Atch (1)_APPENDIX E Risk Assessment Example Format - Draft RFP 9Sep20.pptx

PPTX presentation 86 KB Posted

Attached to
SAILOR 2025 (S2025) READY RELEVANT LEARNING (RRL) FISCAL YEAR 2022 CONTENT CONVERSION
Solicitation number
N61340-21-R-0032
Issued by

About this file

This document contains a draft request for proposal and statement of work for a federal contract opportunity with the Department of the Navy Naval Air Systems Command. The contract is for fiscal year 2022 Ready Relevant Learning content conversion efforts to modernize Navy training delivery methods and allow for rapid infusion of relevant course content. The acquisition will use a full and open competitive negotiation process to award a single-award indefinite delivery indefinite quantity contract. The North American Industry Classification System code is 541330 with a size standard of $41.5 million. An industry day will be held on December 16, 2020 and questions are due by January 4, 2021. The final request for proposal is estimated to be released in March 2021 for content conversion services to accelerate Sailor learning and performance.

View the file

Other files

File Type Posted
RRL FY22 CC Presolicitation QuestionsAnswers Beta.Sam.Gov Posting 2 16Feb2021.pdf PDF
RRL FY22 CC Presolicitation QuestionsAnswers Beta.Sam.Gov Posting 10Feb2021.pdf PDF
RRL FY22 CC Industry Day 16Dec2020 Attendees List.pdf PDF
RRL FY22 CC Industry Day Slides 16Dec20_Presented.pdf PDF
FY22 RRL CC PreSol Questions.xlsx XLSX spreadsheet
Attachment 1 - FY22 CC IDIQ SOW - Draft RFP 4Nov20.docx DOCX document
Atch (1)_APPENDIX B Acronym List - Draft RFP 9Sep20.docx DOCX document
Attachment 3 - Form 4330_Data-Item-Transmittal_Form.pdf PDF
Atch (1)_APPENDIX G Sailor 2025 RRL Operational Engaging Instructional Strategies - Draft RFP 9Sep20.docx DOCX document
Atch (L-2) Small Business Participation Committment Document (SBPCD).docx DOCX document
Atch (1)_APPENDIX M NETC RRL Video Streaming Guidance - Draft RFP 9Sep20.odt ODT document
Exhibit A_FY22 RRL CONTENT CONVERSION (A00X) Engineering CDRLs - 09 Sep 20.docx DOCX document
N6134021R0032 RRL FY22CC DRAFT RFP 4Dec20.pdf PDF
Atch (L-1) Q-A Form.xlsx XLSX spreadsheet
Atch (L-4)_Contractor Performance Assessment Questionaire(CPAQ).docx DOCX document
Atch (1)_APPENDIX H Sailor 2025 RRL Use of Blooms Taxonomy Action Verbs - Draft RFP 9Sep20.odt ODT document
Atch (L-6) CLIN Pricing Form.xlsx XLSX spreadsheet
Atch (1)_APPENDIX F Sailor 2025 RRL Content Delivery Modes - Draft RFP 9Sep20.odt ODT document
Atch (1)_APPENDIX I Sailor 2025 RRL Content Conversion Media Type Characteristics - Draft RFP 9Sep20.pdf PDF
Atch (1)_APPENDIX C Terms and Definitions - Draft RFP 14Oct20.docx DOCX document
Atch (1)_APPENDIX D CDRL List - Draft RFP 9Sep20.docx DOCX document
Atch (L-3)_PastPerformanceContractReferenceWorksheet.docx DOCX document
Exhibit F_FY22 RRL CONTENT CONVERSION (F00X) Training CDRLs - 09 Sep 2020.docx DOCX document
Attachment 2 - FY22 CC DO 001 - Draft RFP 1Dec20.docx DOCX document
Atch (L-5)_Relevancy_Information_of_the_PP_Contract.docx DOCX document
Atch (1)_APPENDIX J Mobile Learning Roadmap - Draft RFP 9Sep20.docx DOCX document
Exhibit B_FY22 RRL CONTENT CONVERSION (B00X) Admin CDRLs - 09 Sep 20.docx DOCX document
Atch (1)_APPENDIX L NETC RRL Single User Gaming and Simulation Guidance - Draft RFP 9Sep20.odt ODT document
Atch (1)_APPENDIX K S2025 xAPI Requirements - Draft RFP 9Sep2020.docx DOCX document
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DISTRIBUTION A. Approved for public release. Distribution is unlimited.

APPENDIX E: Risk Assessment Example Format 09 September 2020

Sailor 2025 – Ready Relevant Learning (RRL) Risk Assessment

Likelihood [5] Near Certainty (~90%)

[4] Highly Likely (~70%)

1
[3] Likely

(~50%)

[2] Low Likelihood (~30%)

[1] Not Likely (~10%)

Consequence[1]
Minimal[2]
Minor[3]
Moderate[4]
Major[5]

Unaccept-able

O

- Original X

- Current Low Moderate High

Consequence Likelihood

Action/Event Date Schd.

ECD

Act.

Current Status Risk Level if Successful C L Suc.

Comments Plan:

T

- Target New Plan - Current Plan Current Original Risk Level N/A N/A

1. Coordinate with schoolhouse staff and TYCOMs for SMEs.

10/1/16 1/26/17 1/26/17 Coordinating with schoolhouse and TYCOMs for SMEs.

Y

2. Coordinate with fleet SMEs prior to and during the acquisition phases.

1/2/17 05/10/17 5/10/17 Continuing coordination with schoolhouse and SMEs.

Y

8/14/17 8/14/17 8/14/17 Continue to coordinate with schoolhouse staff and fleet SMEs prior to and during the acquisition phases.

Y

Risk Status:

Open

Risk Type (Check one in each area Technical Schedule Cost Risk Summary Worksheet Team: Sailor 2025 Risk Owner: NAWCTSD Date Opened: 01 Oct 2016 Updated: 14 Aug 2017 Risk Title: Sufficient Access to Fleet and Schoolhouse SMEs Risk #: 1 Description of Risk: If sufficient access to fleet and schoolhouse Subject Matter Experts (SMEs) is not available during analysis, design, development, and testing, for each wave, then contractor deliverables, the analysis output, and content conversion may be late.

Root Cause: Fleet and schoolhouse SMEs are busy working and teaching classes and have limited availability for RRL visits.

Consequence: Contractor deliverables, the analysis output, and content conversion may be late.

X O X

3. Risk working group meeting

Action/Event Date Schd.

ECD

Act.

Success Criteria L C Suc.

Comments Risk Level if Successful

Plan:

New Plan - Current Plan Current

Team: Sailor 2025 Risk Owner: NAWCTSD Date Opened: 01 Oct 2016 Updated: 14 Aug 2017 Risk Title: Sufficient Access to Fleet and Schoolhouse SMEs Risk #: 1 Risk Summary Worksheet

Backup Information

Program Risk Assessment

Not Likely:

Low Likelihood:

Likely:

Highly Likely:

Near Certainty:

...Will effectively avoid or mitigate this risk based on standard practices ~10% ...Have usually mitigated this type of risk with minimal oversight in similar cases ~30% ...May mitigate this risk, but workarounds will be required ~50% ...Cannot mitigate this risk, but a different approach might ~70% ...Cannot mitigate this type of risk; no known processes or workarounds are available ~90%

Determination of consequence for Schedule and Cost are program Specific.

Consequence

HIGH

MEDIUM

LOW

LevelTechnical PerformanceScheduleCost
1Minimal or no consequence to technical performanceMinimal or no impactMinimal or no impact
2Minor reduction in technical performance or supportability, can be tolerated with little or no impact on program; same approach retainedAdditional activities required, able to meet key dates.
Slip <___Month(s)Cost increase or unit production cost increases

< 1_% of budget

3Moderate reduction in technical performance or supportability with limited impact on program objectives; workarounds availableMinor schedule slip, no impact to key milestones
Slip < __ month(s) plus available float of critical path. Sub-system slip > __ month(s) plus available float. Slip <__Month(s)Cost increase or unit production cost increase

<___ 5% of budget

4Significant degradation in technical performance or major shortfall in supportability; may jeopardize program success; workarounds may not be available or may have negative consequencesPrgm critical path affected, all sched float assoc. w/key MS exhausted
Slip <__ MonthsCost increase or unit production cost increase

<____ 10% of budget

5Severe degradation in technical performance; Cannot meet KPP or Key technical/supportabilility threshold; will jeopardize program success; no workarounds availableCannot meet key program milestones
Slip >___ MonthsExceeds APBA threshold

> ____ 10% of budget

Consequence Level Probability of Occurrence image1.bin image2.emf