Atch 3 - QASP Redelineation.pdf
PDF 193 KB Posted
- Attached to
- Forest Service Region 2 - Vegetation Mapping IDIQ Federal contract opportunity
- Solicitation number
- 1240LP21R0004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1240LP21R0004 Amd 0001 QandA.pdf | ||
| Read Me.docx | DOCX document | |
| FSVegSpatial.gdb.zip | ZIP file | |
| VegUpdate_2020.gdb.zip | ZIP file | |
| R2SuppFSVegSpatialUserGuide_20201203.docx | DOCX document | |
| Read Me.docx | DOCX document | |
| Veg2020_ReferenceData.gdb.zip | ZIP file | |
| Atch 1 Region 2 Basemap.pdf | ||
| Atch 2 - QASP Reattribution.pdf | ||
| Atch 6 Past Performance Data Sheet.docx | DOCX document | |
| Atch 8 MBR Basemap.pdf | ||
| Atch 5 Wage Determination Placeholder.docx | DOCX document | |
| 1240LP21R0004 - R2 Veg Mapping IDIQ RFP.pdf | ||
| Atch 7 MBR Task Order RFQ.pdf | ||
| Atch 4 AD 3001 Documentary Matls Cert.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Vegetation Mapping Updates Delineation QASP
6/14/2021
Government Quality Assurance Surveillance Plan - DELINEATION
The Government will inspect completed checkouts as a basis for acceptance and payments, and to provide recommendations to improve work quality while work is in progress. The Contractor is responsible for providing quality control to assure that work complies with requirements of contract specifications.
Exhibit A
R2 FSVEG SPATIAL POLYGON REDELINEATION INSPECTION FORM
A B C
FIELD
NUM NAME ACCURACY STANDARD POINT VALUE # OF
ERRORS
DEDUCTION
(A X B)
1 Polygon delineation – homogeneous composition +/- 15% (area)* 25
2 Region no errors unacceptable 3 Forest no errors unacceptable 4 District no errors unacceptable 5 Setting ID no errors unacceptable
6 FLM Data Source – value provided by FS no errors 3
7 FLM Description – value provided by FS no errors 3
8 FLM Accuracy Unit – value provided by FS no errors 3
Total Deductions (sum of column 'C') D
Number of Stands Inspected E
Polygon Delineation Form Score (D / E) (must be 5 or less)
F
Inspection Form Comments:
Indicate polygon IDs reviewed
• Accuracy standard error will apply to each stand inspected
Vegetation Mapping Updates Delineation QASP
6/14/2021
Unsatisfactory Work – The Polygon Delineation Form Score has to be 5 or less and all fields with a point value of “unacceptable” must be filled in correctly to pass inspection.
If inspection is not passed, the Forest Service will notify the Contractor and provide feedback/recommendations as to how to improve the quality of the work. If the quality of work is not raised to an acceptable level within 30 working days after notification, the Contracting Officer may reduce payment based on the percentage of unacceptable work.
In the event that work is performed that is contrary to the requirements in the task order, the Government is not liable for costs incurred by the contractor during negligent performance that is without the fault or negligence of the Government.