Atch 1 Eagle Repository Specs.pdf

PDF 23 MB Posted

Attached to
THERMAL ENVELOPE & HVAC UPGRADE Federal contract opportunity
Solicitation number
140F0621R0013
Issued by
Department of the Interior Fish and Wildlife Service

About this file

This solicitation is seeking proposals to provide materials, equipment, labor, and supervision for renovations and upgrades to the thermal envelope, HVAC, and electrical systems at the National Wildlife Property & Eagle Repository facility in Colorado. Key aspects of the work include upgrading the building envelope and HVAC systems, adding a 184 square foot Sally Port entrance, constructing a new conditioned Beetle Colony Room and vestibule/locker area in the warehouse, and miscellaneous interior renovations. The construction type for new areas will be Unprotected Non-Combustible. The solicitation was issued by the U.S. Department of the Interior Fish and Wildlife Service. The primary scope is to improve energy efficiency and working conditions at this 22,000 square foot office and warehouse operated by the Service.

View the file

Other files for this federal contract opportunity

Other files attached to THERMAL ENVELOPE & HVAC UPGRADE, newest first.
File Type Posted
Sol_140F0621R0013_Amd_0003.pdf PDF
Sol_140F0621R0013_Amd_0002.pdf PDF
Amend 0001 Atch 2 Eagle Repository - Bid Schedule_rev_0001.pdf PDF
Amend 0001 Atch 1 Eagle Repository - Electrical Info_0001.pdf PDF
Sol_140F0621R0013_Amd_0001.pdf PDF
Atch 4 Eagle Repository DOL Wage Det.pdf PDF
Atch 2 Eagle Repository Drawings.pdf PDF
Sol_140F0621R0013.pdf PDF
Atch 5 Eagle Repository Past Perf Quest.doc DOC document
Atch 3 Eagle Repository Submittals.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Specifications for

National Eagle & Wildlife Property Repository 6550 Gateway Road, Bldg. 128, Commerce City, CO 80022

IDIQ/Task Order 140F0318D0020/140F0620F0053

Submitted on December 11, 2020

United States Department of the Interior

FISH AND WILDLIFE SERVICE

Division of Engineering

134 Union Blvd.

Lakewood, Colorado 80228

Wood Environment & Infrastructure Solutions, Inc.

920 E. Sheridan St., Suite A

Laramie, WY 82070

Wood Project No: 32810229 blake.shields Stamp blake.shields 24x36 blake.shields 24x36 blake.shields Image blake.shields Image

UNITED STATES

DEPARTMENT OF THE INTERIOR

FISH AND WILDLIFE SERVICE

REGION 6 ENGINEERING

Lakewood, Colorado

THERMAL ENVELOPE & HVAC UPGRADE

NATIONAL EAGLE & WILDLIFE PROPERTY REPOSITORY

ROCKY MOUNTAIN ARSENAL NATIONAL WILDLIFE REFUGE

ADAMS COUNTY, COLORADO

19-036A

December 11, 2020

SPECIFICATIONS

TABLE OF CONTENTS

ROCKY MOUNTAIN ARSENAL NATIONAL WILDLIFE REFUGE

NATIONAL EAGLE & WILDLIFE PROPERTY REPOSITORY

THERMAL ENVELOPE & HVAC UPGRADE

(19-036A)

DIVISION 1 - GENERAL REQUIREMENTS No. of Pages

SECTION 011000 SUMMARY 8

012900 PAYMENT PROCEDURES 1

013100 PROJECT MANAGEMENT & COORDINATION 7

013200 CONSTRUCTION PROGRESS DOCUMENTATION 2

013233 PHOTOGRAPHIC DOCUMENTATION 3

013300 SUBMITTAL PROCEDURES 7

013310 SUBMITTAL TEMPLATE 1

014000 QUALITY REQUIREMENTS 7

015000 TEMPORARY FACILITIES AND CONTROLS 5

017419 CONSTRUCTION WASTE MANAGEMENT & DISPOSAL 5

017700 CLOSEOUT PROCEDURES 2

017823 OPERATION AND MAINTENANCE DATA 7

DIVISION 2 – EXISTING CONDITIONS No. of Pages

SECTION 024119 SELECTIVE DEMOLITION 9

DIVISION 3 – CONCRETE No. of Pages

SECTION 033000 CAST-IN-PLACE CONCRETE 28

DIVISION 4 – MASONRY No. of Pages

SECTION 042200 CONCRETE UNIT MASONRY 14

DIVISION 5 – METALS No. of Pages

SECTION 051200 STRUCTURAL STEEL FRAMING 12

053100 STEEL DECKING 5

055000 METAL FABRICATIONS 14

055213 PIPE AND TUBE RAILINGS 10

DIVISION 6 – WOOD, PLASTICS, AND COMPOSITES No. of Pages

SECTION 061063 EXTERIOR ROUGH CARPENTRY 3

DIVISION 7 – THERMAL AND MOISTURE PROTECTION No. of Pages

SECTION 072100 THERMAL INSULATION 4

074213.19 INSULATED METAL WALL PANELS 11

075323 ETHYLENE-PROPYLENE-DIENE-MONOMER (EPDM) 13

ROOFING

076200 SHEET METAL FLASHING AND TRIM 13

079200 JOINT SEALANTS 9

079219 ACOUSTICAL JOINT SEALANTS 4

DIVISION 8 – OPENINGS No. of Pages

SECTION 081113 HOLLOW METAL DOORS AND FRAMES 7

081416 FLUSH WOOD DOORS 5

083323 OVERHEAD COILING DOORS 9

083473.13 METAL SOUND CONTROL DOOR AND BORROWED 10

LITE ASSEMBLIES

087100 DOOR HARDWARE 14

DIVISION 9 – FINISHES No. of Pages

SECTION 092216 NON-STRUCTURAL METAL FRAMING 5

092900 GYPSUM BOARD 7

095113 ACOUSTICAL PANEL CEILINGS 7

096513 RESILIENT BASE AND ACCESSORIES 5

096519 RESILIENT TILE FLOORING 6

096813 TILE CARPETING 8

098433 SOUND-ABSORBING WALL UNITS 5

099113 EXTERIOR PAINTING 6

099123 INTERIOR PAINTING 6

DIVISION 10 – SPECIALTIES No. of Pages

SECTION 101423.16 ROOM-IDENTIFICATION PANEL SIGNAGE 5

105126 SOLID PLASTIC LOCKERS 3

105613 METAL STORAGE SHELVING 8

DIVISION 21 – FIRE SUPPRESSION No. of Pages

SECTION 210517 SLEEVE AND SLEEVE SEALS FOR 3

FIRE-SUPPRESSION PIPING

210518 ESCUTHEONS FOR FIRE-SUPPRESION PIPING 3

210553 IDENTIFICATION FOR FIRE-SUPPRESION PIPING 4

AND EQUIPMENT

211313 WET-PIPE SPRINKLER SYSTEMS 12

DIVISION 22 – PLUMBING No. of Pages

SECTION 220517 SLEEVES AND SLEEVE SEALS FOR PLUMING 4

PIPING

220518 ESCUTCHEONS FOR PLUMBING PIPING 3

220523.12 BALL VALVES FOR PLUMBING AND PIPING 4

220523.14 CHECK VALVES FOR PLUMBING PIPING 4

220529 HANGERS AND SUPPORTS FOR PLUMBING PIPING 8

AND EQUIPMENT

220553 IDENTIFICATION FOR PLUMBING PIPING AND 4

EQUIPMENT

220719 PLUMBING PIPING INSULATION 14

221116 DOMESTIC WATER PIPING 9

221119 DOMESTIC WATER PIPING SPECIALTIES 6

221316 SANITARY WASTE AND VENT PIPING 10

223119 SANITARY WASTE PIPING SPECIALTIES 5

DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING No. of Pages

(HVAC)

SECTION 230130.52 EXISTING HBAC AIR DISTRIBUTION SYSTEM 4

CLEANING

230517 SLEEVES AND SLEEVE SEALS FOR HVAC PIPING 3

230518 ESCUTCHEONS FOR HVAC PIPING 2

230529 HANGERS AND SUPPORTS FOR HVAC PIPING 8

AND EQUIPMENT

230553 IDENTIFICATION FOR HVAC PIPING AND 4

EQUIPMENT

230593 TESTING, ADJUSTING, AND BALANCING FOR HVAC 15

230713 DUCT INSTALLATION 13

230719 HVAC PIPING INSULATION 11

231123 FACILITY NATURAL-GAS PIPING 16

232213 STEAM AND CONDENSATE HEATING PIPING 6

233113 METAL DUCTS 11

233300 AIR DUCT ACCESSORIES 8

233346 FLEXIBLE DUCTS 2

233423 HVAC POWER VENTILATORS 4

233713.13 AIR DIFUSERS 3

233713.23 REGISTERS AND GRILLES 2

237416.11 PACKAGED, SMALL-CAPACITY, ROOFTOP 11

AIR-CONDITIONING UNITS

238126 SPLIT-SYSTEM AIR-CONDITIONERS 5

238239.19 WALL AND CEILING UNIT HEATERS 3

238413.29 SELF-CONTAINED STEAM HUMIDIFIERS 7

DIVISION 26 – ELECTRICAL No. of Pages

SECTION 260519 LOW-VOLTAGE ELECTRICAL POWER CONDUCTER 8

AND CABLES

260526 GROUNDING AND BONDING FOR ELECTRICAL 4

SYSTEMS

260529 HANGERS AND SUPPORTS FOR ELECTRICAL 4

SYSTEMS

260533 RACEWAYS AND BOXES FOR ELECTRICAL 8

SYSTEMS

260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS 7

262726 WIRING DEVICES 6

262816 ENCLOSED SWITCHES AND CIRCTUI BREAKERS 5

265119 LED INTERIOR LIGHTING 5

DIVISION 31 – EARTHWORK No. of Pages

SECTION 310516 AGGREGATES FOR EARTHWORK 3

312316.13 TRENCHING 6

DIVISION 32 – EXTERIOR IMPROVEMENTS No. of Pages

SECTION 329219 SEEDING 5

DIVISION 33 – UTILITIES No. of Pages

SECTION 334200 STORMWATER CONVEYANCE 7

END OF SECTION

National Eagle & Wildlife Property Repository December 2020

SUMMARY 011000 - 1

SECTION 011000 - SUMMARY

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Project information.

2. Project background.

3. Work covered by Contract Documents.

4. Work under separate contracts.

5. Access to site.

6. Coordination with occupants.

7. Coordination with local utilities.

8. Work restrictions.

9. Permits and Fees.

10. Applicable codes, standards, and specifications.

11. Means and methods.

12. Safety.

13. Environmental Protection.

B. Related Requirements:

1. Section 015000 "Temporary Facilities and Controls" for limitations and procedures governing temporary use of Government's facilities.

1.2 PROJECT INFORMATION

A. Project Location: The site of the work is at the National Eagle and Wildlife Property Repository, 6550 Gateway Road, Building 128 Commerce City, CO 80022

B. Station Contact Information: Greg Langer, Project Leader, (303) 236-7901

Elisa Dahlberg, Project Leader, (303) 729-2224

1.3 PROJECT BACKGROUND

A. The National Wildlife Property & Eagle Repository (NWPR) is a 22,000 square foot office and warehouse located northeast of Denver, Colorado at the Rocky Mountain Arsenal National Wildlife Refuge. The facility is responsible for receiving wildlife items that have been forfeited or abandoned to the U.S. Fish and Wildlife Service. In accordance with the law, these items are stored in a secure environment, and many of the items are donated to educational facilities, nonprofit organizations, and conservation agencies to aid in teaching about endangered species and other wildlife.

SUMMARY 011000 - 2

The NWPR facility serves a critical purpose in fulfilling the conservation mandate of the USFWS and is in need of several architectural and mechanical renovations to ensure that the sensitive items housed at the facility can be adequately preserved. Renovations will also update select office and educational areas to enhance mission capabilities, as well as visitor experience.

1.4 WORK COVERED BY CONTRACT DOCUMENTS

A. The primary scope of work includes the renovation and upgrade of the thermal envelope and heating, ventilation, and air conditioning (HVAC) and electrical systems and the addition of a 184 sf Sally Port. The work also includes miscellaneous interior renovations and the construction of a new, conditioned Beetle Colony Room, and a vestibule/locker area in the Warehouse. The construction type for the new Sally Port, new north wall infill, and miscellaneous interior walls will be II-B Unprotected Non-Combustible Construction (IBC 2018). The Occupancy Classification will be unchanged, as Business Group B (IBC 2018).

1.5 WORK UNDER SEPARATE CONTRACTS

A. General: In the event there is work being performed under a separate contract the Contractor shall cooperate fully with separate contractors so work on those contracts may be carried out smoothly, without interfering with or delaying work under this Contract or other contracts. Coordinate the Work of this Contract with work performed under separate contracts.

1.6 ACCESS TO SITE

A. All operations of the Contractor (including storage of materials) upon Government premises shall be confined to areas authorized or approved by the Contracting Officer.

B. Limit use of Project site areas within the Contract limits indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated.

1. Limits: Confine construction operations to limits shown in the construction drawings. Use of any areas not shown in the drawings for construction activities such as material staging, fabrication, parking, equipment storage, etc. must be approved in writing by the station project leader and contracting officer.

2. Driveways, Walkways and Entrances: Keep driveways and loading areas, and entrances serving premises clear and available to Government, Government Representatives, and emergency vehicles at all times. Do not use these areas for parking or storage of materials.

C. Condition of Existing Building: Maintain portions of existing building affected by construction operations in a weather tight condition throughout construction period. Repair damage caused by construction operations.

1.7 COORDINATION WITH OCCUPANTS

A. Full Government Occupancy: Government will occupy site and existing adjacent building(s) during entire construction period. Cooperate with Station Manager during construction operations

SUMMARY 011000 - 3

to minimize conflicts and facilitate Government usage. Perform the Work so as not to interfere with Government's day-to-day operations. Maintain existing exits unless otherwise indicated.

1. Notify Station Manager not less than 48 hours in advance of activities that will affect Station operations.

1.8 WORK RESTRICTIONS

A. Work Restrictions, General: Comply with restrictions on construction operations. Comply with limitations on use of public streets and with other requirements of authorities having jurisdiction.

B. On-Site Work Hours: Limit work in the existing building to normal business working hours of 7:00 a.m. to 4:00 p.m., Monday through Friday, unless otherwise indicated.

1. Work on weekends will be restricted to Contracting Officers approval and at the Station Managers discretion.

2. No work will take place over Federally observed holidays.

C. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied unless permitted under the following conditions and then only after providing temporary utility services according to requirements indicated:

1. Notify Station Manager not less than 48 hours in advance of proposed utility interruptions.

D. Noise, Vibration, and Odors: Coordinate operations that may result in high levels of noise and vibration, odors, or other disruptions to the Government.

1. Notify Station Manager not less than 48 hours in advance of proposed disruptive operations.

E. Nonsmoking Building: Smoking is not permitted within the building or within 25 feet (8 m) of entrances, operable windows, or outdoor-air intakes.

F. COVID-19 Guidelines: All workers shall comply with OSHA COVID-19 Control and Prevention Guidelines (https://www.osha.gov/SLTC/covid-19/construction.html) to reduce the risk of COVID- 19 transmission, including, but not limited to:

1. Wear cloth face coverings and gloves.

2. Maintain social distancing of 6 feet when possible.

3. Clean and disinfect frequently touched surfaces.

4. Limit tool sharing when possible.

5. Practice proper hand hygiene.

6. Notify your supervisor and stay at home if any symptoms are experienced.

7. Train workers on:

a. The signs and symptoms of COVID-19 and an explanation of how the disease is potentially spread, including the fact that infected people can spread the virus even if they do not have symptoms.

b. All policies and procedures that are applicable to the employee's duties as they relate to potential exposures to SARS-CoV-2. It is helpful to provide employees with a written copy of those standard operating procedures.

c. Information on appropriate social distancing and hygiene practices, including:

SUMMARY 011000 - 4

d. Avoiding physical contact with others and maintaining a distance of at least 6 feet from customers and other individuals, whenever possible, including inside work trailers.

e. Appropriate cleaning practices (i.e., washing hands frequently with soap and water for at least 20 seconds, or, if soap and water are not immediately available, using alcohol-based hand sanitizer that contains at least 60% alcohol and rubbing hands until they are dry; sanitizing all surfaces workers will touch).

f. The proper way to cover coughs and sneezes following CDC recommendations (i.e., sneezing or coughing into a tissue or into the upper sleeve).

g. Alternatives to shaking hands upon entry, and the importance of workers not touching their own faces (mouth, nose, eyes).

h. The benefits of driving to work sites or parking areas individually, when possible, without passengers or carpools.

i. The types, proper use, limitations, location, handling, decontamination, removal, and disposal of any PPE being used.

j. The importance of staying home if they are sick.

k. Wearing masks over their noses and mouths to prevent them from spreading the virus.

l. The need to continue using other normal control measures, including PPE, necessary to protect workers from other job hazards associated with construction activities.

m. Using Environmental Protection Agency-approved cleaning chemicals from List N or that have label claims against the coronavirus for cleaning frequently touched surfaces like tools, handles, and machines.

n. The need to report any safety and health concerns.

G. Protection of Existing Items to Remain: Contractor shall protect existing items as specified in Section 024119 “Selective Demolition”.

1.9 COORDINATION WITH LOCAL UTILITIES

A. The Contractor shall be responsible for contracting and arranging with local utility for the termination, moving, or connection of utilities that serve existing buildings and ones that are planned to serve the new Work.

B. Local utilities that serve Rocky Mountain Arsenal National Wildlife Refuge, Commerce City, Adams County, Colorado are:

1. Electric, Xcel Energy, Eric Kasperbaur, 303-519-1477

2. Water, Denver Water, 303-893-2444

3. Wastewater, Rocky Mountain Arsenal, Elisa Dahlberg, 303-729-2224

4. Natural Gas, Xcel Energy, Eric Kasperbaur, 303-519-1477

5. Telephone, Century Link, 800-244-1111

6. Internet, Century Link, 800-244-1111

SUMMARY 011000 - 5

1.10 PERMITS AND FEES

A. The Contractor shall be responsible for obtaining all necessary local, State, and Federal permits and licenses, and payment of related fees, per the Contract Clauses.

1.11 APPLICABLE CODES, STANDARDS AND SPECIFICATIONS

A. All work shall comply with the codes and standards applicable to each type of work as listed in individual Sections of these Specifications.

B. Where a conflict occurs between a referenced document and the Project Specifications, the Project Specifications govern.

C. Where a conflict occurs between referenced documents, the document containing the most stringent requirements governs.

D. Where referenced documents are not specified by date, the document current at the bid opening applies.

E. Materials, applications, and tests specified by reference to published standards of society, association, code, or other published standards are included in the specifications as if written in their entirety.

F. Conform to all regulations and statutes of the State of Colorado and to all Federal Regulations which apply.

1.12 MEANS AND METHODS

A. Means and methods of construction shall be such as the Contractor or subcontractors may choose;

subject, however, to the Contracting Officer's right to reject means and methods proposed which:

1. Constitute a hazard to the work, persons, or property.

2. Will not produce finished work in accordance with terms of the contract.

3. Are contrary to specified means or methods included in the contract.

B. The right to reject means and methods of the Contractor or subcontractor shall not be construed or interpreted as acceptance of control of means and methods by the Contracting Officer.

C. The Contracting Officer's approval of means and methods or failure to exercise right to reject means and methods shall not relieve the Contractor of the obligation to complete the work required by the contract.

D. Total responsibility for control of all means and methods lies with the Contractor for all work.

1.13 SAFETY

A. The Contractor shall provide, erect and maintain all necessary barricades, suitable and sufficient flasher lights, flagmen, danger signals and signs, and shall take all necessary precautions for the

SUMMARY 011000 - 6

protection of the work and the safety of the public. All ponds and water control structures shall remain accessible by vehicle. Roads closed to traffic shall be protected by effective barricades and shall be placed with acceptable warning signs. All barricades and obstructions shall be illuminated at night and all lights shall be kept burning from sunset until sunrise. Install appropriate traffic signs at crossroads and approaches to site as needed to direct affected public traffic. Specific signs and barricade requirements are detailed in the U.S. Department of Transportation, "Manual on Uniform Traffic Control Devices".

B. The Contractor shall assume full responsibility and liability for compliance with all applicable Federal, State, and local regulations pertaining to the protection of workers, visitors to the site, and persons occupying areas adjacent to the site, including the provisions of 29CFR1910 and 29CFR1926 of the Code of Federal Regulations. The Contractor shall hold harmless the Government for failure to comply with any applicable safety or health regulation on the part of himself, his employees, or his subcontractors.

C. Provide personal safety equipment and training commensurate with the hazards which may exist at the work site. The personal safety equipment and training shall be determined by a thorough hazard analysis of all work site areas. The safety program available at all work sites shall include a minimum of:

1. One nonfreezing-type fire extinguisher in each workshop and shed used for storage of materials at the work site. Place in location readily accessible to construction personnel.

2. A first aid kit for use of construction personnel commensurate with size of project with items necessary for first aid treatment of all injuries.

3. The Contractor shall conduct regular onsite safety inspections and all construction personnel shall receive a safety orientation.

4. Post telephone numbers of nearest hospital, ambulance service or flight for life, and fire station in conspicuous location. Advise all workers of location of telephone numbers.

1.14 ENVIRONMENTAL PROTECTION

A. The Contractor shall abate and control all environmental pollution arising from construction activities by complying with all applicable Federal, State, and local laws and regulations concerning environmental pollution control and abatement, as well as the specified requirements in this contract. Compliance with this requirement by subcontractors will be the responsibility of the Contractor.

B. Fossils and Artifacts

1. Should the Contractor discover any fossils or artifacts during construction operations, such objects shall become the property of the Government. The Contractor shall cease construction operations in the area of the "find," and immediately notify the station manager of such discovery. Construction operations may proceed in other areas not affected by this clause. Care shall be exercised by the Contractor not to damage fossils or artifacts uncovered during excavation operations.

2. Failure to comply with this requirement may be considered a violation of the Archeological Resources Protection Act of 1979 as amended. Destruction of historic and prehistoric sites and/or unauthorized collection of cultural materials can result in criminal and/or civil penalties. Penalties can include fines, prison sentences, and/or confiscation of equipment.

SUMMARY 011000 - 7

3. If the Contractor uses fill from a nongovernmental source to perform work that is required under this project, and a new borrow site is opened or an existing borrow area is expanded in order to obtain such materials, the Contractor shall assure that any new borrow area disturbance meet the requirements of Section 106 of the National Historic Preservation Act.

C. Abatement of Air Pollution

1. The Contractor shall comply with applicable Federal, State, and local laws and regulations concerning the prevention and control of air pollution.

2. Construction activities shall be performed in such a manner that air pollution will be held to a minimum.

3. Burning of materials, trees and brush, combustible construction materials, and rubbish will not be permitted. Construction debris shall be disposed of at a location designated by the Contracting Officer or hauled off the Station to an approved disposal site.

D. Prevention of Water Pollution

1. As applicable, the Contractor is responsible for implementing the terms and requirements of the Colorado storm water discharge permit, as issued to the State under the National Pollution Discharge Elimination System (NPDES) by the Environmental Protection Agency (EPA). The Contractor shall apply for and execute all permits as required by the State of Colorado regarding storm water discharge from the construction site. The Contractor shall submit to the Contracting Officer a copy of all permit applications and a copy of all approvals from the State. Allow the Government 10 days for review of the application package prior to submission.

2. During construction, the Contractor shall comply with all applicable Federal, State, and local laws and regulations concerning the control and abatement of water pollution.

3. The Contractor's construction activities shall be performed by methods that will prevent entrance or accidental spillage of solid matter, contaminants, debris, and other objectionable pollutants and wastes into streams, flowing or dry water-courses, lakes, ponds, and underground water sources. The Contractor shall dispose of all pollutants such as petroleum products, rubbish, cement, concrete, etc., and objectionable material at a jurisdictionally accepted waste management facility.

4. Sanitary facilities, such as chemical toilets shall be located far enough from wells, live streams, or ponds to prevent pollution of the water.

5. Dewatering work for structure foundations or earthwork operations adjacent to or encroaching on streams or watercourses shall be conducted in a manner that prevents muddy water and eroded materials from entering streams or watercourses. This shall be accomplished by construction of intercepting ditches, bypass channels, barriers, settling ponds, or other approved means. Excavated material shall not be placed in or adjacent to watercourses where it can be washed away by high water or storm runoff.

E. Prevention of site contamination

1. The purpose of this section is to prevent invasive species from being introduced to the project work sites. This includes both plant and animal species. Invasive species can have long last detrimental effects at project sites at US Fish and Wildlife Service lands.

2. Prior to entrance to the work site, all equipment brought on site will be thoroughly washed to remove dirt, seeds, and plant parts. Any equipment that has been any body of water within the past 30 days will be thoroughly cleaned with hot water greater than 140 degree F

SUMMARY 011000 - 8

(typically the temperature found at commercial truck washes) and dried for a minimum of five days before being used at this project site. In addition, before transporting equipment from the project site all visible mud, plants and fish/animals will be removed, all water will be eliminated, and the equipment will be thoroughly cleaned. Anything that came in contact with water will be cleaned and dried following the above procedure.

F. Environmental Litigation: Time lost due to work stoppage because of failure of the Contractor to comply with these requirements may not be the subject of a claim for extension of time, for additional costs, or damages.

END OF SECTION 011000

PAYMENT PROCEDURES 012900 - 1

SECTION 012900 – PAYMENT PROCEDURES

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative and procedural requirements necessary to prepare and process Applications for Payment.

1.2 SCHEDULE OF VALUES

A. Coordination: Coordinate preparation of the schedule of values with preparation of Contractor's construction schedule.

1. Submit the schedule of values to Contracting Officer at earliest possible date but no later than seven days before the date scheduled for submittal of initial Applications for Payment.

1.3 APPLICATIONS FOR PAYMENT

A. Each Application for Payment shall be consistent with previous applications and payments as certified by Contracting Officer.

B. Payment Application Times: The date for each progress payment is indicated in the Agreement between Government and Contractor.

C. Initial Application for Payment: Administrative actions and submittals that must precede or coincide with submittal of first Application for Payment include the following:

1. Schedule of values.

2. Contractor's construction schedule (preliminary if not final).

3. Submittal schedule (preliminary if not final).

D. Final Payment Application: After completing Project closeout requirements, submit final Application for Payment with releases and supporting documentation not previously submitted and accepted, including, but not limited, to the following:

1. Evidence of completion of Project closeout requirements.

2. Written guarantees, warranties, and certificates.

3. Record (As-Built) Drawings

4. All test reports.

END OF SECTION 012900

PROJECT MANAGEMENT AND COORDINATION 013100 - 1

SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

1. Coordination drawings.

2. Requests for Information (RFIs).

3. Project meetings.

1.2 DEFINITIONS

A. RFI: Request from Government, Owner, Construction Manager, Architect/Engineer, or Contractor seeking information required by or clarifications of the Contract Documents.

1.3 INFORMATIONAL SUBMITTALS

A. Subcontract List: Prepare a written summary identifying individuals or firms proposed for each portion of the Work, including those who are to furnish products or equipment fabricated to a special design. Include the following information in tabular form:

1. Name, address, and telephone number of entity performing subcontract or supplying products.

2. Number and title of related Specification Section(s) covered by subcontract.

3. Drawing number and detail references, as appropriate, covered by subcontract.

1.4 GENERAL COORDINATION PROCEDURES

A. Coordination: Coordinate construction operations included in different Sections of the Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate construction operations, included in different Sections, which depend on each other for proper installation, connection, and operation.

1. Provide a construction schedule noting demolition activities, construction activities, deliveries, payments, etc., as needed to convey coordination information to the Contacting Officer, Contacting Officer’s Representative (COR), Government Inspector as well as local staff.

2. Schedule construction operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation.

3. Coordinate installation of different components to ensure maximum performance and accessibility for required maintenance, service, and repair.

4. Make adequate provisions to accommodate items scheduled for later installation.

PROJECT MANAGEMENT AND COORDINATION 013100 - 2

B. Prepare memoranda for distribution to each party involved, outlining special procedures required for coordination. Include such items as required notices, reports, and list of attendees at meetings.

1. Prepare similar memoranda for Owner and separate contractors if coordination of their Work is required.

C. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities as well as any activities of other contractors to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following:

1. Preparation of Contractor's construction schedule.

2. Preparation of the Schedule Of Values.

3. Installation and removal of temporary facilities and controls.

4. Delivery and processing of submittals.

5. Progress meetings.

6. Pre-installation conferences.

7. Project closeout activities.

8. Startup and adjustment of systems.

1.5 COORDINATION DRAWINGS

A. Coordination Drawings, General: Prepare coordination drawings according to requirements in individual Sections, where installation is not completely shown on Shop Drawings, where limited space availability necessitates coordination, or if coordination is required to facilitate integration of products and materials fabricated or installed by more than one entity.

1. Content: Project-specific information, drawn accurately to a scale large enough to indicate and resolve conflicts. Do not base coordination drawings on standard printed data. Include the following information, as applicable:

a. Indicate functional and spatial relationships of components of architectural, structural, civil, mechanical, and electrical systems.

b. Indicate dimensions shown on the Drawings. Specifically note dimensions that appear to be in conflict with submitted equipment and minimum clearance requirements.

Provide alternate sketches to Architect/Engineer indicating proposed resolution of such conflicts. Minor dimension changes and difficult installations will not be considered changes to the Contract.

1.6 REQUESTS FOR INFORMATION (RFIs)

A. General: Immediately on discovery of the need for additional information or interpretation of the Contract Documents, Contractor shall prepare and submit an RFI in the form specified.

1. The Government will return RFIs as submitted to the Government by other entities controlled by Contractor with no response. RFI’s must come directly from the Contractor.

2. Coordinate and submit RFIs in a prompt manner so as to avoid delays in Contractor's work or work of subcontractors.

PROJECT MANAGEMENT AND COORDINATION 013100 - 3

B. Content of the RFI: Include a detailed, legible description of item needing information or interpretation and the following:

1. Project name.

2. Project number.

3. Date.

4. Name of Contractor.

5. RFI number, numbered sequentially.

6. RFI subject.

7. Specification Section number and title and related paragraphs, as appropriate.

8. Drawing number and detail references, as appropriate.

9. Field dimensions and conditions, as appropriate.

10. Contractor's suggested resolution. If Contractor's solution(s) impacts the Contract Time or the Contract Sum, Contractor shall state impact in the RFI.

11. Contractor's signature.

12. Attachments: Include sketches, descriptions, measurements, photos, Product Data, Shop

Drawings, coordination drawings, and other information necessary to fully describe items needing interpretation.

C. RFI Forms: AIA Document G716, or Software-generated form with substantially the same content as indicated above, acceptable to the Government.

D. The Governments Action: The Government will review each RFI, determine action required, and respond. Allow seven working days for the Government’s response for each RFI. RFIs received after 1:00 p.m. will be considered as received the following working day.

1. The following RFIs will be returned without action:

a. Requests for approval of submittals.

b. Requests for approval of substitutions.

c. Requests for coordination information already indicated in the Contract Documents.

d. Requests for adjustments in the Contract Time or the Contract Sum.

e. Requests for interpretation of Architect's actions on submittals.

f. Incomplete RFIs or inaccurately prepared RFIs.

g. Request For Information submitted by a sub-contractor to the Contractor.

2. The Government’s action may include a request for additional information, in which case the time for response will date from time of receipt of additional information.

3. The Government’s action on RFIs that may result in a change to the Contract Time or the Contract Sum may be eligible for Contractor to submit Change Proposal.

a. If Contractor believes the RFI response warrants change in the Contract Time or the Contract Sum, notify Contacting Officer and COR in writing within 10 days of receipt of the RFI response.

E. RFI Log: Prepare, maintain, and submit a tabular log of RFIs organized by the RFI number. Submit log weekly with not less than the following information:

1. Project name.

2. Name and address of Contractor.

PROJECT MANAGEMENT AND COORDINATION 013100 - 4

3. Name and address of Contacting Officer and COR.

4. RFI number including RFIs that were dropped and not submitted.

5. RFI description.

6. Date the RFI was submitted.

7. Date the Contacting Officer’s response was received.

F. On receipt of the Government’s action, update the RFI log and immediately distribute the RFI response to affected parties. Review response and notify the Government within seven days if Contractor disagrees with response.

1. Identification of related Minor Change in the Work, Construction Change Directive, and Proposal Request, as appropriate.

2. Identification of related Field Order, Work Change Directive, and Proposal Request, as appropriate.

1.7 PROJECT MEETINGS

A. General: Schedule and conduct meetings and conferences at Project site unless otherwise indicated.

1. Attendees: Inform participants and others involved, and individuals whose presence is required, of date and time of each meeting. Notify the Facility Director, the Contracting officer and the COR of scheduled meeting dates and times.

2. Agenda: Prepare the meeting agenda. Distribute the agenda to all invited attendees.

3. Minutes: Entity responsible for conducting meeting will record significant discussions and agreements achieved. Distribute the meeting minutes to everyone concerned, including the Contracting Officer and the COR, Construction Manager, and Engineer, within three days of the meeting.

B. Preconstruction Conference: The Contracting Officer will schedule a preconstruction conference before starting construction, at a time convenient to the Contracting Officer, COR, Facility Director, On-Site Government Inspector and Contractor.

1. Attendees: Authorized representatives of the Contracting Officer, Government Project Manager, Owner's Commissioning Authority, Construction Manager, Architect/Engineer, and their consultants; Contractor and its superintendent; major subcontractors; suppliers; and other concerned parties shall attend the conference. Participants at the conference shall be familiar with Project and authorized to conclude matters relating to the Work.

2. Agenda: Discuss items of significance that could affect progress, including the following:

a. Tentative construction schedule.

b. Phasing.

c. Critical work sequencing and long-lead items.

d. Designation of key personnel and their duties.

e. Procedures for processing field decisions and Change Orders.

f. Procedures for RFIs.

g. Procedures for testing and inspecting.

PROJECT MANAGEMENT AND COORDINATION 013100 - 5

h. Procedures for processing Applications for Payment.

i. Distribution of the Contract Documents.

j. Submittal procedures.

k. Preparation of record documents.

l. Use of the premises and existing building.

m. Work restrictions.

n. Working hours.

o. Owner's occupancy requirements.

p. Responsibility for temporary facilities and controls.

q. Procedures for moisture and mold control.

r. Procedures for disruptions and shutdowns.

s. Construction waste management and recycling.

t. Parking availability.

u. Office, work, and storage areas.

v. Equipment deliveries and priorities.

w. First aid.

x. Security.

y. Progress cleaning.

3. Minutes: Entity responsible for conducting meeting will record and distribute meeting minutes.

C. Preinstallation Conferences: Conduct a preinstallation conference at Project site before each construction activity that requires coordination with other construction.

1. Attendees: Installer and representatives of manufacturers and fabricators involved in or affected by the installation and its coordination or integration with other materials and installations that have preceded or will follow, shall attend the meeting. Advise the Government of scheduled meeting dates.

2. Agenda: Review progress of other construction activities and preparations for the particular activity under consideration, including requirements for the following:

a. Contract Documents.

b. Options.

c. Related RFIs.

d. Related Change Orders.

e. Purchases.

f. Deliveries.

g. Submittals.

h. Review of mockups.

i. Possible conflicts.

j. Compatibility problems.

k. Time schedules.

l. Weather limitations.

m. Manufacturer's written instructions.

n. Warranty requirements.

o. Compatibility of materials.

p. Acceptability of substrates.

q. Temporary facilities and controls.

r. Space and access limitations.

PROJECT MANAGEMENT AND COORDINATION 013100 - 6

s. Regulations of authorities having jurisdiction.

t. Testing and inspecting requirements.

u. Installation procedures.

v. Coordination with other work.

w. Required performance results.

x. Protection of adjacent work.

y. Protection of construction and personnel.

3. Record significant conference discussions, agreements, and disagreements, including required corrective measures and actions.

4. Reporting: Distribute minutes of the meeting to each party present and to other parties requiring information.

5. Do not proceed with installation if the conference cannot be successfully concluded. Initiate whatever actions are necessary to resolve impediments to performance of the Work and reconvene the conference at earliest feasible date.

D. Progress Meetings: Conduct progress meetings at regular intervals as directed by the Contracting officer and/or the COR.

1. Attendees: In addition to representatives of the Government, Construction Manager, and Architect/Engineer (as applicable), each contractor, subcontractor, supplier, and other entity concerned with current progress or involved in planning, coordination, or performance of future activities shall be represented at these meetings. All participants at the meeting shall be familiar with Project and authorized to conclude matters relating to the Work.

2. Agenda: Review and correct or approve minutes of previous progress meeting. Review other items of significance that could affect progress. Include topics for discussion as appropriate to status of Project.

a. Contractor's Construction Schedule: Review progress since the last meeting.

Determine whether each activity is on time, ahead of schedule, or behind schedule, in relation to Contractor's construction schedule. Determine how construction behind schedule will be expedited; secure commitments from parties involved to do so.

Discuss whether schedule revisions are required to ensure that current and subsequent activities will be completed within the Contract Time.

1) Review schedule for next period.

b. Review present and future needs of each entity present, including the following:

1) Interface requirements.

2) Sequence of operations.

3) Status of submittals.

4) Deliveries.

5) Off-site fabrication.

6) Access.

7) Site utilization.

8) Temporary facilities and controls.

PROJECT MANAGEMENT AND COORDINATION 013100 - 7

9) Progress cleaning.

10) Quality and work standards.

11) Status of correction of deficient items.

12) Field observations.

13) Status of RFIs.

14) Status of proposal requests.

15) Pending changes.

16) Status of Change Orders.

17) Pending claims and disputes.

18) Documentation of information for payment requests.

3. Minutes: Entity responsible for conducting the meeting will record and distribute the meeting minutes to each party present and to parties requiring information.

a. Schedule Updating: Revise Contractor's construction schedule after each progress meeting where revisions to the schedule have been made or recognized. Issue revised schedule concurrently with the report of each meeting.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 013100

CONSTRUCTION PROGRESS DOCUMENTATION 013200 - 1

SECTION 013200 – CONSTRUCTION PROGRESS DOCUMENTATION

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative and procedural requirements for documenting the progress of construction during performance of the Work, including the following:

1. Contractor's construction schedule.

2. Construction schedule updating reports.

3. Daily construction reports.

4. Site condition reports.

1.2 DEFINITIONS

A. Activity: A discrete part of a project that can be identified for planning, scheduling, monitoring, and controlling the construction project. Activities included in a construction schedule consume time and resources.

1. Critical Activity: An activity on the critical path that must start and finish on the planned early start and finish times.

2. Predecessor Activity: An activity that precedes another activity in the network.

3. Successor Activity: An activity that follows another activity in the network.

1.3 INFORMATIONAL SUBMITTALS

A. Contractor's Construction Schedule: Initial schedule, of size required to display entire schedule for entire construction period.

1. Submit a working electronic copy of schedule, using software indicated, and labeled to comply with requirements for submittals. Include type of schedule (initial or updated) and date on label.

B. Construction Schedule Updating Reports: Submit with Applications for Payment.

1.4 COORDINATION

A. Coordinate Contractor's construction schedule with the schedule of values, submittal schedule, progress reports, payment requests, and other required schedules and reports.

1. Secure time commitments for performing critical elements of the Work from entities involved.

2. Coordinate each construction activity in the network with other activities and schedule them in proper sequence.

CONSTRUCTION PROGRESS DOCUMENTATION 013200 - 2

PART 2 - PRODUCTS

2.1 CONTRACTOR'S CONSTRUCTION SCHEDULE, GENERAL

A. Time Frame: Extend schedule from date established from the Notice to Proceed to the date of completion.

B. Activities: Treat each story or separate area as a separate numbered activity for each main element of the Work. Comply with the following:

1. Activity Duration

2. Procurement Activities

3. Submittal Review Time

4. Punch List and Final Completion: Include not more than 15 days for completion of punch list items and final completion.

C. Constraints: Include constraints and work restrictions indicated in the Contract Documents and as follows in schedule, and show how the sequence of the Work is affected.

1. Phasing: Arrange list of activities on schedule by phase.

2. Work under More Than One Contract: Include a separate activity for each contract.

3. Work by Owner: Include a separate activity for each portion of the Work performed by

Owner.

4. Work Restrictions: Show the effect of the following items on the schedule:

a. Coordination with existing construction.

b. Limitations of continued occupancies.

c. Uninterruptible services.

d. Partial occupancy before Substantial Completion.

e. Use of premises restrictions.

f. Provisions for future construction.

g. Seasonal variations.

h. Environmental control.

5. Work Stages: Indicate important stages of construction for each major portion of the Work.

6. Other Constraints

D. Milestones: Include milestones indicated in the Contract Documents in schedule, including, but not limited to, the Notice to Proceed, Substantial Completion, and final completion and the following interim milestones.

1. Insert milestones not indicated elsewhere.

END OF SECTION 013200

PHOTOGRAPHIC DOCUMENTATION 013233 - 1

SECTION 013233 - PHOTOGRAPHIC DOCUMENTATION

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative and procedural requirements for the following:

1. Preconstruction photographs.

2. Periodic construction photographs.

B. Related Requirements:

1. Section 017700 "Closeout Procedures" for submitting photographic documentation as Project Record Documents at Project closeout.

1.2 INFORMATIONAL SUBMITTALS

A. Key Plan: Submit key plan of Project site and building with notation of vantage points marked for location and direction of each photograph. Indicate elevation or story of construction. Include same information as corresponding photographic documentation.

B. Digital Photographs: Submit unaltered, original, full-size image files within 5 days of taking photographs.

1. Digital Camera: Minimum sensor resolution of 8 megapixels.

2. Digital photographs to be submitted in the order in which they were taken with the photograph “name” as given by the device used to take to photo.

3. Identification: Provide the following information with each image description in file metadata tag:

a. Date and time photograph was taken

b. Unique photograph number

1.3 QUALITY ASSURANCE

A. Photographs to be clear, focused, level, have proper exposure settings (not over exposed or under exposed), and clearly show and document the subject matter. Detail photographs (close-ups) to be preceded by a larger overall view of the area being documented.

1.4 USAGE RIGHTS

A. If a professional photographer is used for this requirement, obtain and transfer copyright usage rights from photographer to Owner for unlimited reproduction of photographic documentation.

PHOTOGRAPHIC DOCUMENTATION 013233 - 2

PART 2 - PRODUCTS

2.1 PHOTOGRAPHIC MEDIA

A. Digital Images: Provide images in JPG format, with minimum size of 8 megapixels.

PART 3 - EXECUTION

3.1 CONSTRUCTION PHOTOGRAPHS

A. Photographer: Engage a qualified photographer to take construction photographs. Photographer need not be a professional photographer, but an individual familiar with and able to produce clear, focused photographs of the subject area with good reference points.

B. General: Take photographs using the maximum range of depth of field, and that are in focus, to clearly show the Work. Photographs with blurry or out-of-focus areas will not be accepted.

1. Maintain key plan with each set of construction photographs that identifies each photographic location.

C. Digital Images: Submit digital images exactly as originally recorded in the digital camera, without alteration, manipulation, editing, or modifications using image-editing software.

1. Date and Time: Include date and time in file name for each image.

2. Field Office Images: Maintain one set of images accessible in the field office at Project site, available at all times for reference. Identify images in the same manner as those submitted to the Government.

D. Preconstruction Photographs: Before commencement of excavation, commencement of demolition and starting construction, take photographs of Project site and surrounding properties, including existing items to remain during construction, from different vantage points, as directed by Government.

1. Flag excavation areas before taking construction photographs.

2. Take minimum of 10 photographs, or as needed, to show existing conditions adjacent to property before starting the Work.

3. Take minimum of 10 photographs, or as needed, of existing buildings either on or adjoining property to accurately record physical conditions at start of construction.

E. Periodic Construction Photographs: Take photographs as needed to fully document the construction progress. Select vantage points to show status of construction and progress since last photographs were taken. Try to retake progress photos from the same vantage points when possible so as to show relative construction progress.

F. Final Completion Construction Photographs: Take color photographs after date of Substantial Completion for submission as Project Record Documents. The Government will inform photographer of desired vantage points.

PHOTOGRAPHIC DOCUMENTATION 013233 - 3

G. Additional Photographs: The Government may request photographs in addition to periodic photographs specified as needed to verify progress or to verify work completion accuracy.

1. Three days' notice will be given, where feasible.

2. In emergency situations, take additional photographs within 24 hours of request.

3. Circumstances that could require additional photographs include, but are not limited to, the following:

a. Special events planned at Project site.

b. Immediate follow-up when on-site events result in construction damage or losses.

c. Photographs to be taken at fabrication locations away from Project site. These photographs are not subject to unit prices or unit-cost allowances.

d. Substantial Completion of a major phase or component of the Work.

e. Extra record photographs at time of final acceptance.

f. Owner's request for special publicity photographs.

END OF SECTION 013233

SUBMITTAL PROCEDURES 013300 - 1

SECTION 013300 – SUBMITTAL PROCEDURES

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes requirements for the submittal schedule and administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other submittals.

1.2 DEFINITIONS

A. Action Submittals: Written and graphic information and physical samples that require Architect's Contracting Officer responsive action.

B. Informational Submittals: Written and graphic information and physical samples that do not require Architect's Contracting Officer responsive action. Submittals may be rejected for not complying with requirements.

1.3 ACTION SUBMITTALS

A. Submittal Schedule: Submit a schedule of submittals, arranged in chronological order by dates required by construction schedule.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .