHUTDOWNS AND OUTAGES REQUIRED WITH THE VA (4) WEEKS IN ADVANCE.
- PROVIDE LIGHTING AND POWER LAYOUTS IN MECHANICAL ROOM 1E201 PER ELECTRICAL SHEETS EL102.D AND EP102.D. PROVIDE CIRCUITING PER ELECTRICAL SHEETS EL102.D AND EP102.D. COORDINATE AND MINIMIZE ANY REQUIRED POWER SHUTDOWNS AND OUTAGES REQUIRED WITH THE VA (4) WEEKS IN ADVANCE.
- AT THE END OF PHASE 1, ALL WORK LOCATED WITHIN THE TEMPORARY CORRIDOR SHALL BE REMOVED IN ITS ENTIRETY TO PREPARE FOR WORK DONE IN PHASE 2.
ELECTRICAL NOTES:
- CONNECT ALL ELECTRICAL DEVICES TO THE PANELS LOCATED IN ELECTRICAL ROOM 1C102C
AND ELECTRICAL ROOM 1C924 AS REQUIRED. COORDINATE AND MINIMIZE ANY REQUIRED
POWER SHUTDOWNS AND OUTAGES REQUIRED WITH THE VA (4) WEEKS IN ADVANCE.
ELECTRICAL ROOM 1C102C
ELECTRICAL ROOM 1C924
1REVISED PHASING
0 2' 4' 8' 12'
1/4" = 1'-0"
37-PIN CONNECTOR FOR PATIENT BED CONTROLS (NURSE CALL/CODE
BLUE/TV/LIGHTS/PHONE
N
TELEPHONE BACKBOARD (WALL MOUNTED)
TELEPHONE TERMINAL CABINET
DEVICE MOUNTING LOCATION AND HEIGHT NOTES:
1. FOR WHEELCHAIR PATIENT USE MOUNT TELEPHONE OUTLET 36" AFF TO BOTTOM OF OUTLET
BOX.
2. DESK PHONES - MOUNT OUTLET 1'-6" AFF.
3. PAY PHONES - MOUNT OUTLET 4'-0" AFF
4. HEIGHT OF TELECART OUTLETS SHALL BE AS INDICATED ON BEDWALLS OR PBPU DETAILS.
5. SEE VA BARRIER FREE DESIGN GUIDE PG-18-13.
NURSE CALL CORRIDOR DOME LIGHT WITH SOUNDER:
2 = NURSE'S CALL DOME LIGHT (SUFFIX INDICATES NUMBER OF LAMP) MTD 6" ABOVE DOOR.
Z = AUXILIARY INTERSECTIONAL DOME LIGHT.
NURSE CALL STATION:
2 = DUPLICATE FACILITIES FOR TWO BEDS (SEPARATE INDICATORS AT
MASTER STATION) MTD 5'-0" AFF UNLESS OTHERWISE NOTED
D = DUTY STATION. MTD 5'-0" AFF UNLESS NOTED NOTED.
T = PULL CORD MTD 6'-0" AFF FOR SHOWER LOCATION, MTD 4'-6" AFF FOR TUB LOCATION, & MTD
3'-0" AFF FOR TOILET LOCATION.
E = STAFF ASSISTANCE MTD 5'-0" AFF.
B = CODE BLUE
P = PATIENT BED STATION
S = AUDIO VISUAL WALL STATION (STAFF) MTD 5'-0" AFF UNLESS OTHERWISE NOTED.
U = UTILITY CALL STATION, MTD 5'-0" AFF UNLESS OTHERWISE NOTED.
NURSE CALL TERMINAL CABINET.
NURSE'S CALL MASTER STATION MTD ON NURSE'S COUNTER TOP, UNLESS
OTHERWISE NOTED.
OUTLET; LETTER INDICATES AS FOLLOWS:
V = VIDEO CONNECTION (1) RG6 COAXIAL CABLE
OUTLET DATA ONLY - (1) CAT6A CABLE PER PORT.
# = NUMBER OF PORTS, CH = COUNTER HEIGHT,
MF = MODULAR FURNITURE CONNECTION
OUTLET (VOIP) TELEPHONE, (1) PORT; (1) CAT6A CABLE. LETTER INDICATES
AS FOLLOWS:
J = JACK TYPE 18" AFF W = WALL TYPE 48" AFF WITH MOUNTING POSTS
FLOOR RECEPTACLE, (VOIP) TELEPHONE
FIBEROPTICS LINE = FO
WORK AREA TCO, COMBINATION TELEPHONE/DATA COMMUNICATION OUTLET - 4 DATA PORT FACE
PLATE WITH 4 DATA PORTS - (1) CAT6A CABLE PER PORT.
NCS
NCT
TTB
V
J
N
FO
COMMUNICATION SYMBOLS
SYMBOL DESCRIPTION
CH = COUNTER HEIGHT
MF = MODULAR FURNITURE CONNECTION
CH
GENERAL NOTES
1. PRODUCTS SHALL BE OF MATERIALS THAT ARE SUITABLE FOR THE ENVIRONMENT IN WHICH THEY ARE TO BE INSTALLED.
2. WORKING CLEARANCES AROUND ELECTRICAL EQUIPMENT SHALL BE MAINTAINED IN COMPLIANCE WITH THE NATIONAL ELECTRICAL CODE ARTICLE 110, COORDINATE
EQUIPMENT INSTALLATION TO MAINTAIN REQUIRED CLEARANCES.
3. IF AN OUTLET BOX IS REQUIRED TO BE LOCATED IN AN ASSEMBLY OR PARTITION RATED AS "FIRE/SMOKE" OR "SMOKE" OR IDENTIFIED AS EITHER "FIRE/SMOKE" OR "SMOKE", THEN ALL OF THE FOLLOWING CONDITIONS SHALL BE MET:
A. THE OUTLET BOX SHALL BE METALLIC.
B. THE OUTLET BOX OPENINGS SHALL OCCUR ONLY ON ONE SIDE OF THE FRAMING SPACE.
C. THE OUTLET BOX OPENINGS SHALL NOT EXCEED 16 SQUARE INCHES.
D. ALL CLEARANCES BETWEEN THE OUTLET BOX AND THE WALL BOARD MATERIAL SHALL BE COMPLETELY SEALED WITH APPROVED MATERIALS IN ACCORDANCE WITH THE
APPLICABLE CODES AND STANDARDS FOR THE PROJECT.
E. PROVIDE A SUPPLEMENTAL BARRIER AROUND OUTLETS LARGER THAN 16 INCHES SO THAT THE ORIGINAL RATING OF THE PENETRATION IS MAINTAINED.
F. THE TOTAL AGGREGATE SURFACE AREA OF THE OUTLET BOX SHALL NOT EXCEED 100 SQUARE INCHES PER 100 SQUARE FEET.
G. THE OUTLET BOX SHALL BE SEPARATED FROM OPENINGS ON THE OPPOSITE SIDE OF THE RATED PARTITION BY A MINIMUM HORIZONTAL DISTANCE OF 24 INCHES.
H. THE OUTLET BOX SHALL BE SECURELY FASTENED TO A PARTITION FRAMING MEMBER BY MEANS OF AN APPROVED ATTACHMENT METHOD.
I. OPENINGS CUT INTO THE WALL BOARD MATERIAL SHALL NOT EXCEED 1/8 INCH BETWEEN THE EDGES OF THE OUTLET BOX AND THE EDGES OF THE OPENING.
4. LOCATIONS OF EQUIPMENT SHOWN ON THE DRAWINGS ARE APPROXIMATE, COORDINATE EXACT EQUIPMENT LOCATION AND CONNECTION REQUIREMENTS WITH THE
APPROPRIATE TRADE PRIOR TO INSTALLATION.
5. FOR EXACT LOCATION OF CEILING MOUNTED EQUIPMENT REFER TO THE ARCHITECTURAL REFLECTED CEILING PLAN. LOCATIONS OF EQUIPMENT NOT INCLUDED ON THE REFLECTED CEILING PLAN SHALL BE COORDINATED WITH THOSE ITEMS SHOWN. COORDINATION OF CEILING MOUNTED EQUIPMENT SHALL BE PRIOR TO ANY ROUGH-IN.
NOTIFY ARCHITECT OF ANY DISCREPANCY.
6. PROVIDE FINAL CONNECTIONS TO OWNER PROVIDED EQUIPMENT WHERE INDICATED ON THE PLAN DRAWINGS.
7. PRIOR TO ROUGH-IN AND INSTALLATION OF ANY FLOOR MOUNTED DEVICE, VERIFY LOCATION WITH THE ARCHITECT.
8. VERIFY AND COORDINATE THE LOCATION OF REQUIRED DIVISION 27 OUTLETS WITH OTHER TRADE DRAWINGS AND OWNER PROVIDED EQUIPMENT.
PULL SCHEDULE REQUIREMENTS
CONTRACTOR SHALL PROVIDE PULL SCHEDULE WITH TELECOM SHOP DRAWINGS. TELECOM SHOP DRAWINGS WILL NOT BE REVIEWED UNLESS THEY INCLUDE PULL
SCHEDULES.
STRUCTURED CABLING SYSTEM (SCS):
THE SCS CONTRACTOR (SCSC) SHALL PROVIDE ALL BACKBONE AND HORIZONTAL CABLING, COMPONENTS AND TERMINATIONS AS REQUIRED FOR A COMPLETE AND OPERATIONAL CABLING
SYSTEM PER INDUSTRY BEST PRACTICES AS PRESCRIBED BY BICSI AND NEC.
THE SCSC SHALL BE RESPONSIBLE FOR COORDINATION WITH THE ELECTRICAL CONTRACTOR (EC) FOR SPECIFIC LOCATIONS OF ALL TELECOMMUNICATIONS SYSTEM DEVICES, INCLUDING
ANCILLARY SYSTEM COMPONENTS AND ASSOCIATED CONDUITS PROVIDED BY THE EC.
THE ELECTRICAL CONTRACTOR (EC) SHALL BE RESPONSIBLE FOR PROVIDING AND INSTALLING ALL ROUGH-IN COMPONENTS ASSOCIATED WITH THE TELECOMMUNICATIONS SYSTEM COMPONENTS AS NOTED ON THE DRAWINGS AND SPECIFICATIONS, INCLUDING BUT NOT LIMITED TO, CONDUIT AND BACK-BOXES. THE EC SHALL COORDINATE ALL REQUIREMENTS WITH THE
SCS CONTRACTOR.
TELECOM ROOM (TR) EQUIPMENT RACKS:
THE SCS CONTRACTOR (SCS) SHALL FURNISH AND INSTALL ALL EQUIPMENT RACKS. THE SCS CONTRACTOR SHALL FURNISH AND INSTALL ALL CABLING PATCH PANELS (COPPER AND FIBER) WITH RACK, AND SHALL BE RESPONSIBLE FOR ALL CABLE TERMINATIONS AT THE PATCH PANELS.
THE VA SHALL BE RESPONSIBLE FOR FURNISHING AND INSTALLING ALL ACTIVE EQUIPMENT, CONTROLLERS, SWITCHES, ETC. THAT RESIDE WITHIN THESE RACKS.
ACCESS CONTROL:
THE SCS CONTRACTOR (SCS) SHALL BE RESPONSIBLE FOR INSTALLING ALL CABLING AND DEVICES TO SUPPORT THE VA PROVIDED SECURITY HEAD END EQUIPMENT. VA SHALL INSTALL, CONNECT AND CONFIGURE FINAL SECURITY HEAD END EQUIPMENT.
THE ELECTRICAL CONTRACTOR (EC) SHALL BE RESPONSIBLE FOR PROVIDING AND INSTALLING ALL ROUGH-IN COMPONENTS ASSOCIATED WITH THE SECURITY SYSTEM AS NOTED ON THE DRAWINGS AND SPECIFICATIONS, INCLUDING BUT NOT LIMITED TO, CONDUIT AND BACK-BOXES. THE EC SHALL COORDINATE WITH THE SCS CONTRACTORS.
GROUNDING AND BONDING:
THE EC SHALL BE RESPONSIBLE FOR INSTALLING THE GROUNDING BUSBAR(S) AS ILLUSTRATED ON THE DRAWINGS AND SPECIFICATIONS, AND CONNECTING IT TO THE BUILDING MAIN ELECTRICAL SERVICE GROUND. THE EC SHALL BE RESPONSIBLE FOR GROUNDING ALL BACKBONE CONDUIT AND CABLE TRAY.
THE SCSC SHALL BE RESPONSIBLE FOR GROUNDING ALL RACKS, CABINETS, ENCLOSURES, PROTECTOR BLOCKS AND CABLE LADDER-RACK INSIDE TELECOMMUNICATIONS ROOMS.
FIRESTOPPING:
THE EC SHALL BE RESPONSIBLE FOR FIRE-STOPPING SLEEVE ASSEMBLIES TO OBTAIN A UL RATING.
THE SCSC SHALL BE RESPONSIBLE FOR FIRE-STOPPING INSIDE THE SLEEVES AFTER CABLE INSTALLATION IS COMPLETE.
CASEWORK / MILLWORK:
THE SCSC SHALL BE RESPONSIBLE FOR INSTALLING TELECOMMUNICATIONS OUTLETS IN CASEWORK, AS REQUIRED. CABLES SHALL BE CONCEALED IN CASEWORK.
THE EC SHALL BE RESPONSIBLE FOR INSTALLING ASSOCIATED CONDUIT AND BACK-BOXES.
CONDUIT:
THE EC SHALL BE RESPONSIBLE TO PROVIDE AND INSTALL ALL BACKBONE AND HORIZONTAL CABLING PATHWAYS. THIS SHALL INCLUDE ALL INTERIOR CONDUITS, PATHWAY COMPONENTS SUCH AS JUNCTION BOXES, PULL BOXES, WALL/CEILING PENETRATIONS AND CONDUIT SLEEVES, WHETHER SHOWN ON THE DRAWINGS OR AS REQUIRED TO PENETRATE FULL-HEIGHT PARTITIONS AS SHOWN ON THE DRAWINGS. THE EC SHALL PROVIDE AND INSTALL ALL BUSHINGS ON TELECOMMUNICATIONS
CONDUITS PRIOR TO INSTALLATION OF CABLING.
THE SCSC SHALL BE RESPONSIBLE FOR ALL WIRE RACEWAYS, CABLE RUNWAY (LADDER RACK) AND OTHER REQUIREMENTS FOR ROUTING AND SECURING CABLE INSIDE
THE MAIN TELECOMMUNICATIONS ROOM (MTR) AND ALL TR'S.
TELECOMMUNICATIONS COMMUNICATIONS OUTLETS (C.O.'S) AND DEVICES:
THE EC SHALL BE RESPONSIBLE FOR PROVIDING AND INSTALLING ALL CONDUIT AND BACK-BOXES ASSOCIATED WITH THE TELECOMMUNICATIONS C.O.'S AND DEVICES.
THE SCSC SHALL BE RESPONSIBLE FOR INSTALLATION OF ALL STRUCTURED CABLING, JACKS, FACEPLATES AND JUMPER/PATCH CORDS.
BACKBOARDS:
THE EC SHALL BE RESPONSIBLE FOR PROVIDING AND INSTALLING ALL BACKBOARDS AS ILLUSTRATED ON THE DRAWINGS AND AS REQUIRED FOR A COMPLETE SYSTEM AS ILLUSTRATED IN THE SPECIFICATIONS. THE EC SHALL BE RESPONSIBLE FOR ROUGH-IN OF ALL CONDUIT AND BACK-BOXES. POWER CONDUITS SHALL BE CONCEALED BEHIND ALL BACKBOARDS. BACKBONE CONDUIT SHALL BE EXPOSED AS ILLUSTRATED ON THE DRAWINGS (TR WALL ELEVATIONS).
COORDINATION NOTES:
SYMBOL DESCRIPTION
CEILING MOUNTED WIRELESS ACCESS POINT (WAP) - (2) CAT6A CABLES
PROXIMITY CARD READER, MTD. 4'-0" AFF UNLESS OTHERWISE NOTED.CR
FLOOR RECEPTACLE, COMBINATION TELEPHONE/DATA COMMUNICATION OUTLET - 4 DATA PORTS -
(1) CAT6A CABLE PER PORT.
NUMERIC KEYPAD, MTD. 4'-0" AFF UNLESS OTHERWISE NOTED.KP
REQUEST TO EXIT DEVICE IN DOOR HARDWARE. RE
FIX
SECURITY ACCESS, VIDEO CAMERA WITH LENS
ML = MULTI LENS
FIX = FIXED WITH MOTION DETECTOR
PZ = MOTION DETECTOR WITH PAN AND ZOOM
PTZ= MOTION DETECTOR WITH PAN, TILT, AND ZOOM
CEILING MOUNTED PUBLIC ADDRESS SYSTEM SPEAKERS
SECURITY DURESS BUTTON
D = DURESS
P = PANIC
D
FIX
CEILING MOUNTED
WALL MOUNTED
REQUEST TO EXIT DEVICE MOUNTED ABOVE DOOR.RE
TELECOMM GROUND BUS BAR, COPPER
INTERCOM CALL STATIONICS
ADMINISTRATIVE PHONEAP
INTERCOM/VOIP HANDSETIHS
COMBINATION CARD READER/NUMERIC KEYPAD, MTD. 4'-0" AFF UNLESS
OTHERWISE NOTED.
CP
4-POST NETWORK EQUIPMENT RACK.
LADDER TYPE CABLE TRAY; SIZE AND MOUNTING HEIGHT AS INDICATED ON PLANS.
BASKET/SOLID BOTTOM/CHANNEL TYPE CABLE TRAY; SIZE, TYPE AND MOUNTING HEIGHT AS
INDICATED ON PLANS.
VERTICAL CABLE MANAGEMENT.
TELECOMMUNICATIONS ABBREVIATIONS
A/C UNIT AIR CONDITIONING UNIT
A/E ARCHITECT/ENGINEER
AAP ALARM ANNUNCIATOR PANEL
AC ALTERNATING CURRENT OR ARMORED CABLE
ACC ACCESSIBLE
ADDL ADDITIONAL
ADJ ADJACENT, ADJOINING
ADO AUTOMATIC DOOR OPENER
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AHJ AUTHORITY HAVING JURISDICTION
ALT ALTERNATE
AMB OR A AMBIENT
ARCH ARCHITECT
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AV AUDIO VISUAL
BAT BATTERY
BBC BONDING BACKBONE CONDUCTOR
BC BARE COPPER
BD BOARD
BFF BELOW FINISH FLOOR
BLDG BUILDING
BPIP BOILER PLANT INSTRUMENTATION PANEL
BYP BY PASS
C CONDUIT
CAB CABINET
CALC CALCULATE
CAP CAPACITY
CAT CATALOG
CATV COMMUNITY ANTENNA TELEVISION
CCR CONTROL CONTACTOR
CCTV CLOSED CIRCUIT TELEVISION
CD CONSTRUCTION DOCUMENTS
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR FURNISHED/CONTRACTOR INSTALLED
CF/OI CONTRACTOR FURNISHED/OWNER INSTALLED
CFE CONTRACTOR FURNISHED EQUIPMENT
CLG CEILING
CMU CONCRETE MASONRY UNIT
COAX COAX CABLE
COMM COMMUNICATION
COMPT COMPARTMENT
CONC CONCRETE
CONT CONTINUE
CONTR CONTRACTOR
COORD COORDINATE
CTV CABLE TELEVISION
CU COPPER
CU FT CUBIC FEET
CUR CURRENT
DAS DISTRIBUTED ANTENNA SYSTEM
DB DECIBEL OR DIRECT BURIAL
DC DIRECT CURRENT
DEG C DEGREES CELSIUS
DEG F DEGREES FAHRENHEIT
DEMO DEMOLITION
DIAG DIAGRAM
DISTR DISTRIBUTION
DN DOWN
DRSW DOOR SWITCH
DWG DRAWING
EC EMPTY CONDUIT
EG EQUIPMENT GROUND
EL ELEVATION
ELEC ELECTRIC OR ELECTRICAL
ELEV ELEVATOR
EMER EMERGENCY
EMI ELECTROMAGNETIC INTERFERENCE
EMT ELECTRICAL METALLIC TUBING
ENCL ENCLOSURE
EPO EMERGENCY POWER OFF
ESMT EASEMENT
EXIST EXISTING
FLEX FLEXIBLE METALLIC CONDUIT
FOUTT TELEPHONE FLOOR OUTLET
FP FIRE PROTECTION
FT FEET OR FOOT
G OR GND GROUND OR GENERATOR
GEN GENERATOR
GTB GROUND TERMINAL BOX
HT HEIGHT
HZ HERTZ
IMC INTERMEDIATE METAL CONDUIT
IR INFRARED
J-BOX JUNCTION BOX
LF LINEAR FEET (FOOT)
LTNG LIGHTNING
LV LOW VOLTAGE
MATV MASTER ANTENNA TELEVISION SYSTEM
MAX MAXIMUM
MECH MECHANICAL
MH MANHOLE
MIN MINIMUM
MT MOUNT
MTD MOUNTED
MTG MOUNTING
NA NOT APPLICABLE
NEC NATIONAL ELECTRICAL CODE
NEUT OR N NEUTRAL
NIC NOT IN CONTRACT
NS NO SCALE
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
P POLE
PA PUBLIC ADDRESS
PB PANELBOARD, PULL BOX, OR PUSHBUTTON
PBB PRIMARY BONDING BUSBAR
PBPU PREFABRICATED BEDSIDE PATIENT UNIT
PED PEDESTAL
PEND PENDANT
PF POWER FACTOR
PH PHASE
PNL PANEL
PVC POLYVINYL CHLORIDE (PLASTIC)
PWR POWER
RCP REFLECTED CEILING PLAN
REC RECESSED
RECPT RECEPTACLE
RGS RIGID GALVANIZED STEEL
RM ROOM
REQD REQUIRED
SF SQUARE FOOT (FEET)
SHT SHEET
SI INTERNATIONAL SYSTEM OF UNITS
SPEC SPECIFICATION
SURF SURFACE
SW SWITCH
TBC TELECOMMUNICATIONS BONDING BUSBAR
TEL TELEPHONE
TP TWISTED PAIR
TPS TWISTED PAIR SHIELDED
TTB TELEPHONE TERMINAL BOARD
TV TELEVISION
TYP TYPICAL
MSB MAIN SWITCH BOARD
UFD UNDERFLOOR DUCT
UGND UNDERGROUND
UL UNDERWRITERS LABORATORY
UON UNLESS OTHERWISE NOTED
UPS UNINTERRUPTIBLE POWER SUPPLY
UTIL UTILITY
V VOLT
WP WEATHERPROOF
9. ALL RACEWAY SYSTEMS SHOWN TO SUPPORT THE INSTALLATION OF THE DIVISION 27 EQUIPMENT SHALL BE PROVIDED BY THE ELECTRICAL CONTRACTOR. PROVIDE COORDINATION FOR THE INSTALLATION OF THIS RACEWAY SYSTEM WITH THE ELECTRICAL CONTRACTOR.
10. EACH VOICE/DATA OUTLET LOCATION SHOWN, SHALL HAVE A DOUBLE GANG OUTLET BOX WITH A SINGLE GANG PLASTER RING AND (1) 1-1/2" CONDUIT TO TR. WORK BY
ELECTRICAL CONTRACTOR PER SPECS.
11. ALL BONDING AND GROUNDING ELEMENTS UTILIZED FOR STRUCTURED CABLING SYSTEM SHALL BE IN COMPLIANCE WITH SPECIFICATION SECTION 262000.
12. PROVIDE ALL SLEEVES AS REQUIRED FOR ALL LOW VOLTAGE CABLE PATHWAYS. RESTORE THE FIRE RATING OF THE SURFACE.
13. CABLE INSTALLED BELOW SLAB SHALL HAVE INDOOR/OUTDOOR RATED JACKET FOR PROTECTION OF STRUCTURED CABLE.
14. TELECOMMUNICATIONS ROOM SHALL BE BONDED AND GROUNDED IN ACCORDANCE WITH TIA-607D.
15. ALL TELECOMMUNICATIONS CONDUITS SHALL BE PROVIDED WITH BUSHINGS AT EACH END FOR PROTECTION OF…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .