Atch 4 - Technical Evaluation Worksheet Rotterdam Netherlands 1 Jul 21 Final.docx
DOCX document 43 KB Posted
- Attached to
- S&RTS Rotterdam, Netherlands Request for Proposal - Amendment 3 Federal contract opportunity
- Solicitation number
- HTC711-21-R-R016
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Atch 2 - SOR - Rotterdam Netherland Rev 1 (final) 8-4-21.xlsx | XLSX spreadsheet | |
| SF 30 Amendment 3.pdf | ||
| SF Amendment 2.pdf.pdf | ||
| Round 2 Questions.xlsx | XLSX spreadsheet | |
| SF30 Amendment 1.pdf | ||
| Round 1 Questions v1.pdf | ||
| Atch 2 - SOR - Rotterdam Netherland (final) 7-1-21.xlsx | XLSX spreadsheet | |
| Atch 3 - RFP Information Sheet.docx | DOCX document | |
| HTC711-21-R-R016 SRTS Rotterdam Netherlands Final.pdf | ||
| Atch 5 - Contractor Plan for Continuation of Essential Contractor Services.docx | DOCX document | |
| Atch 6 - SRTS General Compliance Tool.xlsx | XLSX spreadsheet | |
| Atch 1 - PWS - Rotterdam Netherlands FINAL.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WHEN FILLED IN THIS DOCUMENT BECOMES CUI
Attachment 4 – HTC711-21-R-R016
Source Selection Information – See FAR 2.101 and 3.104
TECHNICAL EVALUATION WORKSHEET
SOLICITATION #: HTC711-21-R-R016
STEVEDORING AND RELATED TERMINAL SERVICES
PORTS: ROTTERDAM, NETHERLANDS
When completing this technical worksheet based on the posted requirements, the Offeror shall assume the Government has no prior knowledge of the Offerors experience past or present.
The Government will base their evaluation SOLELY on the information presented for EACH question based on the Offerors answer given in this Technical Worksheet questionnaire.
Please make sure you answer each question fully and in detail.
**Submission Rules**
The Offerors proposal shall not simply rephrase or restate the Government’s requirements, but rather shall provide convincing rationale to address how the Offeror intends to meet each item in the worksheet in accordance with the Performance Work Statement (PWS). Statements that the Offeror understands, can or will comply with the PWS; statements paraphrasing the PWS or parts thereof, flowcharts simply listing activities related to performance of the PWS; and phrases such as “standard procedures will be employed” or “well known techniques will be used,” etc., without a description/explanation of how services will be performed shall be considered unacceptable.
The entire submission of this Technical Worksheet shall not exceed 25 single sided pages in length. Page size shall be no larger than 8.5x11 inches.
Sections 1 through 6 of this Technical Worksheet shall not exceed 25 pages (a single-side is equal to 1-page).
If more than 25 pages are received for Sections 1 through 6, only the first 25 pages will be evaluated and all other pages will be removed and therefore not evaluated.
Documentary evidence (photos) and Material Handling Equipment (MHE) lists will not count against the page limits.
NOTE** Failure to complete this document in its entirety or attach requested documents may result in being ineligible for award.
**Technical Evaluation Questions**
1. Labor/Management
1a. Describe/explain your capability to provide personnel within a 24 hour notice, in order to support multiple work sites, reception of cargo for truck and loading/discharging multiple decks simultaneously on multiple vessels.
Click here to enter text.
1b. Describe/explain your plan for addressing labor shortages due to competing requirements “example; commercial “vs” military, and moving from normal work schedules to working 24/7 and how you would mitigate any labor shortages.
Click here to enter text.
1c. Describe the type/class of labor that makes up the different work parties/gangs (i.e. truck gang, and vessel gangs), and their supervision structure.
Click here to enter text.
1d. Describe/explain how you will maintain driver pool for the USG specialized military equipment (i.e. M1A2, M2, strikers, MRAPS).
Click here to enter text.
2. Material Handling Equipment (MHE)
2a. Describe and provide a list with photos, of what equipment you have in your inventory that is available to use to handle all classes of supply (to include HAZMAT). Please include details about LO/LO and RO/RO operations for vessel and truck operations. Please provide photos supporting the 70T ramp and mobile cranes.
Click here to enter text.
2b. Describe how would you supply equipment for working multiple vessels, where conducting operations in a 24/7 environment to support loading and discharging multiple decks simultaneously on multiple vessels on multiple berths?
Click here to enter text.
2c. Describe and provide photos of what equipment you have in your inventory that would be used to tow/dray dead lined vehicles up to 160,000 lbs. on, and off a vessel with deck heights up to 10’6’’. Describe also your plan to mitigate working multiple decks on a vessel loading/discharging inoperable vehicles to and from staging lots, while keeping up with minimum set productivity levels.
Click here to enter text.
2d. The Government requires that you provide contact maintenance team, equipment and vehicle(s) capable of determining the condition of its cargo rapidly. Describe how your company will support this requirement while working in multiple operations (i.e. staging lots, loading trucks, and on multiple vessel decks).
2e. The Government requires that its contractor shall have the capability to make minor equipment repairs on site and during an operation (i.e. changing tire, refueling vehicles, changing batteries). Describe how your company will provide this requirement?
Click here to enter text.
3. Reception and Disposition
3a. The Government requires our stevedore contractor to provide reception and disposition only services of convoyed vehicles the port. Please explain your current or past business practices with this requirement.
Click here to enter text.
3b. The Government maintains positive control of all cargo being imported and exported, please explain or show evidence of how (based on the requirements) you would maintain control of cargo placed in your care, including tallying, checking and inventory of cargo.
Click here to enter text.
3c. The Government may elect to operate on a 24/7 basis. Explain or show evidence of your management services to operate under those conditions, include available labor, skills sets, and include certifications, licensing, training as describe in the requirement.
Click here to enter text.
4. Vessel Operations
4a. The Government requires its contractor to be flexible in providing service. The Contractor shall provide flexible start times for receiving cargo at the port, starting vessels at odd hours or transitioning from normal work day schedules. Please explain your ability to provide this flexibility of varied start times and describe any impacts to Government.
Click here to enter text.
4b. Describe/explain your ability to load/discharge cargo to/from a vessel without causing damage and In Accordance With (IAW) the Governments safety requirements.
Click here to enter text.
4c. Explain or describe how you would LO/LO the M1070 with M1000 trailer on board a cargo vessels. Explain the lifting points, type of rigging and tie down used after its loaded.
4d. Explain how you would perform lashing/securing U.S. Military Cargo and specific tie down procedures related to vessel operations. Describe in detail how to secure down a vehicle weighing 68,000lbs, pulling a loaded trailer, how many and what type of lashing would be used.
4e. The Governments cargo is unique in that it comes in all weight classes, operable and inoperable (wheel vehicles, track vehicles, containers, breakbulk), where working multiple decks is advantageous to the Government. Explain your stevedore’s ability to conduct vessel discharge operations, by describing what MHE, labor, lift capability, and staging, where rail operations are being worked simultaneously.
Click here to enter text.
5. Truck operations
5a. Explain how your company can provide staging areas for loading and unloading commercial line haul trucks.
Click here to enter text.
5b. Explain your capabilities to successfully and efficiently conducting truck operations without causing damage to any Government cargo. Describe your management plan to safety load or discharge the Governments cargo per its requirements.
Click here to enter text.
5c. Explain your capabilities you have for cargo reception & disposition via trucks. Explain the area used for loading/discharging trucks and the close proximity of staging areas, and piers.
Click here to enter text.
5d. During truck operations there may be a need for portable end ramps (weight capacity of 70 tons). Please show evidence and describe your ability to provide portable end ramps (weight capacity of 70 tons), (photos accepted).
Click here to enter text.
5e. Describe/explain your ability to provide security for handling sensitive and classified cargo.
Click here to enter text.
6. Rail Operation
6a. Explain your cability to provide direct rail access for loading and unloading US Military cargo and the length of track at a minimum of 180m.
Click here to enter text.
6b. Explain your capabilities to successfully and efficiently conduct rail operations without causing damage to any Government cargo. Describe your management plan to safety load or discharge the Governments cargo per the requirement.
Click here to enter text.
6c. Explain the capabilities you have for cargo disposition via rail. Explain if railheads are in close or general proximity of staging areas, or piers.
Click here to enter text.
6d. During rail operation there may be a need for portable end ramps (weight capacity of 70 tons), and steal spanner plates. Please show evidence and describe your ability to provide portable end ramps (weight capacity of 70 tons), (photos accepted).
Click here to enter text.
Controlled by: USTRANSCOM Controlled by: Dir. of Acquisition CUI Category/is: SSEL Limited Dissemination Control: FED ONLY POC: Brita Dorsey, 618-220-7049