Maintenance and Repair of Hangar Doors
Solicitation number
FA5613-22-Q-0014
Issued by

About this file

This performance work statement outlines requirements for the maintenance, repair, and inspection of hangar doors located at Ramstein Air Base in Germany. The contractor shall provide all necessary management, tools, supplies, equipment, parts, and labor to maintain eight hangar doors in safe operating condition, performing annual inspections, maintenance in accordance with a control program, and responding to routine and emergency repair calls within three and two hours respectively. Services include cleaning, repairs, load testing, and compliance with German safety regulations. Excluded are acts of vandalism and alterations requiring modernization. The contractor must be licensed in Germany and employ qualified personnel. Work shall be coordinated with the contracting officer's representative and facility managers.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

FOR

HANGAR DOORS

MAINTENANCE, REPAIR, & INSPECTION

SERVICES

ON

RAMSTEIN AIR BASE

1 JULY 2022

1. DESCRIPTION OF SERVICES. The contractor shall provide all management, tools, supplies, equipment, parts and labor necessary to maintain, repair, and inspect the real property hangar doors (HD) on Ramstein Air Base (TYFR*), in a manner that will ensure continuous and safe operation (full maintenance and repair with the exception of the exclusions listed in paragraph

2. below). Services are to be performed in accordance with all applicable German local, state, and federal standards, codes, laws, manufacturer recommendations and all required safety regulations (see paragraph 8.12.). The most stringent of these shall apply. The hangar doors and their locations are listed in Appendix B, Equipment List.

1.1. This full maintenance contract signifies a service provider (contractor) takes total service responsibility for the equipment identified in the contract. Except those services covered in paragraph 2. below, the monthly fixed prices shall include all inspections and maintenance calls, repairs, replacements, routine and emergency service calls. This contract allows the Government to budget total yearly costs and eliminates concerns relating to individual parts repair or replacement invoicing. The contractor assumes all responsibility and determines the amount of service visits and types of service required to keep the hangar doors operating safely and within the performance objectives of paragraph 6.

1.2. Work conducted on hangar doors will be in accordance with, but not limited to, the references listed in paragraph 8.12. and shall be performed only by qualified personnel trained for the services required. Contractor technicians shall have knowledge of the current German Safety and Accident Prevention Regulations (Deutsche Gesetzliche Unfallversicherung – DGUV) and the usage of guidelines and generally recognized rules of engineering in accordance with commercial practices to be able to assess the condition of the equipment properly. The contractor shall be familiar with the different equipment used under this contract. The contractor shall submit certificates of competency (Befähigte Person für Kraftbetriebene Fenster, Türen und Tore / Competent Person for Power Driven Windows, Doors and Gates) of the employees being intended to perform the solicited services to the Contracting Office upon submission of quote. The training certificates shall be obtained through an accreditation authority (for example TÜV – Technischer Überwachungsverein, DEKRA). The contractor, subcontractor, teaming/joint venture partner, etc.

being intended to perform the services must be registered or a member of the German Chamber of Industry and Commerce (Industrie- und Handelskammer) or the German Chamber of Trade (Handwerkskammer). Membership must continue throughout contract performance. Contractors, subcontractors, teaming/joint venture partners of EU member states being intended to perform the services must possess a valid EU certificate (“EU Bescheinigung”) issued by a German Chamber of Trade or German Chamber of Industry and Commerce. The EU certificate must be renewed annually throughout the life of the contract.

1.3. TECHNICAL DESCRIPTION OF EQUIPMENT. Hangar doors are electrically operated.

Hangar doors consist of commercial and industrial type models. Hangar doors consist of, but are not limited to, a structural framework with an electrical system, electrical motor and a mechanical system for manual operation. Please refer to Appendix B, Equipment List, for specific information.

*Installation Code

2. EXCLUDED SERVICES. The following are not covered in the full maintenance service arrangement and are considered over and above services:

2.1. Alterations (a.k.a. modernizations) are not covered in the full maintenance service arrangement. (See paragraph 3.2.)

2.2. Acts by parties other than the contractor of vandalism, abuse, negligence, damage resulting from rescue and recovery operations, acts of God (including damage resulting from emergency power, generator power spikes, and low quality, lightning-stroke), building subsidence, and modernization are not included in the contract. This also applies to towing steel ropes for hangar doors (Mitnehmerstahlseil fuer Hangar-Fluegel), as well as to vertical shock absorbers.

2.3. In the event that the contractor encounters an item of work included in paragraph 2.1. and 2.2., the contractor will report the situation to the Contracting Officer’s Representative (COR). The report will include the work location, a detailed scope of the required work, justification for contractor determination that the work was not included in the contract, and an itemized cost estimate (including time to repair, all required parts and a breakdown of labor hours). NOTE: Any part, component or assembly unavailable from the manufacturer due to obsolescence, remains the contractor’s responsibility to obtain an engineered equivalent product from a commercial source, unless waived by the Contracting Officer (CO).

3. DEFINITIONS.

3.1. Maintenance, Repair and Replacement. Maintenance, repair and replacement are on existing hangar doors and included in the contract scope of services. All maintenance, repair and replacement of damaged, broken, or worn parts are to be done in a manner that ensures that the equipment may be operated safely. Maintenance, repair and replacement are actions to restore equipment to a state in which it may safely perform its required operations as installed in accordance with the manufacturer’s recommendations. All work carried out shall be in accordance with standard commercial practices using only Original Equipment Manufacturer (OEM) parts.

Upon non-availability of OEM parts, items of equal or higher quality are permissible upon the COR`s concurrence. All services carried out by the contractor shall be in accordance with, but not limited to, the standard guidelines listed in paragraph 8.12.

3.2. Alteration. An alteration is also on existing hangar doors, but is not included under the full maintenance service arrangement. Alteration/modernization will result in a modification to the contract. This also applies to spare parts and components that have reached their end-of-line manufacturer production. The typical alteration results in a betterment to the safe operation of the equipment. In the case of hangar doors, when an alteration is made, all affected safety requirements must be complied with. All work as part of an alteration is required to comply with the standard guidelines listed in paragraph 8.12, as well as any additional regulations that may apply.

4. MAINTENANCE AND INSPECTION SERVICES.

4.1. The contractor with the CO and COR (or representative) shall determine the working order and condition of all assets listed in Appendix B, Equipment List, within thirty (30) calendar days of contract award. The Government will either replace missing items or repair all items not in working order or serviceable condition, or the CO will direct the contractor to replace the missing items, accomplish the repair, and reimburse the contractor in accordance with the contract. Defects that existed before the start of the period of performance fall under CLIN X003, “Over and Above Services”. The contractor and CO shall certify their agreement as to the working order of the equipment.

4.2. The contractor shall develop and submit to the Government an annual written Maintenance Control Program (MCP) for each hangar door no later than thirty (30) calendar days of contract award to cover the basic contract and any option periods. The MCP shall, at a minimum, include required inspections, timelines for inspections and maintenance to be performed and requires the contractor to coordinate with the respective Facility Manager/alternate prior to carrying out services. The contractor shall perform inspections and maintenance of all hangar doors in accordance with the MCP. The MCP shall ensure compliance with all minimum code requirements. The contractor shall submit schedule deviations to the COR as soon as possible, but no later than the day before a service is scheduled.

4.3. The contractor shall perform maintenance in accordance with the MCP to ensure reliable and continuous safe operation. The maintenance work shall be in accordance with commercial practices or manufacturer’s specifications, if available, and shall be intended to maintain the hangar doors in safe and reliable operating condition. The MCP is required to specify appropriate intervals for specific maintenance items. Maintenance shall be carried out following the guidelines as listed in paragraph 8.12. below, as well as any additional regulations that may apply, and shall include, but not be limited to the substitution/replacement/renewal/changing of parts, batteries, and motors.

4.4. Cleaning of equipment spaces and daily cleanup of job sites in conjunction with maintenance, inspections and tests, as well as repairs, is required.

4.5. The contractor shall perform annual safety inspections on all hangar doors listed in the attached Appendix B, Equipment List. All safety inspections shall be in compliance with, but not limited to, the applicable regulations and guidelines listed in paragraph 8.12. of this PWS. In addition, the contractor shall provide DGUV-V3 testings / electrical safety checks, which are to be carried out every four (4) years and apply to electrical components testing. Load testing of electrical components must be carried out in the base year and fourth option year of this contract.

4.6. The contractor shall prepare and submit a written report no later than eight (8) business days of work accomplished. The report shall include, but not be limited to:

(a) Date and time of the service

(b) Location, equipment/serial number and type

(c) Full operational test

(d) Overall condition including discrepancies cited and repairs needed

(e) Name of the technician performing the service

(f) Amount of man hours

(g) Parts used including price

4.7. The Government may perform inspections of the hangar doors at no cost to the contractor for purposes of capital asset management and quality assurance. If discrepancies are discovered during these inspections, the contractor will be notified in writing of any determination and may be responsible for corrective actions.

4.8. The contractor shall maintain a copy of all current hangar doors inspection documentation, along with an index indicating the location, date inspected, and date of the next required inspection having provided the original to the CO/COR upon request. The index and copies of certificates shall be delivered to the CO/COR upon request; however, no later than one (1) business day of a request for review.

5. REPAIR SERVICE CALLS. The contractor shall provide service calls (routine and emergency) under the full maintenance service agreement at no additional charge to the price agreed upon in the contract. All repair work shall be done in accordance with standard commercial practices. The contractor shall repair and replace components of the hangar doors at no additional cost to the price agreed upon in the contract.

5.1. ROUTINE CALLS. Service calls will be classified as routine when the work or adjustments do not qualify as an emergency call.

5.1.1. The contractor shall respond in-person to the hangar door and begin work on routine service calls at no additional cost to the Government no later than three (3) hours after receipt of the call on regular scheduled workdays/hours.

5.1.2. The contractor shall report to the work location, survey the repair, and provide the CO/COR an estimate of time and cost of repairs, when the repair is not covered in the full maintenance service contract, but necessary to bring the hangar doors back to operation. Refer to the Appendix D – Over & Above (O&A) Instructions.

5.2. EMERGENCY CALLS. Emergency calls are defined as calls made for services when a hangar door system fails and constitutes a danger to personnel, threatens to damage properties, or threatens to disrupt activity, operations, and/or training missions.

5.2.1. The contractor shall respond in person to the hangar door and begin work on emergency service calls no later than two (2) hours after receipt of the call.

5.2.2. The contractor shall report to the work location, survey the repair, and provide the CO/COR an estimate of time to repair and cost of repairs when the repair is not covered in the basic full maintenance service contract, but necessary to bring the hangar doors back to operation. Refer to Appendix D – Over & Above (O&A) Instructions.

5.3. REPORTING. The contractor shall prepare and submit to the CO/COR a written report no later than eight (8) business days after a routine/emergency repair has been completed. The report shall include:

(a) Date, time and call number of the service

(b) Location, equipment/serial number and type

(c) Full functionality test

(d) Service performed (malfunction and description of work)

(e) Amount of man hours

(f) Parts used including price

(g) Name of the technician performing the service

5.3.1. The contractor shall submit a written monthly report listing all open calls no later than the first business day of the following month.

6. SERVICES SUMMARY. The Government will evaluate contractor performance in accordance with the below criteria. The Services Summary (SS) provides information on contract requirements and the expected level of contractor performance. The contract service requirements are summarized in performance objectives. The performance threshold briefly describe the acceptable levels of service required for each requirement. These thresholds are critical to mission success.

Performance Objective PPWS Paragraph(s)

Performance Threshold Remedy

SS-1. Inspection – MCP Adherence.

4.2. Meets maintenance and

inspection intervals as stated in

MCP.

Inspection according to MCP Rating Thresholds:

Satisfactory – 90% within stated inspection or maintenance schedules.

Unsatisfactory – below 90% within stated inspection or maintenance schedules.

Inspection within 3 business days

SS-2. Hangar Doors Service Availability.

4., 4.2., 4.3., 4.4., 4.5., 4.6., 4.7., 4.8.

Hangar Doors Service Availability

Hangar Doors Service Availability Rating Thresholds:

Calculation = ((sum of all HD * # days in service during the selected month for each HD) / (# sum of all HD * # days in the selected month)).

Satisfactory – 90% service availability in selected month.

Unsatisfactory – below 90% service availability in selected month.

N/A

SS-3. Repair Service Call Routine

– Response Time. Response to routine calls within time specified in paragraph 5.1.1.

5.1.1. Response to routine service call

thresholds (monthly inspection basis).

Response Rating Thresholds:

Satisfactory – 90% within stated response time.

Unsatisfactory – below 90% within stated response time.

Performance within 2 hours

SS-4. Repair Service Call – Emergency – Response Time.

Response to emergency calls within the time specified in paragraph 5.2.1.

5.2.1. Response to emergency service

call thresholds (monthly inspection basis).

Response Rating Thresholds:

Satisfactory – 95% within stated response time.

Unsatisfactory – below 95% within stated response time.

Performance within 2 hours

SS-5. Reporting. 2., 2.1., 2.2., 2.3., 4., 4.1., 4.2., 4.3., 4.4., 4.5., 4.6., 4.7., 4.8., 5., 5.1., 5.1.1., 5.1.2., 5.2., 5.2.1., 5.2.2., 5.3., 5.3.1.

Appendix D & E

Reports Submittal.

Submittal Rating Thresholds:

Satisfactory – 95% within required submittal time.

Unsatisfactory – below 95% within required submittal time.

No later than 24 hours

7. GOVERNMENT FURNISHED PROPERTY AND SERVICES. The Government does not anticipate providing any Government furnished property (GFP).

7.1. DAMAGE TO GOVERNMENT PROPERTY. The contractor shall report all damage to U.S. Government property within one (1) hour after occurrence to the COR. The contractor shall report all damage to U.S. Government property within one (1) hour after occurrence to the 786 CEOES Service Contract section, phone: 06371-47-4879. The contractor shall use reasonable care to avoid damaging existing buildings, equipment, and vegetation on the Government installation. If the contractor’s failure to use reasonable care causes damage to any of this property, the contractor shall replace or repair the damage at no expense to the Government as the CO directs. If the contractor fails or refuses to make such repair or replacement, the contractor shall be liable for the cost, which may be deducted from the contract price.

8. GENERAL INFORMATION.

8.1. QUALITY CONTROL. The contractor shall develop and maintain a quality control program to ensure maintenance and repair services are performed in accordance with standard guidelines and codes as listed in paragraph 8.12. of this PWS, as well as any additional regulations that may apply. A quality control plan (QCP) shall be provided upon submission of quote. The contractor shall develop and implement procedures to eliminate reoccurrence of once identified/repaired defects. As a minimum, the contractor shall develop quality control procedures that address the areas identified in paragraph 6., “Services Summary”. The QCP shall demonstrate how the contractor ensures quality performance during the contract period of performance. The contractor shall maintain the QCP throughout the period of performance of the contract. The CO will be provided updates to the QCP as they occur during the period of performance. The QCP will identify the procedures in writing for inspections, individual responsible, hangar doors MCP, and the location of all inspection records and key control logs which will always be available to the Government upon request. The QCP will have the inspection forms and records which will be used for the service. The contractor will identify to the CO/COR the responsible quality control inspector to notify in case of customer complaints.

8.2. QUALITY ASSURANCE. The Government will periodically evaluate the contractor’s performance in accordance with the Quality Assurance Surveillance Plan. For unacceptable performance of routine and emergency repair service calls (SS-3 and SS-4) noted, the contractor shall report to the site location within two (2) hours after notification to correct unacceptable performance. The contractor shall re-perform at no additional cost to the Government. Any re-performance and/or unacceptable performance will be documented by the COR and may result in the Government seeking equitable price reduction or adequate consideration in accordance with FAR 52.212-4, Contract Terms and Conditions – Commercial Products and Commercial Services. To record validation results, the COR will use the contractor’s MCP, maintenance and repair reports to ensure all terms and conditions of applicable regulations and manufacturer instructions are met to ensure safe and continuous operation of the installed equipment subject to this contract. Results of the validation then become the official Air Force record of the contractor’s performance. When a performance threshold has not been met or contractor performance has not been accomplished as required, the COR will initiate and provide the CO with a Corrective Action Report (CAR) for issuance to the contractor. The contractor shall respond to the CAR in accordance with the instructions provided and return it to the CO within five (5) calendar days of receipt. The CO will forward the contractor’s response to the COR once received. The COR will perform re-inspection within one (1) business day of receipt of the contractor’s response.

8.3. HOURS OF OPERATION. The contractor shall coordinate all work to be accomplished in accordance with this PWS and with the COR and Facility Manager/alternate for each piece of equipment to be maintained and repaired. Emergency repairs may be required twenty-four (24) hours, Monday through Sunday including holidays. Business hours are 0700-1600, Monday through Friday. The time for maintenance and repairs to be performed shall be coordinated before any work is scheduled. The contractor’s hours of operations shall be in accordance with the table below.

Hours of Operation

Preventive Maintenance, Maintenance Services and Safety Inspections

Repairs

Emergency Repairs

Monday-Friday 0700–1600 0700–1600 24 hours

Saturdays, Sundays, & German and U.S. Federal Holidays

24 hours

U.S./German Federal Holidays.

1st January New Year’s Day Neujahr U.S. and German 3rd Monday in January Martin Luther King Day

U.S.

3rd Monday in February Washington’s Birthday U.S.

** Good Friday Karfreitag German ** Easter Monday Ostermontag German 1st May Labor Day Tag der Arbeit German ** Ascension Day Christi Himmelfahrt German ** Whit Monday Pfingstmontag German Last Monday in May Memorial Day U.S.

** Corpus Christi Day Fronleichnam German 19th June Juneteenth Day U.S.

4th July Independence Day U.S.

1st Monday in September Labor Day U.S.

3rd October German Unification Tag der dt. Einheit German 2nd Monday in October Columbus Day Tag der dt. Einheit U.S.

1st November All Saints’ Day Allerheiligen German 11th November Veteran’s Day U.S.

4th Thursday in November Thanksgiving U.S.

25th December Christmas Weihnachten U.S. and German 26th December 2nd Day of Christmas 2. Weihnachtstag German

When a U.S. federal holiday is on a Saturday, the preceding Friday will be observed. When the holiday is on a Sunday, the following Monday will be observed.

** Indicates date change each year – **Movable holidays.

8.4. SECURITY REQUIREMENTS. Contractor personnel shall comply with all requirements and procedures in accordance with AFFARS clause 5352.242-9000, Contractor Access to Air Force Installations. Contractor employees will be required to obtain and display identification badges.

Please anticipate delays when accessing the base with commercial vehicles and allow time for commercial vehicles to reach their destination. Contractor employees shall drive only on designated routes and obey the speed limits posted throughout base. Procedures for commercial vehicle access to the base are subject to change without prior notice.

Citizens from certain countries are currently banned from entering U.S. installations; Security Forces maintains a list of these banned countries. This includes individual contractor employees, therefore any contractor employee who is a citizen of one of these countries will not be allowed to access the installation. The list of excluded countries is subject to change without modification or amendment of the PWS or contract.

8.4.1. CONTRACTOR/EMPLOYEE BASE PASS AND IDENTIFICATION, SPECIAL

CLEARANCES. Contractor personnel shall obtain a Defense Biometric Identification Card (DBIDS) not later than fourteen (14) days prior to the Period of Performance (PoP). In order to obtain the DBIDS, the contractor is required to submit to the COR following:

AE190-16A (Request for DBIDS) Memo of DBIDS Request Military Installation Access List Copy of Passport / ID Card (Personalausweis) Security Questionnaire for Simple Security Check Police Good Conduct Certificate (Polizeiliches Fuehrungszeugnis) ß

AE190-16A, Memo of DBIDS, Military Installation Access List Request, and the Security Questionnaire will be provided by the COR, 786 CES/CEOES.

Contractor personnel shall present completed documentation to Security Forces personnel at bldg. #134, Ramstein Air Base, to obtain their DBIDS. Contractor personnel can only gain access to the KMC (Kaiserslautern Military Community) after the security check has been passed with a positive result. It is the responsibility of the contractor to collect and return the DBIDS within one

(1) week from personnel that is no longer employed, in case the contract is terminated and/or after end of the PoP (Period of Performance).

8.4.2. ACCESS TO RESTRICTED AREAS. Access to secure areas must be coordinated with the COR. Restricted areas require notification through the COR to the Facility Manager/alternate at least one (1) week prior to the date of service to allow ample time for coordination.

8.4.3. ESCORT. For any restricted/secure area access in conjunction with the scope of service, the COR will arrange for an escort and entry authorization at the designated place of performance.

8.4.4. LANGUAGE REQUIREMENT. Contractor employees performing services shall be able to speak English sufficiently well to communicate on a basic level with on-site personnel.

8.5. CONTINUATION OF ESSENTIAL DEPARTMENT OF DEFENSE SERVICES

DURING CRISIS DECLARED BY THE NATIONAL COMMAND AUTHORITY OR

OVERSEAS COMBATANT COMMANDER. In accordance with DODI 1100.22, Policy and Procedure for Determining Work Force Mix, paragraph 5b, it is determined that none of the services as stated in this PWS are mission-essential.

8.6. SPECIAL QUALIFICATIONS. The contractor must be licensed in Germany, where the work is conducted to provide the services specified in this contract. All work will be performed by personnel who are trained and qualified for the systems and equipment. Contractor personnel being intended to perform the solicited services must possess certificates of competency (Befähigte Person für Kraftbetriebene Fenster, Türen und Tore / Competent Person for Power Driven Windows, Doors and Gates) and must adhere to the standard guidelines listed in paragraph 8.12., as well as to any additional regulations that may apply. The contractor, subcontractor, teaming/joint venture partner, etc. being intended to perform the services must be registered or a member of the German Chamber of Industry and Commerce (Industrie-und Handelskammer) or the German Chamber of Trade (Handswerkskammer). Membership must continue throughout contract performance. Contractors, subcontractors, teaming/joint venture partners of EU member states being intended to perform the solicited services must possess a valid EU certificate (“EU Bescheinigung”) issued by a German Chamber of Trade or German Chamber of Industry and Commerce. The EU certificate must be renewed annually throughout the life of the contract.

8.7. SCHEDULE COORDINATION. The contractor shall be responsible for coordinating all phases of his/her operations with the appropriate base personnel through the CO/COR. The facilities shall remain in operation while the contractor is working, and it is up to the contractor to coordinate around the normal activities of the facility.

8.8. ENVIRONMENTAL CONTROL. The contractor shall comply and assure that all subcontractors comply with all applicable federal, state, and local laws, regulations, ordinances, policies and standards related to environmental matters. Where applicable, the contractor shall use environmentally safe products in the course of completion of their project. The contractor shall maintain, in a company vehicle on site, Material Safety Data Sheets (MSDS) for all chemicals. A copy of all MSDS will be provided to the CO/COR. The MSDS data is subject to random checks by the Government. The contractor shall maintain, and provide on demand, an inventory of materials being brought to the Government facility. The contractor shall complete, and provide on demand, monthly inventories of HAZMAT used, including but not limited to: solvents, paints, degreasers, greases, Ozone Depleting Substances, and oils brought to the Government facility. If the contractor spills or releases any HAZMAT or other substance contained in 40 CFR 302 into the environment, the contractor shall immediately notify the CO/COR and appropriate emergency responders. The contractor is responsible for all costs associated with clean-up and restoration, including any applicable fines and/or penalties. The contractor shall maintain a spill plan as required by federal, state, and local laws and regulations.

8.9. CONFORMANCE WITH ENVIRONMENTAL MANAGEMENT SYSTEMS. The

contractor shall perform work under this contract consistent with the relevant environmental policy and objectives identified in the installation environmental management system (EMS) applicable to the contract. The contractor shall perform work in a manner that conserves water, energy, and other resources to the maximum extent feasible and ensure minimum production of waste as possible, giving preference to recycling and reutilization opportunities. Furthermore, the contractor shall give preference to less toxic materials whenever available and still reliable for their work. In the event an environmental nonconformance or noncompliance of host nation and USAF environmental laws and regulations associated with the contracted services is identified, the contractor shall take corrective and/or preventative action. In the case of a noncompliance, the contractor shall respond and take corrective action immediately. In the case of a nonconformance, the contractor shall respond and take corrective action based on the time schedule established by the EMS Coordinator. In addition, the contractor shall ensure that their employees are aware of the environmental management system on base and how these requirements affect their work performed under this contract. All on-site contractor personnel shall receive the installation EMS awareness level information.

8.10. CONFORMANCE WITH ENVIRONMENTAL REQUIREMENTS. The contractor shall perform all work in accordance with applicable German and U.S. Air Force environmental laws, regulations and operating standards, including but not limited to, the Final Governing Standards (FGS) for Germany. The contractor shall be immediately capable of understanding and addressing environmental laws and regulations as they pertain to work performed under this contract. The FGS for Germany and other important environmental laws and requirements applicable to all contractors working on base will be made available upon request.

8.11. CONTRACT MANAGER. The contractor shall provide the name of a contract manager (primary and alternate) who shall be responsible for the performance of work and have full authority to act on behalf of the contractor on all contract matters relating to the daily operations of this contract. The contract manager shall be available during normal duty hours (0700-1600).

The contractor shall be able to meet with the COR to resolve any contract-related issues. The contract manager and alternate shall be able to understand, read, speak, and write basic and technical English (to speak English with sufficient structural accuracy and vocabulary to participate in formal and informal conversations on practical, social, and professional topics). The contractor shall provide to the CO and COR, no later than five (5) business days after award, a list with the names of all personnel performing under this contract including their individual function and contact information (valid cell phone numbers). Any required changes to this list shall be submitted in writing to the CO and COR, ten (10) business days prior to the change taking effect.

8.12. APPLICABLE GUIDANCE. The contractor shall comply with all applicable regulations and requirements. The below list may not be complete and all-inclusive. Systems shall be checked in accordance with:

Manufacturer Specifications DGUV Deutsche Unfallverhütungs Vorschriften (UVV) / German Accident Prevention

Regulations

Technische Regeln für Arbeitsstätten / Technical Rules for Workplaces “ASR A1.7” Berufsgenossenschaftliche Regeln (BGR) 232 (Richtlinien für Kraftbetriebene Fenster, Türen und Tore / Trade Association Rules 232 Guidelines for Power Driven Windows, Doors, and Gates

DGUV 209-070 (Sicherheit bei der Hydraulik bei der Instandhaltung / Safety in Hydraulic Maintenance)

DGUV Regel 113-020 “BGR 237” (Hydraulik-Schlauchleitungen / Hydraulic Hose Lines) DGUV Regel 100-500 “BGR 500” (Betreiben von Hebebühnen / Operation of Hydraulic

Lifts) Betriebssicherheitsverordnung (BetrSichVO) / Ordinance on Industrial Safety and Health DGUV-V3 Prüfung Elektrischer Betriebsmittel / Testing of Electrical Systems DIN EN VDE 0100 (Daten und Fakten für das Errichten von Niederspannungen / Low-voltage Electrical Installations) EU-Maschinenrichtlinie 2006/42/EG / EU Directive 2006/42/EC on Machinery WHG (Wasserhaushaltsgesetz – German Water Act)

8.13. WASTE DISPOSAL. All trash and hazardous waste, generated as a result of services performed, shall be disposed off-base and in accordance with the German National Waste Disposal Act (Abfallbeseitigungsgesetz – AbfG) at no additional cost to the Government.

APPENDICES.

A. Workload Estimate Data per Year B. Equipment List C. Deliverables D. Over & Above (O&A) Instructions E. Over and Above Work Order Form

Appendix A – Workload Estimate Data per Year

ITEM

DESCRIPTION OF SERVICE

ESTIMATED

QUANTITY

1 Annual Maintenance with Safety Inspections on Hangar Doors (IAW Current Equipment List)

8 ea

2 Repair Service Calls (based on a 5-year average)

15 ea

3 Repair Service Calls with Crane (based on a 5-year average)

5 ea

4 Emergency Service Calls

(based on a 5-year average)

5 ea

5 Parts Cost

(based on a 5 year average)

EUR 25,201.00 Per Year

*IAW = In Accordance With

This workload estimate does not bind the Government to these fixed quantities. A workload estimate is only a best guess estimate based on the current equipment list and historical data and its purpose is to provide the contractor with data needed to estimate probable workload and perform risk assessment needed to formulate a fair and reasonable FFP.

As assets are replaced, upgraded, decommissioned, and lose warranty, the equipment list will be updated at least annually. For the scope of this contract, any upward or downward quantity change to Appendix A, Workload Estimate Data per Year, of up to 10% is considered in-scope and will not require a modification.

Appendix B – Equipment List

Appendix B – Hangar Door Info

# Building Drive Hangars Manufacturer Size Wings Year Motor Ropes Heater

1 2018 electric yes Butzbach 9,3m x 15.5m

2x4 Wings

2008 2 Ea 6 Ea 8 Ea

2 2091 electric no / storage area

Bohlen 28m x

8 m 2x4

Wings renewed/repaired

(2016) 1 Ea 6 Ea n.A

3 2210 electric yes Bohlen

50m x 12,5 m

- 51 ton

2x3 Wings repaired/renewed

(2016) 6 Ea n.A n.A

4 2291 electric yes Bohlen

50m x 12,5 m

- 51 tons

2x3 Wings repaired/renewed

(2016) 6 Ea n.A n.A

5 2310 electric yes Bohlen

50m x 12,5 m

- 51 tons

2x3 Wings repaired/renewed

(2016) 6 Ea n.A n.A

6 2331 electric yes Bohlen 30m x

8 m 2x3

Wings 2017 2 Ea 4 Ea 2 Ea

7 3330 front electric yes Butzbach 80m x 25m -

44 tons

2x5 Wings

2005 2 Ea 8 Ea 10 Ea

8 3330 back electric yes Butzbach 30m x

8 m 2x2

Wings 2005 2 Ea 2 Ea 2 Ea

Appendix C – Deliverables

All deliverables must meet professional standards and the requirements set forth in the applicable contractual documents. The contractor shall be responsible for delivering all end items. All required documents, reports and schedules shall be sent by email in Adobe PDF format to the organizational email address of the requiring activity:

786CES.ServiceContracts.OrgBox@us.af.mil

DELIVERABLE PARA

REFERENCE

DUE DATE DELIVER TO

Maintenance Control Program (MCP) for each hangar door

4.2. NLT 30 calendar days of

contract award

CO/COR

Quality Control Plan 8.1. Submit with quote CO Certificates of Competency

1.2., 8.6. Submit with quote CO

Maintenance Reports 4.6. NLT 8 business days of work accomplished

COR

Response Time to Routine Repair Service Call

5.1.1. NLT 3 hours after receipt of

call

COR

Response Time to Emergency Repair Call

5.2.1 NLT 2 hours after receipt of

call

COR

Routine Repair Reports 5.3. NLT 8 business days after repair completion date

COR

Emergency Repair Reports

5.3. NLT 8 business days after

repair completion date

COR

Over & Above Work Justification and Quotation

2, 2.2., 2.3., 3.2., Appendix D & E

NLT 5 business days after reporting to work location

COR

Appendix D – Over & Above (O&A) Instructions

1. O&A Work Definition. O&A work means work discovered during the course of contract performance that is not covered in the full maintenance service arrangement covered by the line items for the basic work under the contract, and necessary in order to satisfactorily return the hangar doors to a safe and operational condition. The contractor shall identify needed repairs and recommend corrective action during contract performance. Using a contract modification permits the Government and the contractor to negotiate parts and labor which are necessary to make repairs or prevent malfunctions, but are not specifically identified and priced. Examples of O&A work include, but are not limited to: EXCLUDED SERVICES identified in paragraph 2.

NOTE: The Government reserves the right at any time to utilize other contract vehicles, perform work in house, or to outsource it without any notice or further consultation for maintenance/repair or replacement of equipment or infrastructure system upgrades/modifications. If Over and Above work is peformed under this contract, competing quotes from other sources will be requested by the Government to determine price fair and reasonableness in accordance with FAR 13.106- 3(a)(1). If pricing obtained from other sources is found to be lower than the pricing submitted by the contractor holder, the Government reserves the right at any time to award a contract to the lowest-priced offerer.

1.2. O&A Work Procedures.

1.2.1.. The contractor shall submit to the Contracting Officer Representative (COR) an O&A request form describing the O&A work being proposed. The form, with all applicable fields completed, shall be submitted no later than five (5) business days after reporting to the work location. Should the five (5) business days be insufficient due to delays caused by establishing repair costs, the contractor shall provide written documentation (for example, a letter/email from the parts manufacturer) to the COR explaining any delays.

1.2.2. The COR will send the work request package to the CO for review/approval.

1.2.3. The contractor and CO will negotiate a firm-fixed-price settlement for the work. The contractor shall not begin work until receipt of a signed/approved work request form or approval memo from the CO. The contractor shall commence work and complete work by the mutually agreed upon dates stipulated in the form/memo.

Appendix E – Over & Above (O&A) Work Request Form

Control Number ______________

Work location, work to be performed & required parts: _________________________________

Justification:

Price: The total O&A proposed pricing shall include all labor, parts, and delivery.

Total of Parts/Materials Costs EUR_____________________

Labor Costs EUR_____________________

Total of all O&A Costs EUR_____________________

Schedule of Work: Start___________ Complete____________ Days & Hours_____________

Warranty Period: Parts____________ Labor_______________

Other Conditions:

Contractor Government COR Contracting Officer Signature & Date Signature & Date Signature & Date