Atch 5 - KH Report - Sample Report.pdf
PDF 372 KB Posted
- Attached to
- 30 CES - Hood and Duct Inspection Services
- Solicitation number
- FA461025Q0076
About this file
This document is a Semi-Annual Wet Chemical Pre-Engineered Fire Extinguishing System Inspection, Testing, and Maintenance Report for Breakers - Global Grill located at 13330 Oregon St. in Vandenberg SFB, Ca. The report details a comprehensive inspection of a fire suppression system in the main kitchen, with a PCL 300 cylinder, Pyro Chem system, and 10 flow points. The system includes 1 hood, 1 plenum, 1 duct, and two griddles, with fixed temperature sensing elements (2 fusible links at 450°) scheduled for installation on 04/30/24.
The inspection covers multiple aspects of the fire extinguishing system, including manual actuators, tamper indicators, physical condition, and functional tests. All items in the inspection, testing, and maintenance sections were marked as "Pass" (P), indicating the system is fully operational and meets California Code of Regulations - Title 19 requirements. The last hydrostatic test was conducted in 2015, and the report includes provisions for documenting any deficiencies or comments, though no issues were noted in this particular report.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Hood and Duct Inspection Services_RFIs.pdf | ||
| Atch 2_Hood and Duct Insp_Price Sheet_22Sep25.xlsx | XLSX spreadsheet | |
| Hood and Duct Inspection_RFQ_9Sep25.pdf | ||
| Atch 1_Hood and Duct Insp_SOW.pdf | ||
| Atch 3_Wage Det_8Jul25.pdf | ||
| Atch 2_Hood and Duct Insp_Price Sheet.xlsx | XLSX spreadsheet | |
| Atch 4_Hood and Duct Insp_Clauses.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Wet Chemical Pre-Engineered Fire Extinguishing System
California Code of Regulations - Title 19 Inspection, Testing, and Maintenance
Semi-Annual Report 1 of 2
Property Information Contractor or Licensed Owner Information
Building Name Name Address Address
City St. Zip City License # Phone Contact Person SFM Job # Phone CSLB Misc.
System Information Cylinder Size Last Hydrostatic Test Date Flow Points Capacity Used System Location System Mfr. Model # Fuel/Heat Shut Off:
Gas # Electrical # Integral Make Up Air Shut Down
Items # of Items Dimensions Nozzle Model #
Nozzle Flow Points
Nozzle Qty
Total Flow Points
Hoods Plenums Ducts
Cooking Appliances Left to Right with Sizes and Coverage Nozzles
Appliance Name Nozzle Model
Nozzle Flow Points
Total Flow Points Appliance Name Nozzle
Model Nozzle
Flow Points Total
Flow Points
Fixed Temperature Sensing Elements (Such as Fusible Links)
Quantity Temp Mfr Date
Install Date Quantity Temp Mfr
Date Install Date
Inspection, Testing, and Maintenance I = Inspection T = Test M = Maintenance P = Pass F = Fail N/A = Not Applicable
Item Description NFPA 17A CA
ed. Reference Date Comments Only P,F,N/A
1.1 I Manual Actuators are Unobstructed
(i.e. Remote Pull Station) 7.2.2(2)
1.2 I Tamper Indicators & Seals Intact 7.2.2(3)
1.3 I Maintenance Tag in Place 7.2.2(4)
Title 19 §906
1.4 I No Obvious Physical Damage 7.2.2(5)
1.5 I Gauge Readings within Proper Limits
(Stored Pressure) 7.2.2(6)
1.6 I Blow-Off Caps in Place & Undamaged 7.2.2(7)
1.7 I Hoods, Ducts, Filters in Place and Clean CFC 904.11.6.3
1.8 I Hood, Ducts & Protected Cooking Appliances Have
Not Been Replaced, Modified or Relocated 7.2.2(8)
2.1 T Automatic Detection/Manual Actuation Functioned
Correctly 7.3.3.4
Form AES 20 Sept. 3, 2013
Wet Chemical Pre-Engineered Fire Extinguishing System
California Code of Regulations - Title 19 Inspection, Testing, and Maintenance
Semi-Annual Report 2 of 2
Property Information Contractor or Licensed Owner Information
Building Name Name
Address Job #
City
Inspection, Testing, and Maintenance I = Inspection T = Test M = Maintenance P = Pass F = Fail N/A = Not Applicable
Item Description NFPA 17A CA
ed. Reference Date Comments Only P,F,N/A
2.2 T Fuel Shut-Off Operated Correctly 7.3.3.4
2.3 T Regulator Tested & is within Acceptable Limits 7.3.3.4
2.4 T Manual Reset Relay Functioned Correctly
(If Applicable) 7.3.3.4
3.1 M All Agent Containers within Acceptable Hydrostatic
Test Dates 7.5.1(1)
3.2 M All Auxiliary Pressure Containers and/or Hose
Assemblies within Acceptable Hydrostatic Test Dates 7.5.1(2)(3)
3.3 M Cartridge Weights within Acceptable Limits 7.3.3.1(2)
3.4 M Liquid Level within Acceptable Limits
(Non-pressurized) 7.3.3.1(2)
3.5 M No Signs of Corrosion in Agent Cylinder
(Non-pressurized) 7.3.3.1(2)
3.6 M Distribution Piping Unobstructed and Contiguous 7.3.3.1(3)
3.7 M Nozzles are Correct, Clean & Properly Aimed 7.3.3.1(2)
3.8 M FL[HG THPS FXVLEOH MHWDO AOOR\ T\SH 'HWHFWRUV RHSODFHG 7.3.4
3.9 M Fixed-Temp (Other Than Fusible Metal Alloy Type) &
Heat Detectors Maintained or Replaced 7.3.5
3.10 M Auxiliary Equipment Such as Water valves
Functioned Correctly 7.3.3.1(2)
3.11 M Internal Maintenance as Required by Manufacturer Title 19 §904.7
D = Deficiency C = Comment (Indicate type )
Item Date Riser D C Deficiencies and Comments Indicate all equipment, devices and parts that were repaired or replaced
Check here if additional Deficiencies and Comments are listed on Form AES 9�
See Correction Form AES 10 for corrected deficiencies.
Number attached�
Number attached�
I hereby certify that the fire protection equipment listed above has been fully inspected, tested, and maintained on this date by the company indicated above, in accordance with CCR, Title 19, Sections 901 to 906 and that the equipment is fully operable except as noted in the “Deficiencies and Comments” section of this form.
Print Name
Signature Date
Form AES 20 Sept. 3, 2013
| NFPA 25 Form AES 1 Cover Sheet 2013 |
| NFPA 25 Form AES 10 Correction Notice 2013 |
| NFPA 25 Form AES 2.1 Quarterly Annual Wet Pipe 2013 |
| NFPA 25 Form AES 2.2 5-Year Wet Pipe |
| NFPA 25 Form AES 2.3 Quarterly Annual Dry Pipe 2013 |
| NFPA 25 Form AES 2.4 5-Year Dry Pipe 2013 |
| NFPA 25 Form AES 2.5 Quarterly Annual Preaction Water 2013 |
| NFPA 25 Form AES 2.6 5-Year Preaction Water 2013 |
| NFPA 25 Form AES 2.7 Quarterly Annual Deluge System 2013 |
| NFPA 25 Form AES 2.8 5-Year Deluge System 2013 |
| NFPA 25 Form AES 2.9 Main Drain Test Continuation Form 2013 |
| NFPA 25 Form AES 20 Wet Chemical Pre-Engineered 2013 |
| NFPA 25 Form AES 21 Dry Chemical Pre-Engineered 2013 |
| NFPA 25 Form AES 22 Speciality Pre-Engineered and Engineered Extinguishing 2013 |
| NFPA 25 Form AES 3 Quarterly Annual Standpipe 2013 |
| NFPA 25 Form AES 3.1 5-Year Standpipe 2013 |
| NFPA 25 Form AES 4 Qtrly-Annual Private Fire Service Main 2013 |
| NFPA 25 Form AES 4.1 5 Yr Private Fire Service Main 2013 |
| NFPA 25 Form AES 5.1 ITM Diesel Fire Pump Weekly 2013 |
| NFPA 25 Form AES 5.2 ITM Diesel Fire Pump Annual 2013 |
| NFPA 25 Form AES 5.3 ITM Electric Fire Pump Monthly 2013 |
| NFPA 25 Form AES 5.4 ITM Electric Fire Pump Annual 2013 |
| NFPA 25 Form AES 6 Water Storage Tanks Annual 2013 |
| NFPA 25 Form AES 7 Water Spray Fixed System 2013 |
| NFPA 25 Form AES 8 Foam Water Sprinkler System 2013 |
| NFPA 25 Form AES 9 Continuation Form 2013 |
| Address: |
| City: |
| State: |
| ZIP: |
| License: C-16 761360 |
| Phone: 4 |
| undefined: |
| SFM: |
| PropertyPhone: 805-606-5496 |
| undefined_2: |
| CSLB: |
| Misc: |
| CylinderSize: PCL 300 |
| HydroDate: 2015 |
| FlowPoint: 10 |
| SystemLocation: In main kitchen |
| SystemMfr: Pyro Chem |
| Model: Kitch. Knight |
| Gas#: Yes |
| Electric#: Yes |
| AirShutDown: |
| of ItemsHoods: 1 |
| DimensionsHoods: N/A |
| Nozzle Model Hoods: N/A |
| Nozzle Flow pointsHoods: N/A |
| Nozzle QtyHoods: N/A |
| Total Flow pointsHoods: N/A |
| of ItemsPlenums: 1 |
| DimensionsPlenums: 8' |
| Nozzle Model Plenums: 1H |
| Nozzle Flow pointsPlenums: 1 |
| Nozzle QtyPlenums: 1 |
| Total Flow pointsPlenums: 1 |
| of ItemsDucts: 1 |
| DimensionsDucts: 8' x 18" |
| Nozzle Model Ducts: 1L |
| Nozzle Flow pointsDucts: 1 |
| Nozzle QtyDucts: 1 |
| Total Flow pointsDucts: 1 |
| Appliance NameRow1: Griddle |
| Nozzle ModelRow1: 2H |
| Nozzle Flow pointsRow1: 2 |
| Total Flow points Appliance NameRow1: 4 |
| Total Flow points Appliance NameRow1_2: |
| Nozzle ModelRow1_2: |
| Nozzle Flow pointsRow1_2: |
| Total Flow pointsRow1: |
| Appliance NameRow2: Griddle |
| Nozzle ModelRow2: 2H |
| Nozzle Flow pointsRow2: 2 |
| Total Flow points Appliance NameRow2: 4 |
| Total Flow points Appliance NameRow2_2: |
| Nozzle ModelRow2_2: |
| Nozzle Flow pointsRow2_2: |
| Total Flow pointsRow2: |
| Appliance NameRow3: |
| Nozzle ModelRow3: |
| Nozzle Flow pointsRow3: |
| Total Flow points Appliance NameRow3: |
| Total Flow points Appliance NameRow3_2: |
| Nozzle ModelRow3_2: |
| Nozzle Flow pointsRow3_2: |
| Total Flow pointsRow3: |
| Appliance NameRow4: |
| Nozzle ModelRow4: |
| Nozzle Flow pointsRow4: |
| Total Flow points Appliance NameRow4: |
| Total Flow points Appliance NameRow4_2: |
| Nozzle ModelRow4_2: |
| Nozzle Flow pointsRow4_2: |
| Total Flow pointsRow4: |
| Appliance NameRow5: |
| Nozzle ModelRow5: |
| Nozzle Flow pointsRow5: |
| Total Flow points Appliance NameRow5: |
| Total Flow points Appliance NameRow5_2: |
| Nozzle ModelRow5_2: |
| Nozzle Flow pointsRow5_2: |
| Total Flow pointsRow5: |
| Qty1: |
| 0: |
| 0: 2 |
| 1: |
| 1: |
| 0: |
| 1: |
| Temp1: |
| 0: |
| 0: 450° |
| 1: |
| 1: |
| 0: |
| 1: |
| MfrDate1: |
| 0: |
| 0: 2024 |
| 1: |
| 1: |
| 0: |
| 1: |
| InspComment1: |
| 0: |
| 1: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| 8: |
| InspDD1: |
| 0: [P] |
| 1: [P] |
| 2: [P] |
| 3: [P] |
| 4: [P] |
| 5: [P] |
| 6: [P] |
| 7: [P] |
| 8: [P] |
| InspComments2Pg: |
| 0: |
| 1: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| 8: |
| 9: |
| 10: |
| 11: |
| 12: |
| 13: |
| ddPG2: |
| 0: [P] |
| 1: [N/A] |
| 2: [P] |
| 3: [P] |
| 4: [P] |
| 5: [P] |
| 6: [N/A] |
| 7: [N/A] |
| 8: [P] |
| 9: [P] |
| 10: [P] |
| 11: [N/A] |
| 12: [N/A] |
| 13: [P] |
| DefItem1: |
| 0: |
| 1: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| DefRiser1: |
| 0: |
| 1: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| DefComment1: |
| 0: |
| 1: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| undefined_12: Off |
| Text1: |
| undefined_13: Off |
| Text2: |
| Print Name: |
| 0: |
| Text3: |
| Text5: Annette Vaughn |
| Text1: Breakers - Global Grill |
| Text2: Bldg. 13330 , Oregon St. |
| Text4: Vandenberg SFB, Ca |
| Text6: |
| Text7: |
| Date1_af_date: 04/30/24 |
| Date2_af_date: |
| Date3_af_date: |
| Date4_af_date: |
| Date5_af_date: |
| Date6_af_date: |
| Date7_af_date: |
| Date8_af_date: |
| Date9_af_date: |
| Date10_af_date: |
| Date11_af_date: |
| Date12_af_date: |
| Date13_af_date: |
| Check Box2: Off |
| Check Box3: Off |
| Check Box4: Off |
| Check Box5: Off |
| Check Box6: Off |
| Check Box7: Off |
| Check Box8: Off |
| Check Box9: Off |
| Check Box10: Off |
| Check Box11: Off |
| Check Box12: Off |
| Check Box13: Off |
| Check Box14: Off |
| Check Box15: Off |
| Check Box16: Off |
| Check Box17: Off |
File details come from the government source that posted it. Updated .