Att_07_140P8421Q0068_Technical_Info_Form.pdf
PDF 120 KB Posted
- Attached to
- Topographic Restoration at Millerton, NPS-PORE
- Solicitation number
- 140P8421Q0068
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL INFORMATION FORM
(Attachment 07)
THIS FORM IS OPTIONAL
(ensure equivalent information is provided)
Topographical Restoration at Millerton NPS Parcel, Point Reyes National Seashore
RFQ No.: 140P8421Q0068
Quoters shall submit the following information:
Quoters Business Name: ___________________________________
Quoters Address: ___________________________________
Quoters DUNS: ___________________________________
Quoters Phone: ___________________________________
Quoters Contact Name: ___________________________________
Quoters Signature: ___________________________________
CONTRACTOR’S PROPOSED TEAM:
Do you plan to self-perform all of the work? ___________________________
YES or NO answer
Are you proposing to use a subcontractor? ___________________________ YES or NO answer
List any proposed subcontractor(s) and indicate what key trade they may be assigned to perform:
Subcontractor Name Key Trade
If you are proposing to use a subcontractor, describe what work activities you plan to self-perform:
RFQ No. 140P8421Q0068, Attachment 07, Technical Information Form
REQUIRED QUALIFICATIONS/CERTIFICATION:
Is your firm a CA Licensed C-37 (Landscaping Contractor), ___________________________ “A” (General Engineering Contractor), or YES or NO answer “B” (General Building Contractor)?
☐ proof of license is required – include with your quote
IF you are proposing to use a sub-contractor, list name of sub(s): _______________________________
☐ proof of proposed sub’s applicable current CA license is required – include with your quote
☐ proof of prime contractor’s applicable current CA license is required – include with your quote
Who will be performing the tree work? List name of company: _______________________________
☐ proof of current CA Contractor State License Classification such as D-49 (Tree Service Contractor) is required – include with your quote
☐ proof of current professional certification such as International Society of Arboriculture, Tree Care Industry Association, or equivalent professional certification is required – include with your quote
SCHEDULE:
Is your firm able to perform this work within the stated ___________________________ performance period of 8/15/2021 – 10/31/2021? YES or NO answer
☐ Attach a proposed schedule for this project with your quote, such as Gantt chart or similar format showing major elements of work with start date, end date, and sequence; and the identification of the critical path activities.
LIST OF RELEVANT EXPERIENCE (LIST OF PROJECTS) & PAST PERFORMANCE REFERENCES:
1) Project Title: ___________________________ Contract # (if known): ______________
Agency/Owner: ___________________________ $ Amount: _______________________
Performance Period: ___________________________
Briefly describe how this project is similar in nature and scope to current advertised requirement:
Past Performance Reference (Name & Title): _______________________________________________
Phone Number: ___________________________ Email: __________________________
2) Project Title: ___________________________ Contract # (if known): ______________
Performance Period: ___________________________
Briefly describe how this project is similar in nature and scope to current advertised requirement:
3) Project Title: ___________________________ Contract # (if known): ______________
Performance Period: ___________________________
Briefly describe how this project is similar in nature and scope to current advertised requirement:
EXPERIENCE AND TECHNICAL COMPETENCE OF KEY PERSONNEL:
List any key personnel that the quoter proposes to use on this project, including any proposed subcontractors, such as:
i. Project Manager __________________________________________
ii. Superintendent __________________________________________
iii. Quality Control Manager __________________________________________
iv. Environmental Control Manager __________________________________________
v. Safety Manager __________________________________________
vi. Arborist __________________________________________
☐ Quoter should detail the role that each key personnel is proposed to perform in execution of this contract. Comparable experience, especially with restoration-related projects and projects involving a high degree of environmental restrictions on contracts with the Federal Government, other public agencies, or private organizations may be considered.
☐ Provide other documents and narrative to address the experience and technical competence of key personnel. No specific form or format is prescribed for these documents and narrative.
NARRATIVE - TECHNICAL APPROACH
Submit a brief written narrative limited to 2 pages describing your technical approach to successfully accomplish this project, to be evaluated as described in Section M.1.
“Technical approach” is the quoter’s means and methods to complete a technical aspect of required work in this solicitation, including the following:
i. Approach to successfully accomplish the work advertised by this solicitation in accordance with the project specifications and within the proposed contract performance period.
ii. Approach to safely coordinate construction work with the least possible obstruction and inconvenience to the public and adjacent oyster retail operations.
iii. Approach to implementing an ecological restoration project using methods that will yield the best chance of a successful outcome in terms of restoring the site.
iv. Approach to working in environmentally sensitive areas using methods that minimize impact to the environment, including spread of weeds and pathogens.
v. Approach to working in semi-remote locations greater than 1.5 hours away from metropolitan areas where supplies, materials, and maintenance/ repair services are available and on project sites with isolated off-road access.
SAFETY RECORD
☐ Submit an overview of your company’s general Construction Safety Program – attach with your quote
NARRATIVE – in the space below briefly provide an assessment of the safety risks associated with this construction project, and discuss any changes to your company’s Construction Safety Program required to address your assessment of the project risk:
☐ Submit a copy of your company’s OSHA 300A logs for the previous three calendar years.
☐ If proposing to use a subcontractor for any major component of the work, additionally submit a copy of your proposed roofing subcontractor’s OSHA 300A logs for the previous three calendar years.
File details come from the government source that posted it. Updated .