Atch_1_Specifications.pdf
PDF 704 KB Posted
- Attached to
- WICA Replace Failed Lift Station & Old Septic Tank Federal contract opportunity
- Solicitation number
- 140P6323B0002
About this file
This document is a solicitation for replacing a failed lift station and old septic tanks at the Elk Mountain Campground in Wind Cave National Park.
The solicitation seeks to replace six concrete septic tanks and one lift station. The work includes demolishing and disposing of the existing structures and installing new septic tanks and a lift station. The project will be completed under a single contract within 180 calendar days of the start date. Bids are due by October 12th, 2022.
The solicitation requires replacement septic tanks constructed of portland type II sulfate-resistant cement with a minimum strength of 3,000 pounds per square inch. A prefabricated fiberglass reinforced polyester lift station is also required, along with duplex submersible pumps, a control panel, discharge piping and valves. The successful bidder must perform start-up services and training.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amd_0002_Atch_1_Questions_Answers_0002.pdf | ||
| Sol_140P6323B0002_Amd_0002.pdf | ||
| Site_Visit_Sign_In_Sheet_0001.pdf | ||
| As_Builts_Elk_Mtn_Campground_0001.pdf | ||
| Sol_140P6323B0002_Amd_0001.pdf | ||
| Atch_4_Sewer_Addendum_A.pdf | ||
| Atch_3_Sewer_Table_Of_Contents_Addendum_A.pdf | ||
| Atch_9_Limitations_on_Subcontracting_Report.xlsx | XLSX spreadsheet | |
| Atch_5_Drawings_Map_Sewer_Addendum_A.pdf | ||
| Atch_2_Drawings.pdf | ||
| Atch_8_Submittal_List.pdf | ||
| Atch_7_Drawings_Concrete_Patch_Addendum_A.pdf | ||
| Atch_6_Concrete_Patch_Addendum_A.pdf | ||
| Atch_10_Wage_Determination_SD20230032_03_10_2023.pdf | ||
| Sol_140P6323B0002.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Div. 1 V. 2022-9-6 Page | 1
WIND CAVE NATIONAL PARK
ELK MOUNTAIN CAMPGROUND
REPLACE FAILED LIFT STATION & OLD SEPTIC TANKS
PMIS 245317
Drawing No: 80038
PROJECT SPECIFICATIONS
FINAL CONSTRUCTION DOCUMENTS
NATIONAL PARK SERVICE
OCTOBER 12, 2022
10/12/202210/12/2022
Page | 2
TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
Section 01 10 00 - Division 01 Short Form General Requirements
DIVISION 22 – PLUMBING
Section 22 13 13 – Facility Sanitary Sewers Section 22 13 43 – Facility Packaged Sewage Pumping Stations Section 22 13 53 – Facility Septic Tanks
DIVISION 26 – ELECTRICAL
Section 26 05 19 – Low Voltage Electrical Power Conductors and Cables Section 26 05 29 – Hangers and Supports for Electrical Systems Section 26 05 33 – Raceways and Boxes for Electrical Systems Section 26 05 53 – Identification for Electrical Systems Section 26 27 26 – Wiring Devices Section 26 28 13 – Fuses Section 26 28 16 – Enclosed Switches and Circuit Breakers
DIVISION 31 – EARTHWORK
Section 31 10 00 – Site Clearing Section 31 20 00 – Earth Moving
Page | 3
SECTION 01 10 00
DIVISION 1 SHORT FORM GENERAL REQUIREMENTS
PART 1 – GENERAL
ITEM 1 - DESCRIPTION OF WORK
1.1 Background: The sanitary sewer service lines from each of the existing comfort stations in the campground drain to septic tanks which are located adjacent to each comfort station. The residence at the campground entrance also drains to a septic tank. All septic tanks are connected to a sewer main which then drains to a lift station which is currently out of service.
When the lift station is operational, the sewage is pumped to the gravity sanitary sewer main located near the visitor center. This gravity main eventually discharges to a lagoon system. The intent of the project is to replace the existing concrete septic tanks with new concrete septic tanks, and to replace the existing lift station with a new lift station.
1.2 Work Covered by the Contract Documents:
A. Project Location: The septic tanks and lift station to be replaced are in the Elk Mountain Campground within Wind Cave National Park.
B. Work consists of: Replacement of 6 concrete septic tanks and replacement of one lift station.
C. All work will be performed under a single contract.
D. Period of performance: Work shall be completed within 180 calendar days of the start date provided on the Notice to Proceed.
ITEM 2 – PROTECTING EXISTING UTILITIES
2.1 Protecting Existing Utilities: Notify Contracting Officer (CO), Contracting Officer’s Representative
(COR) and utility companies as required to request location services prior to and to coordinate any excavation/digging operations, and/or for demolition if within Scope of Work.
2.2 Contractor shall be responsible for locating and preventing damage to known utilities on site or indoors. If contractor damage occurs, alert CO and COR as soon as safely possible, and repair utility at no additional expense to the Government. If damage occurs to an unknown utility, contact CO and COR as soon as safely possible.
2.3 Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Government or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated below:
A. Notify CO and COR not less than two business days in advance of proposed utility interruptions.
Page | 4
B. Hours for Utility Shutdowns: Utilities at each comfort station may be shut down for the duration of construction. Shut down of utilities for the residence shall not exceed 8 hours unless approved in advance by COR.
ITEM 3 - CONTRACTOR’S USE OF PREMISES
3.1 Conduct of Operations: At all times the contractor shall conduct his operations in conformance with the rules and regulations promulgated by the Secretary of the Interior for the National Park
Service, and applicable park rules and regulations prescribed by the Park Superintendent.
A. No signs or advertisements (except those specified herein and as required for safety) shall be displayed on the construction site or within the park unless approved by the Contracting
Officer.
B. Smoking is not permitted within any Federal building or within 25 feet of entrances, operable windows, or outdoor air intakes.
C. Public Use of Site: Contractor shall at all times conduct operations to ensure the least inconvenience to the public. Campground will remain open to the public during construction
(depending on the time of year) with the intent to only close the areas that are under construction.
3.2 On-site work hours: Work shall be generally performed during normal business working hours of
8 a.m. to 5 p.m., Monday through Friday, except when otherwise indicated.
A. Work on Saturdays, Sundays, Federal holidays, early morning, or at night may not be performed without prior consent from the CO and COR. Submit requests for work outside of the stated normal business hours to the CO and COR for approval at least 48 hours in advance of the work.
The following Federal holidays are observed by the National Park Service:
New Year Day
Martin Luther King, Jr’s Birthday
Washington’s Birthday
Memorial Day
Juneteenth National Independence Day
Independence Day
Labor Day
Columbus Day
Veterans Day
Thanksgiving Day
Christmas Day
B. Note: Any of the above holidays falling on a Saturday will be observed on the preceding
Friday; holidays falling on Sunday will be observed on the following Monday. The specific day that each holiday is recognized for each year can be found at the following site: Federal
Holidays (opm.gov).
https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/#url=2022 https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/#url=2022
Page | 5
3.3 Contractor Use of Site:
A. General: Contractor shall have limited use of the site for construction operations. Limit use of premises to construction area as shown on site plan. Do not disturb portions of Project site beyond areas in which the Work is indicated.
B. Driveways and Entrances: Keep driveways, access roads, and entrances serving premises clear and available to Government, Government's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials. Schedule deliveries to minimize use of driveways and entrances.
C. Define site disturbance area, including earthwork and clearing of vegetation, to:
1. 25 feet beyond constructed areas with permeable surfaces that require additional staging areas to limit compaction in the constructed area.
D. Utilities
1. General: Cost or use charges for temporary facilities shall be included in the Contract Sum as required.
2. Water Service: Contractor may access water at the maintenance yard free of charge.
Contractor shall utilize own water tanks and coordinate filling with the park. Use resources wisely and minimize waste of water.
3. Electric Power Service: Electric power from existing system is not available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations without any additional permit costs. Power may or may not meet your construction power tool requirements, provide generators if questionable. Use power in a resourceful manner and avoid excess power waste.
4. Waste Operation:
a. Toilets: Contractor may use existing restrooms in the campground if they are open
(depending on the time of year), otherwise, Contractor may use existing vault toilet in loop B.
b. Waste Removal / Recycling: Contractor is responsible for removing all waste created by the project. Contractor shall recycle to the highest degree possible and empty dumpsters as necessary to avoid debris on site. Locate as shown on site plan or coordinated with COR.
E. Security and Protection facilities:
1. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with state and federal environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects.
2. Cleaning of Equipment: The Contractor shall ensure that prior to moving on to the Project Area, all equipment, is free of soil, seeds, vegetative matter, or other debris that could contain or hold seeds. Ensure that all equipment has been pressure washed and is free of exotic species prior to start-up of operations and moving of equipment to Project Area.
Equipment shall be considered free of soil, seeds, and other debris when a visual
Page | 6 inspection does not disclose such material. Disassembly of equipment components or specialized inspection tools are not required.
3. Tree and Plant Protection: Provide Tree Protection fence at drip line of trees impacted in construction area. Coordinate with COR. Restore damaged areas to original condition, repairing or replacing damaged trees and plants, at no additional expense to the Government.
a. Provide temporary barriers to protect existing trees and plants and root zones.
b. Do not remove, injure, or destroy trees or other plants without prior approval. Consult with Contracting Officer Representative and remove agreed-on roots and branches that interfere with construction.
c. Do not fasten ropes, cables, or guys to trees.
d. Carefully supervise excavating, grading, filling, and other construction operations near trees to prevent damage.
4. Pest Control: Follow best practices to minimize attraction and harboring of rodents, roaches, and other pests and to perform extermination and control procedures at regular intervals so Project will be free of pests and their residues at project completion. Perform control operations lawfully, using environmentally safe materials.
5. Temporary Enclosures: N/A
6. Site Enclosure Fence: N/A
7. Security Enclosure and Lockup: N/A
3.4 Storage - Staging Areas:
A. Confine Storage of materials and equipment to the project staging area noted on the plans/aerial. Specific storage and staging area’s may be discussed at the preconstruction briefing. Contractor shall take appropriate measures to ensure items in staging areas are secure and not subject to theft or damage. Limits of use and control shall be subject to
Contracting Officer’s approval. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.
3.5 Preservation of Natural Features: Carefully supervise construction operations near trees and other vegetation to prevent damage.
3.6 Hauling Restrictions: Contractor to verify path to site and meet state and county road requirements and height restrictions for all park work/access.
3.7 Housekeeping:
A. Keep project neat, orderly, and in a safe condition at all times.
1. Dispose of waste materials and recycling legally outside the park. The contractor shall not use park dumpsters
2. Address Recycling: Government goal is to salvage and recycle as much nonhazardous construction waste as possible. Use sustainable methods to extent possible during this project, recycling material as is probable with local means. Maintain accurate
Page | 7 documentary records for submittal of all recycled materials used including fly ash and slag cement.
3.8 Occupancy Requirements for Buildings:
A. Existing Buildings:
1. Full Government Occupancy: Government will occupy the existing residential building during the entire contract period.
a. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from the CO or COR.
B. New /Existing Buildings Unoccupied:
1. Contractor shall be responsible for and protect the entire facility and construction site from notice to proceed through final acceptance.
2. Water will be shutoff to the campground and the existing comfort stations will be closed between October 2, 2022, and May 19, 2023. The existing vault toilet in loop B will remain open. If construction occurs outside of this shutdown period, each comfort station may be shut down as necessary for construction.
3.9 Photo Documentation:
A. Contractor must provide existing condition, progress, and completion photos. All photos shall be in focus, show maximum range of depth of field general photo and then close up detail photo as needed. Shall be in JPEG digital form and submitted electronically by email or via
CD-R Archival Gold or DVD-R Archival Gold media with printed labels and 8 mega pixels minimum within 7 days from time of taken or as approved by COR.
B. Existing Condition Images:
1. Before starting construction, take color, dated, digital images of project site and adjacent property/roads/etc. that may be impacted by construction activity/traffic. Include existing items to remain or be salvaged from different vantage points and with context for location identification.
C. Construction Progress Images:
1. Document all sub-surface work/ trenches etc. prior to backfill with photos covering enough overall field view to show location and then zoom in for details. (Locations and dimensions shall also be noted on as built drawing set.)
2. Maintain organized index for photos with date, description, etc.
3. Additional images as needed when questions or emergency situations occur. Submit within 24 hours.
Page | 8
D. Completion Images:
1. Document all completed work within scope of work.
2. Maintain organized index for photos with date, description, etc..
3. Additional images as needed when questions or emergency situations occur. Submit within 24 hours.
3.10 Fire and Life Safety:
A. As a minimum, conduct one weekly 15 minute "toolbox" safety meetings. These meetings shall be conducted by a foreman or supervisor and attended by all construction personnel at the worksite. Topics need to coincide with work scheduled for the following week. Document and submit meeting minutes to the CO and COR within one day after the meeting and document the meetings on the daily reports.
B. Comply with the requirements of NFPA 241 (Standard for Safeguarding Construction, Alteration, and Demolition Operations). Take all necessary precautions to prevent fire during construction. Provide adequate ventilation during use of volatile or noxious substances.
C. Store and handle hazardous materials in accordance with manufacturers and OSHA 29CFR1926 Subpart D requirements 1926 | Occupational Safety and Health Administration (osha.gov). Maintain readily available, on site, MSDS/Safety Data Sheets (SDS) for each chemical.
1. Immediately report all spills of hazardous materials to the CO, COR, and park.
2. Maintain a spill emergency response kit.
3. Train employees how to respond to a spill and use the emergency response kit.
3.11 Noise and Acoustics Management: N/A
ITEM 4 - COMMENCEMENT, PROSECUTION, AND COMPLETION
4.1 The Contractor shall commence work in accordance with the terms and conditions of the contract.
Contractor shall coordinate and incorporate long lead and delivery time items within the schedule.
ITEM 5 - EXAMINATION OF THE SITE
5.1 All bidders are urged to visit the job site and examine existing conditions before submitting bids.
Contractors will be accountable for understanding existing conditions. No cost changes for items viewable during site visit will be allowed.
ITEM 6 - ABBREVIATIONS
6.1 The list of abbreviations, standards and organizations which may be used in/referred within the
Construction Specifications or Special Provisions, may be found linked from the listed page below. On the home page, follow the link under “Contracting and Procurement” labeled “NPS
Reference Standards.” https://www.nps.gov/orgs/1671/do-business-with-us.htm https://www.osha.gov/laws-regs/regulations/standardnumber/1926 https://www.osha.gov/laws-regs/regulations/standardnumber/1926 https://www.nps.gov/orgs/1671/do-business-with-us.htm
Page | 9
ITEM 7 - ACCIDENT PREVENTION
7.1 Description: The work of this section consists of establishing and implementing an effective accident prevention program (APP) and providing a safe environment for all personnel and visitors.
7.2 Submittals:
A. Accident Prevention (Safety) Plan (APP): Submit a site-specific accident prevention (safety) plan. The Plan shall be written to comply with OSHA and project requirements (a generic plan is not acceptable) including but not limited to the following:
1. Name and qualifications of responsible supervisor to carry out the program.
2. First aid and rescue procedures.
3. Training, both initial and continuing.
4. Outline of each phase of the work, the hazards associated with each major phase, and the methods proposed to provide for property protection and safety of the public, National
Park Service personnel, and Contractor's employees. Identify the work included under each phase, with a Job Hazard Analysis (JHA)/Job Safety Analysis (JSA), etc. A sample
JHA template may be provided upon request.
5. Planning for possible emergency situations, such as cave-ins, earthquake, explosions, fires, floods, power outages, slides, and windstorms. Such planning shall take into consideration the nature of construction, site conditions, and degree of exposure of persons and property.
6. Contractor to identify nearest location of medical facility for emergencies
7. Recognition that works will be performed in remote areas with limited communication or cell phone coverage if applicable.
8. Supplemental hazard specific plans may be required IAW 29 CFR 1926 or 1910.
B. Meeting and Inspection Reports: Safety Meetings: As a minimum, conduct 15 minute
"toolbox" safety meetings. These meetings shall be conducted by a foreman and attended by all construction personnel at the worksite. Submit a report of safety meetings and inspections to CO and COR within one day after the meeting and document the meetings on the daily reports.
7.3 Qualification of Employees:
A. Ensure that employees are physically qualified to perform their assigned duties in a safe manner to include operators of vehicles and equipment. Provide operating instructions for all equipment.
B. Do not allow employees to work whose ability or alertness is impaired because of drugs, fatigue, illness, intoxication, or other conditions that may expose themselves or others to injury.
7.4 Accident Reporting: The Contractor shall report all accidents to the CO and COR as soon as safely possible and assist the CO and COR and other officials as required in the investigation of the accident.
Page | 10
7.5 First Aid Facilities: Provide access to facilities for the number of employees and appropriate to the hazards associated with the types of ongoing construction work at the site.
7.6 Emergency Instructions: Post telephone numbers and reporting instructions for ambulance, physician, hospital, fire department, and police in conspicuous locations at the work site.
7.7 Personal Protective Equipment (PPE): It is the Contractor's responsibility to require all those working on or visiting the site to wear necessary protective equipment at all times.
A. PPE must meet requirements of applicable ANSI standards. Selection shall conform to OSHA
29CFR 1926 Subpart E.
B. A hard hat use area shall be designated by the Contractor. The hard hat area shall be posted by the Contractor in a manner satisfactory to the Contracting Officer.
C. All PPE will be serviceable at all times. At a minimum, maintain four (4) sets of PPE including hard hats and all other Accident Prevention Plan required equipment.
7.8 Hazardous Materials: It shall be the responsibility of all operators and contractors, functioning within the park to properly cleanup, mitigate and remediate if necessary, all unauthorized discharges of hazardous materials or non-hazardous chemical and biological products released from fleet and/or other support vehicles or stationary sources. Response shall be consistent with guidelines established by federal, state, and local regulations, and as outlined within the operator's Safety or Hazardous Materials Business Plan.
A. If a spill, leak, or other release occurs, the operator shall as soon as possible, without impeding cleanup, notify the National Park Service Emergency Dispatch.
ITEM 8 - PRECONSTRUCTION CONFERENCE
8.1 If the Contracting Officer decides to conduct a preconstruction conference, the successful offeror will be notified and will be required to attend. The Contracting Officer’s notification will include specific details regarding the date, time, and location of the conference, any need for attendance by subcontractors, and information regarding the items to be discussed. See Item 9.1C below.
ITEM 9 - SUBMITTALS
9.1 General Contracting Submittal Procedures:
A. General: Prepare and submit submittals required by individual Technical Specification
Sections. Types of submittals are indicated in individual specific sections.
1. CM-16 Transmittal Form: All submittals shall be transmitted via electronic email using
National Park Service form CM-16 form. The form will be provided by the Contracting
Officer. No action will be taken on a submittal item unless accompanied by the CM-16 transmittal form. Submit completed CM-16 forms to the CO and the COR
B. Submittal List: administrative required submittals are listed below in 9.1.C and does not include technical section submittal requirements included in each technical section.
Page | 11
C. Preconstruction Conference Submittal: Satisfactory evidence of liability insurance coverage and workman’s compensation, and any applicable bonds, must be submitted within 10 calendar days of Notice of Award. The following items shall be submitted a minimum of one week prior to the Preconstruction Conference. If all of these documents have not been received one week prior to the scheduled Pre-Construction Conference date, the conference will be cancelled, Notice to Proceed may not be issued, and the Contracting Officer will consider other contractual remedies. Work shall not commence until written Notice to
Proceed has been issued. Contracting Officer will notify Contractor of tentative date for the
Pre-Construction Conference:
1. Letter designating Project Superintendent.
2. Construction Schedule. (Must include shop drawings, procurement time including long lead time items, mobilization, trade work progression and completion at minimum.)
3. A comprehensive breakdown of the Schedule of Values.
4. Accident Prevention (Safety) Plan (see section 7 of this document).
5. A list of Subcontractors for this project.
6. Written statements from subcontractors certifying compliance with applicable labor
i. standard clauses (SF1413).
7. Quality Control Plan.
8. Waste Management Plan.
9. (If Contractor plans to disturb greater than 1.0 acre during construction activities) a Storm
Water Pollution Prevention Plan and documentation of permit coverage from the South
Dakota Department of Agriculture and Natural Resources under the SWD General Permit for Stormwater Discharges Associates with Construction Activities.
10. List of Required Construction Permits. Include the following information for each permit:
a. Name of Permit.
b. The Agency(ies) with Jurisdiction issuing the permit.
c. Information required from the Government to complete the permit application.
9.2 Project Shop Drawings, Product Data, and Samples: Contracting Officer will provide sample cover sheet and a list of required submittals is included in each technical specification or attached at the end of this document.
A. Shop Drawings: Indicate all coordinating materials and work impacting the installation coordination, connection details, anchorage requirements, hardware locations, and installation details and locations.
1. Submit Shop Drawings according to Part 9.1 of this section to include one digital file (.PDF or .TIF) and two full size hardcopy documents to COR.
B. Product Data: Provide component construction and specification data sheets, anchorage requirements and any other product specific data.
1. Submit Product Data according to Part 9.1 of this section to include one digital file (.PDF or .TIF) to COR.
Page | 12
C. Samples: Submit 2 color samples 4” x 6” minimum in size for all color and product selections.
Paint samples shall be actual paint finish drawdown for all project colors.
1. Submit Samples CM-16 Transmittal Form according to Part 9.1 of this section to include one digital file (.PDF or .TIF) and physical samples of actual material to COR.
D. For submittals specified above, forward submittals to Contracting Officer and COR at least 15 days before need for approval (depends on length of project).
E. After approving submittals, Contracting Officer and/or COR will return one copy to the
Contractor. If submittals are not approved, Contracting Officer will return all copies to
Contractor with reasons for rejection. Resubmit, identifying changes. Any work done before approval shall be at Contractor's own risk.
9.3 Approved Equals: If an item in this solicitation is identified as “brand name or equal” or lists more than 1 manufacturer, the description of the proposed item must reflect the characteristics and level of quality that will satisfy the Government’s needs as demonstrated by the salient physical, functional, or performance characteristics that “equal” products must meet and/or exceed that as specified in the solicitation or relevant specification.
A. For each item proposed as an “approved equal,” submit supporting data, including:
1. Drawings and samples as appropriate.
2. Comparison of the characteristics of the proposed item with that specified and with the salient characteristics provided.
3. Changes required in other elements of the work because of the substitution.
4. Name, address, and telephone number of vendor.
5. Manufacturer’s literature regarding installation, operation, and maintenance, including schematics for electrical and hydraulic systems, lubrication requirements, and parts lists.
Describe availability of maintenance service, and state source of replacement materials.
B. A request for approval constitutes a representation that Contractor:
1. Has investigated the proposed item and determined that it is equal or superior in all respects to that specified.
2. Will provide the same warranties for the proposed item as for the item specified.
3. Has determined that the proposed item is compatible with interfacing items.
4. Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution.
5. Waives all claims for additional expenses that may be incurred as a result of the substitution.
C. Approved Equals will be evaluated and approved/disapproved during the submittal process.
9.4 Schedule of Values: Submit the Schedule of Values a minimum of one week prior to the
Preconstruction Conference for COR review. Schedule of Values shall include defined work line items with cost break downs including labor, material, and equipment for COR approval.
Page | 13
9.5 Progress Reporting: The initial Construction Schedule and Schedule of Values are required a minimum of one week prior to the Preconstruction Conference. After the Notice to Proceed is issued and after on-site work begins, progress will be documented via daily logs and by providing an updated Construction Schedule and Schedule of Values when requested, but minimally with each pay application. Submit digital copy electronically (PDF preferred) of all required documents.
Construction Schedules are normally in bar chart form and indicate estimated starting and completion dates for each part of the work. For a pay application to be reviewed and processed in a timely manner, the following information must either be submitted prior to or accompany submission of the pay application:
A. Daily/weekly progress reports during construction as part of the administration process.
B. Updated Schedule of Values: Breakdown each lump-sum item into component work activities used in the schedule, for which progress payments may be requested. The Schedule of
Values will form the basis for payment. The work activities broken out within the schedule of values shall be integrated into and made a logical part of the construction baseline schedule submitted under this specification. The total costs for the component work activities shall equal the contract price for that lump-sum item. The Contracting Officer may request data to verify accuracy of dollar values. A sample Schedule of Values format may be provided upon request.
ITEM 10 – TEMPORARY SERVICES
10.1 It is the Contractor’s responsibility to provide temporary services, equipment, tools, and skilled labor as required for the chosen means and methods to perform the work in accomplishing this
Contract.
ITEM 11 - PROJECT CLOSEOUT
11.1 Description: The work of this section consists of final cleanup, closeout submittals, final inspection procedures working toward Final Acceptance.
11.2 Cleaning: Remove all tools, equipment, surplus materials, and rubbish. Move attic stock to location coordinated with COR. At time of final inspection, project shall be thoroughly clean and ready for intended use. Inspector holds the right to reschedule if project is not ready for inspection.
11.3 Completion and Final Inspection: Contractor shall submit written certification of project completion and request a final inspection to the Contracting Officer and COR. The Contracting
Officer or designee will make an inspection within 10 days of receipt of request or at a mutually agreeable time.
A. If the work is determined to be complete following the final inspection with minor comments, the COR will prepare and provide the Contractor a Punch List noting outstanding items to be addressed.
B. If the work is not determined to be complete following the final inspection, the Contracting
Officer will notify Contractor in writing, stating reasons. Contractor, after completing the work according to the Contract Documents, shall resubmit completion and request a new final
Page | 14 inspection. Re-inspection costs may be charged against the Contractor in accordance with the Inspection of Construction contract clause.
C. Contractor shall complete the Punch List within 30 calendar days, or a time directed by the
CO.
D. Once Contractor completes all items of work on the Punch List and all contractually required items are accepted, Contracting Officer will issue Letter of Final Acceptance of Work and request the final pay application.
E. If the Contractor fails to complete the work within the time frame, the Contracting Officer may correct the work with an appropriate reduction in contract price or charge for re-inspection costs in accordance with the Inspection of Construction contract clause.
F. Disposition of any permits and warranties required by the specifications in this section.
11.4 Final Acceptance of the Work: After all punch list deficiencies have been corrected, a Letter of
Final Acceptance will be issued. A Release of Claims document must be executed and submitted to the Contracting Officer before final payment can occur.
11.5 Warranties
A. Construction Warranty shall be based on date of final acceptance of the work and remain in effect for one year.
B. Provide all manufacturer warranty information of products installed organized by Division. All contact information, extent of coverage and conditions shall be clearly noted as well as date of overall final acceptance.
C. Information shall include operation and maintenance manuals for each warranted product.
PART 2 – PRODUCTS (NOT USED)
PART 3 – EXCUTION (NOT USED)
END OF SECTION
WICA - 245317 221313 - 1
FACILITY SANITARY SEWERS
SECTION 221313
FACILITY SANITARY SEWERS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. PVC pipe and fittings.
2. Nonpressure-type transition couplings.
3. Pressure-type pipe couplings.
4. Cleanouts.
1.3 ACTION SUBMITTALS
A. Product Data: For the following:
1. Pipe and fittings.
2. Non-pressure and pressure couplings
3. Cleanouts.
1.4 DELIVERY, STORAGE, AND HANDLING
A. Do not store plastic manholes, pipe, and fittings in direct sunlight.
B. Protect pipe, pipe fittings, and seals from dirt and damage.
PART 2 - PRODUCTS
2.1 PVC PIPE AND FITTINGS
A. PVC Type PSM Sewer Piping:
1. Pipe: ASTM D3034, SDR 23.5, PVC Type PSM sewer pipe with bell-and-spigot ends for gasketed joints.
2. Fittings: ASTM D3034, PVC with bell ends.
3. Gaskets: ASTM F477, elastomeric seals.
B. PVC Force Main Piping:
1. Pipe: ASTM D1785, Schedule 80 PVC, with plain ends for solvent-cemented joints.
2. Fittings: ASTM D2467, Schedule 80 PVC, socket type.
2.2 NONPRESSURE-TYPE TRANSITION COUPLINGS
A. Comply with ASTM C1173, elastomeric, sleeve-type, reducing or transition coupling; for joining underground nonpressure piping. Include ends of same sizes as piping to be joined and include corrosion-resistant-metal tension band and tightening mechanism on each end.
WICA - 245317 221313 - 2
B. Sleeve Materials:
1. For Plastic Pipes: ASTM F477, elastomeric seal or ASTM D5926, PVC.
2. For Dissimilar Pipes: ASTM D5926, PVC or other material compatible with pipe materials being joined.
C. Shielded, Flexible Couplings:
1. Description: ASTM C1460, elastomeric or rubber sleeve with full-length, corrosion-resistant outer shield and corrosion-resistant-metal tension band and tightening mechanism on each end.
D. Ring-Type, Flexible Couplings:
1. Description: Elastomeric compression seal with dimensions to fit inside bell of larger pipe and for spigot of smaller pipe to fit inside ring.
E. Nonpressure-Type, Rigid Couplings:
1. Description: ASTM C1461, sleeve-type, reducing- or transition-type mechanical coupling;
molded from ASTM C1440, TPE material; with corrosion-resistant-metal tension band and tightening mechanism on each end.
2.3 PRESSURE-TYPE PIPE COUPLINGS
A. Tubular-Sleeve Couplings: AWWA C219, with center sleeve, gaskets, end rings, and bolt fasteners.
B. Metal, bolted, sleeve-type, reducing or transition coupling; for joining underground pressure piping. Include 150-psig minimum pressure rating and ends of same sizes as piping to be joined.
C. Center-Sleeve Material: Stainless steel..
D. Gasket Material: Natural or synthetic rubber.
E. Metal Component Finish: Corrosion-resistant coating or material.
2.4 CLEANOUTS
A. PVC Cleanouts:
1. Description: PVC body with PVC threaded plug. Include PVC sewer pipe fitting and riser to cleanout of same material as sewer piping. Install with PVC riser to cast-iron cleanout casting at grade.
PART 3 - EXECUTION
3.1 EARTHWORK
A. Excavating, trenching, and backfilling are specified in Section 312000 "Earth Moving."
3.2 PIPING INSTALLATION
A. General Locations and Arrangements: Drawing plans and details to indicate general location and arrangement of underground sanitary sewer piping. Location and arrangement of piping layout take into account design considerations. Install piping as indicated, to extent practical.
Where specific installation is not indicated, follow piping manufacturer's written instructions.
WICA - 245317 221313 - 3
B. Install piping beginning at low point, true to grades and alignment indicated with unbroken continuity of invert. Place bell ends of piping facing upstream. Install gaskets, seals, sleeves, and couplings according to manufacturer's written instructions for using lubricants, cements, and other installation requirements.
C. Install proper size increasers, reducers, and couplings where different sizes or materials of pipes and fittings are connected. Reducing size of piping in direction of flow is prohibited.
D. Install gravity-flow, nonpressure, drainage piping according to the following:
1. Install PVC Type PSM sewer piping according to ASTM D2321 and ASTM F1668.
E. Install force-main, pressure piping according to the following:
1. Install piping with restrained joints at tee fittings and at horizontal and vertical changes in direction. Use corrosion-resistant rods, pipe or fitting manufacturer's proprietary restraint system, or cast-in-place-concrete supports or anchors.
2. Install PVC force main piping according to ASTM D2774 and ASTM F1668.
F. Clear interior of piping and manholes of dirt and superfluous material as work progresses.
Maintain swab or drag in piping, and pull past each joint as it is completed. Place plug in end of incomplete piping at end of day and when work stops.
3.3 PIPE JOINT CONSTRUCTION
A. Join gravity-flow, nonpressure, drainage piping according to the following:
1. Join PVC Type PSM sewer piping according to ASTM D2321 and ASTM D3034 for elastomeric-seal joints or ASTM D3034 for elastomeric-gasket joints.
2. Join dissimilar pipe materials with nonpressure-type, flexible couplings.
B. Join force-main, pressure piping according to the following:
1. Join PVC force main piping according to ASTM D2855.
2. Join dissimilar pipe materials with pressure-type couplings.
C. Pipe couplings, expansion joints, and deflection fittings with pressure ratings at least equal to piping rating may be used in applications below unless otherwise indicated.
1. Use nonpressure flexible couplings where required to join gravity-flow, nonpressure sewer piping unless otherwise indicated.
a. Shielded flexible couplings for pipes of same or slightly different OD.
b. Unshielded, increaser/reducer-pattern, flexible or rigid couplings for pipes with different OD.
c. Ring-type flexible couplings for piping of different sizes where annular space between smaller piping's OD and larger piping's ID permits installation.
2. Use pressure pipe couplings for force-main joints.
3.4 CLEANOUT INSTALLATION
A. Install cleanouts and riser extensions from sewer pipes to cleanouts at grade. Install piping so cleanouts open in direction of flow in sewer pipe.
B. Set cleanout frames and covers in earth in cast-in-place-concrete block, 20 by 20 by 4 inches deep. Set with tops 1 inch above surrounding grade.
C. Set cleanout frames and covers in concrete pavement and roads with tops flush with pavement surface.
WICA - 245317 221313 - 4
3.5 FIELD QUALITY CONTROL
A. Inspect interior of piping to determine whether line displacement or other damage has occurred.
Inspect after approximately 24 inches (600 mm) of backfill is in place, and again at completion of Project.
1. Submit separate report for each system inspection.
2. Defects requiring correction include the following:
a. Alignment: Less than full diameter of inside of pipe is visible between structures.
b. Deflection: Flexible piping with deflection that prevents passage of ball or cylinder of size not less than 92.5 percent of piping diameter.
c. Damage: Crushed, broken, cracked, or otherwise damaged piping.
d. Infiltration: Water leakage into piping.
e. Exfiltration: Water leakage from or around piping.
3. Replace defective piping using new materials, and repeat inspections until defects are within allowances specified.
4. Reinspect and repeat procedure until results are satisfactory.
B. Test new piping systems, and parts of existing systems that have been altered, extended, or repaired, for leaks and defects.
1. Do not enclose, cover, or put into service before inspection and approval.
2. Test completed piping systems according to requirements of authorities having jurisdiction.
3. Schedule tests and inspections by authorities having jurisdiction with at least 24 hours' advance notice.
4. Submit separate report for each test.
5. Hydrostatic Tests: Test sanitary sewerage according to requirements of authorities having jurisdiction and the following:
a. Fill sewer piping with water. Test with pressure of at least 10-foot (3-m) head of water, and maintain such pressure without leakage for at least 15 minutes.
b. Close openings in system and fill with water.
c. Purge air and refill with water.
d. Disconnect water supply.
e. Test and inspect joints for leaks.
f. Test plastic gravity sewer piping according to ASTM F1417.
6. Force Main: Perform hydrostatic test after thrust blocks, supports, and anchors have hardened. Test at pressure not less than 1-1/2 times the maximum system operating pressure, but not less than 150 psig.
a. PVC Piping: Test according to AWWA M23, "Testing and Maintenance" Chapter.
C. Leaks and loss in test pressure constitute defects that must be repaired.
D. Replace leaking piping using new materials, and repeat testing until leakage is within allowances specified.
3.6 CLEANING
A. Clean dirt and superfluous material from interior of piping.
WICA - 245317 221343 - 1
FACILITY PACKAGED SEWAGE PUMPING STATIONS
SECTION 221343
PART 1 - GENERAL
1. DESCRIPTION
1.1. SCOPE OF WORK:
Contractor shall furnish all labor, materials, equipment, and performance of all work necessary or incidental to furnish and install a duplex prefabricated fiberglass reinforced polyester (FRP) lift station. The lift station shall be a completely factory-assembled unit, requiring only minor adjustments and reassembly in the field.
2. QUALITY ASSURANCE
2.1. QUALIFICATIONS OF MANUFACTURER:
2.1.1. The manufacturer shall demonstrate the ability to fabricate the various lift station components, as shown in the plans and as specified herein, utilizing adequate number of skilled workmen, equipment, tools, facilities, and subcontractors.
2.2. REFERENCED STANDARDS
2.2.1. ASTM A36 (Latest Revision): Standard Specification for Structural Steel.
2.2.2. ASTM A283D (Latest Revision): Standard Specification for Structural Steel.
2.2.3. ASTM D883 (Latest Revision): Definitions of Terms Relating to Plastics.
2.2.4. ASTM D3753 (Latest Revision): Standard Specification for Glass-Fiber-Reinforced
Polyester Manholes.
2.2.5. ANSI B16.1 (Latest Revision): Standard Specification for 125 lb. Standard Flat Face Cast Iron Flanges.
3. SUBMITTALS
3.1. Shop Drawings and Manufacturer’s Literature: The prefabricated FRP lift station manufacturer shall prepare shop drawings for the complete lift station including structural and opening details, equipment mounting and location details, and manufacturer’s cut sheets for each item of equipment in the lift station. The main component of the submittals shall be an 8½” x 11" drawing of the complete prefabricated FRP lift station prepared by the manufacturer. Manufacturer’s cut sheets shall indicate capacities, dimensions, and materials of construction for all equipment in the prefabricated FRP lift station.
4. OPERATING AND MAINTENANCE MANUALS:
4.1. The prefabricated FRP lift station supplier shall prepare a complete operations and maintenance (O&M) manual for the complete lift station. The O&M manual shall include routine maintenance requirements and spare parts lists for each major item of equipment in the lift station. The names and telephone numbers of companies where spare parts and/or trained service technicians are available shall also be included for each item of equipment.
WICA - 245317 221343 - 2
5. DELIVERY AND HANDLING
5.1. CONDITIONS FOR DELIVERY AND HANDLING:
5.1.1. The manufacturer of the prefabricated FRP lift station shall coordinate with the contractor so that the lift station is delivered to the jobsite on time for installation.
Handling instructions shall be provided by the lift station manufacturer with the lift station to insure proper handling of the lift station structure. After delivery to the jobsite, the contractor shall store the motor control panel off the ground in a dry location until it is mounted and supplied with electrical service. The contractor shall also ensure that all pump power and control cables, as well as float cables are protected from submergence until they are properly installed and sealed.
6. GUARANTEE
6.1. The prefabricated FRP lift station manufacturer shall guarantee the complete prefabricated
FRP lift station to be free from defects in materials and workmanship for a period of one year from the date of delivery
PART 2 - PRODUCTS
1. MATERIALS
1.1. Fiberglass Reinforced Polyester Wet Well (and Integral Valvebox): Unless otherwise indicated the plastic terminology used in this specification shall be in accordance with the definitions given in American Society for Testing and Materials (ASTM) designations D883 - Definitions of Terms Relating to Plastics.
2. RESINS:
2.1. The resins used shall be a commercial grade polyester and shall be evaluated as a laminate by test or determined by previous service to be acceptable for the intended environment.
The resins used may contain the minimum amount of fillers or additives required to improve handling properties. Up to 5% by weight of thixotropic agent, which will not interfere with visual inspection, may be added to the resin for viscosity control. Resins may contain pigments and dyes by agreement between manufacturer and engineer, recognizing that such additives may interfere with visual inspection of FRP laminate quality.
3. REINFORCED MATERIAL:
3.1. The reinforcing material shall be a commercial grade of glass fiber (continuous strand, chopped-strand, continuous mat, and non-continuous mat) having a coupling agent, which will provide a suitable bond between the glass reinforcement material and resin.
4. LAMINATE STRUCTURE:
4.1. The FRP laminate shall consist of a resin rich inner surface: chop-spray interior liner; and a chop-hoop filament-wound structural exterior layer.
4.1.1. INNER SURFACE:
4.1.1.1. The resin rich inner surface shall be free of cracks and crazing with smooth finish and with an average of not over two (2) pits per square foot, providing the pits are less than 0.125 inches in diameter and 0.3125 inches in depth and are covered with sufficient resin to avoid exposure of any fiberglass reinforcement
WICA - 245317 221343 - 3
material. Some waviness shall be permissible as long as the surface is smooth. Between 0.01 to 0.02 inches of resin, rich surface shall be provided.
4.1.1.2. Chop-Spray Interior Liner: The interior liner shall be reinforced by 25 to 35% by weight of chopped strand glass fiber having fiber lengths from 0.5 to 2.0 inches. The chop-spray interior liner protects the chop-hoop filament-wound structural exterior liner from corrosion damage caused by “wicking” of the wet well liquid contents. A minimum of 0.100 inches of chop-spray interior liner shall be provided.
4.1.1.3. CHOP-HOOP FILAMENT-WOUND STRUCTURAL EXTERIOR LAYER:
4.1.1.3.1.1. The structural reinforcement of the wet well shall be by the chop-hoop filament-wound manufacturing method only. The axial reinforcement shall be continuous-strand glass fiber. The longitudinal reinforcement shall be chopped-strand glass fiber. The glass fiber reinforcement content of the chop-hoop filament wound structural exterior layer shall be 50 to 80% by weight. The exterior surface of the wet well shall be relatively smooth with no exposed reinforcement fibers or sharp projections. Hand finish work is permissible to prevent reinforcement fiber exposure. The wall thickness of the chop-hoop filament-wound structural exterior layer shall vary with the wet well height to provide the aggregate strength necessary to meet the tensile and flexural physical properties requirements.
5. PHYSICAL PROPERTIES:
5.1. Wet Well FRP Wall Laminate: The wet well FRP wall laminate must be designed to withstand wall collapse or buckling based on the following assumptions and third-party specifications:
5.1.1.1. HYDROSTATIC LOADING OF 62.4 LBS. PER CUBIC FOOT
5.1.1.2. SATURATED SOIL WEIGHT OF 120 LBS. PER CUBIC FOOT
5.1.1.3. SOIL MODULUS OF 700 LBS. PER SQUARE FOOT
5.1.1.4. PIPE STIFFNESS VALUES AS SPECIFIED IN ASTM D3753
The wet well FRP laminate must be constructed to withstand or exceed two times the assumed loading on any depth of the wet well.
6. WET WELL FRP BOTTOM LAMINATE:
6.1. The wet well FRP bottom laminate shall have less than 0.375 inches of center elastic deflection (deformation) when in service in totally submerged conditions.
7. FRP LAMINATE SURFACE HARDNESS:
7.1. The finished FRP laminate will have a Barcol Hardness of at least 90% of the resin manufacturer’s specified hardness for the fully cured resin. The Barcol Hardness shall be the same for both interior and exterior surfaces.
WICA - 245317 221343 - 4
8. WET WELL TOP FLANGE:
8.1. The wet well top flange shall have an outside diameter at least 4.0 inches greater than the inside diameter of the well.
8.2. A six-hole pattern shall accommodate the mounting of a cover with at least 0.375 inches in diameter 300 series stainless steel fasteners. Non-corroding stainless steel threaded inserts shall be fully encapsulated with non-continuous mat or chopped-strand glass fiber reinforcement. The inserts shall have an offset tab to prevent stripping or spinning out when removing and reinserting cover fasteners.
9. STEEL ANTI-FLOATATION FLANGE:
9.1. The steel anti-floatation flange shall be constructed from 0.1875 inches thick ASTM A36 structural steel plate, encapsulated in at least 0.125 inches of chopped-strand glass fiber reinforcement on all sides. The steel anti-floatation flange shall be square with outside dimensions of at least 4.0 inches greater than the wet well inside diameter. The steel anti-floatation flange shall be attached to the wet well bottom with chopped-strand glass fiber reinforcement. Contractor shall place the wet well on a concrete pad and fill with grout covering the entire steel anti-floatation flange. The amount of grout shall be sufficient to prevent floatation of the wet well based on the jobsite conditions. The steel anti-floatation flange shall not require bolt holes to secure it to the concrete pad.
10. PUMP QUICK DISCONNECT MOUNTING STUDS:
10.1.1. Shall be 300 series stainless steel threaded studs of at least 0.375 inches in diameter shall be used. The studs shall first be threaded into the 0.1875" inches thick ASTM A36 structural steel anti-floatation flange/bottom of the wet well and then welded into place. Once installed, the studs shall be sealed with at least two layers of non-continuous glass fiber mat or chopped-strand glass fiber reinforcement.
11. DISCHARGE COUPLING:
11.1. (1 1/4" and 2" Systems) A 1¼” or 2” NPT full coupling full welded in the center of a 14 gauge steel plate, finished with black enamel, shall be factory installed with at least 0.375 inches in diameter 300 series stainless steel fasteners.
This is the start of the file's text. The full file is on GovTribe.