This document includes an attachment to a bid schedule and details of a related federal contract opportunity for dam removal services. The bid schedule attachment provides a cost breakdown template with line items for mobilization, general requirements, site access and improvements, excavation, removal of an existing spillway structure, dewatering, furnishing and installing riprap and bedding, placing random fill, installing guardrail, conducting a signed survey to confirm excavation limits, reclamation and cleanup. The federal contract opportunity notice is for removal of a 110-foot long dam spillway at the Sand Lake National Wildlife Refuge in South Dakota. The work includes excavating a trapezoidal channel through the dam, installing riprap along the excavation, and installing a new 20-foot wide guardrail on the dam crest. The contracting agency is the U.S. Fish and Wildlife Service and the point of contact is provided.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| PROJECT DESCRIPTION: |
| Breach existing dam - removal of a 110-foot long service spillway; excavating a trapezoidal channel through the dam at EL. 1282.5’ comprised of a 150-long bottom dimension with side slopes of 3(H):1(V); installation of rip-rap (D50=12”) along the crest, bottom and side-slopes of the new excavation as indicated on the construction drawings; and install a new 20’ wide guardrail barrier on the dam crest where indicated on the construction drawings for the Houghton Dam Structure at Sand Lake National Wildlife Refuge. |
| A. GENERAL CONDITIONS: | ||||
| Item 1: General Requirements | ||||
| Mobilization and demobilization + Bond | $ | 0 | ||
| Bond | $ | 0 | ||
| 0 | ||||
| General Requirements (other) | $ | 0 |
Division 1 Total $ 0
B. SUMMARY OF COST BREAKDOWN FOR MATERIALS, LABOR AND EQUIPMENT
Item 2 - Access Road and Site Improvements $ 0.00
Item 3 - Excavation $ 0.00
Item 4 - Removal of Existing Spillway Structure $ 0.00
Item 5 - Dewatering $ 0.00
Item 6 - Furnish and install Riprap $ 0.00
Item 7 - Furnish and install Bedding $ 0.00
Item 8 - Placing random fill $ 0.00
Item 9 - Install Guardrail $ 0.00
Item 10 - Signed Survey confirming limits of excavation $ 0.00
Item 11 - Reclamation and Cleanup $ 0.00
BASE TOTAL $ 0.00
OVERHEAD AND PROFIT (percentage) % 0% $ 0
BASE TOTAL PLUS OVERHEAD AND PROFIT $ 0