This document is a Request for Proposal (RFP) for a Delivery Order (DO) under an existing Indefinite Delivery/Indefinite Quantity (IDIQ) contract for Concrete Target Fabrication.
The RFP is for the fabrication of two 20'x20'x2' concrete targets with a compressive strength of 5 ksi at 56 days, as well as conducting density tests on those targets at 7, 28, 56, and the day of test. The targets are to be delivered and placed by 15 October 2024. Pricing information for the targets and density tests is requested, including breakdowns for materials, labor, and equipment. The contract will be awarded by the Department of the Air Force Materiel Command Test Center (Air Force Test Center). Offerors are instructed to submit any questions to the Contracting Officer and Contracting Specialist identified in the RFP.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Atch 8 - DO 01 RFP V2.pdf | ||
| Target Fabrication QA V2 Site Visit Added.pdf | ||
| Target Fabrication Site Visit Results.pdf | ||
| Target Fabrication QA V1.docx | DOCX document | |
| Target Fabrication QA V1.docx | DOCX document | |
| Atch 5 - Engineering Drawing Package.pdf | ||
| Target Fab 2024 Combined Synopsis Solicitation.docx | DOCX document | |
| Atch 6 - HAFB Site Visit Background Consent.docx | DOCX document | |
| Atch 7 - Use_of_non-government_advisors.pdf | ||
| Atch 1 - Requirements Document Concrete Target Fabrication 2024.pdf | ||
| Atch 2 - Provisions and Clauses FA910124QB049.pdf | ||
| Atch 3 - Holloman Specific Language.pdf | ||
| Atch 4 - Target Fab 2024 Evaluation Plan.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
9 Aug 2024 Selected Vendor
Air Force Test Center 704th Test Group, Installation Contracting Charles W, King, Contracting Officer 872 DeZonia Drive, Building 1085 Holloman AFB, NM 88330
Reference: Concrete Target Fabrication IDIQ Contract
Dear Vendor, This request for proposal is for target fabrication in accordance with the referenced contract.
Please see the following table for delivery order 01 and provide a proposal for all targets and density tests identified below.
CLIN TARGET # QTY SIZE STRENGTH DRAWING PLACEMENT*
0001 100 1 20’x20’x2’ 5 KSI @ 56 days X20115494 15 Oct 2024
0001 101 1 20’x20’x2’ 5 KSI @ 56 days X20115494 15 Oct 2024
*Placement on or before this date.
CLIN TARGET # QTY ITEM
0002 100-101 2 Density Tests
For all targets, four (4) core density test events are to be completed at the following days:
• 7 days, 28 days, 56 days, the DOT (Day Of Test)
Targets utilizes Lifting Lugs, No. 20074226 -10
No. of target lugs required is 4 lugs: Required Lifting lugs provided by the Government.
DEPARTMENT OF THE AIR FORCE
HEADQUARTERS AIR FORCE TEST CENTER
(AFMC)
Please ensure the proposal for all CLINs contains all relevant pricing (unit and total) data for the targets. Supporting information shall include percentages for materials, labor and equipment, as required.
If you have any questions or need further information, please contact Mr. Charles King at 575- 430-1013 or by email at charles.king.42@us.af.mil or Ms. Tyler Payne at 931-454-4614, or by email at tyler.payne.9@us.af.mil.
Sincerely, TYLER S. PAYNE
Contracting Officer mailto:charles.king.42@us.af.mil mailto:tyler.payne.9@us.af.mil
File details come from the government source that posted it. Updated .