ATT 02. Price Proposal Form N6264926RA059.xlsx
XLSX spreadsheet 52 KB Posted
- Attached to
- USS HIGGINS (DDG-76) 6C1 FARM OUT
- Solicitation number
- N6264926RA059
About this file
This is a Price Proposal Form for ship repair and maintenance services on the USS HIGGINS (DDG-76) destroyer. The solicitation (N6264926RA059) seeks proposals for 6C1 farm-out work to be performed at Commander Fleet Activities Yokosuka (CFAY) Naval Base in Japan, with an anticipated Period of Performance from September 9, 2026 to March 2, 2027. The contract involves two Task Group Instructions (TGIs) covering various ship repair, overhaul, preservation, and replacement work. Proposals must be submitted no later than July 13, 2026 at 10:00 AM Japan Standard Time.
The form is a template requiring offerors to populate labor costs (both in-house and sub-contractor man-hours), material costs, and Other Direct Costs (ODCs) in Japanese Yen across multiple Contract Line Items (CLINs), including a base CLIN and a growth CLIN with a 7.0% growth factor. Pricing breakdowns must account for specific work categories including structural work, steel work, false deck and rigging work, and AIT support services. The contracting officer and contract specialist is Neil Flint (neil.s.flint.civ@us.navy.mil). Complete work specifications and Task Order Instructions are available through DoD SAFE, a secure government repository requiring prior access requests. Offerors must also address hazardous materials per FAR 52.223-3 and anticipate potential sea transportation requirements per DFARS 252.247-7022.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6264926RA0590005.pdf | ||
| Att IX HIG_6C1_B6_POP_List_R1.pdf | ||
| N6264926RA0590001.pdf | ||
| N6264926RA059.pdf | ||
| ATT 04. GFP_List_V3_38KB344119_38KB346804.xlsx | XLSX spreadsheet | |
| ATT 05. Source of Repair Instruction.pdf | ||
| ATT 03. Request for Information Form.pdf | ||
| ATT 06. Warranty Tracking Information.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUMMARY
OFFEROR/COMPANY NAME:
| TAB | SUMMARY | SUMMARY | CLIN | Total Labor (MH) | Labor Cost | Material Cost | ODC Cost | Proposed Price |
| SOLICITATION NO: | N6264926RA059 | CLIN 0001 38KB344119A01 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| SHIP/VESSEL NAME: | USS HIGGINS (DDG 76) | CLIN 0002 (Growth CLIN) | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| CLIN 0003 38KB346804A01 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |||
| CLIN 0004 (Growth CLIN) | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |||
| DESCRIPTION: | 6C1 Farm Out | Total for All CLIN | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Total WI/TGI (Specify) | 2 | Total Evaluated Price | ¥0 |
| Growth CLIN % | 7.00% |
| Note to Offerors: The values in this Summary table is linked to the corresponding data from Tabs for each TGI listed, manual input is not necessary. | |||||||||
| No. | Work Item/TGI No. | DESCRIPTION | Proposed Labor | Material/ODCs | Proposed Price (JPY) | ||||
| In-House Labor (MH) | Sub-Contractor Labor (MH) | Total Labor (MH) | Overall Total Labor Cost (JPY) | Material Cost (JPY) | ODC (JPY) | ||||
| 1 | 38KB344119A01 | F/O -S/A 98418K, ACCOMP STRL, STML, FALSE DK & RIGGING WORK FOR HF TERM MOD | |||||||
| 2 | 38KB346804A01 | F/O - PROVIDE AIT SUPPORT WORK FOR SA 96346 |
1. 38KB344119A01
| SHIP NAME/AVAILABILITY: | USS HIGGINS (DDG 76) - 6C1 Farm Out | 1_38KB344119A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264926RA059 | ||||||||||
| Work Item/TGI #: | 1_38KB344119A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | F/O -S/A 98418K, ACCOMP STRL, STML, FALSE DK & RIGGING WORK FOR HF TERM MOD | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
HOURS
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
2. 38KB346804A01
| SHIP NAME/AVAILABILITY: | USS HIGGINS (DDG 76) - 6C1 Farm Out | 2_38KB346804A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264926RA059 | ||||||||||
| Work Item/TGI #: | 2_38KB346804A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | F/O - PROVIDE AIT SUPPORT WORK FOR SA 96346 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
HOURS
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
File details come from the government source that posted it. Updated .