ATCH-1_1240BE26Q0011_CLIN-Structure-Pricing.pdf
PDF 296 KB Posted
- Solicitation number
- 1240BE26Q0011
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Schedule of Items/Price Schedule (CLIN Structure and Pricing) for a five-year federal contract covering vault toilet pumping and waste disposal services across multiple ranger districts and locations in Oregon and Idaho.
The contract runs from May 1, 2026 through April 30, 2031, divided into five 12-month ordering periods. Services are required across eight geographic areas: Whitman Ranger District Vicinity (15 annual pumps), LaGrande Ranger District Vicinity (11 annual pumps), Joseph OR Vicinity (28 annual pumps), Riggins ID North Vicinity (9 annual pumps), Riggins ID South Vicinity (6 annual pumps), Black Lake Vicinity (1 annual pump), Joseph OR Specialized Equipment Vicinity (2 annual pumps), and Snake River Specialized Equipment Vicinity (1 annual pump). Each service area contains multiple vault toilets at various locations requiring pumping within 14 calendar days of notification. The contractor must charge a flat fee per service call. The schedule includes corresponding CLINs for each ordering period (0001-0008 for Period One; 1001-1008 for Period Two; 2001-2008 for Period Three; 3001-3008 for Period Four; 4001-4008 for Period Five), with optional CLINs 3010 and 4010 for Joseph OR expansion services (7 annual pumps each). Multiple awards may be made; contractors may submit pricing for all items or for entire CLIN series only. Invoices must be submitted via IPP by unit with final invoices ending in "F" and including a release-of-liability statement.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATCH-01_1240BE26Q0011 _ CLIN-Structure-Pricing Page 1 of 17 Pages
Schedule of Items/Price Schedule
Period of Performance (POP): The period of performance shall be 1 May 2026 through 30 April 2031. The PoP will be divided into five ordering periods consisting of 12 months each.
Period Ordering Period Start Date Ordering Period End Date
Ordering Period 1 1 May 2026 30 April 2027
Ordering Period 2 1 May 2027 30 April 2028
Ordering Period 3 1 May 2028 30 April 2029
Ordering Period 4 1 May 2029 30 April 2030
Ordering Period 5 1 May 2030 30 April 2031
Item Supplies/Services Est Annual Qty
Unit of Issue EA Unit Price
Total Price
Ordering Period One, 1 May 2026 thru 30 April 2027
0001 Vault toilet pumping service, Whitman Ranger District Vicinity. Within 14 calendar days of notification the Contractor shall perform vault pumping and waste disposal service within the Whitman Ranger District. In accordance with PWS Para 3, and the technical instructions located in ATCH- 3_Instructions. The Contractor shall charge a flat fee for each service. Area consists of 28 vault toilets at 16 locations.
Estimated annual workload is 15 pumps.
Minimum ordering quantity is three. See Map01_Whitman, ATCH-6_Vault Toilet Listing.
15 EA $ $
Page 2 of 17 Pages
0002 Vault toilet pumping service, LaGrande Ranger District Vicinity. Within 14 calendar days of notification the Contractor shall perform vault pumping and waste disposal service within the LaGrande Ranger District. In accordance with PWS Para 3, and the technical instructions located in PWS ATCH- 3_Instructions. The Contractor shall charge a flat fee for each service. Area consists of 25 vault toilets at 18 locations.
Estimated annual workload is 11 pumps.
Minimum ordering quantity is three. See Maps-02_LaGrande, ATCH-6 Vault Toilet Listing, LaGrande.
11 EA $ $
0003 Vault toilet pumping service, Joseph, OR Vicinity. Within 14 calendar days of notification the Contractor shall perform vault pumping and waste disposal service within the Joseph, OR Vicinity . In accordance with PWS Para 3, and the technical instructions located in ATCH- 3_Instructions. The Contractor shall charge a flat fee for each service. Area consists of 61 vault toilets at 41 locations.
Estimated annual workload is 28 pumps.Minimum ordering quantity is three. See ATCH-6_Maps_Joseph, ATCH- 7 Vault Toilet Listing, Joeseph.
18 EA $ $
0004 Vault toilet pumping service, Riggins, ID North Vicinity. Within 14 calendar days of notification the Contractor shall perform vault pumping and waste disposal service within the Riggins, ID North Vicinity . In accordance with PWS Para 3, and the technical instructions located in ATCH-3_Instructions. The Contractor shall charge a flat fee for each service.
Area consists of 10 vault toilets at 4 locations. Estimated annual workload is 9 pumps. Minimum ordering quantity is three. See Maps-04_Joseph, ATCH-6 Vault Toilet Listing, Riggins N.
9 EA $ $
Page 3 of 17 Pages
0005 Vault toilet pumping service, Riggins, ID South Vicinity. Within 14 calendar days of notification the Contractor shall perform vault pumping and waste disposal service within the Riggins, ID South Vicinity . In accordance with PWS Para 3, and the technical instructions located in ATCH-3_Instructions. The Contractor shall charge a flat fee for each service.
Area consists of 8 vault toilets at 6 locations. Estimated annual workload is 6 pumps. Minimum ordering quantity is three. See Maps-05_Joseph, ATCH-6 Vault Toilet Listing, Riggins S.
6 EA $ $
0006 Vault toilet pumping service, Black Lake Vicinity. Within 14 calendar days of notification the Contractor shall perform vault pumping and waste disposal service within the Black Lake Vicinity . In accordance with PWS Para 3, and the technical instructions located in ATCH- 3_Instructions. The Contractor shall charge a flat fee for each service. Area consists of 1 vault toilets at 1 location.
Estimated annual workload is 1 pump.
Minimum ordering quantity is one. See ATCH-06_Maps_Black Lake, ATCH-6 Vault Toilet Listing, Black Lake.
1 EA $ $
0007 Vault toilet pumping service, Joeseph, OR Specialized Equipment Vicinity.
Within 14 calendar days of notification the Contractor shall perform vault pumping and waste disposal service within the Joeseph, OR Specialized Equipment Vicinity . In accordance with PWS Para 3, and the technical instructions located in ATCH-3_Instructions. The Contractor shall charge a flat fee for each service.
Area consists of 4 vault toilets at 3 locations. Estimated annual workload is 2 pumps. Minimum ordering quantity is one.
See Maps-07_Joseph, ATCH-6 Vault Toilet Listing, Joeseph Special.
2 EA $ $
0008 Vault toilet pumping service, Snake River Specialized Equipment Vicinity.
Within 14 calendar days of notification the Contractor shall perform vault pumping
1 EA $ $
Page 4 of 17 Pages and waste disposal service within the Snake River Specialized Equipment Vicinity . In accordance with PWS Para 3, and the technical instructions located in ATCH-3_Instructions. The Contractor shall charge a flat fee for each service.
Area consists of 4 vault toilets at 2 locations. Estimated annual workload is 1 pump. Minimum ordering quantity is one.
Maps-08_SnakeRiverSpc, ATCH-6 Vault Toilet Listing, Snake Special.
Total Ordering Period One $
Qty
Unit of Issue EA Unit Price
Total Price
Ordering Period Two, 1 May 2027 thru 30 April 2028
1001 Vault toilet pumping service, Whitman calendar days of notification the Contractor shall perform vault pumping and waste disposal service within the Whitman Ranger District. In accordance with PWS Para 3, and the technical instructions located in ATCH- 3_Instructions. The Contractor shall charge a flat fee for each service. Area consists of 28 vault toilets at 16 locations.
Estimated annual workload is 15 pumps.
Minimum ordering quantity is three. See Map01_Whitman, ATCH-6_Vault Toilet Listing.
15 EA $ $
1002 Vault toilet pumping service, LaGrande Ranger District Vicinity. Within 14 calendar days of notification the Contractor shall perform vault pumping and waste disposal service within the LaGrande Ranger District. In accordance with PWS Para 3, and the technical instructions located in PWS ATCH- 3_Instructions. The Contractor shall charge a flat fee for each service. Area consists of 25 vault toilets at 18 locations.
Estimated annual workload is 11 pumps.
Minimum ordering quantity is three. See
11 EA $ $
Page 5 of 17 Pages
Maps-02_LaGrande, ATCH-6 Vault Toilet Listing, LaGrande.
1003 Vault toilet pumping service, Joseph, OR Vicinity. Within 14 calendar days of notification the Contractor shall perform vault pumping and waste disposal service within the Joseph, OR Vicinity . In accordance with PWS Para 3, and the technical instructions located in ATCH- 3_Instructions. The Contractor shall charge a flat fee for each service. Area consists of 46 vault toilets at 33 locations.
Estimated annual workload is 28 pumps.
Minimum ordering quantity is three. Map- 03s_Joseph, ATCH-6 Vault Toilet Listing, Joeseph.
18 EA $ $
1004 Vault toilet pumping service, Riggins, ID North Vicinity. Within 14 calendar days of notification the Contractor shall perform vault pumping and waste disposal service within the Riggins, ID North Vicinity . In accordance with PWS Para 3, and the technical instructions located in ATCH-3_Instructions. The Contractor shall charge a flat fee for each service.
Area consists of 10 vault toilets at 4 locations. Estimated annual workload is 9 pumps. Minimum ordering quantity is three. See Maps-04_Joseph, ATCH-6 Vault Toilet Listing, Riggins N..
9 EA $ $
1005 Vault toilet pumping service, Riggins, ID South Vicinity. Within 14 calendar days of notification the Contractor shall perform vault pumping and waste disposal service within the Riggins, ID South Vicinity . In accordance with PWS Para 3, and the technical instructions located in ATCH-3_Instructions. The Contractor shall charge a flat fee for each service.
Area consists of 8 vault toilets at 6
6 EA $ $
Page 6 of 17 Pages locations. Estimated annual workload is 6 pumps. Minimum ordering quantity is three. See Maps-05_Joseph, ATCH-6 Vault Toilet Listing, Riggins S.
1006 Vault toilet pumping service, Black Lake Vicinity. Within 14 calendar days of notification the Contractor shall perform vault pumping and waste disposal service within the Black Lake Vicinity . In accordance with PWS Para 3, and the technical instructions located in ATCH- 3_Instructions. The Contractor shall charge a flat fee for each service. Area consists of 1 vault toilets at 1 location.
Estimated annual workload is 1 pump.
Minimum ordering quantity is one. See ATCH-06_Maps_Black Lake, ATCH-7 Vault Toilet Listing, Black Lake.
1 EA $ $
1007 Vault toilet pumping service, Joeseph, OR Specialized Equipment Vicinity.
Within 14 calendar days of notification the Contractor shall perform vault pumping and waste disposal service within the Joeseph, OR Specialized Equipment Vicinity . In accordance with PWS Para 3, and the technical instructions located in ATCH-3_Instructions. The Contractor shall charge a flat fee for each service.
Area consists of 4 vault toilets at 3 locations. Estimated annual workload is 2 pumps. Minimum ordering quantity is one.
See Maps-07_Joseph, ATCH-6 Vault Toilet Listing, Joeseph Special.
2 EA $ $
1008 Vault toilet pumping service, Snake River Specialized Equipment Vicinity.
Within 14 calendar days of notification the Contractor shall perform vault pumping and waste disposal service within the Snake River Specialized Equipment Vicinity . In accordance with PWS Para 3, and the technical instructions located in ATCH-3_Instructions. The Contractor shall charge a flat fee for each service.
Page 7 of 17 Pages
Area consists of 4 vault toilets at 2 locations. Estimated annual workload is 1 pump. Minimum ordering quantity is one.
Maps-08_SnakeRiverSpc, ATCH-6 Vault
Total Ordering Period Two $
Qty
Unit of Issue EA Unit Price
Total Price
Ordering Period Three, 1 May 2028 thru 30 April 2029
2001 Vault toilet pumping service, Whitman calendar days of notification the Contractor shall perform vault pumping and waste disposal service within the Whitman Ranger District. In accordance with PWS Para 3, and the technical instructions located in ATCH- 3_Instructions. The Contractor shall charge a flat fee for each service. Area consists of 28 vault toilets at 16 locations.
Estimated annual workload is 15 pumps.
Minimum ordering quantity is three. See Map01_Whitman, ATCH-6_Vault Toilet Listing.
15 EA $ $
2002 Vault toilet pumping service, LaGrande Ranger District Vicinity. Within 14 calendar days of notification the Contractor shall perform vault pumping and waste disposal service within the LaGrande Ranger District. In accordance with PWS Para 3, and the technical instructions located in PWS ATCH- 3_Instructions. The Contractor shall charge a flat fee for each service. Area consists of 25 vault toilets at 18 locations.
Estimated annual workload is 11 pumps.
Minimum ordering quantity is three. See Maps-02_LaGrande, ATCH-6 Vault Toilet Listing, LaGrande.
11 EA $ $
Page 8 of 17 Pages
2003 Vault toilet pumping service, Joeseph, OR Vicinity. Within 14 calendar days of notification the Contractor shall perform vault pumping and waste disposal service within the Joeseph, OR Vicinity . In accordance with PWS Para 3, and the technical instructions located in ATCH- 3_Instructions. The Contractor shall charge a flat fee for each service. Area consists of 46 vault toilets at 33 locations.
Estimated annual workload is 28 pumps.Minimum ordering quantity is three. Map-03s_Joseph, ATCH-6 Vault Toilet Listing, Joeseph.
18 EA $ $
2004 Vault toilet pumping service, Riggins, ID North Vicinity. Within 14 calendar days of notification the Contractor shall perform vault pumping and waste disposal service within the Riggins, ID North Vicinity . In accordance with PWS Para 3, and the technical instructions located in ATCH-3_Instructions. The Contractor shall charge a flat fee for each service.
Area consists of 10 vault toilets at 4 locations. Estimated annual workload is 9 pumps. Minimum ordering quantity is three. See Maps-04_Joseph, ATCH-6 Vault Toilet Listing, Riggins N.
9 EA $ $
2005 Vault toilet pumping service, Riggins, ID South Vicinity. Within 14 calendar days of notification the Contractor shall perform vault pumping and waste disposal service within the Riggins, ID South Vicinity . In accordance with PWS Para 3, and the technical instructions located in ATCH-3_Instructions. The Contractor shall charge a flat fee for each service.
Area consists of 8 vault toilets at 6 locations. Estimated annual workload is 6 pumps. Minimum ordering quantity is three. See Maps-05_Joseph, ATCH-6 Vault Toilet Listing, Riggins S.
6 EA $ $
Page 9 of 17 Pages
2006 Vault toilet pumping service, Black Lake Vicinity. Within 14 calendar days of notification the Contractor shall perform vault pumping and waste disposal service within the Black Lake Vicinity . In accordance with PWS Para 3, and the technical instructions located in ATCH- 3_Instructions. The Contractor shall charge a flat fee for each service. Area consists of 1 vault toilets at 1 location.
Estimated annual workload is 1 pump.
Minimum ordering quantity is one. See ATCH-06_Maps_Black Lake, ATCH-7 Vault Toilet Listing, Black Lake.
1 EA $ $
2007 Vault toilet pumping service, Joeseph, OR Specialized Equipment Vicinity.
Within 14 calendar days of notification the Contractor shall perform vault pumping and waste disposal service within the Joeseph, OR Specialized Equipment Vicinity . In accordance with PWS Para 3, and the technical instructions located in ATCH-3_Instructions. The Contractor shall charge a flat fee for each service.
Area consists of 4 vault toilets at 3 locations. Estimated annual workload is 2 pumps. Minimum ordering quantity is one.
See Maps-07_Joseph, ATCH-6 Vault Toilet Listing, Joeseph Special.
2 EA $ $
2008 Vault toilet pumping service, Snake River Specialized Equipment Vicinity.
Within 14 calendar days of notification the Contractor shall perform vault pumping and waste disposal service within the Snake River Specialized Equipment Vicinity . In accordance with PWS Para 3, and the technical instructions located in ATCH-3_Instructions. The Contractor shall charge a flat fee for each service.
Area consists of 4 vault toilets at 2 locations. Estimated annual workload is 1 pump. Minimum ordering quantity is one.
Maps-08_SnakeRiverSpc, ATCH-6 Vault Toilet Listing, Snake Special.
Total Ordering Period Three $
Page 10 of 17 Pages
Item Supplies/Services Est Annual Qty
Unit of Issue EA Unit Price
Total Price
Ordering Period Four, 1 May 2029 thru 30 April 2030
3001 Vault toilet pumping service, Whitman calendar days of notification the Contractor shall perform vault pumping and waste disposal service within the Whitman Ranger District. In accordance with PWS Para 3, and the technical instructions located in ATCH- 3_Instructions. The Contractor shall charge a flat fee for each service. Area consists of 28 vault toilets at 16 locations.
Estimated annual workload is 15 pumps.
Minimum ordering quantity is three. See Map01_Whitman, ATCH-6_Vault Toilet Listing.
15 EA $ $
3002 Vault toilet pumping service, LaGrande Ranger District Vicinity. Within 14 calendar days of notification the Contractor shall perform vault pumping and waste disposal service within the LaGrande Ranger District. In accordance with PWS Para 3, and the technical instructions located in PWS ATCH- 3_Instructions. The Contractor shall charge a flat fee for each service. Area consists of 25 vault toilets at 18 locations.
Estimated annual workload is 11 pumps.
Minimum ordering quantity is three. See Maps-02_LaGrande, ATCH-6 Vault Toilet Listing, LaGrande.
11 EA $ $
3003 Vault toilet pumping service, Joeseph, OR Vicinity. Within 14 calendar days of notification the Contractor shall perform vault pumping and waste disposal service within the Joeseph, OR Vicinity . In accordance with PWS Para 3, and the technical instructions located in ATCH- 3_Instructions. The Contractor shall charge a flat fee for each service. Area consists of 46 vault toilets at 33 locations.
Estimated annual workload is 28 pumps.Minimum ordering quantity is
18 EA $ $
Page 11 of 17 Pages three. Map-03s_Joseph, ATCH-6 Vault Toilet Listing, Joeseph.
3004 Vault toilet pumping service, Riggins, ID North Vicinity. Within 14 calendar days of notification the Contractor shall perform vault pumping and waste disposal service within the Riggins, ID North Vicinity . In accordance with PWS Para 3, and the technical instructions located in ATCH-3_Instructions. The Contractor shall charge a flat fee for each service.
Area consists of 10 vault toilets at 4 locations. Estimated annual workload is 9 pumps. Minimum ordering quantity is three. See Maps-04_Joseph, ATCH-6 Vault Toilet Listing, Riggins N.
9 EA $ $
3005 Vault toilet pumping service, Riggins, ID South Vicinity. Within 14 calendar days of notification the Contractor shall perform vault pumping and waste disposal service within the Riggins, ID South Vicinity . In accordance with PWS Para 3, and the technical instructions located in ATCH-3_Instructions. The Contractor shall charge a flat fee for each service.
Area consists of 8 vault toilets at 6 locations. Estimated annual workload is 6 pumps. Minimum ordering quantity is three. See Maps-05_Joseph, ATCH-6 Vault Toilet Listing, Riggins S.
6 EA $ $
3006 Vault toilet pumping service, Black Lake Vicinity. Within 14 calendar days of notification the Contractor shall perform vault pumping and waste disposal service within the Black Lake Vicinity . In accordance with PWS Para 3, and the technical instructions located in ATCH- 3_Instructions. The Contractor shall charge a flat fee for each service. Area consists of 1 vault toilets at 1 location.
Estimated annual workload is 1 pump.
Page 12 of 17 Pages
Minimum ordering quantity is one. See ATCH-06_Maps_Black Lake, ATCH-7 Vault Toilet Listing, Black Lake.
3007 Vault toilet pumping service, Joeseph, OR Specialized Equipment Vicinity.
Within 14 calendar days of notification the Contractor shall perform vault pumping and waste disposal service within the Joeseph, OR Specialized Equipment Vicinity . In accordance with PWS Para 3, and the technical instructions located in ATCH-3_Instructions. The Contractor shall charge a flat fee for each service.
Area consists of 4 vault toilets at 3 locations. Estimated annual workload is 2 pumps. Minimum ordering quantity is one.
See Maps-07_Joseph, ATCH-6 Vault Toilet Listing, Joeseph Special.
2 EA $ $
3008 Vault toilet pumping service, Snake River Specialized Equipment Vicinity.
Within 14 calendar days of notification the Contractor shall perform vault pumping and waste disposal service within the Snake River Specialized Equipment Vicinity . In accordance with PWS Para 3, and the technical instructions located in ATCH-3_Instructions. The Contractor shall charge a flat fee for each service.
Area consists of 4 vault toilets at 2 locations. Estimated annual workload is 1 pump. Minimum ordering quantity is one.
Maps-08_SnakeRiverSpc, ATCH-6 Vault Toilet Listing, Snake Special.
Total Ordering Period Four $
Qty
Unit of Issue EA Unit Price
Total Price
Page 13 of 17 Pages
Ordering Period Five, 1 May 2030 thru 30 April 2031
4001 Vault toilet pumping service, Whitman calendar days of notification the Contractor shall perform vault pumping and waste disposal service within the Whitman Ranger District. In accordance with PWS Para 3, and the technical instructions located in ATCH- 3_Instructions. The Contractor shall charge a flat fee for each service. Area consists of 28 vault toilets at 16 locations.
Estimated annual workload is 15 pumps.
Minimum ordering quantity is three. See Map01_Whitman, ATCH-6_Vault Toilet Listing.
15 EA $ $
4002 Vault toilet pumping service, LaGrande Ranger District Vicinity. Within 14 calendar days of notification the Contractor shall perform vault pumping and waste disposal service within the LaGrande Ranger District. In accordance with PWS Para 3, and the technical instructions located in PWS ATCH- 3_Instructions. The Contractor shall charge a flat fee for each service. Area consists of 25 vault toilets at 18 locations.
Estimated annual workload is 11 pumps.
Minimum ordering quantity is three. See Maps-02_LaGrande, ATCH-6 Vault Toilet Listing, LaGrande.
11 EA $ $
4003 Vault toilet pumping service, Joeseph, OR Vicinity. Within 14 calendar days of notification the Contractor shall perform vault pumping and waste disposal service within the Joeseph, OR Vicinity . In accordance with PWS Para 3, and the technical instructions located in ATCH- 3_Instructions. The Contractor shall charge a flat fee for each service. Area consists of 46 vault toilets at 33 locations.
Estimated annual workload is 28 pumps.Minimum ordering quantity is three. Map-03s_Joseph, ATCH-6 Vault Toilet Listing, Joeseph..
18 EA $ $
Page 14 of 17 Pages
4004 Vault toilet pumping service, Riggins, ID North Vicinity. Within 14 calendar days of notification the Contractor shall perform vault pumping and waste disposal service within the Riggins, ID North Vicinity . In accordance with PWS Para 3, and the technical instructions located in ATCH-3_Instructions. The Contractor shall charge a flat fee for each service.
Area consists of 10 vault toilets at 4 locations. Estimated annual workload is 9 pumps. Minimum ordering quantity is three. See Maps-04_Joseph, ATCH-6 Vault Toilet Listing, Riggins N.
9 EA $ $
4005 Vault toilet pumping service, Riggins, ID South Vicinity. Within 14 calendar days of notification the Contractor shall perform vault pumping and waste disposal service within the Riggins, ID South Vicinity . In accordance with PWS Para 3, and the technical instructions located in ATCH-3_Instructions. The Contractor shall charge a flat fee for each service.
Area consists of 8 vault toilets at 6 locations. Estimated annual workload is 6 pumps. Minimum ordering quantity is three. See Maps-05_Joseph, ATCH-6 Vault Toilet Listing, Riggins S.
6 EA $ $
4006 Vault toilet pumping service, Black Lake Vicinity. Within 14 calendar days of notification the Contractor shall perform vault pumping and waste disposal service within the Black Lake Vicinity . In accordance with PWS Para 3, and the technical instructions located in ATCH- 3_Instructions. The Contractor shall charge a flat fee for each service. Area consists of 1 vault toilets at 1 location.
Estimated annual workload is 1 pump.
Minimum ordering quantity is one. See ATCH-06_Maps_Black Lake, ATCH-6 Vault Toilet Listing, Black Lake.
Page 15 of 17 Pages
4007 Vault toilet pumping service, Joeseph, OR Specialized Equipment Vicinity.
Within 14 calendar days of notification the Contractor shall perform vault pumping and waste disposal service within the Joeseph, OR Specialized Equipment Vicinity . In accordance with PWS Para 3, and the technical instructions located in ATCH-3_Instructions. The Contractor shall charge a flat fee for each service.
Area consists of 4 vault toilets at 3 locations. Estimated annual workload is 2 pumps. Minimum ordering quantity is one.
See Maps-07_Joseph, ATCH-6 Vault Toilet Listing, Joeseph Special.
2 EA $ $
4008 Vault toilet pumping service, Snake River Specialized Equipment Vicinity.
Within 14 calendar days of notification the Contractor shall perform vault pumping and waste disposal service within the Snake River Specialized Equipment Vicinity . In accordance with PWS Para 3, and the technical instructions located in ATCH-3_Instructions. The Contractor shall charge a flat fee for each service.
Area consists of 4 vault toilets at 2 locations. Estimated annual workload is 1 pump. Minimum ordering quantity is one.
Maps-08_SnakeRiverSpc, ATCH-6 Vault
Total Ordering Period Five
Option CLIN, Ordering Period Four, 1 May 2029 thru 30 April 2030
Option
CLIN
Vault toilet pumping service, Joseph, OR. (Option) Within 14 calendar days of notification the Contractor shall perform vault pumping and waste disposal service within the Joseph, OR Specialized Equipment Vicinity . In accordance with PWS Para 3, and the technical instructions located in ATCH-3_Instructions. The Contractor shall charge a flat fee for each service. Area consists of 19 vault toilets at 10 locations. Estimated annual workload is 7 pumps. Minimum ordering quantity is
7 EA $ $
Page 16 of 17 Pages
3. See Map-09_JosephOption, ATCH-6 Vault Toilet Listing, Joseph Option.
Option CLIN, Ordering Period Five, 1 May 2030 thru 30 April 2031
Option
CLIN
Vault toilet pumping service, Joseph, OR. (Option) Within 14 calendar days of notification the Contractor shall perform vault pumping and waste disposal service within the Joseph, OR Specialized Equipment Vicinity . In accordance with PWS Para 3, and the technical instructions located in ATCH-3_Instructions. The Contractor shall charge a flat fee for each service. Area consists of 19 vault toilets at 10 locations. Estimated annual workload is 7 pumps. Minimum ordering quantity is
3. See Map-09_JosephOption, ATCH-6 Vault Toilet Listing, Joseph Option.
7 EA $ $
Total Option CLINs $
Total Ordering Period One $
Total Ordering Period Two $
Total Ordering Period Three $
Total Ordering Period Four $
Total Ordering Period Five $
Total Contract Value $
VENDOR ___________________________________________________________
VENDOR AUTHORIZED REPRESENTATIVE ____________________________
SIGNATURE _____________________________ DATE ___________________
UNIQUE ENTITY IDENTIFIER (UEI)___________________________
VENDOR CONTACT INFORMATION.
Tel:_____________________ Email______________________
Schedule Notes:
This schedule covers five ordering periods
1. Multiple awards may be made from this solicitation; contractors may submit pricing for:
Tel:_____________________
Page 17 of 17 Pages
a) All items.
b) For a single or a multiple of CLIN Series. Contractors must provide pricing for an entire CLIN Series. For example, CLIN 0001 is vault toilet pumping service for the Whitman Ranger District Vicinity. Contractors must quote the entire series 0001, 1001, 2001, 3001, and 4001.
c) Contractors that quote Joseph Vicinity CLIN Series 0003, Must quote the entire series and the Joseph option CLINs 3010 and 4010.
2. Invoices shall be submitted via IPP in the units specified in the schedule once per order. .
3. Final Invoice number will end with the character “F”. For example, invoice 1245 would be 1245F.
IPP Box check as final
4. Final Invoice will include the statement:
This is the final invoice for Task Order 1240BE26F00XX. In consideration of payment of the amount invoiced, the Contractor hereby releases the Government from any and all liability under this contract for further claims, equitable adjustments, or damages attributable to this contract.
File details come from the government source that posted it. Updated .