Att 0003 - Price Schedule for GDSM Drain Inspection.pdf

PDF 110 KB Posted

Attached to
Garrison Spillway Chute Subdrain Inspection Garrison Dam, ND
Solicitation number
W9128F26QA043
Issued by

About this file

This is a Price Schedule for FY26 Spillway Drainage Inspection services at Garrison Dam, North Dakota. The solicitation requires contractors to provide comprehensive drainage inspection and maintenance services across seven line items, six of which are mandatory and one optional.

The mandatory services include: Task #1 - flushing, measuring sediment, camera inspection and reporting for Rows 2-9 spillway subdrains (14,060 linear feet); Task #2 - the same services for Row 1 spillway subdrains (2,120 linear feet); Task #3 - flushing, measuring sediment, camera inspection and reporting for spillway box drains (4,800 linear feet); Task #4 - depth-sounding and camera inspection of 14 crest relief wells (550 linear feet); Task #5 - construction and maintenance of a temporary chute access staircase (1 job); and Task #6 - all other work including mobilization, demobilization, pre-fieldwork submittals, and meetings (1 job). The optional service is Task #7 (Option 1) - flushing, measuring sediment, camera inspection and reporting for power plant drainage network (5,295 linear feet). Contractors must submit unit prices for all items with no more than two decimal places; in case of discrepancy between unit prices and total prices, unit prices will prevail. Estimated quantities are subject to the "Variation in Estimated Quantity" contract clause, meaning the unit price will apply for any overruns or underruns. Any single adjustment to the total award amount will be applied to Item No. 006 unless otherwise apportioned.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Schedule

FY26 Spillway Drainage Inspection

Garrison Dam, ND

Item

No.

Required Services Description QTY UNIT

UNIT

PRICE

TOTAL

Task #1

Flush, measure sediment, camera and report for Rows 2-9 spillway subdrain

The work for this item shall include all equipment, materials, and labor necessary for the flushing, measuring the sediment volume, camera-inspecting and reporting for all spillway slab subdrains accessed from Rows 2 through 9 manholes in the spillway chute slab.

14,060

Linear

Foot

(LF)

Task #2

Flush, measure sediment, camera and report for Row 1 spillway subdrain

The work for this item shall include all equipment, materials, and labor necessary for the flushing, measuring the sediment volume, camera-inspecting and reporting for all spillway slab subdrains accessed from Row 1 manholes in the spillway chute slab.

2,120

Linear

Task #3

Flush, measure sediment, camera and report for spillway box drains

The work for this item shall include all equipment, materials, and labor necessary for the flushing, measuring the sediment volume, camera-inspecting and reporting for all box drains located along the outer base of the spillway chute walls.

4,800

Linear

Task #4

Sound and inspect crest relief wells

The work for this item shall include all equipment, materials, and labor necessary for the depth-sounding, camera-inspecting and reporting of the 14 spillway crest relief wells.

Linear

Task #5

Temporary Chute

Access Staircase

The work for this item shall include all equipment, materials, and labor necessary for the construction of a chute access staircase to be maintained for the duration of activities within the spillway chute.

1 Job

Task #6

All Other Work

This work shall include costs associated with mobilization and de-mobilization of personnel and equipment, pre-fieldwork submittals and meetings, and fulfillment of any requirements not associated with other specific tasks.

1 Job

Task #7

(OPTION 1)

Flush, measure sediment, camera and report for power plant drainage

The work for this item shall include all equipment, materials, and labor necessary for the flushing, measuring the sediment volume, camera-inspecting and reporting for the power plant seepage drain network

5,295

Linear

Notes:

The quantities for unit priced items are estimated only and the respective unit price will prevail in the event of an overrun or underrun subject to Contract Clauses "Variation in Estimated Quantity."

2. Prices must be entered for all items of the schedule. Total amount of line items submitted without unit prices being entered on individual items will be rejected. In case of variation between the unit prices and the total price per line item, the unit prices will be considered the quoted price. No more than two decimal places are allowed for the unit and total prices.

3. A modification to the award which provides for a single adjustment to the total amount of the award should state the application of the adjustment to each respective unit price and total price affected. If the modification is not so apportioned, the single adjustment will be applied to Item No. 006.