Atch 2 - SOR - Rotterdam Netherland (final) 7-1-21.xlsx

XLSX spreadsheet 71 KB Posted

Attached to
S&RTS Rotterdam, Netherlands Request for Proposal - Amendment 3 Federal contract opportunity
Solicitation number
HTC711-21-R-R016
Issued by
Department of Defense United States Transportation Command

View the file

Other files for this federal contract opportunity

Other files attached to S&RTS Rotterdam, Netherlands Request for Proposal - Amendment 3, newest first.
File Type Posted
SF 30 Amendment 3.pdf PDF
Atch 2 - SOR - Rotterdam Netherland Rev 1 (final) 8-4-21.xlsx XLSX spreadsheet
SF Amendment 2.pdf.pdf PDF
Round 2 Questions.xlsx XLSX spreadsheet
SF30 Amendment 1.pdf PDF
Round 1 Questions v1.pdf PDF
Atch 3 - RFP Information Sheet.docx DOCX document
Atch 4 - Technical Evaluation Worksheet Rotterdam Netherlands 1 Jul 21 Final.docx DOCX document
Atch 1 - PWS - Rotterdam Netherlands FINAL.pdf PDF
HTC711-21-R-R016 SRTS Rotterdam Netherlands Final.pdf PDF
Atch 5 - Contractor Plan for Continuation of Essential Contractor Services.docx DOCX document
Atch 6 - SRTS General Compliance Tool.xlsx XLSX spreadsheet
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Definitions

Source Selection Information - See FAR 2.101 and 3.104
WORKING HOURSSHIFT HOURS (as applicable)
Hours may be estimatedWorking Shift / Hoursoperating hours
Straight TimeBase wages before differentials are appliedDay Shift
Night shift
Regular8am to 5pm1st Shift
duty hours2nd Shift
3rd Shift
Regular OverBefore 8am and after 5pm4th Shift
Time (OT)
Swing / Hoot Owl
Meal HoursNoon to 1pm (may be premium meal hour)
6pm to 7-pmNormal work day hours
Midnight to 1am
6am to 7am** Note: Hours stated may be changed as operations or mission scope dictates.

UNITS OF MEASURE

MTONMeasurement Tons (measure of volume)1 MTON = 40 cubic feet (1.13 cubic meters)
HRHour = 1 HR = 60 minutes
DYDay = 1 DY = 24 hours
MTHMonth = 1 MTH = 30 days
EAEach
SQFTSquare Feet (measure of area)1' SQFT = 144'' inchs dimensions 12''x12''
SQMTSquare Meter (measure of area)1 SQFT = 0.0929 square meters
1 CFT = 1728 cubic inches 12"x12"x12"
BNDBundle
PCPiece (one each)
ROLLRoll ( roll of wire)
MIMile (measure of distance) = 1 Mile = 5280 feet ( 1,609.34 meters )
TRIPSTrip = 1 Trip, as described in the PWS (if applicable)
LTLong Ton = 1 LT = 2,240 pounds ( 1,016.05 kilograms )
LBSUS. Pounds = 1 LBS = 0.45 kilograms
KGkg = 1 kg = 2.204 pounds
MTONMTON recorded and billed to the sponsor will be applied to the gross cube (40 cubic feet = 1 MTON) of the container.

COMMODITY HANDLING METHODS (includes all standard lashing & Unlashing, blocking and bracing cargo)

LO/LOLift On / Lift Off - includes all standard lashing,( a ) Shore Crane Type (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))
& Unlashing, blocking and bracing cargo( b ) Ships Gear, Ships crane
RO/RORoll On / Roll Off - includes all standard lashing,( c ) Vehicle rolling under Own Power - Containers loaded by ramp
& Unlashing, blocking and bracing cargo
TO/TOTow On / Tow Off - includes all standard lashing,( d ) Trailers towed by Contractor Equipment or Gov't vehicles
& Unlashing, blocking and bracing cargo( e ) Inoperable Vehicles being towed

RO/RO Containers, loaded by contractor trailer Containers loaded onto trailers, bomb carts, MIFI's, or other equipment, otherwise trailered into RORO vessels and unloaded, stowed and lashed

CONTAINER - BREAK BULK DEFINITIONS
20Explosives, in crates, boxes, tubs, tubes
25Milvan - Containers packed with explosives. Explosives placed in containers are classified as containers.
40Break-Bulk cargo, Non-explosive, Non-ISO cornered , includes M7 FRS, shelters, shop sets, ISU-90/60, mind rollers, blade boxes, skid mounted generators,
crates, 463L pallets,
44Cargo transporters (CONEX) ISO Fitted, loaded/empty - INCLUDE QUADCONS, BICONS, TRICONS, stackable tank modules, SINGLE OR LESS THAN TEU
45Milvan - Containers (non-explosives). All containers ISO Fitted 20'-40' empty or full, includes ISO 20' FRC-Fuel tank moduals, ISO hippo,
ISO 20' stackable flat racks, ISO FPU/BOH
VEHICLE CATEGORY DEFINITIONS
60 - MEDIUM VEHICLE25,001 US. pounds to 60,000 pounds 11,340.26 kg to 27,215.54 kg 11.161 LT to 26.786 LT
60 - GOVERNMENT VEHICLES, UNBOXED, weighing 25,001lbs. to 60,000lbs. per unit
Includes but not limited to: trucks, tractors, track vehicles, semi-trailer vans, mobile cranes, construction equipment (track or wheel), road graders,
rock crushers, busses, boats (trailered/cradled).

61 - LIGHT VEHICLE 25,000 pounds or less 11,339.81 kilograms or less 11.16 long tons

61 - GOVERNMENT VEHICLES, UNBOXED, weighing 25,000lbs. or less per unit includes but limited to: trucks, ambulances, tractors, POV, engineer construction equipment,
personnel carriers, boats or boats on cradles) engineer construction equipment, tracked vehicles and boats (trailered/cradled).

67 - HEAVY VEHICLE 60,001 pounds or more 27,216 kg. or more 26.786 LT or more

67 - GOVERNMENT VEHICLES, UNBOXED, weighing 60,000lbs. per unit or more includes but not limited to: trucks, tractors, vans, track vehicles, HETS, MRAPs, Heavy mobile cranes,
tracked or wheeled engineer construction equipment, and boats (trailered/cradled).

Summary

THIS DOCUMENT BECOMES CUI ONCE COMPLETED
Source Selection Information - See FAR 2.101 and 3.104
OFFEROR NAME:
INSTRUCTIONS TO OFFEROR:
- Input Offeror Name in cell C1 above.
- Input unit rates in ALL yellow highlighted cells in the "Schedule" sheet (enter 0 if you do not wish to offer a price).
- Offeror should consider that all proposed unit rates will apply to the entire period of performance, to include options and extensions, upon award.
- This spreadsheet will populate the Total Evaluated Price based upon unit prices input in the highlighted cells of the "Schedule" sheet.
SUMMARY for all Port LocationsControlled Unclassified Information – CUI//SP-BUDG”
5 Year Ordering Period6mo Extension
Rotterdam, The Netherlands$ 600,000.00$ 60,000.00

TOTAL $ 600,000.00 $ 60,000.00

TOTAL VALUE OF 5 YEAR PLUS EXTENSION PERIOD FOR PORT OF ROTTERDAM, NETHERLANDS $ 660,000.00

TOTAL ALL YEARS COMBINED TO INCLUDE 25% CEILING$ 825,000.00
↓↓↓ PORT(S) SUMMARYS BELOW ↓↓↓
SUMMARY Rotterdam, The NetherlandsControlled Unclassified Information – CUI//SP-BUDG”
5 Year Ordering Period6mo Extension
Schedule1A1LOAD VESSEL$ - 0$ - 0

Schedule 1A1a LASHING ONLY $ - 0 $ - 0

Schedule 1A2 DISCHARGE VESSEL $ - 0 $ - 0

Schedule 1A2a UNLASHING ONLY $ - 0 $ - 0

Schedule 1B1 LOAD RAIL $ - 0 $ - 0

Schedule 1B2 DISCHARGE RAIL $ - 0 $ - 0

Schedule 1B3 LOAD TRUCKS $ - 0 $ - 0

Schedule 1B4 DISCHARGE TRUCKS $ - 0 $ - 0

Schedule 1C RECEPTION $ - 0 $ - 0

Schedule 1D DISPOSITION $ - 0 $ - 0

Schedule 1E STUFFING/UNSTUFFING $ - 0 $ - 0

Schedule 2 EXTRA LABOR $ - 0 $ - 0

Schedule 3A DETENTION $ - 0 $ - 0

Schedule 3B OVERTIME DIFFERENTIALS $ - 0 $ - 0

Schedule 3C MINIMUM TIME $ - 0 $ - 0

Schedule 4 EQUIPMENT $ - 0 $ - 0

Schedule 5 STORAGE $ - 0 $ - 0

Schedule 6 FACILITIES $ - 0 $ - 0

Schedule 8 MISCELLANEOUS $ 120,000.00 $ 60,000.00

TOTAL $ 120,000.00 $ 60,000.00

$ 180,000.00

&"Times New Roman,Bold"&18&K00B050UNCLASSIFIED // FOR OFFICIAL USE ONLY - FOUO

Rotterdam

THIS DOCUMENT BECOMES CUI ONCE COMPLETED
Source Selection Information - See FAR 2.101 and 3.104
STEVEDORING & RELATED TERMINAL SERVICESPERIOD OF PERFORMANCE:2 Oct 2021through1 Apr 2027(including 6 mo extension, if applicable)
LOCATION:Rotterdam, The Netherlandsinput start dateinput final end date
Attachment #TOTAL COST ALL SCHEDULES PORT 1$ 120,000.00
Line ItemCategoryScheduleCommodityDescriptionUnit of DurationEstimated DurationUnit of MeasureUnit PriceUnit QuantityExtended Price
1Commodity1A1LOAD VESSEL35aAIRCRAFT, WHOLE OR UNBOXED | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA1$ - 0
2Commodity1A1LOAD VESSEL35bAIRCRAFT, WHOLE OR UNBOXED | LO/LO - Ships Gear, Ships craneEA1$ - 0
3Commodity1A1LOAD VESSEL35cAIRCRAFT, WHOLE OR UNBOXED | RO/RO, by rampEA75$ - 0
4Commodity1A1LOAD VESSEL35dAIRCRAFT, WHOLE OR UNBOXED | RO/RO, by ramp - Loaded by PSAEA75$ - 0
5Commodity1A1LOAD VESSEL40aGENERAL CARGO (Breakbulk) NOT OTHERWISE SPECIFIED (NOS) | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))MTON5$ - 0
6Commodity1A1LOAD VESSEL40bGENERAL CARGO (Breakbulk) NOT OTHERWISE SPECIFIED (NOS) | LO/LO - by lift with equipment other than described in 40aMTON5$ - 0
7Commodity1A1LOAD VESSEL44aCONTAINERS LESS THAN TEU - SINGLE - Conex, Quadcons, Tricons, Bicons, W/ISO | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))EA5$ - 0
8Commodity1A1LOAD VESSEL44bCONTAINERS LESS THAN TEU - SINGLE - Conex, Quadcons, Tricons, Bicons, W/ISO | LO/LO - Ships Gear, Ships craneEA5$ - 0
9Commodity1A1LOAD VESSEL44cCONTAINERS LESS THAN TEU - SINGLE - Conex, Quadcons, Tricons, Bicons, W/ISO | RO/RO - Loaded /Discharged by truck/trailer, forklift, by rampEA5$ - 0
10Commodity1A1LOAD VESSEL45aMILVAN-CONTAINER 20' - 40' (TEU configured) PACKED W/ NON-EXPLOSIVES | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))EA100$ - 0
11Commodity1A1LOAD VESSEL45bMILVAN-CONTAINER 20' - 40' (TEU configured) PACKED W/ NON-EXPLOSIVES | LO/LO - Ships Gear, Ships crane, or Mobile shore craneEA5$ - 0
12Commodity1A1LOAD VESSEL45cMILVAN-CONTAINER 20' - 40' (TEU configured ) PACKED W/ NON-EXPLOSIVES | RO/RO - Loaded /Discharged by truck/trailer, forklift, by rampEA400$ - 0
13Commodity1A1LOAD VESSEL47HOUSEHOLD GOODS (Boxes, Crates)MTON900$ - 0
14Commodity1A1LOAD VESSEL60aMEDIUM VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA10$ - 0
15Commodity1A1LOAD VESSEL60bMEDIUM VEHICLES OR TRAILERS | LO/LO - Ships Gear, Ships craneEA10$ - 0
16Commodity1A1LOAD VESSEL60cMEDIUM VEHICLES | RO/RO - Vehicle rolling under Own Power , by rampEA200$ - 0
17Commodity1A1LOAD VESSEL60dMEDIUM TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA200$ - 0
18Commodity1A1LOAD VESSEL60eMEDIUM VEHICLES| TO/TO - Inoperable Vehicle TowedEA50$ - 0
19Commodity1A1LOAD VESSEL61aLIGHT VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA10$ - 0
20Commodity1A1LOAD VESSEL61bLIGHT VEHICLES OR TRAILERS | LO/LO - Ships Gear, Ships craneEA10$ - 0
21Commodity1A1LOAD VESSEL61cLIGHT VEHICLES | RO/RO - Vehicle rolling under Own Power , by rampEA200$ - 0
22Commodity1A1LOAD VESSEL61dLIGHT TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA200$ - 0
23Commodity1A1LOAD VESSEL61eLIGHT VEHICLES | TO/TO - Inoperable Vehicle TowedEA50$ - 0
24Commodity1A1LOAD VESSEL67aHEAVY VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA5$ - 0
25Commodity1A1LOAD VESSEL67bHEAVY VEHICLES OR TRAILERS | LO/LO - Ships Gear, Ships craneEA5$ - 0
26Commodity1A1LOAD VESSEL67cHEAVY VEHICLES | RO/RO - Vehicle rolling under Own Power by rampEA250$ - 0
27Commodity1A1LOAD VESSEL67dHEAVY TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA250$ - 0
28Commodity1A1LOAD VESSEL67eHEAVY VEHICLES | TO/TO - Inoperable Vehicle TowedEA50$ - 0
TOTAL 1A1 - Loading Vessel$ - 0
29Commodity1A1aLASHING ONLY35AIRCRAFT, WHOLE OR UNBOXEDEA80$ - 0
30Commodity1A1aLASHING ONLY40GENERAL CARGO NOT OTHERWISE SPECIFIED (NOS) (Breakbulk)MTON250$ - 0
31Commodity1A1aLASHING ONLY44CONTAINERS OTHER THAN TEU - SINGLE - W/ISO - Quadcons, Tricons, BiconsEA100$ - 0
32Commodity1A1aLASHING ONLY45MILVAN-CONTAINERS 20'/40' PACKED W/ NON-EXPLOSIVES - ISO (TEU configured) Conex, Quadcons, Tricons, Bicons ))EA250$ - 0
33Commodity1A1aLASHING ONLY60MEDIUM VEHICLES OR TRAILERSEA250$ - 0
34Commodity1A1aLASHING ONLY61LIGHT VEHICLES OR TRAILERSEA250$ - 0
35Commodity1A1aLASHING ONLY67HEAVY VEHICLES OR TRAILERSEA250$ - 0
TOTAL 1A1a - Lashing Only$ - 0
36Commodity1A2DISCHARGE VESSEL35aAIRCRAFT, WHOLE OR UNBOXED | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA1$ - 0
37Commodity1A2DISCHARGE VESSEL35bAIRCRAFT, WHOLE OR UNBOXED | LO/LO - Ships Gear, Ships craneEA1$ - 0
38Commodity1A2DISCHARGE VESSEL35cAIRCRAFT, WHOLE OR UNBOXED | RO/RO, by rampEA75$ - 0
39Commodity1A1DISCHARGE VESSEL35dAIRCRAFT, WHOLE OR UNBOXED | RO/RO, by ramp - Discharged by PSAEA75$ - 0
40Commodity1A2DISCHARGE VESSEL40aGENERAL CARGO NOT OTHERWISE SPECIFIED (NOS) | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))MTON5$ - 0
41Commodity1A2DISCHARGE VESSEL40bGENERAL CARGO NOT OTHERWISE SPECIFIED (NOS) | LO/LO - by lift with equipment other than described in 40aMTON5$ - 0
42Commodity1A2DISCHARGE VESSEL44aCONTAINERS LESS THAN TEU - SINGLE - Conex, Quadcons, Tricons, Bicons, W/ISO | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))EA5$ - 0
43Commodity1A2DISCHARGE VESSEL44bCONTAINERS LESS THAN TEU - SINGLE - Conex, Quadcons, Tricons, Bicons, W/ISO | LO/LO - Ships Gear, Ships craneEA5$ - 0
44Commodity1A2DISCHARGE VESSEL44cCONTAINERS LESS THAN TEU - SINGLE - Conex, Quadcons, Tricons, Bicons, W/ISO | RO/RO - Loaded /Discharged by truck/trailer, forklift, by rampEA5$ - 0
45Commodity1A2DISCHARGE VESSEL45aMILVAN-CONTAINER 20' - 40' (TEU configured) PACKED W/ NON-EXPLOSIVES | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))EA100$ - 0
46Commodity1A2DISCHARGE VESSEL45bMILVAN-CONTAINER 20' - 40' (TEU configured) PACKED W/ NON-EXPLOSIVES | LO/LO - Ships Gear, Ships crane, or Mobile shore craneEA5$ - 0
47Commodity1A2DISCHARGE VESSEL45cMILVAN-CONTAINER 20' - 40' (TEU configured ) PACKED W/ NON-EXPLOSIVES | RO/RO - Loaded /Discharged by truck/trailer, forklift, by rampEA400$ - 0
48Commodity1A2DISCHARGE VESSEL47HOUSEHOLD GOODS (Boxes, Crates)MTON900$ - 0
49Commodity1A2DISCHARGE VESSEL60aMEDIUM VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA10$ - 0
50Commodity1A2DISCHARGE VESSEL60bMEDIUM VEHICLES OR TRAILERS | LO/LO - Ships Gear, Ships craneEA10$ - 0
51Commodity1A2DISCHARGE VESSEL60cMEDIUM VEHICLES | RO/RO - Vehicle rolling under Own Power , by rampEA200$ - 0
52Commodity1A2DISCHARGE VESSEL60dMEDIUM TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA200$ - 0
53Commodity1A2DISCHARGE VESSEL60eMEDIUM VEHICLES| TO/TO - Inoperable Vehicle TowedEA50$ - 0
54Commodity1A2DISCHARGE VESSEL61aLIGHT VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA10$ - 0
55Commodity1A2DISCHARGE VESSEL61bLIGHT VEHICLES OR TRAILERS | LO/LO - Ships Gear, Ships craneEA10$ - 0
56Commodity1A2DISCHARGE VESSEL61cLIGHT VEHICLES | RO/RO - Vehicle rolling under Own Power , by rampEA200$ - 0
57Commodity1A2DISCHARGE VESSEL61dLIGHT TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA200$ - 0
58Commodity1A2DISCHARGE VESSEL61eLIGHT VEHICLES | TO/TO - Inoperable Vehicle TowedEA50$ - 0
59Commodity1A2DISCHARGE VESSEL67aHEAVY VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA5$ - 0
60Commodity1A2DISCHARGE VESSEL67bHEAVY VEHICLES OR TRAILERS | LO/LO - Ships Gear, Ships craneEA5$ - 0
61Commodity1A2DISCHARGE VESSEL67cHEAVY VEHICLES | RO/RO - Vehicle rolling under Own Power by rampEA250$ - 0
62Commodity1A2DISCHARGE VESSEL67dHEAVY TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA250$ - 0
63Commodity1A2DISCHARGE VESSEL67eHEAVY VEHICLES | TO/TO - Inoperable Vehicle TowedEA50$ - 0
TOTAL - 1A2- Discharge Vessel$ - 0
64Commodity1A2aUNLASHING ONLY35AIRCRAFT, WHOLE OR UNBOXEDEA80$ - 0
65Commodity1A2aUNLASHING ONLY40GENERAL CARGO NOT OTHERWISE SPECIFIED (NOS) (Breakbulk)MTON250$ - 0
66Commodity1A2aUNLASHING ONLY44CONTAINERS OTHER THAN TEU - SINGLE - W/ISO - Quadcons, Tricons, BiconsEA100$ - 0
67Commodity1A2aUNLASHING ONLY45MILVAN-CONTAINERS 20'/40' PACKED W/ NON-EXPLOSIVES - ISO (TEU configured) Conex, Quadcons, Tricons, Bicons ))EA250$ - 0
68Commodity1A2aUNLASHING ONLY60MEDIUM VEHICLES OR TRAILERSEA250$ - 0
69Commodity1A2aUNLASHING ONLY61LIGHT VEHICLES OR TRAILERSEA250$ - 0
70Commodity1A2aUNLASHING ONLY67HEAVY VEHICLES OR TRAILERSEA250$ - 0
TOTAL 1A2a Unlashing only$ - 0
71Commodity1B1LOAD RAIL40aGENERAL CARGO NOT OTHERWISE SPECIFIED (NOS) | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))MTON25$ - 0
72Commodity1B1LOAD RAIL40bGENERAL CARGO NOT OTHERWISE SPECIFIED (NOS) | LO/LO - by lift with equipment other than described in 40aMTON25$ - 0
73Commodity1B1LOAD RAIL44aCONTAINERS LESS THAN TEU - SINGLE - Conex, Quadcons, Tricons, Bicons, W/ISO | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))EA20$ - 0
74Commodity1B1LOAD RAIL44bCONTAINERS LESS THAN TEU - SINGLE - Conex, Quadcons, Tricons, Bicons, W/ISO | LO/LO - Ships Gear, Ships craneEA20$ - 0
75Commodity1B1LOAD RAIL44cCONTAINERS LESS THAN TEU - SINGLE - Conex, Quadcons, Tricons, Bicons, W/ISO | RO/RO - Loaded /Discharged by truck/trailer, forklift, by rampEA1$ - 0
76Commodity1B1LOAD RAIL45aMILVAN-CONTAINER 20' - 40' (TEU configured) PACKED W/ NON-EXPLOSIVES | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))EA20$ - 0
77Commodity1B1LOAD RAIL45bMILVAN-CONTAINER 20' - 40' (TEU configured) PACKED W/ NON-EXPLOSIVES | LO/LO - Ships Gear, Ships crane, or Mobile shore craneEA100$ - 0
78Commodity1B1LOAD RAIL45cMILVAN-CONTAINER 20' - 40' (TEU configured ) PACKED W/ NON-EXPLOSIVES | RO/RO - Loaded /Discharged by truck/trailer, forklift, by rampEA1$ - 0
79Commodity1B1LOAD RAIL60aMEDIUM VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA20$ - 0
80Commodity1B1LOAD RAIL60bMEDIUM VEHICLES OR TRAILERS | LO/LO - Ships Gear, Ships craneEA20$ - 0
81Commodity1B1LOAD RAIL60cMEDIUM VEHICLES | RO/RO - Vehicle rolling under Own Power , by rampEA20$ - 0
82Commodity1B1LOAD RAIL60dMEDIUM TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA20$ - 0
83Commodity1B1LOAD RAIL60eMEDIUM VEHICLES| TO/TO - Inoperable Vehicle TowedEA20$ - 0
84Commodity1B1LOAD RAIL61aLIGHT VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA20$ - 0
85Commodity1B1LOAD RAIL61bLIGHT VEHICLES OR TRAILERS | LO/LO - Ships Gear, Ships craneEA20$ - 0
86Commodity1B1LOAD RAIL61cLIGHT VEHICLES | RO/RO - Vehicle rolling under Own Power , by rampEA20$ - 0
87Commodity1B1LOAD RAIL61dLIGHT TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA20$ - 0
88Commodity1B1LOAD RAIL61eLIGHT VEHICLES | TO/TO - Inoperable Vehicle TowedEA20$ - 0
89Commodity1B1LOAD RAIL67aHEAVY VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA20$ - 0
90Commodity1B1LOAD RAIL67bHEAVY VEHICLES OR TRAILERS | LO/LO - Ships Gear, Ships craneEA20$ - 0
91Commodity1B1LOAD RAIL67cHEAVY VEHICLES | RO/RO - Vehicle rolling under Own Power by rampEA20$ - 0
92Commodity1B1LOAD RAIL67dHEAVY TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA20$ - 0
93Commodity1B1LOAD RAIL67eHEAVY VEHICLES | TO/TO - Inoperable Vehicle TowedEA20$ - 0
TOTAL 1B1 Load Railcars$ - 0
94Commodity1B2DISCHARGE RAIL40aGENERAL CARGO NOT OTHERWISE SPECIFIED (NOS) | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))MTON25$ - 0
95Commodity1B2DISCHARGE RAIL40bGENERAL CARGO NOT OTHERWISE SPECIFIED (NOS) | LO/LO - by lift with equipment other than described in 40aMTON25$ - 0
96Commodity1B2DISCHARGE RAIL44aCONTAINERS LESS THAN TEU - SINGLE - Conex, Quadcons, Tricons, Bicons, W/ISO | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))EA20$ - 0
97Commodity1B2DISCHARGE RAIL44bCONTAINERS LESS THAN TEU - SINGLE - Conex, Quadcons, Tricons, Bicons, W/ISO | LO/LO - Ships Gear, Ships craneEA20$ - 0
98Commodity1B2DISCHARGE RAIL44cCONTAINERS LESS THAN TEU - SINGLE - Conex, Quadcons, Tricons, Bicons, W/ISO | RO/RO - Loaded /Discharged by truck/trailer, forklift, by rampEA1$ - 0
99Commodity1B2DISCHARGE RAIL45aMILVAN-CONTAINER 20' - 40' (TEU configured) PACKED W/ NON-EXPLOSIVES | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))EA20$ - 0
100Commodity1B2DISCHARGE RAIL45bMILVAN-CONTAINER 20' - 40' (TEU configured) PACKED W/ NON-EXPLOSIVES | LO/LO - Ships Gear, Ships crane, or Mobile shore craneEA100$ - 0
101Commodity1B2DISCHARGE RAIL45cMILVAN-CONTAINER 20' - 40' (TEU configured ) PACKED W/ NON-EXPLOSIVES | RO/RO - Loaded /Discharged by truck/trailer, forklift, by rampEA1$ - 0
102Commodity1B2DISCHARGE RAIL60aMEDIUM VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA20$ - 0
103Commodity1B2DISCHARGE RAIL60bMEDIUM VEHICLES OR TRAILERS | LO/LO - Ships Gear, Ships craneEA20$ - 0
104Commodity1B2DISCHARGE RAIL60cMEDIUM VEHICLES | RO/RO - Vehicle rolling under Own Power , by rampEA20$ - 0
105Commodity1B2DISCHARGE RAIL60dMEDIUM TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA20$ - 0
106Commodity1B2DISCHARGE RAIL60eMEDIUM VEHICLES| TO/TO - Inoperable Vehicle TowedEA20$ - 0
107Commodity1B2DISCHARGE RAIL61aLIGHT VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA20$ - 0
108Commodity1B2DISCHARGE RAIL61bLIGHT VEHICLES OR TRAILERS | LO/LO - Ships Gear, Ships craneEA20$ - 0
109Commodity1B2DISCHARGE RAIL61cLIGHT VEHICLES | RO/RO - Vehicle rolling under Own Power , by rampEA20$ - 0
110Commodity1B2DISCHARGE RAIL61dLIGHT TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA20$ - 0
111Commodity1B2DISCHARGE RAIL61eLIGHT VEHICLES | TO/TO - Inoperable Vehicle TowedEA20$ - 0
112Commodity1B2DISCHARGE RAIL67aHEAVY VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA20$ - 0
113Commodity1B2DISCHARGE RAIL67bHEAVY VEHICLES OR TRAILERS | LO/LO - Ships Gear, Ships craneEA20$ - 0
114Commodity1B2DISCHARGE RAIL67cHEAVY VEHICLES | RO/RO - Vehicle rolling under Own Power by rampEA20$ - 0
115Commodity1B2DISCHARGE RAIL67dHEAVY TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA20$ - 0
116Commodity1B2DISCHARGE RAIL67eHEAVY VEHICLES | TO/TO - Inoperable Vehicle TowedEA20$ - 0
TOTAL 1B2 Discharge Railcars$ - 0
117Commodity1B3LOAD TRUCKS40aGENERAL CARGO NOT OTHERWISE SPECIFIED (NOS) | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))MTON25$ - 0
118Commodity1B3LOAD TRUCKS40bGENERAL CARGO NOT OTHERWISE SPECIFIED (NOS) | LO/LO - by lift with equipment other than described in 40aMTON25$ - 0
119Commodity1B3LOAD TRUCKS44aCONTAINERS LESS THAN TEU - SINGLE - Conex, Quadcons, Tricons, Bicons, W/ISO | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))EA20$ - 0
120Commodity1B3LOAD TRUCKS44bCONTAINERS LESS THAN TEU - SINGLE - Conex, Quadcons, Tricons, Bicons, W/ISO | LO/LO - Ships Gear, Ships craneEA20$ - 0
121Commodity1B3LOAD TRUCKS44cCONTAINERS LESS THAN TEU - SINGLE - Conex, Quadcons, Tricons, Bicons, W/ISO | RO/RO - Loaded /Discharged by truck/trailer, forklift, by rampEA1$ - 0
122Commodity1B3LOAD TRUCKS45aMILVAN-CONTAINER 20' - 40' (TEU configured) PACKED W/ NON-EXPLOSIVES | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))EA20$ - 0
123Commodity1B3LOAD TRUCKS45bMILVAN-CONTAINER 20' - 40' (TEU configured) PACKED W/ NON-EXPLOSIVES | LO/LO - Ships Gear, Ships crane, or Mobile shore craneEA100$ - 0
124Commodity1B3LOAD TRUCKS45cMILVAN-CONTAINER 20' - 40' (TEU configured ) PACKED W/ NON-EXPLOSIVES | RO/RO - Loaded /Discharged by truck/trailer, forklift, by rampEA1$ - 0
125Commodity1B3LOAD TRUCKS47HOUSEHOLD GOODS (Boxes, Crates)MTON1000$ - 0
126Commodity1B3LOAD TRUCKS60aMEDIUM VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA20$ - 0
127Commodity1B3LOAD TRUCKS60bMEDIUM VEHICLES OR TRAILERS | LO/LO - Ships Gear, Ships craneEA20$ - 0
128Commodity1B3LOAD TRUCKS60cMEDIUM VEHICLES | RO/RO - Vehicle rolling under Own Power , by rampEA20$ - 0
129Commodity1B3LOAD TRUCKS60dMEDIUM TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA20$ - 0
130Commodity1B3LOAD TRUCKS60eMEDIUM VEHICLES| TO/TO - Inoperable Vehicle TowedEA20$ - 0
131Commodity1B3LOAD TRUCKS61aLIGHT VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA20$ - 0
132Commodity1B3LOAD TRUCKS61bLIGHT VEHICLES OR TRAILERS | LO/LO - Ships Gear, Ships craneEA20$ - 0
133Commodity1B3LOAD TRUCKS61cLIGHT VEHICLES | RO/RO - Vehicle rolling under Own Power , by rampEA20$ - 0
134Commodity1B3LOAD TRUCKS61dLIGHT TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA20$ - 0
135Commodity1B3LOAD TRUCKS61eLIGHT VEHICLES | TO/TO - Inoperable Vehicle TowedEA20$ - 0
136Commodity1B3LOAD TRUCKS67aHEAVY VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA20$ - 0
137Commodity1B3LOAD TRUCKS67bHEAVY VEHICLES OR TRAILERS | LO/LO - Ships Gear, Ships craneEA20$ - 0
138Commodity1B3LOAD TRUCKS67cHEAVY VEHICLES | RO/RO - Vehicle rolling under Own Power by rampEA20$ - 0
139Commodity1B3LOAD TRUCKS67dHEAVY TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA20$ - 0
140Commodity1B3LOAD TRUCKS67eHEAVY VEHICLES | TO/TO - Inoperable Vehicle TowedEA20$ - 0
TOTAL 1B3 Loading Trucks$ - 0
141Commodity1B4DISCHARGE TRUCKS40aGENERAL CARGO NOT OTHERWISE SPECIFIED (NOS) | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))MTON25$ - 0
142Commodity1B4DISCHARGE TRUCKS40bGENERAL CARGO NOT OTHERWISE SPECIFIED (NOS) | LO/LO - by lift with equipment other than described in 40aMTON25$ - 0
143Commodity1B4DISCHARGE TRUCKS44aCONTAINERS LESS THAN TEU - SINGLE - Conex, Quadcons, Tricons, Bicons, W/ISO | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))EA20$ - 0
144Commodity1B4DISCHARGE TRUCKS44bCONTAINERS LESS THAN TEU - SINGLE - Conex, Quadcons, Tricons, Bicons, W/ISO | LO/LO - Ships Gear, Ships craneEA20$ - 0
145Commodity1B4DISCHARGE TRUCKS44cCONTAINERS LESS THAN TEU - SINGLE - Conex, Quadcons, Tricons, Bicons, W/ISO | RO/RO - Loaded /Discharged by truck/trailer, forklift, by rampEA1$ - 0
146Commodity1B4DISCHARGE TRUCKS45aMILVAN-CONTAINER 20' - 40' (TEU configured) PACKED W/ NON-EXPLOSIVES | LO/LO - Shore Crane (Fixed Port Gantry or Mobile Container Crane (i.e. Gottwald))EA20$ - 0
147Commodity1B4DISCHARGE TRUCKS45bMILVAN-CONTAINER 20' - 40' (TEU configured) PACKED W/ NON-EXPLOSIVES | LO/LO - Ships Gear, Ships crane, or Mobile shore craneEA100$ - 0
148Commodity1B4DISCHARGE TRUCKS45cMILVAN-CONTAINER 20' - 40' (TEU configured ) PACKED W/ NON-EXPLOSIVES | RO/RO - Loaded /Discharged by truck/trailer, forklift, by rampEA1$ - 0
149Commodity1B4DISCHARGE TRUCKS47HOUSEHOLD GOODS (Boxes, Crates)MTON1000$ - 0
150Commodity1B4DISCHARGE TRUCKS60aMEDIUM VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA20$ - 0
151Commodity1B4DISCHARGE TRUCKS60bMEDIUM VEHICLES OR TRAILERS | LO/LO - Ships Gear, Ships craneEA20$ - 0
152Commodity1B4DISCHARGE TRUCKS60cMEDIUM VEHICLES | RO/RO - Vehicle rolling under Own Power , by rampEA20$ - 0
153Commodity1B4DISCHARGE TRUCKS60dMEDIUM TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA20$ - 0
154Commodity1B4DISCHARGE TRUCKS60eMEDIUM VEHICLES| TO/TO - Inoperable Vehicle TowedEA20$ - 0
155Commodity1B4DISCHARGE TRUCKS61aLIGHT VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA20$ - 0
156Commodity1B4DISCHARGE TRUCKS61bLIGHT VEHICLES OR TRAILERS | LO/LO - Ships Gear, Ships craneEA20$ - 0
157Commodity1B4DISCHARGE TRUCKS61cLIGHT VEHICLES | RO/RO - Vehicle rolling under Own Power , by rampEA20$ - 0
158Commodity1B4DISCHARGE TRUCKS61dLIGHT TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA20$ - 0
159Commodity1B4DISCHARGE TRUCKS61eLIGHT VEHICLES | TO/TO - Inoperable Vehicle TowedEA20$ - 0
160Commodity1B4DISCHARGE TRUCKS67aHEAVY VEHICLES OR TRAILERS | LO/LO - Shore Crane (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))EA20$ - 0
161Commodity1B4DISCHARGE TRUCKS67bHEAVY VEHICLES OR TRAILERS | LO/LO - Ships Gear, Ships craneEA20$ - 0
162Commodity1B4DISCHARGE TRUCKS67cHEAVY VEHICLES | RO/RO - Vehicle rolling under Own Power by rampEA20$ - 0
163Commodity1B4DISCHARGE TRUCKS67dHEAVY TRAILERS | TO/TO - Towed by Contractor Equipment or (connect/disconnected) trailer and prime moverEA20$ - 0
164Commodity1B4DISCHARGE TRUCKS67eHEAVY VEHICLES | TO/TO - Inoperable Vehicle TowedEA20$ - 0
TOTAL 1B4 Discharge Trucks$ - 0
165Commodity1CRECEPTION CONVOYS ONLY40GENERAL CARGO NOT OTHERWISE SPECIFIED (NOS) (Breakbulk)MTON100$ - 0
166Commodity1CRECEPTION CONVOYS ONLY44CONTAINERS OTHER THAN TEU - SINGLE - W/ISO - Quadcons, Tricons, BiconsEA25$ - 0
167Commodity1CRECEPTION CONVOYS ONLY45MILVAN-CONTAINERS 20'/40' PACKED W/ NON-EXPLOSIVES - ISO (TEU configured) Conex, Quadcons, Tricons, Bicons ))EA50$ - 0
168Commodity1CRECEPTION CONVOYS ONLY47HOUSEHOLD GOODS (Boxes, Crates)MTON250$ - 0
169Commodity1CRECEPTION CONVOYS ONLY60MEDIUM VEHICLES OR TRAILERSEA25$ - 0
170Commodity1CRECEPTION CONVOYS ONLY61LIGHT VEHICLES OR TRAILERSEA25$ - 0
171Commodity1CRECEPTION CONVOYS ONLY67HEAVY VEHICLES OR TRAILERSEA25$ - 0
TOTAL 1C Reception Only$ - 0
172Commodity1DDISPOSITION CONVOYS ONLY40GENERAL CARGO NOT OTHERWISE SPECIFIED (NOS) (Breakbulk)MTON100$ - 0
173Commodity1DDISPOSITION CONVOYS ONLY44CONTAINERS OTHER THAN TEU - SINGLE - W/ISO - Quadcons, Tricons, BiconsEA25$ - 0
174Commodity1DDISPOSITION CONVOYS ONLY45MILVAN-CONTAINERS 20'/40' PACKED W/ NON-EXPLOSIVES - ISO (TEU configured) Conex, Quadcons, Tricons, Bicons ))EA50$ - 0
175Commodity1DDISPOSITION CONVOYS ONLY47HOUSEHOLD GOODS (Boxes, Crates)MTON250$ - 0
176Commodity1DDISPOSITION CONVOYS ONLY60MEDIUM VEHICLES OR TRAILERSEA25$ - 0
177Commodity1DDISPOSITION CONVOYS ONLY61LIGHT VEHICLES OR TRAILERSEA25$ - 0
178Commodity1DDISPOSITION CONVOYS ONLY67HEAVY VEHICLES OR TRAILERSEA25$ - 0
TOTAL 1D Disposition ONLY$ - 0
179Commodity1ESTUFFING/UNSTUFFING40GENERAL CARGO NOT OTHERWISE SPECIFIED (NOS) (Breakbulk)MTON100$ - 0
180Commodity1ESTUFFING/UNSTUFFING44CONTAINERS OTHER THAN TEU - SINGLE - W/ISO - Quadcons, Tricons, BiconsEA25$ - 0
181Commodity1ESTUFFING/UNSTUFFING45MILVAN-CONTAINERS 20'/40' PACKED W/ NON-EXPLOSIVES - ISO (TEU configured) Conex, Quadcons, Tricons, Bicons ))EA50$ - 0
182Commodity1ESTUFFING/UNSTUFFING47HOUSEHOLD GOODS (Boxes, Crates)MTON250$ - 0
TOTAL 1E Stuffing-Unstuffing$ - 0
186Manhours2EXTRA LABOR (XL)Day[ Straight Time ] - GENERAL LABOR: LONGSHOREMAN | LASHER | LINE HANDLERSHR100$ - 0
187Manhours2EXTRA LABOR (XL)Day[ Straight Time ] - SKILLED LABOR (OPERATORS): FORKLIFT | HEAD DRIVERHR100$ - 0
188Manhours2EXTRA LABOR (XL)Day[ Straight Time ] - SKILLED LABOR (OPERATORS): CRANEMANHR50$ - 0
189Manhours2EXTRA LABOR (XL)Day[ Straight Time ] - FOREMAN: SHIP FOREMAN| DOCK FOREMAN| CARPENTER FOREMANHR25$ - 0
191Manhours2EXTRA LABOR (XL)Day[ Straight Time ] - WALKING BOSSHR25$ - 0
192Manhours2EXTRA LABOR (XL)Day[ Straight Time ] - CLERK | CHECKERHR100$ - 0
193Manhours2EXTRA LABOR (XL)Day[ Straight Time ] - HEAD CHECKER | CHIEF CLERK | TIMEKEEPERHR25$ - 0
194Manhours2EXTRA LABOR (XL)Day[ Straight Time ] - CARPENTERHR25$ - 0
195Manhours2EXTRA LABOR (XL)Day[ Straight Time ] - MECHANIC | DRIVER | GEARMANHR50$ - 0
196Manhours2EXTRA LABOR (XL)Second[ Straight Time ] - GENERAL LABOR: LONGSHOREMAN | LASHER | LINE HANDLERSHR100$ - 0
197Manhours2EXTRA LABOR (XL)Second[ Straight Time ] - SKILLED LABOR (OPERATORS): FORKLIFT | HEAD DRIVERHR100$ - 0
198Manhours2EXTRA LABOR (XL)Second[ Straight Time ] - SKILLED LABOR (OPERATORS): CRANEMANHR50$ - 0
199Manhours2EXTRA LABOR (XL)Second[ Straight Time ] - FOREMAN: SHIP FOREMAN| DOCK FOREMAN| CARPENTER FOREMANHR25$ - 0
201Manhours2EXTRA LABOR (XL)Second[ Straight Time ] - WALKING BOSSHR25$ - 0
202Manhours2EXTRA LABOR (XL)Second[ Straight Time ] - CLERK | CHECKERHR100$ - 0
203Manhours2EXTRA LABOR (XL)Second[ Straight Time ] - HEAD CHECKER | CHIEF CLERK | TIMEKEEPERHR25$ - 0
204Manhours2EXTRA LABOR (XL)Second[ Straight Time ] - CARPENTERHR25$ - 0
205Manhours2EXTRA LABOR (XL)Second[ Straight Time ] - MECHANIC | DRIVER | GEARMANHR50$ - 0
206Manhours2EXTRA LABOR (XL)Third[ Straight Time ] - GENERAL LABOR: LONGSHOREMAN | LASHER | LINE HANDLERSHR100$ - 0
207Manhours2EXTRA LABOR (XL)Third[ Straight Time ] - SKILLED LABOR (OPERATORS): FORKLIFT | HEAD DRIVERHR100$ - 0
208Manhours2EXTRA LABOR (XL)Third[ Straight Time ] - SKILLED LABOR (OPERATORS): CRANEMANHR50$ - 0
209Manhours2EXTRA LABOR (XL)Third[ Straight Time ] - FOREMAN: SHIP FOREMAN| DOCK FOREMAN| CARPENTER FOREMANHR25$ - 0
211Manhours2EXTRA LABOR (XL)Third[ Straight Time ] - WALKING BOSSHR25$ - 0
212Manhours2EXTRA LABOR (XL)Third[ Straight Time ] - CLERK | CHECKERHR100$ - 0
213Manhours2EXTRA LABOR (XL)Third[ Straight Time ] - HEAD CHECKER | CHIEF CLERK | TIMEKEEPERHR25$ - 0
214Manhours2EXTRA LABOR (XL)Third[ Straight Time ] - CARPENTERHR25$ - 0
215Manhours2EXTRA LABOR (XL)Third[ Straight Time ] - MECHANIC | DRIVER | GEARMANHR50$ - 0
TOTAL 2 Extra Labor (XL)$ - 0
216Manhours3ADETENTIONDay[ Straight Time ] - GENERAL LABOR: LONGSHOREMAN | LASHER | LINE HANDLERSHR100$ - 0
217Manhours3ADETENTIONDay[ Straight Time ] - SKILLED LABOR (OPERATORS): FORKLIFT | HEAD DRIVERHR100$ - 0
218Manhours3ADETENTIONDay[ Straight Time ] - SKILLED LABOR (OPERATORS): CRANEMANHR50$ - 0
219Manhours3ADETENTIONDay[ Straight Time ] - FOREMAN: SHIP FOREMAN| DOCK FOREMAN| CARPENTER FOREMANHR25$ - 0
221Manhours3ADETENTIONDay[ Straight Time ] - WALKING BOSSHR25$ - 0
222Manhours3ADETENTIONDay[ Straight Time ] - CLERK | CHECKERHR100$ - 0
223Manhours3ADETENTIONDay[ Straight Time ] - HEAD CHECKER | CHIEF CLERK | TIMEKEEPERHR25$ - 0
224Manhours3ADETENTIONDay[ Straight Time ] - CARPENTERHR25$ - 0
225Manhours3ADETENTIONDay[ Straight Time ] - MECHANIC | DRIVER | GEARMANHR50$ - 0
226Manhours3ADETENTIONSecond[ Straight Time ] - GENERAL LABOR: LONGSHOREMAN | LASHER | LINE HANDLERSHR100$ - 0
227Manhours3ADETENTIONSecond[ Straight Time ] - SKILLED LABOR (OPERATORS): FORKLIFT | HEAD DRIVERHR100$ - 0
228Manhours3ADETENTIONSecond[ Straight Time ] - SKILLED LABOR (OPERATORS): CRANEMANHR50$ - 0
229Manhours3ADETENTIONSecond[ Straight Time ] - FOREMAN: SHIP FOREMAN| DOCK FOREMAN| CARPENTER FOREMANHR25$ - 0
231Manhours3ADETENTIONSecond[ Straight Time ] - WALKING BOSSHR25$ - 0
232Manhours3ADETENTIONSecond[ Straight Time ] - CLERK | CHECKERHR100$ - 0
233Manhours3ADETENTIONSecond[ Straight Time ] - HEAD CHECKER | CHIEF CLERK | TIMEKEEPERHR25$ - 0
234Manhours3ADETENTIONSecond[ Straight Time ] - CARPENTERHR25$ - 0
235Manhours3ADETENTIONSecond[ Straight Time ] - MECHANIC | DRIVER | GEARMANHR50$ - 0
236Manhours3ADETENTIONThird[ Straight Time ] - GENERAL LABOR: LONGSHOREMAN | LASHER | LINE HANDLERSHR100$ - 0
237Manhours3ADETENTIONThird[ Straight Time ] - SKILLED LABOR (OPERATORS): FORKLIFT | HEAD DRIVERHR100$ - 0
238Manhours3ADETENTIONThird[ Straight Time ] - SKILLED LABOR (OPERATORS): CRANEMANHR50$ - 0
239Manhours3ADETENTIONThird[ Straight Time ] - FOREMAN: SHIP FOREMAN| DOCK FOREMAN| CARPENTER FOREMANHR25$ - 0
241Manhours3ADETENTIONThird[ Straight Time ] - WALKING BOSSHR25$ - 0
242Manhours3ADETENTIONThird[ Straight Time ] - CLERK | CHECKERHR100$ - 0
243Manhours3ADETENTIONThird[ Straight Time ] - HEAD CHECKER | CHIEF CLERK | TIMEKEEPERHR25$ - 0
244Manhours3ADETENTIONThird[ Straight Time ] - CARPENTERHR25$ - 0
245Manhours3ADETENTIONThird[ Straight Time ] - MECHANIC | DRIVER | GEARMANHR50$ - 0
TOTAL 3A Detention$ - 0
246Manhours3BOVERTIME DIFFERENTIALSDay[ Regular OT ] - GENERAL LABOR: LONGSHOREMAN | LASHER | LINE HANDLERSHR100$ - 0
147Manhours3BOVERTIME DIFFERENTIALSDay[ Regular OT ] - SKILLED LABOR (OPERATORS): FORKLIFT | HEAD DRIVERHR50$ - 0
148Manhours3BOVERTIME DIFFERENTIALSDay[ Regular OT ] - SKILLED LABOR (OPERATORS): CRANEMANHR25$ - 0
149Manhours3BOVERTIME DIFFERENTIALSDay[ Regular OT ] - FOREMAN: SHIP FOREMAN| DOCK FOREMAN| CARPENTER FOREMANHR25$ - 0
151Manhours3BOVERTIME DIFFERENTIALSDay[ Regular OT ] - WALKING BOSSHR100$ - 0
152Manhours3BOVERTIME DIFFERENTIALSDay[ Regular OT ] - CLERK | CHECKERHR25$ - 0
153Manhours3BOVERTIME DIFFERENTIALSDay[ Regular OT ] - HEAD CHECKER | CHIEF CLERK | TIMEKEEPERHR25$ - 0
154Manhours3BOVERTIME DIFFERENTIALSDay[ Regular OT ] - CARPENTERHR50$ - 0
155Manhours3BOVERTIME DIFFERENTIALSDay[ Regular OT ] - MECHANIC | DRIVER | GEARMANHR50$ - 0
156Manhours3BOVERTIME DIFFERENTIALSSecond[ Regular OT ] - GENERAL LABOR: LONGSHOREMAN | LASHER | LINE HANDLERSHR100$ - 0
157Manhours3BOVERTIME DIFFERENTIALSSecond[ Regular OT ] - SKILLED LABOR (OPERATORS): FORKLIFT | HEAD DRIVERHR50$ - 0
158Manhours3BOVERTIME DIFFERENTIALSSecond[ Regular OT ] - SKILLED LABOR (OPERATORS): CRANEMANHR25$ - 0
159Manhours3BOVERTIME DIFFERENTIALSSecond[ Regular OT ] - FOREMAN: SHIP FOREMAN| DOCK FOREMAN| CARPENTER FOREMANHR25$ - 0
161Manhours3BOVERTIME DIFFERENTIALSSecond[ Regular OT ] - WALKING BOSSHR100$ - 0
162Manhours3BOVERTIME DIFFERENTIALSSecond[ Regular OT ] - CLERK | CHECKERHR25$ - 0
163Manhours3BOVERTIME DIFFERENTIALSSecond[ Regular OT ] - HEAD CHECKER | CHIEF CLERK | TIMEKEEPERHR25$ - 0
164Manhours3BOVERTIME DIFFERENTIALSSecond[ Regular OT ] - CARPENTERHR50$ - 0
165Manhours3BOVERTIME DIFFERENTIALSSecond[ Regular OT ] - MECHANIC | DRIVER | GEARMANHR50$ - 0
166Manhours3BOVERTIME DIFFERENTIALSThird[ Regular OT ] - GENERAL LABOR: LONGSHOREMAN | LASHER | LINE HANDLERSHR100$ - 0
167Manhours3BOVERTIME DIFFERENTIALSThird[ Regular OT ] - SKILLED LABOR (OPERATORS): FORKLIFT | HEAD DRIVERHR50$ - 0
168Manhours3BOVERTIME DIFFERENTIALSThird[ Regular OT ] - SKILLED LABOR (OPERATORS): CRANEMANHR25$ - 0
169Manhours3BOVERTIME DIFFERENTIALSThird[ Regular OT ] - FOREMAN: SHIP FOREMAN| DOCK FOREMAN| CARPENTER FOREMANHR25$ - 0
171Manhours3BOVERTIME DIFFERENTIALSThird[ Regular OT ] - WALKING BOSSHR100$ - 0
172Manhours3BOVERTIME DIFFERENTIALSThird[ Regular OT ] - CLERK | CHECKERHR25$ - 0
173Manhours3BOVERTIME DIFFERENTIALSThird[ Regular OT ] - HEAD CHECKER | CHIEF CLERK | TIMEKEEPERHR25$ - 0
174Manhours3BOVERTIME DIFFERENTIALSThird[ Regular OT ] - CARPENTERHR50$ - 0
175Manhours3BOVERTIME DIFFERENTIALSThird[ Regular OT ] - MECHANIC | DRIVER | GEARMANHR50$ - 0
176Manhours3BOVERTIME DIFFERENTIALSDay[ OT Diff during meal hours ] - GENERAL LABOR: LONGSHOREMAN | LASHER | LINE HANDLERSHR100$ - 0
177Manhours3BOVERTIME DIFFERENTIALSDay[ OT Diff during meal hours ] - SKILLED LABOR (OPERATORS): FORKLIFT | HEAD DRIVERHR50$ - 0
178Manhours3BOVERTIME DIFFERENTIALSDay[ OT Diff during meal hours ] - SKILLED LABOR (OPERATORS): CRANEMANHR25$ - 0
179Manhours3BOVERTIME DIFFERENTIALSDay[ OT Diff during meal hours ] - FOREMAN: SHIP FOREMAN| DOCK FOREMAN| CARPENTER FOREMANHR25$ - 0
181Manhours3BOVERTIME DIFFERENTIALSDay[ OT Diff during meal hours ] - WALKING BOSSHR100$ - 0
182Manhours3BOVERTIME DIFFERENTIALSDay[ OT Diff during meal hours ] - CLERK | CHECKERHR25$ - 0
183Manhours3BOVERTIME DIFFERENTIALSDay[ OT Diff during meal hours ] - HEAD CHECKER | CHIEF CLERK | TIMEKEEPERHR25$ - 0
184Manhours3BOVERTIME DIFFERENTIALSDay[ OT Diff during meal hours ] - CARPENTERHR50$ - 0
185Manhours3BOVERTIME DIFFERENTIALSDay[ OT Diff during meal hours ] - MECHANIC | DRIVER | GEARMANHR50$ - 0
186Manhours3BOVERTIME DIFFERENTIALSSecond[ OT Diff during meal hours ] - GENERAL LABOR: LONGSHOREMAN | LASHER | LINE HANDLERSHR100$ - 0
187Manhours3BOVERTIME DIFFERENTIALSSecond[ OT Diff during meal hours ] - SKILLED LABOR (OPERATORS): FORKLIFT | HEAD DRIVERHR50$ - 0
188Manhours3BOVERTIME DIFFERENTIALSSecond[ OT Diff during meal hours ] - SKILLED LABOR (OPERATORS): CRANEMANHR25$ - 0
189Manhours3BOVERTIME DIFFERENTIALSSecond[ OT Diff during meal hours ] - FOREMAN: SHIP FOREMAN| DOCK FOREMAN| CARPENTER FOREMANHR25$ - 0
191Manhours3BOVERTIME DIFFERENTIALSSecond[ OT Diff during meal hours ] - WALKING BOSSHR100$ - 0
192Manhours3BOVERTIME DIFFERENTIALSSecond[ OT Diff during meal hours ] - CLERK | CHECKERHR25$ - 0
193Manhours3BOVERTIME DIFFERENTIALSSecond[ OT Diff during meal hours ] - HEAD CHECKER | CHIEF CLERK | TIMEKEEPERHR25$ - 0
194Manhours3BOVERTIME DIFFERENTIALSSecond[ OT Diff during meal hours ] - CARPENTERHR50$ - 0
195Manhours3BOVERTIME DIFFERENTIALSSecond[ OT Diff during meal hours ] - MECHANIC | DRIVER | GEARMANHR50$ - 0
196Manhours3BOVERTIME DIFFERENTIALSThird[ OT Diff during meal hours ] - GENERAL LABOR: LONGSHOREMAN | LASHER | LINE HANDLERSHR100$ - 0
197Manhours3BOVERTIME DIFFERENTIALSThird[ OT Diff during meal hours ] - SKILLED LABOR (OPERATORS): FORKLIFT | HEAD DRIVERHR50$ - 0
198Manhours3BOVERTIME DIFFERENTIALSThird[ OT Diff during meal hours ] - SKILLED LABOR (OPERATORS): CRANEMANHR25$ - 0
199Manhours3BOVERTIME DIFFERENTIALSThird[ OT Diff during meal hours ] - FOREMAN: SHIP FOREMAN| DOCK FOREMAN| CARPENTER FOREMANHR25$ - 0
201Manhours3BOVERTIME DIFFERENTIALSThird[ OT Diff during meal hours ] - WALKING BOSSHR100$ - 0
202Manhours3BOVERTIME DIFFERENTIALSThird[ OT Diff during meal hours ] - CLERK | CHECKERHR25$ - 0
203Manhours3BOVERTIME DIFFERENTIALSThird[ OT Diff during meal hours ] - HEAD CHECKER | CHIEF CLERK | TIMEKEEPERHR25$ - 0
204Manhours3BOVERTIME DIFFERENTIALSThird[ OT Diff during meal hours ] - CARPENTERHR50$ - 0
205Manhours3BOVERTIME DIFFERENTIALSThird[ OT Diff during meal hours ] - MECHANIC | DRIVER | GEARMANHR50$ - 0
TOTAL 3B Overtime Differentials$ - 0
206Manhours3CGUARANTEED TIMEDay[ Straight Time ] - GENERAL LABOR: LONGSHOREMAN | LASHER | LINE HANDLERSHR100$ - 0
207Manhours3CGUARANTEED TIMEDay[ Straight Time ] - SKILLED LABOR (OPERATORS): FORKLIFT | HEAD DRIVERHR100$ - 0
208Manhours3CGUARANTEED TIMEDay[ Straight Time ] - SKILLED LABOR (OPERATORS): CRANEMANHR50$ - 0
209Manhours3CGUARANTEED TIMEDay[ Straight Time ] - FOREMAN: SHIP FOREMAN| DOCK FOREMAN| CARPENTER FOREMANHR25$ - 0
211Manhours3CGUARANTEED TIMEDay[ Straight Time ] - WALKING BOSSHR25$ - 0
212Manhours3CGUARANTEED TIMEDay[ Straight Time ] - CLERK | CHECKERHR100$ - 0
213Manhours3CGUARANTEED TIMEDay[ Straight Time ] - HEAD CHECKER | CHIEF CLERK | TIMEKEEPERHR25$ - 0
214Manhours3CGUARANTEED TIMEDay[ Straight Time ] - CARPENTERHR25$ - 0
215Manhours3CGUARANTEED TIMEDay[ Straight Time ] - MECHANIC | DRIVER | GEARMANHR50$ - 0
216Manhours3CGUARANTEED TIMESecond[ Straight Time ] - GENERAL LABOR: LONGSHOREMAN | LASHER | LINE HANDLERSHR100$ - 0
217Manhours3CGUARANTEED TIMESecond[ Straight Time ] - SKILLED LABOR (OPERATORS): FORKLIFT | HEAD DRIVERHR100$ - 0
218Manhours3CGUARANTEED TIMESecond[ Straight Time ] - SKILLED LABOR (OPERATORS): CRANEMANHR50$ - 0
219Manhours3CGUARANTEED TIMESecond[ Straight Time ] - FOREMAN: SHIP FOREMAN| DOCK FOREMAN| CARPENTER FOREMANHR25$ - 0
221Manhours3CGUARANTEED TIMESecond[ Straight Time ] - WALKING BOSSHR25$ - 0
222Manhours3CGUARANTEED TIMESecond[ Straight Time ] - CLERK | CHECKERHR100$ - 0
223Manhours3CGUARANTEED TIMESecond[ Straight Time ] - HEAD CHECKER | CHIEF CLERK | TIMEKEEPERHR25$ - 0
224Manhours3CGUARANTEED TIMESecond[ Straight Time ] - CARPENTERHR25$ - 0
225Manhours3CGUARANTEED TIMESecond[ Straight Time ] - MECHANIC | DRIVER | GEARMANHR50$ - 0
226Manhours3CGUARANTEED TIMEThird[ Straight Time ] - GENERAL LABOR: LONGSHOREMAN | LASHER | LINE HANDLERSHR100$ - 0
227Manhours3CGUARANTEED TIMEThird[ Straight Time ] - SKILLED LABOR (OPERATORS): FORKLIFT | HEAD DRIVERHR100$ - 0
228Manhours3CGUARANTEED TIMEThird[ Straight Time ] - SKILLED LABOR (OPERATORS): CRANEMANHR50$ - 0
229Manhours3CGUARANTEED TIMEThird[ Straight Time ] - FOREMAN: SHIP FOREMAN| DOCK FOREMAN| CARPENTER FOREMANHR25$ - 0
231Manhours3CGUARANTEED TIMEThird[ Straight Time ] - WALKING BOSSHR25$ - 0
232Manhours3CGUARANTEED TIMEThird[ Straight Time ] - CLERK | CHECKERHR100$ - 0
233Manhours3CGUARANTEED TIMEThird[ Straight Time ] - HEAD CHECKER | CHIEF CLERK | TIMEKEEPERHR25$ - 0
234Manhours3CGUARANTEED TIMEThird[ Straight Time ] - CARPENTERHR25$ - 0
235Manhours3CGUARANTEED TIMEThird[ Straight Time ] - MECHANIC | DRIVER | GEARMANHR50$ - 0
TOTAL 3C Guaranteed Time$ - 0
Line ItemCategoryScheduleCommodityDescriptionUnit of DurationEstimated DurationUnit of MeasureUnit PriceUnit QuantityExtended Price
236Manhours4EQUIPMENT RENTAL (EQR)FORKLIFT, 3 LT CAPACITYHR50EA2$ - 0
237Manhours4EQUIPMENT RENTAL (EQR)FORKLIFT, 3.01 LT - 7 LT CAPACITYHR50EA2$ - 0
238Manhours4EQUIPMENT RENTAL (EQR)FORKLIFT, 7.01 LT - 10 LT CAPACITYHR50EA2$ - 0
239Manhours4EQUIPMENT RENTAL (EQR)FORKLIFT, 10.01 LT - 15 LT CAPACITYHR50EA2$ - 0
240Manhours4EQUIPMENT RENTAL (EQR)FORKLIFT, 15.01 LT - 25 LT CAPACITYHR50EA2$ - 0
241Manhours4EQUIPMENT RENTAL (EQR)CONTAINER HANDLER / TOP LIFT, 80,000 LB LIFTING CAPACITYHR50EA2$ - 0
242Manhours4EQUIPMENT RENTAL (EQR)YARD TRACTOR (HUSTLER, YARD DOG)HR50EA2$ - 0
243Manhours4EQUIPMENT RENTAL (EQR)20 FOOT CONTAINER CHASSISHR50EA2$ - 0
244Manhours4EQUIPMENT RENTAL (EQR)40 FOOT CONTAINER CHASSISHR50EA2$ - 0
245Manhours4EQUIPMENT RENTAL (EQR)20 or 40 FOOT FLAT BED TRAILERS | MAFIs or MAFIs WITH PROBEHR50EA2$ - 0
246Manhours4EQUIPMENT RENTAL (EQR)HEAVY DUTY MEDIUM TUG or TRACTORHR50EA2$ - 0
247Manhours4EQUIPMENT RENTAL (EQR)HEAVY DUTY LARGE TUG or TRACTORHR50EA2$ - 0
248Manhours4EQUIPMENT RENTAL (EQR)MOBILE CRANE, 100 LT CAPACITYDY10EA1$ - 0
249Manhours4EQUIPMENT RENTAL (EQR)MOBILE CRANE, 160 LT - CAPACITYDY10EA1$ - 0
250Manhours4EQUIPMENT RENTAL (EQR)MOBILE CRANE, 250 LT - CAPACITYDY10EA1$ - 0
251Manhours4EQUIPMENT RENTAL (EQR)GENERATOR, 60 KILOWATTDY10EA10$ - 0
252Manhours4EQUIPMENT RENTAL (EQR)PREASURE WASHER 2500 PSI, WITH ATTACHMENTS (see pwas for more information)DY10EA3$ - 0
253Manhours4EQUIPMENT RENTAL (EQR)MOBILE FLOOD LIGHT SETS, 1000 WATTS, MULIPLE LIGHT HEADSWK4EA10$ - 0
254Manhours4EQUIPMENT RENTAL (EQR)MOTORIZED BROOM SWEEPER TRUCKDY5EA1$ - 0
TOTAL 4 Equipment Rental$ - 0
255Miscellaneous5STORAGE40GENERAL CARGO NOT OTHERWISE SPECIFIED (NOS)DY1EA10$ - 0
256Miscellaneous5STORAGE44LESS THAN TEU CONTAINERS, QUADCONS, TRICONS, BICONSDY1EA10$ - 0
257Miscellaneous5STORAGE45MILVAN CONTAINER PACKED W/ NON-EXPLOSIVESDY1EA10$ - 0
258Miscellaneous5STORAGE60LIGHT VEHICLESDY1EA10$ - 0
259Miscellaneous5STORAGE61MEDIUM VEHICLESDY1EA10$ - 0
260Miscellaneous5STORAGE67HEAVY VEHICLESDY1EA10$ - 0
TOTAL 5 Stotage$ - 0
261Miscellaneous6PORT FACILITIESTEMPORARY OFFICE SPACE | INCLUDES ELECTRICAL, GENERATOR, HOOKUPS, INTERNET, ENVRIOMENTAL, SETUP/REMOVAL, DAILY CLEANINGMTH1EA30$ - 0

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .