Atch_5_Houghton_Dam_Breach_Bid_Schedule.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- Sand Lake NWR South Dakota, HOUGHTON DAM REMOVAL
- Solicitation number
- 140F0121R0033
About this file
This document includes a bid schedule and related federal contract opportunity for the Houghton Dam removal project at Sand Lake National Wildlife Refuge in South Dakota. The bid schedule outlines ten line items for the project, including general requirements, site access and improvements, excavation, removal of the existing spillway structure, dewatering, installation of riprap and bedding, placement of random fill, installation of guardrail, and project reclamation and cleanup. The total base bid amount is listed as $0.00. The federal contract opportunity further describes the scope of work to remove a 110-foot long service spillway through excavating a trapezoidal channel and installing riprap, bedding, and a new 20-foot wide guardrail barrier. The contracting officer point of contact is provided as Mr. Tim Officer at the Department of the Interior Fish and Wildlife Service.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| PROJECT DESCRIPTION: |
| Breach existing dam - removal of a 110-foot long service spillway; excavating a trapezoidal channel through the dam at EL. 1282.5’ comprised of a 150-long bottom dimension with side slopes of 3(H):1(V); installation of rip-rap (D50=12”) along the crest, bottom and side-slopes of the new excavation as indicated on the construction drawings; and install a new 20’ wide guardrail barrier on the dam crest where indicated on the construction drawings for the Houghton Dam Structure at Sand Lake National Wildlife Refuge. |
| A. GENERAL CONDITIONS: | ||||
| Item 1: General Requirements | ||||
| Mobilization and demobilization + Bond | $ | 0 | ||
| Bond | $ | 0 | ||
| 0 | ||||
| General Requirements (other) | $ | 0 |
Division 1 Total $ 0
B. SUMMARY OF COST BREAKDOWN FOR MATERIALS, LABOR AND EQUIPMENT
Item 2 - Access Road and Site Improvements $ 0.00
Item 3 - Excavation $ 0.00
Item 4 - Removal of Existing Spillway Structure $ 0.00
Item 5 - Dewatering $ 0.00
Item 6 - Furnish and install Riprap $ 0.00
Item 7 - Furnish and install Bedding $ 0.00
Item 8 - Placing random fill $ 0.00
Item 9 - Install Guardrail $ 0.00
Item 10 - Reclamation and Cleanup $ 0.00
BASE TOTAL $ 0.00
OVERHEAD AND PROFIT (percentage) % 0% $ 0
BASE TOTAL PLUS OVERHEAD AND PROFIT $ 0
&"Times New Roman,Regular"&12BIDDING SCHEDULE
Houghton Dam Demo 21-045 Sand Lake NWR Brown County, South Dakota
File details come from the government source that posted it. Updated .