Atch_8_Submittal_List.pdf

PDF 40 KB Posted

Attached to
WICA Replace Failed Lift Station & Old Septic Tank
Solicitation number
140P6323B0002
Issued by

About this file

This submittal list outlines requirements for a project to replace septic tanks and a failed lift station at WICA Elk Mountain Campground. The project involves replacing old septic tanks and a failed wastewater lift station according to specifications in sections 22 13 13, 22 13 43, and 22 13 53. Submittals required include construction details, material descriptions, equipment cut sheets, shop drawings, O&M manuals, product data sheets, warranties, test reports, safety plans, schedules, and statements of compliance for various phases of the project work. The related federal contract opportunity is solicitation number 140P6323B0002 for the National Park Service Midwest Region to complete the replacement work at the campground.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL LIST

Park Acronym/Project Management Information System (PMIS) Number: WICA 245317

Project Title: Replace Septic Tanks and Failed Lift Station

SUBMITTAL REQUIREMENTS

(Indicate with X)

INFORMATIONAL ACTION

S P

E C

IF

IC

A T

IO

N

S E

C T

IO

N

P A

R A

G R

A P

H N

U M

B E

R

DESCRIPTION

C E

R T

IF

IC

A T

IO

N

S O

R

L A

B O

R A

T O

R Y

T E

S T

S

R E

P O

R T

S O

R C

A L C

U L A

T

IO

N S

O R

P L A

N

M A

N U

F A

C T

U R

E R

D A

T A

A N

D I N

S T

R U

C T

IO

N

S

O T

H E

R

S A

M P

L E

S

S H

O P

D R

A W

IN

G

S

M A

N U

F A

C T

U R

E R

D A

T A

A N

D I N

S T

R U

C T

IO

N

S

O T

H E

R

01 10 00 General Requirements

9.1.C Satisfactory evidence of liability insurance coverage and workman's compensation, and any applicable bonds X

Letter designating Project Superintendent X

Construction Schedule. (Must include shop drawings, procurement time including long lead time items, mobilization, trade work progression and completion at minimum.)

X

A comprehensive breakdown of the Schedule of Values. X

Accident Prevention (Safety) Plan X

A list of Subcontractors for this project. X

Written statements from subcontractors certifying compliance with applicable labor standard clauses X

Quality Control Plan. X

Waste Management Plan. X

List of Required Construction Permits. X

22 13 13 Facility Sanitary Sewers

1.3.A Pipe and fittings x

Non-pressure and pressure couplings x

Cleanouts x

22 13 43 Facility Packaged Sewage Pumping Stations

3.3.1 FRP lift station basin x

Structural and opening details x

Equipment mounting and location details x

Manufacturer cut sheets for each item of equipment x

Drawing of complete prefabricated FRP lift station x

4.4.1 O&M Manual x

22 13 53 Facility Septic Tanks

1.3.A Construction Details, material decriptions, dimensions of individual components, and profiles x

Manhole openings, covers, and pipe connections x

Submittal List page 1 of 2

SUBMITTAL LIST

Park Acronym/Project Management Information System (PMIS) Number: WICA 245317

Project Title: Replace Septic Tanks and Failed Lift Station

SUBMITTAL REQUIREMENTS

(Indicate with X)

INFORMATIONAL ACTION

S P

E C

IF

IC

A T

IO

N

S E

C T

IO

N

P A

R A

G R

A P

H N

U M

B E

R

DESCRIPTION

C E

R T

IF

IC

A T

IO

N

S O

R

L A

B O

R A

T O

R Y

T E

S T

S

R E

P O

R T

S O

R C

A L C

U L A

T

IO

N S

O R

P L A

N

M A

N U

F A

C T

U R

E R

D A

T A

A N

D I N

S T

R U

C T

IO

N

S

O T

H E

R

S A

M P

L E

S

S H

O P

D R

A W

IN

G

S

M A

N U

F A

C T

U R

E R

D A

T A

A N

D I N

S T

R U

C T

IO

N

S

O T

H E

R

26 05 19 Low-Voltage Electrical Power Conductors and Cables

1.2.A Product Data for each type of product x

1.3.A Field quality-control reports x

26 05 29 Hangers and Supports for Electrical Systems

1.2.A Product Data for each type of product x

26 05 33 Raceways and Boxes for Electrical Systems

1.2.A Product Data for each type of product x

26 05 53 Identification for Electrical Systems

1.3.A Product Data for each type of product x

26 27 26 Wiring Devices

1.2.A Receptables with GFCI device x

1.3.A Record copy of installation and testing instructions x

1.3.B Sample warranties x

26 28 13 Fuses

1.2.A Product Data for each type of product x

26 28 16 Enclosed Switches and Circuit Breakers

1.2.A Product data x

1.2.B Shop drawings for enclosed switches and breakers x

Submittal List page 2 of 2

File details come from the government source that posted it. Updated .