Atch 4_Setup Instructions.pdf

PDF 8 MB Posted

Attached to
AFNWC Recruitment Exhibit Displays Support Federal contract opportunity
Solicitation number
FA942226Q0001
Issued by
Department of the Air Force Materiel Command

About this file

This document is a comprehensive setup and assembly instruction manual for a 20' x 20' island exhibit display system used at federal contract trade shows and exhibitions. The exhibit is a modular, reconfigurable structure designed for maximum visual impact and functionality in showcasing federal contracting opportunities and agency capabilities.

The exhibit comprises multiple integrated components: a central tower structure (approximately 76" wide x 20" deep x 4" high canopy) featuring SEG graphic displays and puck lighting; two kiosk assemblies (95" height) with internal lightbox transformers and Supernova LED lighting capable of accommodating up to 12 lights per 144W transformer; two MOD-1454 charging tables featuring RGB LED lighting with wireless charger capabilities and remote control functionality; and a MOD-1721 counter assembly (approximately 40" height) with adjustable shelving, LED edge lighting, wireless chargers, and hinged storage doors. The system utilizes primarily CEI152 and CEI110 aluminum extrusion profiles connected via straight and corner connectors, with Z45 and S44 extrusions for specialized structural elements. All graphics employ SEG (Silicone Edge Graphic) technology for seamless, professional appearance. Power distribution requires careful management across multiple circuits: 5 AMP circuits for LED lights and wireless chargers; 10 AMP circuits for lightbox pairs; and 15 AMP circuits for puck lights and monitors. Assembly requires approximately 11 sequential steps, with emphasis on proper torque of all mechanical connections, adherence to safety protocols (no power tools permitted), and potential need for ladders or lifts during setup. Disassembly and repacking procedures mandate retention of all packing materials and tightening of set screws to prevent component loss during transport and storage.

View the file

Other files for this federal contract opportunity

Other files attached to AFNWC Recruitment Exhibit Displays Support, newest first.
File Type Posted
Atch 1_PWS.pdf PDF
Atch 2_CLIN Structure.pdf PDF
Request for Quotation FA942226A0001.pdf PDF
Atch 3_Clauses and Provisions.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

20’ x 20’ Island Exhibit

20’

20’

Plan View

SETUP INSTRUCTIONS

Plan View

10 AMP

- (2) Lightboxes

= 1 sq foot

= Power Requirement

5 AMP

- LED Lights

- Wireless chargers

- (2) Lightboxes

15 AMP

- Puck lights

- Monitor

*Note: Monitor power requirements may vary with type of monitor used.

Monitor

5 AMP 15 AMP

5 AMP

General Information

General Setup Instructions

- Read entire setup instruction manual prior to unpacking parts and pieces.

- The setup instructions are created specifically for this configuration.

WARNING

DO NOT USE POWER TOOLS

- Setup instructions are laid out sequentially in steps, including exploded views with detailed explanation for assembly.

Cleaning & Packing

- For Cleaning Metal, Plex, & Laminate Parts:

Use a MILD NON-ABRASIVE cleanser and soft cloth/paper towel to clean all surfaces.

Hex Tool - Essential for Assembly

Part Identification - Numbering

LADDERS OR LIFTS

MAY BE REQUIRED

ALL CONNECTIONS MUST

BE TIGHTLY SECURED

- Keep exhibit components away from heat and prolonged sun exposure.

Heat and UV exposure will warp and fade components.

- Retain all provided Packing Materials.

All provided packing materials are for ease of repacking & component protection.

Disassembly

- For loss prevention, tighten all set screws and locks during disassembly.

Spline Connection Base Plate & Extrusion Connection

Extrusion & Lock Connection Engaged Lock

Controlling the RGB LED lights Static Mode:

1. Use the Color Ring key to select a color.

2. Saturation is controlled with W/R/G/B keys.

3. White mode is available by long-pressing ‘ON’ key.

4. Colors (not white) are dimmable with the

Brightness key.

Dynamic Mode:

Press "M" key to cycle through the following options:

1. White light fades in and out.

2. Several colors fade in and out.

3. R,G,B three colors fade in and out.

4. R,G,B three colors flash.

5. Six colors flash.

6. Random color flashes.

7. Red color fades in and flashes.

8. Green color fades in and flashes.

9. Blue color fades in and flashes.

ON OFF

S- M S+

W R G B

To Pair a Remote with Multiple Units:

1. Power on the lights.

2. Press ‘ON’ key within 3 seconds.

3. Lights will blink when link is made.

To unpair: Long press ‘ON’ key within 3 seconds after switching on lights.

Receiver:

Specifications:

Remote Control:

Remotes can be paired with one or more receivers.

Different receivers can work synchronously even when started at different times (within 30 min).

1. Working voltage: DC12V/24V 1. Working voltage: 3V

2. Output: Max. 6A/Channel

Total output Max. 10A

3. Max standby power: 0.5W

2. Standby power: <20uA

3. Transmitting power: 6dBm

7A

Connectors Connectors

CEI152 Frame Assembly

Straight Connection When assembling frame, first attach all straight connectors, then attach corner connectors.

1) Place extrusions end-to-end.

2) Loosen all knobs, then slide straight connectors across the seam of extrusions.

3) Tighten all knobs to secure connection.

1) Loosen all knobs.

2) Slide connectors off of one extrusion.

3) Tighten knobs to prevent loss during packing & shipping.

Keep straight connectors in groove of extrusion. Do not remove connectors during disassembly.

All knobs must be tightened securely to ensure a proper connection.

Upper Horizontal Extrusion

Corner Connection

1) Loosen knobs, then slide vertical extrusions onto corner connectors of lower horizontal extrusion.

2) Slide corner connectors of upper horizontal extrusion into grooves of vertical extrusions.

3) Tighten all knobs to secure connection.

1) Loosen knobs on vertical extrusions.

2) Slide the vertical extrusions off of corner connectors on lower and upper horizontal extrusions.

Corner

Slide verticals over lower connectors.

Then slide upper connectors into groove of verticals.

Tighten all knobs.

Adjust connectors if necessary to prevent gaps in connection.

CEI152 Profile

Lower Horizontal Extrusion

COMPLETED ASSEMBLY

All knobs must be tightened securely to ensure a proper connection.

Corner Connectors

Corner Connectors

Slide both connectors across seam of extrusions.

Straight Connector

CEI110 Frame Assembly

Straight Connection When assembling frame, first attach all straight connectors, then attach corner connectors.

1) Place extrusions end-to-end.

2) Loosen all knobs, then slide straight connectors across the seam of extrusions.

3) Tighten all knobs to secure connection.

1) Loosen all knobs.

2) Slide connectors off of one extrusion.

3) Tighten knobs to prevent loss during packing & shipping.

Keep straight connectors in groove of extrusion. Do not remove connectors during disassembly.

Upper Horizontal Extrusion

Corner Connection

1) Loosen knobs, then slide vertical extrusions onto corner connectors of lower horizontal extrusion.

2) Slide corner connectors of upper horizontal extrusion into grooves of vertical extrusions.

3) Tighten all knobs to secure connection.

1) Loosen knobs on vertical extrusions.

2) Slide the vertical extrusions off of corner connectors on lower and upper horizontal extrusions.

Slide verticals over lower connectors.

Then slide upper connectors into groove of verticals.

Lower Horizontal Extrusion

Adjust connectors if necessary to prevent gaps in connection.

COMPLETED ASSEMBLY

CEI110 Profile

Slide both connectors across seam of extrusions.

Connectors

Corner Connectors

Corner Connectors

Connectors

SEG Installation The Perfect Fit

SEG Graphic Installation in 3 Steps

STEP 1: Attach Corners STEP 2: Attach Middle STEP 3: Attach Sides

Insert narrow side of silicone welt into the channel at corner 1, with fabric to the outside.

Repeat for opposite corner 2, then corner 3, then corner 4.

Once corners are attached, press the middle of edge 1 into the channel. Then press middle of edge 2 into the channel on opposite side.

Repeat with edge 3 & 4.

Once the middle of sides are attached, fully press the silicone welt into the channel, between center and corner at location 1.

Repeat the process between center and corner at location 2.

Do the same for welt on opposite side, at locations 3 & 4. Then repeat for locations 5 & 6 and 7 & 8.

Once the welt is fully inserted on all sides, smooth out edges as needed for a perfect fit.

Install video:

1 3

4 2

Always insert graphic into each alternate corner, then into the sides of the frame. Otherwise the graphic will not fit into the frame correctly.

3 4

1 2

5 7

6 8

3 4

PRESS in.

DON’T slide or push along edge To remove the graphic from the frame, locate the fabric pull tab.

Gently pull on the tab to remove the graphic.

Graphics

Graphics

Misc Items

Graphics Setup Hardware

Setup Hardware

Setup Hardware Monitor Mount

Bracket Bracket

B

A

B

1 3 5

7,10 2 4 6 8,9

Setup Hardware Graphics

Crate Packing

Retain all packing materials.

DO NOT DISCARD.

Crate 1 of 2

33,34

29,30

16,16 22,23

21,21

25 27 24,26

28,32

28,32 24,26

27 25 29,30

33,34

22,23

Infills Infills

Infills Infills

12 13 12 13 16 17 16 14 15

14 15

19 20 19 20

MOD-1721

Counter

Misc. Items

Crate Packing

Retain all packing materials.

DO NOT DISCARD.

Crate 2 of 2

MOD-1454

Charging

Table

MOD-1454

Charging

Table

Tower Assembly

Item Qty. Description 1 1 72”h CEI152 Vertical Extrusion 2 1 72”h CEI152 Vertical Extrusion 3 1 72”h CEI152 Vertical Extrusion 4 1 72”h CEI152 Vertical Extrusion 5 1 72”w CEI152 Horizontal Extrusion 6 1 72”w CEI152 Horizontal Extrusion 7 1 68.353”w Z45 Horizontal Extrusion 8 1 69.281”h Z45 Vertical Extrusion 9 1 69.281”h Z45 Vertical Extrusion

10 1 69.281”h Z45 Vertical Extrusion 11 1 74”w x 25”d Large Base Plate

Assemble frame flat on ground.

eye bolt

Steps:

When assembled

8 9 3

Refer to the CEI152 Frame Assembly general information page.

1) Assemble verticals [1-2], [3-4] together using straight connectors.

2) Connect horizontals [5,6] between vertical assemblies [1/2], [3/4] using corner connectors.

3) Attach extrusions [7,8,9,10] to frame extrusions as shown.

4) Connect Base Plate [11] to lower horizontal [5] using bolts & wing nuts.

5) Attach eye bolts to verticals [2,4] where shown.

* 5 * * *

FRONT VIEW Step 1 of 11 groove of CEI-152 horizontal.

* Z45 Attachment Attach Z45 vertical to middle

Z45

FRONT VIEW

CEI-152

1. Place extrusions end-to-end. * CEI152 Straight Connection

2. Slide connectors across seam of extrusions.

3. Tighten all knobs to secure connection.

* CEI152 Corner Connection

1. Slide extrusion onto corner connectors.

2. Tighten all knobs to secure connection.

*Ceiling Bracket Attachment

Washer & Wing Nut

Ceiling Bracket

Bolt & Washer

Vertical Extrusion

Attach ceiling bracket to vertical extrusion using bolts, washers and wing nuts.

Tower Attachments

1) Attach Canopy Panel to upper horizontal [6] using bolts & wing nuts.

2) Connect power cords to Puck Lights. See Puck Light Connection detail.

3) Attach PR63 conduit to vertical extrusions for wire management.

See Cord Management detail.

4) Connect Custom Brackets to verticals [2,4].

See Ceiling Bracket Attachment detail.

FRONT VIEW Step 2 of 11

* Puck Light Connection to power

Transformer Puck Light

Connect transformer to puck lights in ceiling.

Cord Management

Cord pinch

Route cord through conduit.

Attach conduit by pinching the opening and inserting into the groove of extrusion.

Bracket

Bracket

A * *

C on du it

PR

A 1 76”w x 20”d x 4”h Canopy Panel -- 4 24” PR63 Conduit -- 2 Custom Ceiling Bracket

Tower Attachments (cont’d)

Item

Qty.

Description Large Monitor Mount 3” Standoff Barrel

BACK VIEW

1) Apply SEG Graphic to back of frame assembly. Refer to the SEG Installation general information page.

2) Install Monitor Mount to verticals [8,9], facing back of the frame assembly. See Monitor Mount Attachment detail.

3) Apply SEG Graphic to front of frame assembly.

FRONT VIEW Step 3 of 11

Mount

* Monitor Mount Attachment Attach standoff barrels to Z45 verticals.

Connect Monitor Mount to standoff barrels using bolts.

3” Stand-Off Barrels

Monitor Mount

Bolts

Note: Monitor mounts install through SEG graphic.

Z4

Kiosk Assembly

12 2 95”h CEI152 Vertical Extrusion 13 2 95”h CEI152 Vertical Extrusion 14 2 39”w CEI152 Horizontal Extrusion 15 2 39”w CEI152 Horizontal Extrusion 16 2 94.252”h Z45 Vertical Extrusion 17 2 92”h CEI152 Vertical Extrusion 18 2 92”h CEI152 Vertical Extrusion 19 2 39”w CEI152 Horizontal Extrusion 20 2 39”w CEI152 Horizontal Extrusion 21 2 91.252”h Z45 Vertical Extrusion

15 Vertical [16] Attachment Attach Z45 vertical to front

Steps:

1) Assemble verticals [12,13] between horizontals [14,15]. See CEI152 Corner Connection detail.

2) Attach vertical [16] between horizontals [14,15].

3) Assemble verticals [17,18] between horizontals [19,20].

See CEI152 Corner Connection detail.

4) Attach vertical [21] between horizontals [19,20].

5) Connect power cords to Supernova lights as shown.

Repeat steps 1 through 5 for other kiosk assembly.

back frame

Qty. 2 front frame

* * groove of CEI152 horizontal. * Z45

FRONT VIEW

CEI-152

12 16 13 Vertical [21] Attachment

Attach Z45 vertical to back groove of CEI152 horizontal.

Z45

17 21 18

FRONT VIEW

CEI-152

wire

* mgmt.

back frame transformer

ELEVATION VIEW

front frame transformer back frame Assemble frames flat on ground.

Step 4 of 11

Light to Light Attachment Light to Transformer Attachment

Lights Male - Female

Power

Maximum of 7 lights per chain / 12 lights per Transformer

Transformer 144W / 6 Amp / 24V

Transformers are located in kiosk base

* CEI152 Corner Connection

1. Slide extrusion onto corner connectors.

2. Tighten all knobs to secure connection.

notch

B

Kiosk Assembly (cont’d)

B

Qty.

Description 45”w x 24”d x 3”h Base

Lightbox

Transformers

Steps:

Refer to the SEG Installation general information page.

1) Apply SEG graphics to both sides of frame assembly [12/13/14/15/16]. Notes: Lightbox power cords pass through front graphic. Back graphic must be partially removed when connecting to other frame.

Transformers

Base wire mgmt.

are located in kiosk base

2) Attach frame assembly [17/18/19/20/21] to Base [B], using Bolt to T-Nut Connection.

Run wires down through wire management holes to transformer in base.

3) Apply SEG graphic to back (inside) face of frame assembly [17/18/19/20/21].

4) Slide frame [12/13/14/15/16] into notch of Base [B]. Run wires through

SEG graphic & wire management hole to transformer in base.

5) Secure verticals [16] & [21] together using standoff barrels.

See Standoff Barrel Connection detail..

6) Apply SEG graphic to front of frame [17/18/19/20/21].

Repeat steps 1 through 6 for other kiosk assembly.

TOP VIEW

STEPS 1, 2, 3: STEP 4: STEPS 5 & 6:

back frame wires pass through SEG graphic

17 21 management wire

B * *

* Bolt to T-Nut Connection bolt

T-nut

* Standoff Barrel Connection

Attach standoff barrel between extrusions & secure with caps.

Standoff Barrel

Cap

Cap

Standoffs attach through SEG graphics.

Step 5 of standoff barrels

33 24

34 32 31

30 28 22 bracket

Ceiling Assembly brack

Assemble extrusions flat on ground.

1) Attach extrusions [24-25], [26-27] together using connectors. See S44 Straight Connection detail.

2) Connect extrusion [22] between [24,26].

3) Assemble extrusions [28] through [34] in numerical order as shown, inserting Infills between.

4) Attach extrusion [23] between [25,27].

Repeat steps for other ceiling assembly.

22 28

26 hole eye bolt

V4 Connectors on underside

(for attachment to bracket)

Step 6 of 11

Infill 33 29 Infill

Infill 34 30 Infill Infill hole standoff barrels et 25

23 33

34 32 31 30 22 27 28

Infill hole

* S44 Straight Connection

Connector

Slide extrusion over connector. Secure with set screws.

**To prevent product loss, Keep all screws attached to connector piece after disassembling

Infill

Infill Screw s

22 2 41.378” S44 Horizontal Extrusion 23 2 41.378” S44 Horizontal Extrusion 24 2 60” S44 Horizontal Extrusion 25 2 60” S44 Horizontal Extrusion 26 2 60” S44 Horizontal Extrusion 27 2 60” S44 Horizontal Extrusion 28 2 57.283” S44 Horizontal Extrusion 29 2 19.783” S44 Horizontal Extrusion 30 2 19.783” S44 Horizontal Extrusion 31 2 41.378” S44 Horizontal Extrusion 32 2 57.283” S44 Horizontal Extrusion 33 2 19.783” S44 Horizontal Extrusion 34 2 19.783” S44 Horizontal Extrusion

* Ceiling Bracket Attachment

Vertical Extrusion

Assembled Ceiling

V4 connectors

Ceiling Bracket

M8 Bolts

Attach assembled ceiling to ceiling brackets on vertical extrusion using bolts.

Ceiling Attachment

Qty.

Description 2” Standoff Barrel 54.03” cable

1) Attach left ceiling assembly to kiosk horizontals [15] and [20], using bolts & standoff barrels. See Standoff Barrel Attachment detail.

2) Connect left ceiling assembly to bracket on tower vertical [2].

See Ceiling Bracket Attachment detail.

3) Attach right ceiling assembly to kiosk horizontals [15] and [20], using bolts & standoff barrels. See Standoff Barrel Attachment detail.

4) Connect right ceiling assembly to bracket on tower vertical [4].

See Ceiling Bracket Attachment detail.

5) Secure ceiling assemblies by connecting cables to eye bolts on tower & ceiling assemblies. See Cable Attachment detail.

Step 7 of 11

Bolts Bolts

Left Ceiling Assembly * Right Ceiling Assembly

15 * brack*et

Bolts Bolts *bracket

15 * *2

Kiosks Kiosks

Tower Slide V4 connector into groove of extrusion;

tighten set screw to secure connector in place.

standoff

* Standoff Barrel Attachment

Attach Standoff barrel to V4 Connector.

Turn to tighten barrel set screw

V4 connector

* Cable Attachment Eye Bolt

Cable Carabiner

Eye Bolt Assembled

Ceiling

Attach cable to eye bolt on vertical extrusion and to Carabiner on assembled ceiling.

Ve rti ca l E xt ru si on

Controlling the RGB LED lights Static Mode:

1. Use the Color Ring key to select a color.

2. Saturation is controlled with W/R/G/B keys.

3. White mode is available by long-pressing ‘ON’ key.

4. Colors (not white) are dimmable with the

Brightness key.

Function of Keys

Color Ring Indicator

Dynamic Mode:

Press "M" key to cycle through the following options:

1. White light fades in and out.

2. Several colors fade in and out.

3. R,G,B three colors fade in and out.

4. R,G,B three colors flash.

5. Six colors flash.

6. Random color flashes.

7. Red color fades in and flashes.

8. Green color fades in and flashes.

9. Blue color fades in and flashes.

Brightness - Brightness +

Master ON ON Master OFF

Speed - Speed +

Mode (M)

To Pair a Remote with Multiple Units:

1. Power on the lights.

2. Press ‘ON’ key within 3 seconds.

3. Lights will blink when link is made.

To unpair: Long press ‘ON’ key within 3 seconds after switching on lights.

White +/- Blue +/-

Red +/- Green +/-

Receiver:

Specifications:

Remote Control:

Remotes can be paired with one or more receivers.

Different receivers can work synchronously even when started at different times (within 30 min).

1. Working voltage: DC12V/24V 1. Working voltage: 3V

2. Output: Max. 6A/Channel

Total output Max. 10A

3. Max standby power: 0.5W

2. Standby power: <20uA

3. Transmitting power: 6dBm

MOD-1454 Charging Table

1) Connect base to post, using bolt.

2) Route cord from table top through post and base.

3) Connect table top to post with fixed brackets, using black bolts.

Completed Assembly

UNDERSIDE VIEW

Step 8 of 11

Table Top

Black Bolt

Post

Base

Bolt

Door

Counter Assembly

7,7A 8,8A 9,9A

10,10A

Qty.

1,1 1,1 1,1 1,1

Description 39.5” S44 Vertical Extrusion 39.5” S44 Vertical Extrusion 39.5” S44 Vertical Extrusion 39.5” S44 Vertical Extrusion 39.5” S44 Vertical Extrusion

8.341” Z45 Horizontal Extrusion

21.825” Z45 Horizontal Extrusion 8.341” Z45 Horizontal Extrusion

Steps:

1) Assemble lower horizontals [7,8,9,10] between verticals [1,2,3,4,5].

2) Slide Infills between verticals as shown.

3) Attach upper horizontals [7A,8A,9A,10A], securing infills.

4) Connect lower horizontals [16,17,18,19] between verticals

[4,12,13,14,15].

5) Slide Infills between verticals.

6) Secure Infills with upper horizontals [16A,17A,18A,19A].

7) Connect doors to vertical [3] and [13]. See Door Connection detail.

16,16A 17,17A 18,18A 19,19A

1,1 1,1 1,1 1,1

39.5” S44 Vertical Extrusion 39.5” S44 Vertical Extrusion 39.5” S44 Vertical Extrusion 39.5” S44 Vertical Extrusion 4” Z45 Horizontal Extrusion 16.067” Z45 Horizontal Extrusion 4” Z45 Horizontal Extrusion

1 7A 2

8A

10A

16A 12

17A

18A 14

19A

Step 9 of 11

* Door Connection

Slide pin into hinge attached to vertical.

Slide door hinge over pin.

Door Hinge

Hinge

Door

9A

MOD-1721 Counter Assembly (cont’d)

11,11A 1,1 35.853”h Z33 Vertical Extrusion

20 1 38.752” TSP2 Vertical Extrusion 21,21A 1,1 3.193” Z31 Horizontal Extrusion

22 1 39.5” CEI110 Vertical Extrusion 23,23A 1,1 45.75” CEI110 Horizontal Extrusion

24 1 39.5” CEI110 Vertical Extrusion 25,25A

Steps:

1,1 50.037” CEI110 Horizontal Extrusion

1) Connect horizontals [23] and [23A] to vertical [22] and horizontals [25] and [25A] to vertical [24] See CEI110 Frame Assembly sheet for instruction.

2) Attach assembled frames to verticals [1] and [15], as shown. See Frame to Assembly Attachment detail.

3) Slide 2-part Infills into back of both assembled CEI110 frames & secure with verticals [11] & [11A].

4) Assemble horizontals [21,21A] & two brackets to vertical [20], then attach brackets to CEI110 corners [23/25] & [23A/25A], inserting Infill. See Z45 & Bracket Connection detail.

Step 10 of 11

* Frame to Assembly Attachment S44

CEI110

Bolt

Connector

Slide Connector into S44 vertical, then tighten set screws to secure. Attach CEI110 vertical to Connector, using bolt.

* Z31 & Bracket Connection

CEI110

TSP2

Bracket

Z31 Connector

Slide Connector into Z31 horizontal, then tighten set screws to secure. Attach Z31 to Bracket, using bolts. Attach bracket to CEI110 horizontal, using bolts. Slide TSP2 vertical into slot of Bracket, then secure lock of Z31 into vertical TSP2.

23A *

Infill

Infill

Infill

Corner Assembly

* 25A

Bracket

21A * Infill

Bracket 11A Infill

21A *

Infill

Bracket 21 25

Bracket

MOD-1721 Counter Assembly (cont’d)

1) Connect lighting power cords and attach transformers. See Light to Light Connection and Light to Transformer Connection details.

2) Place shelves onto pins. See Shelf Pin detail.

3) Install SEG graphics to front of assembled frames.

Refer to the SEG Installation general information page..

4) Place counter top on top of assembed counter base.

See Counter Top Attachment detail.

5) Connect power cords to wireless chargers and

LED edge lighting in counter top.

FRONT VIEW BACK VIEW

wireless charger

Completed Assembly

Counter Top

Shelf

Counter Top

Shelf

LED edge lighting

SEG Graphic

Transformer

BACK VIEW FRONT VIEW

Step 11 of 11

* Shelf Pin

1) Slide pin into groove of Vertical Extrusion.

Pin

2) Use hex tool to tighten pin in place.

* Counter Top Attachment

Hole

Align hole with pin Rotate pin. Spring will push pin into hole.

Pin

Light to Light Connection

Lights

Female Male

Light to Tranformer Connection

Female Male to power

4 5

Graphics Overview

71.843”w x 144.843”h

38.843”w x 91.843”h

71.843”w x 144.843”h

38.843”w x 94.843”h

49.791”w x 39.382”h

45.501”w x 39.382”h

SEG Graphic

A B

6 1

3 A B

General Setup Instructions
DO NOT USE POWER TOOLS
Cleaning & Packing
LADDERS OR LIFTS MAY BE REQUIRED
Heat and UV exposure will warp and fade components.
Disassembly
Straight Connection
Disassembly
Corner Connection
Disassembly
CEI152 Profile
Straight Connection
Disassembly
Corner Connection
Disassembly
CEI110 Profile
DO NOT DISCARD.
Crate 1 of 2
DO NOT DISCARD.
Crate 2 of 2
Step 1 of 11
Step 2 of 11
Step 3 of 11
Qty. 2
Step 4 of 11
Qty. 2
11
Qty. 2
Step 6 of 11
Step 7 of 11
Step 8 of 11
Step 9 of 11
Step 10 of 11
Step 11 of 11

File details come from the government source that posted it. Updated .