Att 1Marine Mammal Specification 11Feb2020.pdf
PDF 389 KB Posted
- Attached to
- US Navy Marine Mammal Boat
- Solicitation number
- N00024-20-Q-2230
About this file
This is a combined synopsis and solicitation for four Marine Mammal boats to be issued as a HUBZone set-aside. The solicitation will be for anti-swimmer defense boats to be used by the Naval Information Warfare Systems Command Marine Mammal Program. Interested vendors meeting HUBZone qualifications for NAICS code 336612 must submit quotes in response to the full solicitation and seven attachments by the response date. Points of contact are provided for any questions. The Department of the Navy Naval Sea Systems Command is the contracting agency.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N0002420Q2230-0006.pdf | ||
| N0002420Q2230-0005.pdf | ||
| N0002420Q2230-0004.pdf | ||
| N0002420Q2230-0003.pdf | ||
| Updated Att 5 Techncial Data Rights Assertion.pdf | ||
| N0002420Q2230-0002.pdf | ||
| N0002420Q2230-0001.pdf | ||
| Att 7 Warranty Terms.doc | DOC document | |
| Att 5 Techncial Data Rights Assertion.pdf | ||
| N00024-20-Q-2230.pdf | ||
| Att 6 Unique_Item_Identification_(UID).doc | DOC document | |
| Att 2 Marine Mammal Response Matrix 05Dec2019.xlsx | XLSX spreadsheet | |
| Att 3 Vendor Provided Spare Parts List 25Feb 2020.xlsx | XLSX spreadsheet | |
| Att 4 Marine Mammal_Delivery_Schedule.xls | XLS spreadsheet |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 1 – NIWC MARINE MAMMAL BOAT i
Attachment 1
NIWC MARINE MAMMAL BOAT
SPECIFICATION
11 February 2020 ii
REVISION HISTORY
Date Summary Of Change Version
11 Feb
Initial Issue -iii
TABLE OF CONTENTS
REVISION HISTORY ................................................................................................................................. ii
TABLE OF CONTENTS ............................................................................................................................ iii
SECTION 0: GENERAL GUIDANCE AND ADMINISTRATION
040 INTRODUCTION AND GENERAL DESCRIPTION
040-1 BACKGROUND
042 GENERAL ADMINISTRATIVE REQUIREMENTS
042-1 GENERAL REQUIREMENTS
042-2 REFERENCED DOCUMENTS
042-3 ALTERNATE ITEMS
042-4 ORDER OF PRECEDENCE
042-5 STATEMENT OF WORK (SOW)
070 GENERAL REQUIREMENTS OF DESIGN AND CONSTRUCTION
070-1 BOAT CHARACTERISTICS
070-2 CONTRACTOR SUBMITTED DRAWINGS
070-3 ENVIRONMENTAL CONDITIONS
070-4 LOAD CONDITIONS
070-5 SEAKEEPING, DYNAMIC STABILITY, AND MANEUVERABILITY
070-6 CONFIGURATION MANAGEMENT
070-7 ABYC STANDARDS
070-8 ALTERATIONS
070-9 INSTALLATION OF EQUIPMENT, MACHINERY, AND MATERIALS
071 ACCESS
071-1 ACCESSIBILITY
071-2 BILGE ACCESS
073 NOISE LEVELS
074 WELDING AND ALLIED PROCESSES
074-1 GENERAL
074-2 VISUAL INSPECTIONS
074-3 DYE PENETRANT TESTING (PT)
075 FASTENERS
075-1 STAINLESS STEEL FASTENERS
078 MATERIALS
078-1 STRUCTURAL MATERIAL
078-2 CORROSION CONTROL
078-3 BEDDING COMPOUND
iv
078-4 NON-BIODEGRADABLE MATERIALS
078-5 FABRIC MATERIAL
078-6 FIRE RETARDANT INTERIOR MATERIALS
079 STABILITY
079-1 INTACT STABILITY
079-2 FLOTATION (ABYC)
079-3 FLOTATION FOAM
084 TRANSPORTATION AND HANDLING
084-1 ROAD TRANSPORT
084-2 TRAILER (HIGHWAY)
084-3 BOAT TO TRAILER TIE-DOWNS
084-4 TIE-DOWN STRAPS
085 TECHNICAL DATA PACKAGE
085-1 TECHNICAL DESIGN ANALYSES
085-2 DRAWINGS
085-3 BILL OF MATERIALS (BOM)
085-4 COMMERCIAL OFF THE SHELF (COTS) TECHNICAL MANUALS AND
DOCUMENTATION
085-5 BOAT TECHNICAL MANUAL
085-6 OEM CERTIFICATIONS
085-7 OEM WARRANTIES BOOKLET
085-8 TESTS AND TRIALS REPORTS
085-9 MASTER DATA INDEX
092 TESTING
092-1 GENERAL
092-2 TEST CERTIFICATIONS
094 TRIALS
094-1 BUILDER'S TRIALS
094-2 PRE-DELIVERY INSPECTION AND TRIALS (PDIT)
094-3 STEERING AND MANEUVERING TRIALS
099 PHOTOGRAPHS
099-1 PHOTOGRAPHS
SECTION 1: HULL STRUCTURE
100 GENERAL REQUIREMENTS FOR HULL STRUCTURE
100-1 GENERAL STRUCTURAL REQUIREMENTS
100-2 LIMBER HOLES
110 SHELL AND SUPPORTING STRUCTURE
v
110-1 BEACHING PLATE
130 HULL DECKS
130-1 QUICK DRAINING DECKS
130-2 AFT DECK WORKING AREA
150 DECK HOUSE STRUCTURES
150-1 HULL STYLE/CABIN
166 COLLAR
166-1 COLLAR
167 HULL STRUCTURAL CLOSURES
167-1 DOORS AND HATCHES
167-2 EQUIPMENT REMOVAL
169 SPECIAL PURPOSE CLOSURES AND STRUCTURES
169-1 OUTBOARD BRACKET
169-2 ENGINE GUARD
169-3 HARD TOP
SECTION 2: PROPULSION
236 OUTBOARD ENGINES
236-1 OUTBOARD ENGINES (TWIN)
236-2 OUTBOARD ENGINE RIGGING
236-3 OUTBOARD ENGINE INSTALLATION
236-4 OUTBOARD ENGINE BREAK-IN
252 PROPULSION CONTROL SYSTEM
252-1 PROPULSION INSTRUMENT MARINE PACKAGE (INTEGRATED)
SECTION 3: ELECTRIC PLANT
300 GENERAL REQUIREMENTS FOR ELECTRIC PLANT
300-1 SUITABLE FOR MARINE ENVIRONMENT
300-2 PANEL COVERS
300-3 BONDING SYSTEM
300-4 SWITCHES
300-5 ENCLOSURES
300-6 TERMINAL STRIPS
303 PROTECTIVE DEVICES
303-1 DC AND AC OVERCURRENT PROTECTION
304 ELECTRICAL CABLE, WIRING, AND CONNECTIONS
304-1 WATERTIGHT CONNECTIONS
304-2 CABLE SUPPORTS
304-3 MARINE MULTI-CONDUCTOR CABLE
vi
304-4 ELECTRICAL CONNECTIONS
304-5 WEATHERPROOFED CONNECTORS
304-6 WATERTIGHT CABLE PENETRATIONS
304-7 IGNITION PROTECTION
313 BATTERIES
313-1 BATTERIES (OUTBOARD 12 VDC)
313-2 BATTERY CHARGING (OUTBOARDS 12 VDC)
313-3 BATTERY VOLTMETER
313-4 SHORE POWER BATTERY CHARGER (120 VAC TO 12 VDC)
320 POWER DISTRIBUTION SYSTEMS
320-1 DC POWER DISTRIBUTION SYSTEM
320-2 SHORE POWER SYSTEM (120 VAC/60 HZ)
320-3 OUTLETS (12 VDC)
324 ELECTRICAL PANELS
324-1 ELECTRICAL CIRCUIT BREAKER PANELS
330 LIGHTING
330-1 ELECTRONIC DIMMER
330-2 INTERIOR LED LIGHTING (12 VDC)
330-3 DECK LOW LEVEL LIGHTING
330-4 DECK WORK LIGHTS
SECTION 4: COMMAND AND CONTROL
421 NON-ELECTRICAL/ELECTRONIC NAVIGATION AIDS
421-1 MAGNETIC COMPASS
421-2 STORAGE
422 ELECTRICAL NAVIGATION AIDS
422-1 NAVIGATION LIGHTS
422-2 INTEGRATED ELECTRONIC NAVIGATION PACKAGE
422-3 SPOTLIGHT, HANDHELD
422-4 SPOTLIGHTS, FIXED MOUNT
436 ALARM, SAFETY, AND WARNING SYSTEMS
436-1 BILGE FLOODING ALARM SYSTEMS
436-2 CARBON MONOXIDE DETECTION SYSTEM
441 RADIO SYSTEMS
441-1 VHF MARINE BAND RADIO
443 VISUAL AND AUDIBLE COMMUNICATION SYSTEMS
443-1 NAVIGATION HORN
443-2 HAILER/SIREN SYSTEM
vii
SECTION 5: AUXILIARY SYSTEMS
500 GENERAL REQUIREMENTS FOR AUXILIARY SYSTEMS
505 FLUID SYSTEMS
505-1 FLUID SYSTEMS CONNECTIONS
505-2 THROUGH-HULL FITTINGS AND VALVES
505-3 HOSES AND FITTINGS
505-4 HOSE INSTALLATION
505-5 HOSE CLAMPS
511 COMPARTMENT HEATING SYSTEMS
511-1 CABIN DIESEL HEATING
512 MANNED COMPARTMENT VENTILATION SYSTEMS
512-1 DEFOGGING/DEFROSTING SYSTEM
512-2 PILOTHOUSE FANS
523 WASHDOWN SYSTEM
529 BILGE/DRAINAGE SYSTEM
529-1 FIXED MANUAL BILGE PUMP
529-2 ELECTRIC BILGE PUMP(S)
529-3 HULL DRAINS
541 FUEL SYSTEM
541-1 FUEL TANK(S)
541-2 FUEL LEVEL GAUGE
541-3 FUEL VALVES
541-4 FUEL/WATER SEPARATOR AND FILTER
541-5 FUEL FILL AND VENT SYSTEM
541-6 FUEL STRIPPING PORT
555 FIRE FIGHTING
555-1 PORTABLE FIRE EXTINGUISHERS
561 STEERING CONTROL SYSTEMS
561-1 HYDRAULIC STEERING
581 ANCHOR HANDLING
581-1 ANCHOR FITTINGS
581-2 ANCHOR
582 MOORING AND TOWING SYSTEMS
582-1 TOW PROVISIONS
582-2 BOW EYE
582-3 TOW PENDANT
582-4 CLEATS
viii
592 SWIMMER AND DIVER SUPPORT SYSTEMS
592-1 DIVER ACCESS DOOR
SECTION 6: OUTFIT AND FURNISHINGS
600 OUTFIT
600-1 BOAT HOOK
600-2 RING BUOY
600-3 U.S. FLAG AND MAST
600-4 MOORING LINES
600-5 FENDERS
600-6 FIRST AID KIT
602 LABELING
602-1 HULL REGISTRY NUMBER (HRN)
602-2 LABEL PLATES (GENERAL)
602-3 PIPING SYSTEM LABEL PLATES
602-4 VALVE LABEL PLATES
602-5 INSTRUCTION LABEL PLATES
602-6 HOISTING LABEL PLATES
602-7 BOAT INFORMATION LABEL PLATE
602-8 BOAT ALTERATION LABEL PLATE
602-9 IN-SERVICE LABEL PLATE
602-10 SYSTEMS LABEL PLATES
602-11 STOWAGE LABEL PLATES
611 HULL FITTINGS
611-1 HOIST FITTINGS
611-2 HOIST SLINGS
611-3 HOIST HARDWARE
612 RAILS, STANCHIONS, AND LIFELINES
612-1 GRAB RAILS
612-2 LIFE LINES
613 CURTAIN ENCLOSURE
613-1 AFT DECK
613-2 CABIN
625 WINDOWS
625-1 WINDSHIELD WIPER/WASHER SYSTEM
630 PRESERVATIONS AND COVERINGS PAINTING
630-1 EXTERIOR PAINT
630-2 ANODES
ix
630-3 EXTERIOR NON-SKID
630-4 ANTI-FATIGUE MATTING (INTERIOR)
662 WORKING SPACES AND SEATING
662-1 CONSOLE ERGONOMICS
662-2 SEATING – CREW
670 STOWAGE SPACES
670-1 STOWAGE
670-2 SPACE AND WEIGHT RESERVATION FOR SEA LION CAGES
670-3 MEDICAL STOWAGE
SECTION 0: GENERAL GUIDANCE AND ADMINISTRATION
040 INTRODUCTION AND GENERAL DESCRIPTION
040-1 Background
The mission of the NIWC Marine Mammal Boat is to provide a swimmer interdiction presence for US Navy Installations.
042 GENERAL ADMINISTRATIVE REQUIREMENTS
042-1 General Requirements
This Specification is for NIWC Marine Mammal Boat with aluminum hull that includes the following characteristics:
The hull length is to be no less than twenty four (24) feet and no greater than twenty six
(26) feet from bow to transom (engines, engine well, and crash bar excluded), The maximum allowable beam overall is 102 inches, The distance from the waterline to the highest point on the boat (with antennas lowered) shall not exceed twelve (12) ft in all load conditions, The desired draft is thirty (30) inches or less in the Full Load Condition, Sprint speed shall be greater than thirty-five (35) knots at Full Load Condition, Cruise speed shall be thirty (30) knots or greater at Full Load Condition, Aluminum three sided cabin, Twin gasoline outboard engines, Forward and aft centerline tow provisions, Fully operate in up to 2.9 ft Significant Wave Height (Wilbur Marks Sea State 2), and survive at minimum headway in up to 6.9 ft Signification Wave Height (Wilbur Marks Sea State 4), Minimum range 150 nautical miles at 30 knots and Full Load Condition in Wilbur Marks Sea State 2, Payload capacity of 4 crew at 250 pounds per person and 1,200 pounds of mission gear/cargo, Capable of operating in environmental conditions found in the Pacific Northwest, with ambient air temperatures ranging from 5°F to 110°F, Capable of operating in water temperatures ranging from 28°F to 95°F.
GVW shall be 12,000 lbs or less in transport condition per Section 070-4.
The Contractor shall adhere to best marine practices. Specifications identified in this section provide the minimum required general system characteristics and requirements for the selection, installation, onboard performance, onboard inspection of machinery, equipment and outfit, as well as pre-installation handling and inspections of materials for construction.
042-2 Referenced Documents
The following standards and specifications are referenced in this Specification. Where reference is made to a voluntary compliance or best practice standard, the recommended standards and practices shall be considered mandatory under this Contract. Use the most recent edition unless otherwise noted.
33 CFR, Navigation and Navigable Waters
40 CFR, Protection of Environment
46 CFR Part 164, Materials
46 CFR Part 180.70, Ring Life Buoys
49 CFR Part 393, Parts and Accessories Necessary for Safe Operation
49 CFR Part 571, Federal Motor Vehicle Safety Standards
ABYC, Standards and Technical Information Reports for Small Craft
ASME Y14.100, Engineering Drawing Packages
ASTM A182, Standard Specification for Forged or Rolled Alloy and Stainless Steel Pipe Flanges, Forged Fittings, and Valves and Parts for High-Temperature Service
ASTM A276, Standard Specification for Stainless Steel Bars and Shapes
ASTM A312, Standard Specification for Seamless, Welded, and Heavily Cold Worked Austenitic Stainless Steel Pipes
ASTM A351, Standard Specification for Castings, Austenitic, for Pressure-Containing Parts
ASTM B33, Standard Specification for Tin-Coated Soft or Annealed Copper Wire for Electrical Purposes
ASTM B61, Standard Specification for Steam or Valve Bronze Castings
ASTM B62, Standard Specification for Composition Bronze or Ounce Metal Castings
ASTM B584, Standard Specification for Copper Alloy Sand Castings for General Applications
ASTM B928, Standard Specification for High Magnesium Aluminum-Alloy Products for Marine Service and Similar Environments
ASTM F593, Standard Specification for Stainless Steel Bolts, Hex Cap Screws, and Studs
ASTM F594, Standard Specification for Stainless Steel Nuts
ASTM F1166, Standard Practice for Human Engineering Design for Marine Systems, Equipment, and Facilities
IEEE 45, Recommended Practice for Electric Installations on Shipboard
IEEE 1580, Recommended Practice for Marine Cable for Use on Shipboard and Fixed or Floating Facilities
International Regulations for Preventing Collision at Sea, 1972 (72 COLREGS) which are contained in “USCG Navigation Rules and Regulations Handbook”, U.S. Coast Guard Navigation Standards Branch, U.S. Coast Guard Headquarters, Washington, DC
ISO 12215-6, Small Craft – Hull Construction and Scantlings - Part 6: Structural arrangements and details
ISO 12215, Small Craft – Hull Construction and Scantlings
ISO 12217-1:2015 Small Craft – Stability and Buoyancy Assessment and Categorization
– Part 1: Non-Sailing Boats of Hull Length greater than or equal to 6m
MIL-PRF-24667C, Coating System, Non-Skid, for Roll, Spray, or Self-Adhering Application
MIL-PRF-55629, Circuit Breakers, Magnetic, Unsealed or Panel Seal, Trip-Free
MIL-STD-202, Electronic and Electrical Component Parts
MIL-STD-209K, Interface Standard for Lifting and Tiedown Provisions
MIL-STD-1366E, Interface Standard for Transportability Criteria
NAVSEA TO300-AU-SPN-010A, Fabrication, Welding and Inspection of Small Boats and Craft, Aluminum Hulls
NAVSEA 0900-LP-060-4010, Fabrication, Welding and Inspection of Metal Boat and Craft Hulls
NSWCCD-23-TM-2009/33 Rev B, Hoisting System Design and Certification Process Guidance
NSWCCD-23-TM-2009/58 Rev B, U.S. Navy Boat Electrical Practices
NSWCCD-23-TM-2009/61 Rev A, U.S. Navy Boat Example Data Package
NSWCCD-23-TM-2009/64 Rev C, Small Craft Transportability Design and Certification Process Guidance, NSWCCD-23-TM-2009/65 Rev C, Towing Fitting Design and Certification Process Guidance, NSWCCD-23-TM-2011/05 U.S. Navy Craft Mechanical Practices
NSWCCD-23-TM-2011/38 Rev A, Mooring Fitting Design and Verification Process Guidance
NSWCCD-23-TM-2011/39 Anchoring System Design and Verification Process Guidance
NSWCCD-80-TR-2014/038, Weight Management Process Guidance for Boats and Craft
QQ-A-250/8, Aluminum Alloy 50502, Plate and Sheet
RR-C-271D, Chains and Attachments, Carbon and Alloy Steel
SAE J1273, Recommended Practices for Hydraulic Hose Assemblies
SAE J1527, Marine Fuel Hoses
SAE J1942, Hose and Hose Assemblies for Marine Applications
UL 489, Molded-Case Circuit Breakers, Molded-Case Switches, and Circuit-Breaker Enclosures
UL 1077, Standard for Supplementary Protectors for Use in Electrical Equipment
UL 1426, Standard for Electrical Cables for Boats
WSTDA T-1, Recommended Standard Specification for Synthetic Web Tie Downs
042-3 Alternate Items
Where boat components and equipment are specified by brand name or manufacturer and model number or equal, such identification is intended to be descriptive, not restrictive, and is intended to indicate the required characteristics of the product. The Contractor may propose the use of other products which are equal to the specified make and model products. The following general requirements shall form the basis for determining the equality of alternate products unless additional specific or alternate requirements are designated within the applicable sections of this Specification:
The major attributes of form, fit, function, interface, and material of an alternate item shall not degrade the performance of the system within which it is used nor the boat as a whole.
The alternate item shall require no more space or volume than the designated item for installation, operation, or maintenance. The alternate item shall weigh no more than the designated item. The connection fittings required to incorporate the alternate item into a system shall be identical to those necessary to incorporate the specified item. The principles of operation of the alternate item shall be the same as those of the designated item (i.e., hydraulic cylinders shall not be used in lieu of springs, etc.). Input power, capacity, and other operating requirements for the alternate item shall be no greater than those required by the designated item. Output power, capacity, and other performance parameters of the alternate item shall be no less than those required for the designated item and not so much greater than those of the designated item as to require an increased capacity of the system within which the item is installed.
The materials of construction of the alternate item shall be the same as those of the designated item unless the Contractor can demonstrate to the Government that the proposed alternate material will not adversely affect performance or service life of the item, the system within which it is installed, or the boat as a whole.
The reliability and maintainability of an alternate item shall be equal to or better than the specified item. The Contractor shall provide evidence of the reliability and maintainability of the alternate item. This evidence may include such things as results of testing, service histories, documentation of successful use in similar applications, planned maintenance requirements, etc. Where the reliability and maintainability of the specified item has been established by testing, the Government may require that the alternate item undergo similar testing to demonstrate its reliability and maintainability. Such testing, if required, shall be at the Contractor's expense.
An alternate item shall conform to the same industry or Government specifications or standards as the specified item. Where a specified item has been approved or certified by a regulatory or testing agency, such as USCG or Underwriters' Laboratories, the alternate item shall also be approved or certified. The cost of demonstrating compliance with specifications or standards, or of obtaining approval or certification, shall be borne by the Contractor.
If the specified item is one with established logistic support any alternative item shall have equivalent logistic support. If equivalent logistic support has not been established for the alternate item, the Contractor shall bear the expense of establishing equivalent support.
Logistic support shall include, as applicable: maintenance planning and analysis; training and training support, including training equipment, curricula, and instruction materials;
supply support; support equipment such as special tools and test equipment; technical documentation including technical manuals, Product Technical Description (PTD), Planned Maintenance System (PMS), Technical Repair Standards (TRS), and software documentation; computer resource support; facilities for maintenance and training; unique packaging, handling, storage, and transportation requirements; and human engineering considerations.
042-4 Order of Precedence
In case of inconsistency between the requirements of the Contract, this Specification, and the documents referenced in this Specification, the following order of precedence applies:
1. Contract requirements,
2. Specification requirements,
3. Other Government specifications and standards, industry standards, and similar referenced documents.
The following are not considered inconsistencies subject to an order of precedence determination:
a. Silence of one document with respect to details shown in another.
b. Broad boat requirements compared to detailed system or component requirements.
042-5 Statement Of Work (SOW)
This Specification is written to be used in conjunction with the SOW. Additional requirements such as warranty, packaging, delivery, training, et cetera are defined in the SOW.
070 GENERAL REQUIREMENTS OF DESIGN AND CONSTRUCTION
070-1 Boat Characteristics
Length Overall (LOA) including collar and appendages: {{xx.xx}} ft
Hull Length (welded structure only): {{xx.xx}} ft
[Shall be no less than 24ft and no greater than 26 ft per Section 042]
Beam Overall (BOA): {{xx.x}} ft
[Shall be less than or equal to 8.5 ft per Sections 042 and 084]
Chine Beam: {{xx.x}} ft
Height, Keel to Fixed Structure: {{xx.x}} ft
Height, Keel to Moveable Structure: {{xx.x}} ft
Height on trailer when rigged for transport: {{xx.x}} ft
[Shall be less than 162 inches per Section 084]
Width on trailer when rigged for transport: {{xx.x}} ft
[Shall be less than 102 inches per Section 084]
Height from waterline to fixed structure: {{xx.x}} ft [Shall be less than or equal to 12 ft]
Deadrise at midships: {{xx}} degrees
Deadrise at transom: {{xx}} degrees
Total Installed Fuel Capacity: {{xxxx}} gallons
Full Load: {{xx,xxx}} lbs incl {{x}}% construction/build margin
Longitudinal Center of Gravity (LCG): {{xx.x}} ft forward of transom/keel intersect.
Static Draft (hull): {{x.x}} ft
Static Draft (outboards): {{x.x}} ft
[Shall be less than 30 in, per Section 042]
Cruise Speed: {{xx}} knots (kts) at Full Load in calm water
[Shall be 30+ knots per Section 042]
Sprint Speed: {{xx}} kts at Full Load in calm water
[Shall be at least 35 knots per Section 042]
Offeror to provide all parameters above in Attachment 2.
070-2 Contractor Submitted Drawings
At a minimum, provide:
Outboard Plan
Outboard Profile
Inboard Plan
Inboard Profile
Offeror to provide a list of the submitted drawings describing the proposed boat in Attachment 2.
070-3 Environmental Conditions
The boat shall be capable of operating in ambient air temperatures between five (5) degrees Fahrenheit and one hundred and ten (110) degrees Fahrenheit and water temperatures between twenty-eight (28) degrees Fahrenheit and ninety-five (95) degrees Fahrenheit.
The boat shall be capable of full operation in up to Sea State 2 (2.9 ft. significant wave height) The boat shall survive up to Sea State 4 conditions (6.9 ft. significant wave height). Survive means remain upright and intact and make headway, but heading is driven completely by sea conditions.
070-4 Load Conditions
The following load conditions are defined for reference throughout this Specification. These definitions apply to the engineering design values for weight and moments of the boat in the described condition. Weight Management Process Guidance for Boats and Craft, NSWCCD-80- TR-2014/038 may be used for guidance.
Service Life Allowance (SLA): The SLA shall be 300 lbs.
Lightship: The boat, complete in all respects including outfit, and ready for service with liquids in machinery at operating levels, but no personnel, fuel, or other variable loads.
Minimum Payload Capacity: The boat shall be capable of supporting a minimum of 2200 lbs total payload, including personnel and mission gear/cargo. The notional breakdown of payload is 4 personnel at 250 lbs each and 1200 lbs of mission gear/cargo. Mission gear/cargo is defined as a combination of mammals and mammal gear.
Full Load Condition: Lightship plus Minimum Payload, full fuel, and SLA. Gasoline weight shall be calculated using a density of 6.0 lbs/gallon and 7.1 lbs/gallon for diesel.
Minimum Operation (Min Op) Condition: Lightship plus two personnel with 10% fuel.
Fuel weight shall be calculated using a density of 6.0 lbs/gallon for gasoline and 7.1 lbs/gallon for diesel.
PDIT Load Condition: Same as Full Load Condition.
Boat Over-the-Road (OTR): Lightship plus full fuel, 1200 lbs mission gear, and SLA.
Trailer Curb Weight: Trailer complete in all respects, including all tools/stowages on trailer, OTR tiedown straps, and miscellaneous material required for OTR transport (e.g.
boat covers, tiedown strap chafe protection, etc.).
Gross Vehicle Weight (GVW): Boat OTR plus Trailer Curb Weight.
Trailer Design Hoisting: Trailer Curb Weight, and a 10% margin for growth.
Combined (Boat and Trailer) Design Hoisting: Boat OTR (weight and moment), plus Trailer Design Hoisting (weight and moment), including any additional material needed for hoisting trailer beneath boat (e.g. additional tiedown straps, ballast (if necessary) and deck tiedowns, etc).
070-5 Seakeeping, Dynamic Stability, and Maneuverability
The boat shall be able to operate safely at all speeds up to sea state 2 on the Wilbur Marks scale. The crew shall not experience vertical accelerations above 3g at the bow or center of gravity based on the Savitsky Brown paper Procedures for Hydrodynamic Evaluation of Planing Hulls in Smooth and Rough Water calculation.
The boat shall be safe and controllable at all speeds and under all loading conditions specified herein. Safe and controllable includes operation where boat orientation, motions, and accelerations do not pose a hazard to the crew or passengers that is not otherwise controllable by good seamanship and boat handling.
Dynamic Stability: The boat shall be dynamically stable (oscillatory and nonoscillatory) at all operational loading conditions and speeds.
See Sections 094 for trials requirements.
070-6 Configuration Management
The contractor shall practice configuration management of each boat per the SOW.
070-7 ABYC Standards
As a minimum, the boat in all respects shall meet American Boat and Yacht Council (ABYC) standards and recommended practices.
070-8 Alterations
Alterations to Original Equipment Manufacturers’ (OEM) products by the Contractor or distributor are highly discouraged. If alterations are necessary, documentation of the change shall be submitted for Government approval and shall be provided with the Technical Data Package (TDP).
070-9 Installation of Equipment, Machinery, and Materials
Unless otherwise specified, OEM recommendations for design and installation of their products into the boat shall be followed. Systems and components shall be selected for durability, longevity, safety, and ruggedness. Components shall be selected to maximize the use of Commercial-off-the-shelf (COTS) products and to maximize commonality between hulls. Systems and components shall be installed with proper tools.
All systems shall be free from leaks and safety hazards. Equipment, components, wiring, and piping shall be supported clear of the bilge to the maximum extent practicable.
All piping shall be cleaned to a degree of cleanliness that results in a surface that is reasonably free of contamination and any remaining residue on the surface does not interfere with system operation or damage system components.
Foundations and brackets for equipment shall be configured to provide access for cleaning, painting, preservation, and maintenance, and to prevent accumulation of water, dirt, and foreign material.
Connecting piping/hose and wiring shall be run to minimize exposure to weather. Bulkhead and deck penetrations shall be as close as practicable to the equipment being served, preferably by direct connection through the adjacent deck or bulkhead.
Systems, equipment, and components shall be installed to facilitate accessibility for operating efficiency and for inspection, adjustment, and repair. Permanent fittings and structure shall be kept clear of routes required for the removal of machinery and equipment. The space behind equipment may be inaccessible after installation; this factor shall be considered in providing proper preservation in way of such equipment and in selecting the location of pipes, ducts, wireways, and other permanent fittings behind such equipment. Nooks, cracks, and openings where water, dirt, dust, or foreign material can accumulate shall be avoided.
Protection of personnel against operating hazards shall be provided. Shafting, couplings, gears, flexible shafts, and similar items shall have adequate guards installed for protection of personnel.
Such protective guards shall be removable without dismantling the machinery surrounded.
Guards shall be as light as is consistent with required protection and strength. Guards shall be of sufficient strength to be used as steps or hand holds if located where such use may be anticipated.
Protective guards or insulation shall be installed to prevent contact with equipment where surface temperatures exceed 200°F (140°F if in proximity to controls or manual actuators requiring manipulation by personnel during normal operation). Caution signs shall be installed to prevent contact with equipment where surface temperatures exceed 140°F and do not have protective guards or insulation.
Protective guards shall also be installed as barriers to prevent personnel from inadvertently contacting energized and exposed electrical circuits, components, and terminals.
Equipment shall be protected against the hazard of personnel brushing against or being thrown against the equipment, particularly under heavy sea conditions, and inadvertently causing damage to exposed components or resulting in maladjustment of exposed functional controls such as push buttons, knobs, and switches. Protection shall be provided by equipment arrangement or design or by installation of enclosures, screens, or guard rails. All sharp edges exposed to personnel shall be dressed, ground or radiused to avoid injury to personnel.
071 ACCESS
071-1 Accessibility
Electrical and mechanical components shall be accessible for maintenance and repair. All items requiring operation or maintenance (e.g. switches, valves, filters, strainers, seacocks, bilge pumps, etc.) shall be readily accessible while at the dock or underway. Stowage and securing of arches, antennas, masts or other items shall not prevent access to critical items such as battery switches, fuel shut off valves or other items that need to be checked, secured or operated for any of the required transport modes.
071-2 Bilge Access
All bilges and voids shall have removable plates or hatches for bilge access/inspection. The access and inspection openings shall be of sufficient size and locations to allow personnel visual access to the entire bilge and void areas.
073 NOISE LEVELS
Noise levels on exterior decks shall not exceed 84 dBA during low speed up to 5 knots. If noise levels on the aft deck exceed 84 dBA at higher speeds, appropriate warning labels shall be provided on the boat advising personnel of the noise hazard and the need for hearing protection.
074 WELDING AND ALLIED PROCESSES
074-1 General
Welder and weld procedure qualification - weld procedures and welder qualification, including the associated record keeping requirements, shall be in accordance with the American Society of Mechanical Engineers (ASME), the American Welding Society (AWS), or NAVSEA TO300-AU- SPN-010 A, dated 5 October, 1992 (NAVSEA SPN-10).
The Contractor shall select one of these welding codes and adhere to all requirements of the selected document for each welding procedure specification. The Contractor may select different regulating codes for different weld procedures; however, all documentation, welding and welder requirements for each procedure (for example, the Welding Procedure Specifications (WPSs), the Procedure Qualification Records (PQRs) and the welder qualification and testing of the welds) must follow the same code.
All documentation pertaining to welder and weld procedure qualification shall be maintained by the Contractor, available for inspection by the Government.
074-2 Visual Inspections
All welds shall be visually inspected.
Welds shall be free of slag, weld splatter, cracks, sharp irregularities, craters and incomplete fusion.
The weld edge shall not form a reentrant angle with the base metal less than 90 degrees due to lack of fusion, undercut or excessive convexity.
Fillet welds dimensioned 3/8 inch or less shall not vary below the specified size by more than 1/16 inch for a total distance greater than 25 percent of the joint length. Fillet welds dimensioned 7/16 inch and larger shall not be less than the specified size. Fillet welds in excess of the required dimensions shall be avoided; however, oversized welds will be acceptable provided they meet the contour requirements and do not interfere with proper operation of the boat or its components. Fillet weld root openings shall not be greater than 1/16 inch.
Undercut shall not reduce the base metal thickness by more than 1/32 inch.
Welds shall not exhibit porosity or worm holes in excess of two indications 1/16 inch or larger in any 6 inch length of weld, exclusive of weld crater porosity. Grinding to correct the weld profile shall not reduce the base metal thickness by more than 1/32 inch.
074-3 Dye Penetrant Testing (PT)
Critical welded assemblies shall be visually inspected and PT tested per Section 092 as follows:
1. Visually inspect completed critical welded assembly per Section 074-2. If passing, proceed to step 2.
2. Before load testing, PT welds and 1/2 inch of base metal on either side of the weld for linear indications greater than 1/16 inch.
If passing, proceed to step 3.
3. Pull test the installed assembly to the load per Section 092.
4. After load testing, PT welds and 1/2 inch of base metal on either side of the weld for linear indications greater than 1/16 inch. If passing proceed to step 5.
5. Visual inspection of fittings and boat structure for signs of failure or permanent deformation.
075 FASTENERS
075-1 Stainless Steel Fasteners
Fasteners throughout shall be type 316 Stainless Steel (UNS S31600). Fasteners used for structural applications shall be ASTM F593, Alloy Group 2 (type 316 stainless steel), Condition A or CW.
For bolts with high strength requirements, non-stainless steel bolts may be used with Government approval.
Component mounting shall be through-bolted with ASTM F594 (type 316 stainless steel) nylon insert lock nuts and flat washers wherever practicable to suit fastener reinstallation during maintenance and repair. Threaded fasteners shall fully engage nuts with thread protrusion.
Excessive thread protrusion that poses personnel hazard shall be avoided.
Fasteners may be threaded into structural or non-structural materials only with Government approval.
Any pins used for folding, removable, or stowable features shall be secured with stainless steel lanyard to prevent loss. Pin handles may be aluminum. Spring loaded ball bearing type pins shall not be used.
078 MATERIALS
078-1 Structural Material
Components or parts of equipment and machinery shall be new. When materials are referred to in this Specification without further identification, they shall be as specified in this section. Other materials for specific applications are defined in the specific sections of this Specification, or on the drawings or referenced documents that require their use.
No plastic (without explicit Government approval), PVC or Chlorinated polyvinyl chloride (CPVC) shall be used except OEM components (e.g. electric bilge pump, NEMA Boxes).
Aluminum (if used) shall be:
Sand cast (3560 T6)
Plate and sheet (5086 H116 or 5086-H117 both ASTM B928; for non-welded applications 6061 T6 or 6061 T651 may be substituted.)
Extrusions (5086 H111; for non-welded applications 6061 T6 or 6061 T52 may be substituted.)
Drawn tube (5086 H32; for non-welded applications 6061 T6 may be substituted.)
Non-structural components such as handrails, small component brackets and wire ways may include extruded 6061 material. Non-structural 6061 components in welded applications shall be approved by the Government prior to fabrication.
Stainless Steel (if used) shall be:
Cast for general applications (J92800 or J92500; for non-welded applications UNS J92900 or J92600 may be substituted.)
Cast for underwater applications (J92800; for non-welded applications UNS J92900 may be substituted.)
Plate/sheet, bars/shapes, tubing, pipe (S31603; for non-welded applications S31600 may be substituted.)
Valves/fittings (Grade F 316, UNS S31600 – ASTM A182; or Type 316, UNS S31600 – ASTM A276; or Grade TP316, UNS S31600 – ASTM A312; or Grade CF8M, UNS J92900
– ASTM A351)
Bronze (if used) shall be:
Valves/strainers/fittings (UNS C92200 – ASTM B61; or UNS C83600 – ASTM B62; or
UNS C84400 – ASTM B584)
078-2 Corrosion Control
All parts and fittings required for disassembly of systems shall be of Monel, stainless steel type 316L (or 316 if not welded), or copper alloy containing no more than 10% zinc (except manganese bronze), whichever is compatible with the basic material of the equipment. Stainless steel, if used where it is likely to be submerged in seawater, shall be type 316L.
Boat mechanical components and subcomponents shall be suitable for a marine environment (water/corrosion resistant). Joined components shall be galvanically compatible with each other wherever possible, or shall be isolated to prevent galvanic corrosion. Components not available in a corrosion resistant material shall be protected/coated to reduce/eliminate corrosion (e.g. paint, corrosion inhibitor, etc.).
Where it is necessary to join dissimilar metals, ensure complete isolation of faying surfaces of the galvanically dissimilar metals, including fasteners, using non-water absorbent dielectric barrier or sealant materials.
Use U.S. Navy Craft Mechanical Practices NSWCCD-23-TM-2011/05 for guidance.
078-3 Bedding Compound
Bedding compound shall be either Woolsey 2005N or Sikaflex 241 or equal.
078-4 Non-Biodegradable Materials
Use of wood and other hygroscopic or biodegradable materials anywhere on the boat is prohibited.
All materials shall be marine grade and resistant to corrosion and Ultraviolet (UV) exposure.
078-5 Fabric Material
All boat fabric shall be marine grade as well as fade-, stain- and mildew-resistant and a near match in color as the surface it is mounted to or covering unless otherwise noted. Fabrics shall be easy to maintain and waterproof and/or breathable where required. All seams, edges, grommets, fastening points and areas of chafe shall be reinforced. Venting is acceptable to ventilate covers, but must minimize or eliminate the intrusion of water. Seats, seat fabric and foam shall be durable, provide comfort and be flame retardant. Foam shall not retain or absorb water.
078-6 Fire Retardant Interior Materials
All interior materials shall be fire retardant in accordance with 46 CFR Part 164.
079 STABILITY
079-1 Intact Stability
The boat shall meet ISO 12217-1 Small Craft – Stability and Buoyancy Assessment and Categorization for Design Category C. The boat shall meet these stability requirements in the Full Load and Min Op condition with the cockpit free flooding.
A VCG margin of 0.3 ft shall be used for all stability calculations. Any vents, scuppers or openings that allow water to enter below deck shall be used as the down flooding points. All windows, hatches, and openings in the deck that do not meet ABYC H-3.7.3 test for watertight devices or structures shall be treated as potential down flooding points. The boat profile area shall include the entire area directly beneath the aft deck overhead hard top (Section 169-3).
See Section 085 for technical analysis requirements.
079-2 Flotation (ABYC)
Flotation characteristics shall be incorporated (e.g. foam, tubes/collars) to ensure that the boat remains afloat and has Level Flotation when swamped and/or damaged to serve as a survival platform for embarked personnel per ABYC H-8 regardless of boat length.
079-3 Flotation Foam
If flotation foam is required by the analysis (see Section 085) and used to obtain the proper floating characteristics, foam in place solutions (pour in foam) shall not be used. Flotation Foam installed shall meet ABYC H-8.10 Material specification and ABYC H-8.11.3 Installation requirements.
If used, flotation foam shall be installed so as not to prevent visual access to the bilge and voids as specified in Section 071. Foam may be removable to satisfy this requirement.
084 TRANSPORTATION AND HANDLING
084-1 Road Transport
Boat and trailer combination shall meet all requirements for unrestricted over the road transport on Continental United States (CONUS) Highways (i.e. “CONUS Minimal Restrictions” per NSWCCD-23-TM-2009/64 Rev C.
Boat/trailer combination shall not exceed the following dimensions:
Height - 162 inches
Width - 102 inches
Items may exceed the height envelope if hinged or are otherwise collapsible for transport.
Hinged/collapsible items shall lower for transportation using not more than two persons without hand tools, without removal or disconnection of installed equipment. When lowered, hinged/collapsible components design shall be suitable for transportation and extended storage without damage or water intrusion to installed equipment or structure. The hinged/collapsible items shall be provided with a means to be secured down in the lowered position. Covers for equipment protection from water damage while in the lowered position shall be provided, as necessary.
Trailer components (except goal posts) shall not be removed to meet this requirement.
The GVW (see Section 070) shall be 12,000 lbs or less to be within prime mover towing capacity.
084-2 Trailer (Highway)
Trailer shall be provided for each boat and shall have the following characteristics:
Aluminum construction.
Gross Vehicle Weight Rating (GVWR) shall not be less than designed GVW .
Trailer shall be tandem axle.
Light Truck (LT) series tires.
Two matching and mounted spare tires and wheels.
Brake actuation components shall be capable of total submersion in salt water for short periods of time.
Surge brakes on each axle using all stainless steel disc brake components (including stainless steel rotors, stainless steel brake caliper assembly with stainless steel cylinder and guide pins). NOTE: no electric brakes.
Stainless steel brake lines with smooth regular bends. Flex hoses, where necessary, shall be stainless or kevlar, and have a minimum rating of 3000 psi.
Lockable (i.e. hasp for padlock), on-trailer stowage for tools and tiedown straps.
Forward ladder extending to bow of boat.
Hand winch with non-metal, low-stretch synthetic cable and closed end hook. Entire system shall be designed to the same load as the bow eye with a minimum safety factor of 1.5.
Jack stand (foot or roller).
Interchangeable hitch with 3 inch lunette ring and 2 5/16 inch ball receiver (both provided when consistent with trailer GVWR).
Fenders.
Safety chains sized in accordance with federal regulations.
Bunks shall be sized to support boat under accelerations for applicable transport modes.
Service air connections (if necessary for brake operation).
Trailer electrical system shall be equipped for 12 VDC (w/ commercial 7-pin round plug w/ flat connector) and 24 VDC (with 12-pin NATO plug).
Electrical system components shall be marine grade using ring terminals sealed w/ heat shrink at all connections.
Lighting shall be submersible LED.
ASTM F593, type 316 stainless steel fasteners, flat washers, and ASTM F594 nylon insert lock nuts throughout for all structural components. For non-structural applications, other grades of type 316 (e.g. UNS S31600) may be used. Fasteners shall not be threaded into aluminum.
Aluminum or 316 stainless steel components used where possible (e.g. fenders, brackets, etc.), hot-dipped galvanized steel elsewhere (e.g. axles).
Suspension type (e.g. leaf spring, torsional axle, or air with trailing arm) and strength consistent with trailer GVWR.
Each individual axle should be rated to carry at slow speeds the entire weight of the boat and trailer in the over-the-road (OTR) condition.
Hubs rated at highway speeds for a minimum of 50% of the axle rating.
Positive pressure hub system to prevent contamination of hub lubrication.
Loaded trailer dimensions within acceptable limits for all applicable transport modes.
Axle, wheel, and tire creep load capacities provided with trailer technical information.
Tiedown provisions rated capacities to suit hoisting and tiedown requirements.
Tiedown provisions labeled per MIL-STD-209K.
Trailer jack and lug wrench (mounted with provision for a lock) of sufficient size to support tire replacement (e.g. flat tire) with the boat and trailer in the over-the-road (OTR) condition.
The trailer shall comply with all applicable federal requirements, including 49 CFR Part 393 and 49 CFR Part 571, excepting that the CFR exclusion of heavy trailers does not apply for all cited CFR requirements.
Offeror to provide specific make/model in Attachment 2.
084-3 Boat to Trailer Tie-Downs
Boat and trailer shall have aluminum or stainless steel tie-down provisions (e.g. transom tie-down eyes, trailer D-rings, etc). Tie-down provisions not suitable for hoisting with trailer shall be labeled clearly and conspicuously. Labeling of the fittings shall include load ratings of the fittings in lbs.
Tiedown provision and adjacent structure shall be sized for maximum applicable load, as follows:
1. OTR Transport: Restraint of boat to trailer using Boat OTR load condition weight (see Section 070), shall be designed per MIL-STD-1366E and 49 CFR Part 393.102, to provide a minimum safety factor of 1.5 on yield strength, or
2. Trailer Hoisting: Trailer Design Hoisting condition with a minimum safety factor of five
(5) on ultimate strength for hoisting trailer with boat.
Notes:
a) If aluminum or stainless steel trailer tiedowns are not available, hot-dipped galvanized components may be used.
b) Trailer winch cable shall not be considered in restraint calculations for hoisting, but may be considered for OTR loads.
c) See Transportability Design and Certification Process Guidance NSWCCD-23-TM- 2009/64 for additional details.
See Sections 085 and 092 for technical analysis and testing requirements.
084-4 Tie-Down Straps
Tie-down straps shall be provided that comply with “Recommended Standard Specification for Synthetic Web Tie Downs”, Web Sling & Tie Down Association WSTDA-T-1, except that:
Straps are sized for a safety factor of five (5) based on maximum boat-to-trailer design load when suspending completed trailer weight beneath boat
The trailer tie-down strap arrangement shall provide that no single strap failure will result in the trailer being ‘dropped’ during the lift. In addition to the marking requirements of WSTDA-T-1 all straps used for hoisting the trailer shall be permanently marked identifying the testing activity, contract number, date of testing, boat type, rating and intended usage of the strap (and leg to fitting identifier, i.e. 'FWD PORT') and a unique serial number. The optional label from WSTDA-T-1 “not to be used for lifting” shall not be installed.
See Sections 085 and 092 for technical analysis and testing requirements.
085 TECHNICAL DATA PACKAGE
The Technical Data Package (TDP) shall include all information essential for acceptance, operation/training, maintenance, repair, modification and supply support for the delivered boat and trailer. The TDP shall include, but not be limited to:
1. Technical Design Analyses;
2. As-built boat drawings including or cross referenced to:
3. a Bill of Materials (BOM) to the line replaceable unit (LRU) level;
4. Commercial Off-the-Shelf (COTS) manuals;
5. Boat Technical Manual;
6. OEM certifications;
7. OEM warranty duration and coverage descriptions for major systems;
8. Test and Trials Reports;
9. A Master Data Index.
085-1 Technical Design Analyses
Technical Design Analyses shall be clear and complete. No steps shall be skipped or presumed.
Any descriptive information needed to completely describe the calculations and their methods shall be included. For repetitive calculations, a full example calculation describing methodology, assumptions and any additional descriptive information shall be provided. Subsequent repetitive calculations may be placed in a matrix or tabular form that includes all inputs and outputs to these calculations.
Calculations shall be clear and complete and include the following:
Clear, complete and concise assumptions presented in a neat, legible manner.
Any necessary diagrams to fully describe the design situation and its associated calculations.
Pertinent information from all references, standards and guidelines cited including appropriate excerpts.
All symbols and acronyms fully defined.
A sample calculation is included as an Appendix to NSWCCD-23-TM-2009/33 Rev B, Hoisting System Design and Certification Process Guidance, October 2009, US Navy Boats Hoisting Guidance document.
The Contractor shall provide the following Technical Design Analyses:
Boat Stability: The analysis shall demonstrate that the integration of intact stability standards in the boat design meets the required criteria in Section 079 following the procedures and assumptions outlined in ISO 12217-1. Geometry and run files used in the analysis shall be included. Design calculations shall be submitted to the Government for approval no later than 60 days after contract award.
Flotation: The analysis shall demonstrate that the boat design meets flotation requirements set forth in ABYC H-8 per Section 079, excluding the requirement to perform a physical test of a representative sample in ABYC H-8.8.1. Instead, software modeling and simulation and/or calculations equivalent to the physical testing requirement shall be used to demonstrate flotation performance as specified in ABYC H-8.8.4, H.8.8.5, and H-8.8.6.
Tiedown Provision and Strap Design: The analysis shall demonstrate that the design of the tiedowns/restraints, fittings, and straps have the appropriate minimum factor of safety based on the weight and design loads in Section 084.
Structural Analysis: The structural analysis shall demonstrate that the structural design meets the requirements of Section 100. Design calculations shall be submitted to the Government for approval prior to construction.
Electrical Load Analysis: A DC Electrical Load Analysis shall be performed for the conditions described in Section 320. The ELA shall demonstrate proper sizing of power sources. The ELA shall verify cable sizing and voltage drop in accordance with ABYC E11 paragraph 11.14. The ELA shall include a reserve battery capacity analysis in accordance with ABYC E-11 paragraphs 11.6.1 and 11.8.1. ELA to be submitted to the Government for approval prior to construction.
Tow Provision Design: The analysis shall demonstrate that the design of the tow provisions and supporting structure meets the required criteria in Section 582. Design calculations shall be submitted to the Government for approval prior to construction.
Bow Eye Design: The analysis shall demonstrate that the design of the bow eye and supporting structure meets the required criteria in Section 582. Design calculations shall be submitted to the Government for approval prior to construction.
Cleat Design: The analysis shall demonstrate that the design of the cleat and supporting structure meets the required criteria in Section 582. Design calculations shall be submitted to the Government for approval prior to construction.
Hoisting System Design: The analysis shall demonstrate that the design of the hoisting system, including fittings, supporting structure, and slings meets the required criteria in Section 611 using the highest hoisting system loads. Design calculations shall be submitted to the Government for approval prior to construction.
Analysis documentation shall be provided in electronic format (both native format and Adobe Acrobat PDF). Analyses are for the first boat and shall be presented with the Preliminary TDP forty-five (45) days prior to Pre Delivery Inspection and Trials (PDITs), unless an earlier submittal is required by this Section.
085-2 Drawings
Drawings and drawing revisions shall be prepared in accordance with the guidance of ASME Y14.100 and all referenced documents. Drawing level of detail shall be sufficient for acceptance, operation/training, maintenance, repair, modification and supply support for the delivered boat.
The Contractor shall validate the drawings during the construction process by building all boats to the drawings. Drawings shall first be validated against the initial boat. The original drawings shall be revised to show the actual details if discrepancies are found. Subsequent boats shall be checked against the revised drawings to validate the revision. The drawings shall be revised so that they are maintained up to date. The latest revision shall accurately reflect all boats as constructed and the current status of changes, deviations and waivers.