Amd_0002_Atch_1_Questions_Answers_0002.pdf
PDF 78 KB Posted
- Attached to
- WICA Replace Failed Lift Station & Old Septic Tank Federal contract opportunity
- Solicitation number
- 140P6323B0002
About this file
This document contains questions and answers regarding Solicitation Number 140P6323B0002 from the Department of the Interior National Park Service Midwest Region. The solicitation is for a project to replace a failed lift station and old septic tanks at Elk Mountain Campground in Wind Cave National Park. All septic tanks for the project must be concrete according to the requirements. Double cleanouts are not required on the 4x2 dual containment pipe. While SDR23.5 pipe is specified, contractors may request approval for alternate pipe if SDR23.5 is unavailable, but SDR35 or SDR26 would not be acceptable alternatives.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P6323B0002_Amd_0002.pdf | ||
| Site_Visit_Sign_In_Sheet_0001.pdf | ||
| As_Builts_Elk_Mtn_Campground_0001.pdf | ||
| Sol_140P6323B0002_Amd_0001.pdf | ||
| Atch_4_Sewer_Addendum_A.pdf | ||
| Atch_3_Sewer_Table_Of_Contents_Addendum_A.pdf | ||
| Atch_9_Limitations_on_Subcontracting_Report.xlsx | XLSX spreadsheet | |
| Atch_5_Drawings_Map_Sewer_Addendum_A.pdf | ||
| Atch_1_Specifications.pdf | ||
| Atch_2_Drawings.pdf | ||
| Atch_8_Submittal_List.pdf | ||
| Atch_7_Drawings_Concrete_Patch_Addendum_A.pdf | ||
| Atch_6_Concrete_Patch_Addendum_A.pdf | ||
| Atch_10_Wage_Determination_SD20230032_03_10_2023.pdf | ||
| Sol_140P6323B0002.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Wind Cave National Park-Replace Failed Lift Station & Old Septic Tanks-Elk Mountain Campground - 140P6323B0002
Question 1:
Per addendum one, it says, “replace existing concrete septic tank w/ fiberglass septic tank” Do you have any details or specs of this fiberglass septic tank?
Government Response:
All septic tanks are concrete per requirements found on drawing sheet C202 Attachment 2, and in the specifications Attachment 1.
Question 2:
Do you have a detail for the double cleanouts on the 4x2 dual containment pipe?
Government Response:
Attachment 4 does not require double cleanout. Attachment 2 Drawings pg. 11 cleanout information.
Question 3:
If SDR23.5 is not available to be quoted, is SDR35 or SDR26 acceptable?
Government Response:
Pipes shall be SDR 23.5 as specified in section 22 13 13, paragraph 2.1 (A) (1). In the event that this material is not available anywhere, from any available vendor, the contractor shall request an approved equal per the requirements found in section 01 10 00, paragraph 9.3.
File details come from the government source that posted it. Updated .