ASHE 20-1068A CCEB UPDATED.xls
XLS spreadsheet 3 MB Posted
- Solicitation number
- FA568224R0006
About this file
This document is a Construction Cost Estimate Breakdown for project ASHE 20-1068A REPAIR ELECTRICAL M.V. SUBSTATIONS IN FLIGHTLINE LOOP at Aviano Air Base, Italy. The project involves repairs and maintenance of electrical medium voltage substations and related electrical infrastructure at the base. The document provides detailed cost estimates for various work items across categories such as demolition, architectural/civil, mechanical, and electrical work. Specific items include painting, plaster work, lighting fixtures, grounding system repair, switchgear maintenance, and emergency lighting system upgrades. The document indicates this is a lump sum contract, and the contractor will be responsible for completing the full scope of work. The anticipated solicitation date for this project is April 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ASHE 20-1068A DWGS.pdf | ||
| ASHE20-1068A_TECH_SPECS.pdf | ||
| ASHE20-1068A_PSC.pdf | ||
| ATCH_ASHE20-1068A_Maintenance_Annex.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F03 - 1362
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||||
| CONTRACTOR | ADDRESS | |||||||||||
| CONTRACT FOR (Work to be performed) | SUB F03 - 1362 | PROPOSED TOTAL CONTRACT PRICE | ||||||||||
| REPAIR ELECTRICAL MEDIUM VOLTAGE SUBSTATIONS IN FLIGT LINE LOOP, MULTI | ||||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||||
| ASHE 20-1068A | AREA F - AVIANO AIR BASE | |||||||||||
| MATERIAL COSTS | LABOR COSTS | |||||||||||
| LINE NO. | ITEM | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | MANHOURS MANDAYS | AVERAGE RATE | TOTAL | OTHER DIRECT COSTS | LINE TOTAL | ||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni | ||||||||||||
| Ia Architectural Demolition - Ia Demolizioni Architettoniche | ||||||||||||
| 1 | TREE PRUNING | |||||||||||
| Potatura alberi | IT. No. Art. n. | 1 | LS/AC | |||||||||
| Total Architettonico - Totale Architettonico | ||||||||||||
| Ib Mechanical Demolitions - Ib Demolizioni Meccaniche | ||||||||||||
| Not applicable / Non Applicabile | ||||||||||||
| Ic Electrical Demolitions - Ic Demolizioni Elettriche | ||||||||||||
| 2 | REMOVAL OF EMERGENCY LIGHTING FIXTURES | |||||||||||
| rimozione lampade di emergenza | IT. No. Art. n. | 2 | LS/AC | |||||||||
| 3 | REMOVAL OF TVLV DISPLAY | |||||||||||
| rimozione Display TVLV | IT. No. Art. n. | 3 | LS/AC | |||||||||
| Total Electrical - Totale Elettrico | ||||||||||||
| TOTAL PART I / Totale Parte I | ||||||||||||
| PART II - ARCHITECTURAL AND CIVIL WORKS / Parte II - Lavori Architettonici e Civili | ||||||||||||
| 4 | PAINTING OF EXTERIOR WALL SURFACES | |||||||||||
| Tinteggiatura delle superfici esterne | IT. No. Art. n. | 1 | SQM/MQ | |||||||||
| 5 | PAINTING OF INTERIOR SURFACES | |||||||||||
| Tinteggiatura delle superfici interne | IT. No. Art. n. | 2 | SQM/MQ | |||||||||
| 6 | PAINTING OF EXTERIOR METAL SURFACE | |||||||||||
| Pitturazione di superfici metalliche esterne | IT. No. Art. n. | 3 | SQM/MQ | |||||||||
| 7 | NEW CEMENT BASED PLASTER ON EXT/INT WALL | |||||||||||
| Nuovo intonaco a base di cemento sulle pareti int/est | IT. No. Art. n. | 4 | SQM/MQ | |||||||||
| 8 | NEW METAL LOUVER | |||||||||||
| Nuova griglia metallica | IT. No. Art. n. | 5 | EA/NO | |||||||||
| 9 | EXISTING DOOR RENOVATION | |||||||||||
| Manutenzione porte esistenti | IT. No. Art. n. | 6 | LS/AC | |||||||||
| 10 | NEW MOUSE SCREEN, INCL, FRAME | |||||||||||
| Nuova rete antitopo, incluso telaio | IT. No. Art. n. | 7 | LS/AC | |||||||||
| 11 | PANIC HARDWARE BAR INSTALLATION | |||||||||||
| Installazione barra antipanico | IT. No. Art. n. | 8 | Ea/No | |||||||||
| TOTAL PART II / Totale Parte II | ||||||||||||
| PART III - MECHANICAL WORK / Parte III - Lavori Meccanici | ||||||||||||
| 12 | NO.1 ROOF CENTRIFIGAL FANS ROOF | |||||||||||
| No.1 torrini di estrazione | IT. No. Art. n. | 1 | LS/AC | |||||||||
| TOTAL PART III / Totale Parte III | ||||||||||||
| PART VI- ELECTRICAL WORK / Parte VI - Lavori Elettrici | ||||||||||||
| IVa MAINTENANCE/ IVa Manutenzione | ||||||||||||
| 13 | MV SWITCHGEAR MAINTENANCE | |||||||||||
| Manutenzione apparecchiature MT | IT. No. Art. n. | 1 | LS/AC | |||||||||
| 14 | LV SWITCHGEAR MAINTENANCE | |||||||||||
| Manutenzione apparecchiature BT | IT. No. Art. n. | 2 | LS/AC | |||||||||
| 15 | MV/LV TRANSFORMER MAINTENANCE | |||||||||||
| Manutenzione trasformatore MT/BT | IT. No. Art. n. | 3 | LS/AC | |||||||||
| 16 | MISCELLANEOUS ITEMS MAINTENANCE | |||||||||||
| Manutenzione articoli vari | IT. No. Art. n. | 4 | LS/AC | |||||||||
| 17 | CABLEDUCTS MAINTENANCE | |||||||||||
| Manutenzione cavidotti | IT. No. Art. n. | 5 | LS/AC | |||||||||
| TOTAL MAINTENANCE - Totale Manutenzione | ||||||||||||
| IVb REPAIRS/ IVb Riparazioni | ||||||||||||
| 18 | REPAIR OF EXISTING GROUNDING SYSTEM | |||||||||||
| Ripristino dell'impianto di terra esistente | IT. No. Art. n. | 1 | LS/AC | |||||||||
| 19 | NEW EXTERIOR LIGHTING SWITCH | |||||||||||
| Nuovo interruttoreluce esterno | IT. No. Art. n. | 2 | EA/NO | 1.3 | ||||||||
| 20 | NEW SPD | |||||||||||
| Nuovo SPD | IT. No. Art. n. | 3 | EA/NO | |||||||||
| 21 | NEW PILOT LED LAMPS | |||||||||||
| Nuove lampade LED presenza tensione | IT. No. Art. n. | 4 | EA/NO | |||||||||
| 22 | NEW RESISTANCE HEATER | |||||||||||
| Nuova resistenza anticondensa | IT. No. Art. n. | 5 | EA/NO | |||||||||
| 23 | NEW MICRO CIRCUIT BREAKERS | |||||||||||
| Nuovi interruttori modulare | IT. No. Art. n. | 6 | EA/NO | |||||||||
| 24 | ONE LINE DIAGRAMS CASE | |||||||||||
| Quadro schemi unifilari | IT. No. Art. n. | 7 | LS/AC | |||||||||
| 25 | INOX WALL BOX 60X75X35 CM | |||||||||||
| Contenitore a parete Inox 60X75X35 cm | IT. No. Art. n. | 8 | EA/NO | |||||||||
| 26 | LABELS AND CABLES MARKINGS | |||||||||||
| Targhette e contrassegno cavi | IT. No. Art. n. | 9 | LS/AC | |||||||||
| TOTAL REPAIRS/ Totale Riparazioni | ||||||||||||
| IVc SAFETY/ IVc Sicurezza | ||||||||||||
| 27 | NEW FIRE EXTINGUISHER | |||||||||||
| Nuovo estintore | IT. No. Art. n. | 1 | LS/AC | |||||||||
| 28 | REMOVAL OF DOOR GROUNDING CONNECTION | |||||||||||
| Rimozione collegamento di terra dalle porte | IT. No. Art. n. | 2 | LS/AC | |||||||||
| 29 | NEW EMERGENCY LIGHTING SYSTEM | |||||||||||
| Nuovi sistema luci di emergenza | IT. No. Art. n. | 3a | EA/NO | |||||||||
| 30 | NEW MAINTAINED EXIT SIGN | |||||||||||
| Nuovle luci uscita emergenza | IT. No. Art. n. | 3b | EA/NO | |||||||||
| 31 | NEW EMERGENCY LIGHTING SYSTEM PUSH BUTTON | |||||||||||
| Nuovi pulsante controllo sistema luci di emergenza | IT. No. Art. n. | 4 | LS/AC | |||||||||
| TOTAL SAFETY/ Totale Sicurezza | ||||||||||||
| IVd NEW WORKS/ IVd Nuovi Lavori | ||||||||||||
| 32 | CONNECTION OF TV TO EXISTING TELEMONIT. SYS. | |||||||||||
| Connessione del TV all'esistente sist. Telegestione | IT. No. Art. n. | 1 | LS/AC | |||||||||
| 33 | CONNECTION OF SPD TO EXISTING TELEMONIT. SYS. | |||||||||||
| Connessione del SPD al sist. Telegestione | IT. No. Art. n. | 2 | LS/AC | |||||||||
| TOTAL NEW WORKS/ Totale Nuovi Lavori | ||||||||||||
| IVe TEST AND CERTIFICATIONS/ IVe Prove e Certificazioni | ||||||||||||
| 34 | GROUNDING TEST | |||||||||||
| Prove di terra | IT. No. Art. n. | 1 | LS/AC | |||||||||
| 35 | AS BUILT DRAWINGS | |||||||||||
| disegni as built | IT. No. Art. n. | 2a | LS/AC | |||||||||
| 36 | TEST AND CERTIFICATIONS | |||||||||||
| Collaudo e certificazioni | IT. No. Art. n. | 2b | LS/AC | |||||||||
| 37 | DECLARATION OF CONFORMITY DI.CO. | |||||||||||
| Dichiarazione di conformità Di.Co, | IT. No. Art. n. | 2c | LS/AC | |||||||||
| 38 | MAINTENANCE REGISTER | |||||||||||
| Registro manutenzione | IT. No. Art. n. | 2d | LS/AC | |||||||||
| 39 | DPR 462/01 INSPECTION CERTIFICATIONS | |||||||||||
| Certificazione ispezione DPR 462/01 | IT. No. Art. n. | 2e | LS/AC | |||||||||
| TOTAL TEST AND CERTIFICATIONS/ Totale Prove e Certificazioni | ||||||||||||
| IVf PV SYSTEM/ IVf Impianto fotovoltaico | 0 | 0.00 | 0.00 | |||||||||
| Not applicable / Non Applicabile | 0.00 | 0 | 0.00 | 0.00 | 0.00 | |||||||
| TOTAL PART IV / Totale Parte IV | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||
| SUMMARY / Riepilogo | ||||||||||||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS | € - 0 | € - 0 | € - 0 | € - 0 | ||||||||
| PARTII - ARCHITECTURAL AND CIVIL WORKS | € - 0 | € - 0 | € - 0 | € - 0 | ||||||||
| PARTIII - MECHANICAL WORKS | € - 0 | € - 0 | € - 0 | € - 0 | ||||||||
| PART IV - ELECTRICAL WORK | € - 0 | € - 0 | € - 0 | € - 0 | ||||||||
| TOTAL PRICE / Costo Totale | € - 0 | € - 0 | € - 0 | € - 0 | ||||||||
| OR US DOLLARS (RATE 1$ = 0,9798 €) | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
&C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY &C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY&R&P of &N
F06 - 78270
| CONSTRUCTION COST ESTIMATE BREAKDOWN | 0 | |||||||||||
| CONTRACTOR | ADDRESS | |||||||||||
| CONTRACT FOR (Work to be performed) | SUB F06 - 78270 | PROPOSED TOTAL CONTRACT PRICE | ||||||||||
| REPAIR ELECTRICAL MEDIUM VOLTAGE SUBSTATIONS IN FLIGT LINE LOOP, MULTI | ||||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||||
| ASHE 20-1068A | AREA F - AVIANO AIR BASE | |||||||||||
| MATERIAL COSTS | LABOR COSTS | |||||||||||
| LINE NO. | ITEM | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | MANHOURS MANDAYS | AVERAGE RATE | TOTAL | OTHER DIRECT COSTS | LINE TOTAL | ||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni | ||||||||||||
| Ia Architectural Demolition - Ia Demolizioni Architettoniche | ||||||||||||
| 2 | REMOVAL OF STEEL DOOR FRAME | |||||||||||
| Rimozione di telaio porta in accaio | IT. No. Art. n. | 2 | LS/AC | 1.30 | ||||||||
| Total Architettonico - Totale Architettonico | ||||||||||||
| Ib Mechanical Demolitions - Ib Demolizioni Meccaniche | ||||||||||||
| Not applicable / Non Applicabile | ||||||||||||
| Ic Electrical Demolitions - Ic Demolizioni Elettriche | ||||||||||||
| 3 | REMOVAL OF EMERGENCY LIGHTING FIXTURES | |||||||||||
| rimozione lampade di emergenza | IT. No. Art. n. | 3 | LS/AC | |||||||||
| Total Electrical - Totale Elettrico | ||||||||||||
| TOTAL PART I / Totale Parte I | ||||||||||||
| PART II - ARCHITECTURAL AND CIVIL WORKS / Parte II - Lavori Architettonici e Civili | ||||||||||||
| 4 | PAINTING OF EXTERIOR WALL SURFACES | |||||||||||
| Tinteggiatura delle superfici esterne | IT. No. Art. n. | 1 | SQM/MQ | |||||||||
| 5 | PAINTING OF INTERIOR SURFACES | |||||||||||
| Tinteggiatura delle superfici interne | IT. No. Art. n. | 2 | SQM/MQ | |||||||||
| 6 | PAINTING OF EXTERIOR METAL SURFACE | |||||||||||
| Pitturazione di superfici metalliche esterne | IT. No. Art. n. | 3 | SQM/MQ | |||||||||
| 7 | NEW CEMENT BASED PLASTER ON EXT/INT WALL | |||||||||||
| Nuovo intonaco a base di cemento sulle pareti int/est | IT. No. Art. n. | 4 | SQM/MQ | |||||||||
| 8 | NEW STEEL SHEET FLASHING | |||||||||||
| Nuove scossaline metallica | IT. No. Art. n. | 5 | LM/ML | |||||||||
| 9 | NEW ROOF WATERPROOFING LAYER | |||||||||||
| Nuova impermeabilizzazione copertura | IT. No. Art. n. | 6 | SQM/MQ | |||||||||
| 10 | NEW METAL DOWNSPOUTS, INCL CAST IRON BOOT | |||||||||||
| Nuovi discendenti di gronda, incluso terminali in ghisa | IT. No. Art. n. | 7 | LS/AC | |||||||||
| 11 | EXISTING EXT CNC PAVEMENT REPAIR | |||||||||||
| Ripristino pavimentazione esterna esistente in cls | IT. No. Art. n. | 8 | SQM/MQ | |||||||||
| 12 | NEW MOUSE SCREEN, INCL, FRAME | |||||||||||
| Nuova rete antitopo, incluso telaio | IT. No. Art. n. | 9 | EA/NO | |||||||||
| 13 | EXISTING DOOR RENOVATION | |||||||||||
| Manutenzione porte esistenti | IT. No. Art. n. | 10 | LS/AC | |||||||||
| 14 | NEW PANIC BAR | |||||||||||
| Nuova barra antipanico | IT. No. Art. n. | 11 | EA/NO | |||||||||
| TOTAL PART II / Totale Parte II | ||||||||||||
| PART III - MECHANICAL WORK / Parte III - Lavori Meccanici | ||||||||||||
| 15 | NO.1 ROOF CENTRIFIGAL ROOF FAN | |||||||||||
| No.1 torrini di estrazione | IT. No. Art. n. | 1 | LS/AC | |||||||||
| TOTAL PART III / Totale Parte III | ||||||||||||
| PART VI- ELECTRICAL WORK / Parte VI - Lavori Elettrici | ||||||||||||
| IVa MAINTENANCE/ IVa Manutenzione | ||||||||||||
| 16 | MV SWITCHGEAR MAINTENANCE | |||||||||||
| Manutenzione apparecchiature MT | IT. No. Art. n. | 1 | EA/NO | |||||||||
| 17 | LV SWITCHGEAR MAINTENANCE | |||||||||||
| Manutenzione apparecchiature BT | IT. No. Art. n. | 2 | EA/NO | |||||||||
| 18 | MV/LV TRANSFORMER MAINTENANCE | |||||||||||
| Manutenzione trasformatore MT/BT | IT. No. Art. n. | 3 | EA/NO | |||||||||
| 19 | MISCELLANEOUS ITEMS MAINTENANCE | |||||||||||
| Manutenzione articoli vari | IT. No. Art. n. | 4 | EA/NO | |||||||||
| 20 | CABLEDUCTS MAINTENANCE | |||||||||||
| Manutenzione cavidotti | IT. No. Art. n. | 5 | EA/NO | |||||||||
| TOTAL MAINTENANCE - Totale Manutenzione | ||||||||||||
| IVb REPAIRS/ IVb Riparazioni | ||||||||||||
| 21 | REPAIR OF EXISTING GROUNDING SYSTEM | |||||||||||
| Ripristino dell'impianto di terra esistente | IT. No. Art. n. | 1 | LS/AC | |||||||||
| 22 | NEW SPD | |||||||||||
| Nuovo SPD | IT. No. Art. n. | 2 | EA/NO | |||||||||
| 23 | NEW PILOT LED LAMPS | |||||||||||
| Nuove lampade LED presenza tensione | IT. No. Art. n. | 3 | EA/NO | |||||||||
| 24 | NEW RESISTANCE HEATER | |||||||||||
| Nuova resistenza anticondensa | IT. No. Art. n. | 4 | EA/NO | |||||||||
| 25 | NEW MICRO CIRCUIT BREAKERS | |||||||||||
| Nuovi interruttori modulare | IT. No. Art. n. | 5 | EA/NO | |||||||||
| 26 | ONE LINE DIAGRAMS CASE | |||||||||||
| Quadro schemi unifilari | IT. No. Art. n. | 6 | LS/AC | |||||||||
| 27 | INOX WALL BOX 60X75X35 CM | |||||||||||
| Contenitore a parete Inox 60X75X35 cm | IT. No. Art. n. | 7 | EA/NO | |||||||||
| 28 | LABELS AND CABLES MARKINGS | |||||||||||
| Targhette e contrassegno cavi | IT. No. Art. n. | 8 | LS/AC | |||||||||
| TOTAL REPAIRS/ Totale Riparazioni | ||||||||||||
| IVc SAFETY/ IVc Sicurezza | ||||||||||||
| 29 | NEW FIRE EXTINGUISHER | |||||||||||
| Nuovo estintore | IT. No. Art. n. | 1 | LS/AC | |||||||||
| 30 | NEW MONITORING WARNING SIGNS | |||||||||||
| Nuovi cartelli monitori | IT. No. Art. n. | 2 | LS/AC | |||||||||
| 31 | NEW EMERGENCY LIGHTING SYSTEM | |||||||||||
| Nuovi sistema luci di emergenza | IT. No. Art. n. | 3a | EA/NO | |||||||||
| 32 | NEW MAINTAINED EXIT SIGN | |||||||||||
| Nuovle luci uscita emergenza | IT. No. Art. n. | 3b | EA/NO | |||||||||
| 33 | NEW EMERGENCY LIGHTING SYSTEM PUSH BUTTON | |||||||||||
| Nuovi pulsante controllo sistema luci di emergenza | IT. No. Art. n. | 4 | EA/NO | |||||||||
| TOTAL SAFETY/ Totale Sicurezza | ||||||||||||
| IVd NEW WORKS/ IVd Nuovi Lavori | ||||||||||||
| 34 | CONNECTION OF TV TO EXISTING TELEMONIT. SYS. | |||||||||||
| Connessione del TV all'esistente sist. Telegestione | IT. No. Art. n. | 1 | LS/AC | |||||||||
| 35 | CONNECTION OF SPD TO EXISTING TELEMONIT. SYS. | |||||||||||
| Connessione del SPD al sist. Telegestione | IT. No. Art. n. | 2 | LS/AC | |||||||||
| TOTAL NEW WORKS/ Totale Nuovi Lavori | ||||||||||||
| IVe TEST AND CERTIFICATIONS/ IVe Prove e Certificazioni | ||||||||||||
| 36 | GROUNDING TEST | |||||||||||
| Prove di terra | IT. No. Art. n. | 1 | LS/AC | |||||||||
| 37 | AS BUILT DRAWINGS | |||||||||||
| disegni as built | IT. No. Art. n. | 2a | LS/AC | |||||||||
| 38 | TEST AND CERTIFICATIONS | |||||||||||
| Collaudo e certificazioni | IT. No. Art. n. | 2b | LS/AC | |||||||||
| 39 | DECLARATION OF CONFORMITY DI.CO. | |||||||||||
| Dichiarazione di conformità Di.Co, | IT. No. Art. n. | 2c | LS/AC | |||||||||
| 40 | MAINTENANCE REGISTER | |||||||||||
| Registro manutenzione | IT. No. Art. n. | 2d | LS/AC | |||||||||
| 41 | DPR 462/01 INSPECTION CERTIFICATIONS | |||||||||||
| Certificazione ispezione DPR 462/01 | IT. No. Art. n. | 2e | LS/AC | |||||||||
| TOTAL TEST AND CERTIFICATIONS/ Totale Prove e Certificazioni | ||||||||||||
| IVf PV SYSTEM/ IVf Impianto fotovoltaico | 0.00 | 0.00 | ||||||||||
| Not applicable / Non Applicabile | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||
| TOTAL PART IV / Totale Parte IV | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||
| SUMMARY / Riepilogo | ||||||||||||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS | € - 0 | € - 0 | € - 0 | € - 0 | ||||||||
| PARTII - ARCHITECTURAL AND CIVIL WORKS | € - 0 | € - 0 | € - 0 | € - 0 | ||||||||
| PARTIII - MECHANICAL WORKS | € - 0 | € - 0 | € - 0 | € - 0 | ||||||||
| PART IV - ELECTRICAL WORK | € - 0 | € - 0 | € - 0 | € - 0 | ||||||||
| TOTAL PRICE / Costo Totale | € - 0 | € - 0 | € - 0 | € - 0 | ||||||||
| OR US DOLLARS (RATE 1$ = 0,9798€) | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
&C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY &C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY&R&P of &N
F09 - 78030
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||||
| CONTRACTOR | ADDRESS | |||||||||||
| CONTRACT FOR (Work to be performed) | SUB F09 - 78030 | PROPOSED TOTAL CONTRACT PRICE | ||||||||||
| REPAIR ELECTRICAL MEDIUM VOLTAGE SUBSTATIONS IN FLIGT LINE LOOP, MULTI | ||||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | 0 | WORK LOCATION | |||||||||
| ASHE 20-1068A | AREA F - AVIANO AIR BASE | |||||||||||
| MATERIAL COSTS | LABOR COSTS | |||||||||||
| LINE NO. | ITEM | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | MANHOURS MANDAYS | AVERAGE RATE | TOTAL | OTHER DIRECT COSTS | LINE TOTAL | ||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni | ||||||||||||
| Ia Architectural Demolition - Ia Demolizioni Architettoniche | ||||||||||||
| Not applicable / Non Applicabile | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||
| Ib Mechanical Demolitions - Ib Demolizioni Meccaniche | 0.00 | 0.00 | 0.00 | |||||||||
| Not applicable / Non Applicabile | ||||||||||||
| Ic Electrical Demolitions - Ic Demolizioni Elettriche | 0.00 | 0.00 | ||||||||||
| 2 | REMOVAL OF EMERGENCY LIGHTING FIXTURES | |||||||||||
| rimozione lampade di emergenza | IT. No. Art. n. | 2 | LS/AC | 1.3 | ||||||||
| Total Electrical - Totale Elettrico | ||||||||||||
| TOTAL PART I / Totale Parte I | ||||||||||||
| PART II - ARCHITECTURAL AND CIVIL WORKS / Parte II - Lavori Architettonici e Civili | ||||||||||||
| 3 | PAINTING OF EXTERIOR WALL SURFACES | |||||||||||
| Tinteggiatura delle superfici esterne | IT. No. Art. n. | 1 | SQM/MQ | |||||||||
| 4 | PAINTING OF INTERIOR SURFACES | |||||||||||
| Tinteggiatura delle superfici interne | IT. No. Art. n. | 2 | SQM/MQ | |||||||||
| 5 | PAINTING OF METAL SURFACE | |||||||||||
| Pitturazione di superfici metalliche | IT. No. Art. n. | 3 | SQM/MQ | |||||||||
| 6 | EXISTING EXT CNC PAVEMENT REPAIR | |||||||||||
| Ripristino pavimentazione esterna esistente in cls | IT. No. Art. n. | 4 | SQM/MQ | |||||||||
| 7 | NEW ROOF WATERPROOFING LAYER | |||||||||||
| Nuova impermeabilizzazione copertura | IT. No. Art. n. | 5 | SQM/MQ | |||||||||
| 8 | NEW MOUSE SCREEN, INCL, FRAME | |||||||||||
| Nuova rete antitopo, incluso telaio | IT. No. Art. n. | 6 | EA/NO | |||||||||
| 9 | EXISTING DOOR RENOVATION | |||||||||||
| Manutenzione porte esistenti | IT. No. Art. n. | 7 | LS/AC | |||||||||
| 10 | NEW PANIC BAR | |||||||||||
| Nuova barra antipanico | IT. No. Art. n. | 8 | EA/NO | |||||||||
| TOTAL PART II / Totale Parte II | ||||||||||||
| PART III - MECHANICAL WORK / Parte III - Lavori Meccanici | ||||||||||||
| 11 | NO.1 ROOF CENTRIFIGAL FANS ROOF | |||||||||||
| No.1 torrini di estrazione | IT. No. Art. n. | 1 | LS/AC | |||||||||
| TOTAL PART III / Totale Parte III | ||||||||||||
| PART VI- ELECTRICAL WORK / Parte VI - Lavori Elettrici | ||||||||||||
| IVa MAINTENANCE/ IVa Manutenzione | ||||||||||||
| 12 | MV SWITCHGEAR MAINTENANCE | |||||||||||
| Manutenzione apparecchiature MT | IT. No. Art. n. | 1 | EA/NO | |||||||||
| 13 | LV SWITCHGEAR MAINTENANCE | |||||||||||
| Manutenzione apparecchiature BT | IT. No. Art. n. | 2 | EA/NO | |||||||||
| 14 | MV/LV TRANSFORMER MAINTENANCE | |||||||||||
| Manutenzione trasformatore MT/BT | IT. No. Art. n. | 3 | EA/NO | |||||||||
| 15 | MISCELLANEOUS ITEMS MAINTENANCE | |||||||||||
| Manutenzione articoli vari | IT. No. Art. n. | 4 | EA/NO | |||||||||
| 16 | CABLEDUCTS MAINTENANCE | |||||||||||
| Manutenzione cavidotti | IT. No. Art. n. | 5 | LS/AC | |||||||||
| TOTAL MAINTENANCE - Totale Manutenzione | ||||||||||||
| IVb REPAIRS/ IVb Riparazioni | ||||||||||||
| 17 | REPAIR OF EXISTING GROUNDING SYSTEM | |||||||||||
| Ripristino dell'impianto di terra esistente | IT. No. Art. n. | 1 | LS/AC | |||||||||
| 18 | NEW SPD | |||||||||||
| Nuovo SPD | IT. No. Art. n. | 2 | EA/NO | |||||||||
| 19 | NEW PILOT LED LAMPS | |||||||||||
| Nuove lampade LED presenza tensione | IT. No. Art. n. | 3 | EA/NO | |||||||||
| 20 | NEW RESISTANCE HEATER | |||||||||||
| Nuova resistenza anticondensa | IT. No. Art. n. | 4 | EA/NO | |||||||||
| 21 | NEW MICRO CIRCUIT BREAKERS | |||||||||||
| Nuovi interruttori modulare | IT. No. Art. n. | 5 | EA/NO | |||||||||
| 22 | ONE LINE DIAGRAMS CASE | |||||||||||
| Quadro schemi unifilari | IT. No. Art. n. | 6 | LS/AC | |||||||||
| 23 | INOX WALL BOX 60X75X35 CM | |||||||||||
| Contenitore a parete Inox 60X75X35 cm | IT. No. Art. n. | 7 | EA/NO | |||||||||
| 24 | LABELS AND CABLES MARKINGS | |||||||||||
| Targhette e contrassegno cavi | IT. No. Art. n. | 8 | LS/AC | |||||||||
| TOTAL REPAIRS/ Totale Riparazioni | ||||||||||||
| IVc SAFETY/ IVc Sicurezza | ||||||||||||
| 25 | NEW FIRE EXTINGUISHER | |||||||||||
| Nuovo estintore | IT. No. Art. n. | 1 | LS/AC | |||||||||
| 26 | NEW EMERGENCY LIGHTING SYSTEM | |||||||||||
| Nuovi sistema luci di emergenza | IT. No. Art. n. | 2a | EA/NO | |||||||||
| 27 | NEW MAINTAINED EXIT SIGN | |||||||||||
| Nuovle luci uscita emergenza | IT. No. Art. n. | 2b | EA/NO | |||||||||
| 28 | NEW EMERGENCY LIGHTING SYSTEM PUSH BUTTON | |||||||||||
| Nuovi pulsante controllo sistema luci di emergenza | IT. No. Art. n. | 3 | EA/NO | |||||||||
| TOTAL SAFETY/ Totale Sicurezza | ||||||||||||
| IVd NEW WORKS/ IVd Nuovi Lavori | ||||||||||||
| 29 | CONNECTION OF TV TO EXISTING TELEMONIT. SYS. | |||||||||||
| Connessione del TV all'esistente sist. Telegestione | IT. No. Art. n. | 1 | LS/AC | |||||||||
| 30 | CONNECTION OF SPD TO EXISTING TELEMONIT. SYS. | |||||||||||
| Connessione del SPD al sist. Telegestione | IT. No. Art. n. | 2 | LS/AC | |||||||||
| TOTAL NEW WORKS/ Totale Nuovi Lavori | ||||||||||||
| IVe TEST AND CERTIFICATIONS/ IVe Prove e Certificazioni | ||||||||||||
| 31 | GROUNDING TEST | |||||||||||
| Prove di terra | IT. No. Art. n. | 1 | LS/AC | |||||||||
| 32 | AS BUILT DRAWINGS | |||||||||||
| disegni as built | IT. No. Art. n. | 2a | LS/AC | |||||||||
| 33 | TEST AND CERTIFICATIONS | |||||||||||
| Collaudo e certificazioni | IT. No. Art. n. | 2b | LS/AC | |||||||||
| 34 | DECLARATION OF CONFORMITY DI.CO. | |||||||||||
| Dichiarazione di conformità Di.Co, | IT. No. Art. n. | 2c | LS/AC | |||||||||
| 35 | MAINTENANCE REGISTER | |||||||||||
| Registro manutenzione | IT. No. Art. n. | 2d | LS/AC | |||||||||
| 36 | DPR 462/01 INSPECTION CERTIFICATIONS | |||||||||||
| Certificazione ispezione DPR 462/01 | IT. No. Art. n. | 2e | LS/AC | |||||||||
| TOTAL TEST AND CERTIFICATIONS/ Totale Prove e Certificazioni | ||||||||||||
| IVf PV SYSTEM/ IVf Impianto fotovoltaico | ||||||||||||
| Not applicable / Non Applicabile | ||||||||||||
| TOTAL PART IV / Totale Parte IV | ||||||||||||
| SUMMARY / Riepilogo | ||||||||||||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS | € - 0 | € - 0 | € - 0 | € - 0 | ||||||||
| PARTII - ARCHITECTURAL AND CIVIL WORKS | € - 0 | € - 0 | € - 0 | € - 0 | ||||||||
| PARTIII - MECHANICAL WORKS | € - 0 | € - 0 | € - 0 | € - 0 | ||||||||
| PART IV - ELECTRICAL WORK | € - 0 | € - 0 | € - 0 | € - 0 | ||||||||
| TOTAL PRICE / Costo Totale | € - 0 | € - 0 | € - 0 | € - 0 | ||||||||
| OR US DOLLARS (RATE 1$ = 0,9798€) | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
&C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY &C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY&R&P of &N
F11 - 1217
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||||
| CONTRACTOR | ADDRESS | |||||||||||
| CONTRACT FOR (Work to be performed) | SUB F11 - 1217 | PROPOSED TOTAL CONTRACT PRICE | ||||||||||
| REPAIR ELECTRICAL MEDIUM VOLTAGE SUBSTATIONS IN FLIGT LINE LOOP, MULTI | ||||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||||
| ASHE 20-1068A | AREA F - AVIANO AIR BASE | |||||||||||
| MATERIAL COSTS | LABOR COSTS | |||||||||||
| LINE NO. | ITEM | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | MANHOURS MANDAYS | AVERAGE RATE | TOTAL | OTHER DIRECT COSTS | LINE TOTAL | ||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni | ||||||||||||
| Ia Architectural Demolition - Ia Demolizioni Architettoniche | ||||||||||||
| Not applicable / Non Applicabile | ||||||||||||
| Ib Mechanical Demolitions - Ib Demolizioni Meccaniche | 0.00 | 0.00 | 0.00 | |||||||||
| Not applicable / Non Applicabile | ||||||||||||
| Ic Electrical Demolitions - Ic Demolizioni Elettriche | 0.00 | 0.00 | ||||||||||
| 1 | REMOVAL OF EMERGENCY LIGHTING FIXTURES | |||||||||||
| rimozione lampade di emergenza | IT. No. Art. n. | 1 | LS/AC | 1.3 | ||||||||
| 2 | REMOVAL OF TVLV DISPLAY | |||||||||||
| rimozione Display TVLV | IT. No. Art. n. | 2 | LS/AC | |||||||||
| Total Electrical - Totale Elettrico | ||||||||||||
| TOTAL PART I / Totale Parte I | ||||||||||||
| PART II - ARCHITECTURAL AND CIVIL WORKS / Parte II - Lavori Architettonici e Civili | ||||||||||||
| 3 | PAINTING OF EXTERIOR WALL SURFACES | |||||||||||
| Tinteggiatura delle superfici esterne | IT. No. Art. n. | 1 | SQM/MQ | |||||||||
| 4 | PAINTING OF INTERIOR SURFACES | |||||||||||
| Tinteggiatura delle superfici interne | IT. No. Art. n. | 2 | SQM/MQ | |||||||||
| 5 | PAINTING OF METAL SURFACE | |||||||||||
| Pitturazione di superfici metalliche | IT. No. Art. n. | 3 | SQM/MQ | |||||||||
| 6 | NEW MOUSE SCREEN, INCL, FRAME | |||||||||||
| Nuova rete antitopo, incluso telaio | IT. No. Art. n. | 4 | EA/NO | |||||||||
| 7 | PANIC BAR | |||||||||||
| Barra antipanico | IT. No. Art. n. | 5 | EA/NO | |||||||||
| TOTAL PART II / Totale Parte II | ||||||||||||
| PART III - MECHANICAL WORK / Parte III - Lavori Meccanici | ||||||||||||
| 8 | NO.1 ROOF CENTRIFIGAL FANS ROOF | |||||||||||
| No.1 torrini di estrazione | IT. No. Art. n. | 1 | LS/AC | |||||||||
| TOTAL PART III / Totale Parte III | ||||||||||||
| PART VI- ELECTRICAL WORK / Parte VI - Lavori Elettrici | ||||||||||||
| IVa MAINTENANCE/ IVa Manutenzione | ||||||||||||
| 9 | MV SWITCHGEAR MAINTENANCE | |||||||||||
| Manutenzione apparecchiature MT | IT. No. Art. n. | 1 | EA/NO | |||||||||
| 10 | LV SWITCHGEAR MAINTENANCE | |||||||||||
| Manutenzione apparecchiature BT | IT. No. Art. n. | 2 | EA/NO | |||||||||
| 11 | MV/LV TRANSFORMER MAINTENANCE | |||||||||||
| Manutenzione trasformatore MT/BT | IT. No. Art. n. | 3 | EA/NO | |||||||||
| 12 | MISCELLANEOUS ITEMS MAINTENANCE | |||||||||||
| Manutenzione articoli vari | IT. No. Art. n. | 4 | EA/NO | |||||||||
| 13 | CABLEDUCTS MAINTENANCE | |||||||||||
| Manutenzione cavidotti | IT. No. Art. n. | 5 | LS/AC | |||||||||
| TOTAL MAINTENANCE - Totale Manutenzione | ||||||||||||
| IVb REPAIRS/ IVb Riparazioni | ||||||||||||
| 14 | REPAIR OF EXISTING GROUNDING SYSTEM | |||||||||||
| Ripristino dell'impianto di terra esistente | IT. No. Art. n. | 1 | LS/AC | |||||||||
| 15 | NEW INTERIOR LIGHTING FIXTURES | |||||||||||
| Nuovi apparecchi illuminanti PER INTERNO | IT. No. Art. n. | 2 | EA/NO | |||||||||
| 16 | NEW SPD | |||||||||||
| Nuovo SPD | IT. No. Art. n. | 3 | EA/NO | |||||||||
| 17 | NEW PILOT LED LAMPS | |||||||||||
| Nuove lampade LED presenza tensione | IT. No. Art. n. | 4 | EA/NO | |||||||||
| 18 | NEW RESISTANCE HEATER | |||||||||||
| Nuova resistenza anticondensa | IT. No. Art. n. | 5 | EA/NO | |||||||||
| 19 | NEW MICRO CIRCUIT BREAKERS | |||||||||||
| Nuovi interruttori modulare | IT. No. Art. n. | 6 | EA/NO | |||||||||
| 20 | ONE LINE DIAGRAMS CASE | |||||||||||
| Quadro schemi unifilari | IT. No. Art. n. | 7 | LS/AC | |||||||||
| 21 | INOX WALL BOX 60X75X35 CM | |||||||||||
| Contenitore a parete Inox 60X75X35 cm | IT. No. Art. n. | 8 | EA/NO | |||||||||
| 22 | LABELS AND CABLES MARKINGS | |||||||||||
| Targhette e contrassegno cavi | IT. No. Art. n. | 9 | LS/AC | |||||||||
| TOTAL REPAIRS/ Totale Riparazioni | ||||||||||||
| IVc SAFETY/ IVc Sicurezza | ||||||||||||
| 23 | NEW FIRE EXTINGUISHER | |||||||||||
| Nuovo estintore | IT. No. Art. n. | 1 | LS/AC | |||||||||
| 24 | NEW MONITORING WARNING SIGNS | |||||||||||
| Nuovi cartelli monitori | IT. No. Art. n. | 2 | EA/NO | |||||||||
| 25 | NEW EMERGENCY LIGHTING SYSTEM | |||||||||||
| Nuovi sistema luci di emergenza | IT. No. Art. n. | 3a | EA/NO | |||||||||
| 26 | NEW MAINTAINED EXIT SIGN | |||||||||||
| Nuovle luci uscita emergenza | IT. No. Art. n. | 3b | EA/NO | |||||||||
| 27 | NEW EMERGENCY LIGHTING SYSTEM PUSH BUTTON | |||||||||||
| Nuovi pulsante controllo sistema luci di emergenza | IT. No. Art. n. | 4 | EA/NO | |||||||||
| TOTAL SAFETY/ Totale Sicurezza | ||||||||||||
| IVd NEW WORKS/ IVd Nuovi Lavori | ||||||||||||
| 28 | CONNECTION OF TV TO EXISTING TELEMONIT. SYS. | |||||||||||
| Connessione del TV all'esistente sist. Telegestione | IT. No. Art. n. | 1 | LS/AC | |||||||||
| 29 | CONNECTION OF SPD TO EXISTING TELEMONIT. SYS. | |||||||||||
| Connessione del SPD al sist. Telegestione | IT. No. Art. n. | 2 | LS/AC | |||||||||
| TOTAL NEW WORKS/ Totale Nuovi Lavori | ||||||||||||
| IVe TEST AND CERTIFICATIONS/ IVe Prove e Certificazioni | ||||||||||||
| 30 | GROUNDING TEST | |||||||||||
| Prove di terra | IT. No. Art. n. | 1 | LS/AC | |||||||||
| 31 | AS BUILT DRAWINGS | |||||||||||
| disegni as built | IT. No. Art. n. | 2a | LS/AC | |||||||||
| 32 | TEST AND CERTIFICATIONS | |||||||||||
| Collaudo e certificazioni | IT. No. Art. n. | 2b | LS/AC | |||||||||
| 33 | DECLARATION OF CONFORMITY DI.CO. | |||||||||||
| Dichiarazione di conformità Di.Co, | IT. No. Art. n. | 2c | LS/AC | |||||||||
| 34 | MAINTENANCE REGISTER | |||||||||||
| Registro manutenzione | IT. No. Art. n. | 2d | LS/AC | |||||||||
| 35 | DPR 462/01 INSPECTION CERTIFICATIONS | |||||||||||
| Certificazione ispezione DPR 462/01 | IT. No. Art. n. | 2e | LS/AC | |||||||||
| TOTAL TEST AND CERTIFICATIONS/ Totale Prove e Certificazioni | ||||||||||||
| IVf PV SYSTEM/ IVf Impianto fotovoltaico | ||||||||||||
| Not applicable / Non Applicabile | ||||||||||||
| TOTAL PART IV / Totale Parte IV | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||||||
| SUMMARY / Riepilogo | ||||||||||||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS | € - 0 | € - 0 | € - 0 | € - 0 | ||||||||
| PARTII - ARCHITECTURAL AND CIVIL WORKS | € - 0 | € - 0 | € - 0 | € - 0 | ||||||||
| PARTIII - MECHANICAL WORKS | € - 0 | € - 0 | € - 0 | € - 0 | ||||||||
| PART IV - ELECTRICAL WORK | € - 0 | € - 0 | € - 0 | € - 0 | ||||||||
| TOTAL PRICE / Costo Totale | € - 0 | € - 0 | € - 0 | € - 0 | ||||||||
| OR US DOLLARS (RATE 1$ = 0,9798€) | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
&C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY &C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY&R&P of &N
F13 - 71196
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||||
| CONTRACTOR | ADDRESS | |||||||||||
| CONTRACT FOR (Work to be performed) | SUB F13 - 71196 | PROPOSED TOTAL CONTRACT PRICE | ||||||||||
| REPAIR ELECTRICAL MEDIUM VOLTAGE SUBSTATIONS IN FLIGT LINE LOOP, MULTI | ||||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||||
| ASHE 20-1068A | AREA F - AVIANO AIR BASE | |||||||||||
| MATERIAL COSTS | LABOR COSTS | |||||||||||
| LINE NO. | ITEM | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | MANHOURS MANDAYS | AVERAGE RATE | TOTAL | OTHER DIRECT COSTS | LINE TOTAL | ||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni | ||||||||||||
| Ia Architectural Demolition - Ia Demolizioni Architettoniche | ||||||||||||
| Not applicable / Non Applicabile | ||||||||||||
| Ib Mechanical Demolitions - Ib Demolizioni Meccaniche | 0.00 | 0.00 | 0.00 | |||||||||
| Not applicable / Non Applicabile | ||||||||||||
| Ic Electrical Demolitions - Ic Demolizioni Elettriche | 0.00 | 0.00 | ||||||||||
| 1 | REMOVAL OF EMERGENCY LIGHTING FIXTURES | |||||||||||
| rimozione lampade di emergenza | IT. No. Art. n. | 1 | LS/AC | 1.3 | ||||||||
| 2 | REMOVAL OF TVLV DISPLAY | |||||||||||
| rimozione Display TVLV | IT. No. Art. n. | 2 | LS/AC | |||||||||
| Total Electrical - Totale Elettrico | ||||||||||||
| TOTAL PART I / Totale Parte I | ||||||||||||
| PART II - ARCHITECTURAL AND CIVIL WORKS / Parte II - Lavori Architettonici e Civili | ||||||||||||
| 3 | PAINTING OF EXTERIOR WALL SURFACES | |||||||||||
| Tinteggiatura delle superfici esterne | IT. No. Art. n. | 1 | SQM/MQ | |||||||||
| 4 | PAINTING OF INTERIOR SURFACES | |||||||||||
| Tinteggiatura delle superfici interne | IT. No. Art. n. | 2 | SQM/MQ | |||||||||
| 5 | NEW CEMENT BASED PLASTER ON EXT/INT WALL | |||||||||||
| Nuovo intonaco a base di cemento sulle pareti int/est | IT. No. Art. n. | 3 | SQM/MQ | |||||||||
| 6 | NEW CNC EXTERNAL PAVEMENT, INCL EXCAVATION | |||||||||||
| Nuova pavimentazione esterna in cls, incluso scavo | IT. No. Art. n. | 4 | SQM/MQ | |||||||||
| 7 | NEW MOUSE SCREEN, INCL, FRAME | |||||||||||
| Nuova rete antitopo, incluso telaio | IT. No. Art. n. | 5 | LS/AC | |||||||||
| 8 | NEW PANIC BAR | |||||||||||
| Nuova barra antipanico | IT. No. Art. n. | 6 | Ea/No | |||||||||
| TOTAL PART II / Totale Parte II | ||||||||||||
| PART III - MECHANICAL WORK / Parte III - Lavori Meccanici | ||||||||||||
| 8 | NO.1 ROOF CENTRIFIGAL FANS ROOF | |||||||||||
| No.1 torrini di estrazione | IT. No. Art. n. | 1 | LS/AC | |||||||||
| TOTAL PART III / Totale Parte III | ||||||||||||
| PART VI- ELECTRICAL WORK / Parte VI - Lavori Elettrici | ||||||||||||
| IVa MAINTENANCE/ IVa Manutenzione | ||||||||||||
| 9 | MV SWITCHGEAR MAINTENANCE | |||||||||||
| Manutenzione apparecchiature MT | IT. No. Art. n. | 1 | EA/NO | |||||||||
| 10 | LV SWITCHGEAR MAINTENANCE | |||||||||||
| Manutenzione apparecchiature BT | IT. No. Art. n. | 2 | EA/NO | |||||||||
| 11 | MV/LV TRANSFORMER MAINTENANCE | |||||||||||
| Manutenzione trasformatore MT/BT | IT. No. Art. n. | 3 | EA/NO | |||||||||
| 12 | MISCELLANEOUS ITEMS MAINTENANCE | |||||||||||
| Manutenzione articoli vari | IT. No. Art. n. | 4 | EA/NO | |||||||||
| 13 | CABLEDUCTS MAINTENANCE | |||||||||||
| Manutenzione cavidotti | IT. No. Art. n. | 5 | LS/AC | |||||||||
| TOTAL MAINTENANCE - Totale Manutenzione | ||||||||||||
| IVb REPAIRS/ IVb Riparazioni | ||||||||||||
| 14 | REPAIR OF EXISTING GROUNDING SYSTEM | |||||||||||
| Ripristino dell'impianto di terra esistente | IT. No. Art. n. | 1 | LS/AC | |||||||||
| 15 | NEW EXTERIOR LIGHTING SWITCH | |||||||||||
| Nuovo interruttore luce esterna | IT. No. Art. n. | 2 | EA/NO | |||||||||
| 16 | NEW SPD | |||||||||||
| Nuovo SPD | IT. No. Art. n. | 3 | EA/NO | |||||||||
| 17 | NEW PILOT LED LAMPS | |||||||||||
| Nuove lampade LED presenza tensione | IT. No. Art. n. | 4 | EA/NO | |||||||||
| 18 | NEW RESISTANCE HEATER | |||||||||||
| Nuova resistenza anticondensa | IT. No. Art. n. | 5 | EA/NO | |||||||||
| 19 | NEW MICRO CIRCUIT BREAKERS | |||||||||||
| Nuovi interruttori modulare | IT. No. Art. n. | 6 | EA/NO | |||||||||
| 20 | ONE LINE DIAGRAMS CASE | |||||||||||
| Quadro schemi unifilari | IT. No. Art. n. | 7 | LS/AC | |||||||||
| 21 | INOX WALL BOX 60X75X35 CM | |||||||||||
| Contenitore a parete Inox 60X75X35 cm | IT. No. Art. n. | 8 | EA/NO | |||||||||
| 22 | LABELS AND CABLES MARKINGS | |||||||||||
| Targhette e contrassegno cavi | IT. No. Art. n. | 9 | LS/AC | |||||||||
| TOTAL REPAIRS/ Totale Riparazioni | ||||||||||||
| IVc SAFETY/ IVc Sicurezza | ||||||||||||
| 23 | NEW FIRE EXTINGUISHER | |||||||||||
| Nuovo estintore | IT. No. Art. n. | 1 | LS/AC | |||||||||
| 24 | REMOVAL OF DOOR GROUNDING CONNECTION | |||||||||||
| Rimozione collegamento di terra dalle porte | IT. No. Art. n. | 2 | LS/AC | |||||||||
| 24 | NEW EMERGENCY LIGHTING SYSTEM | |||||||||||
| Nuovi sistema luci di emergenza | IT. No. Art. n. | 2a | EA/NO | |||||||||
| 25 | NEW MAINTAINED EXIT SIGN | |||||||||||
| Nuovle luci uscita emergenza | IT. No. Art. n. | 2b | EA/NO | |||||||||
| 26 | NEW EMERGENCY LIGHTING SYSTEM PUSH BUTTON | |||||||||||
| Nuovi pulsante controllo sistema luci di emergenza | IT. No. Art. n. | 3 | EA/NO | |||||||||
| TOTAL SAFETY/ Totale Sicurezza | ||||||||||||
| IVd NEW WORKS/ IVd Nuovi Lavori | ||||||||||||
| 27 | CONNECTION OF TV TO EXISTING TELEMONIT. SYS. | |||||||||||
| Connessione del TV all'esistente sist. Telegestione | IT. No. Art. n. | 1 | LS/AC | |||||||||
| 28 | CONNECTION OF SPD TO EXISTING TELEMONIT. SYS. | |||||||||||
| Connessione del SPD al sist. Telegestione | IT. No. Art. n. | 2 | LS/AC | |||||||||
| TOTAL NEW WORKS/ Totale Nuovi Lavori | ||||||||||||
| IVe TEST AND CERTIFICATIONS/ IVe Prove e Certificazioni | ||||||||||||
| 29 | GROUNDING TEST | |||||||||||
| Prove di terra | IT. No. Art. n. | 1 | LS/AC | |||||||||
| 30 | AS BUILT DRAWINGS | |||||||||||
| disegni as built | IT. No. Art. n. | 2a | LS/AC | |||||||||
| 31 | TEST AND CERTIFICATIONS | |||||||||||
| Collaudo e certificazioni | IT. No. Art. n. | 2b | LS/AC | |||||||||
| 32 | DECLARATION OF CONFORMITY DI.CO. | |||||||||||
| Dichiarazione di conformità Di.Co, | IT. No. Art. n. | 2c | LS/AC | |||||||||
| 33 | MAINTENANCE REGISTER | |||||||||||
| Registro manutenzione | IT. No. Art. n. | 2d | LS/AC | |||||||||
| 34 | DPR 462/01 INSPECTION CERTIFICATIONS | |||||||||||
| Certificazione ispezione DPR 462/01 | IT. No. Art. n. | 2e | LS/AC | |||||||||
| TOTAL TEST AND CERTIFICATIONS/ Totale Prove e Certificazioni | ||||||||||||
| IVf PV SYSTEM/ IVf Impianto fotovoltaico | ||||||||||||
| Not applicable / Non Applicabile | ||||||||||||
| TOTAL PART IV / Totale Parte IV | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||
| SUMMARY / Riepilogo | ||||||||||||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS | € - 0 | € - 0 | € - 0 | € - 0 | ||||||||
| PARTII - ARCHITECTURAL AND CIVIL WORKS | € - 0 | € - 0 | € - 0 | € - 0 | ||||||||
| PARTIII - MECHANICAL WORKS | € - 0 | € - 0 | € - 0 | € - 0 | ||||||||
| PART IV - ELECTRICAL WORK | € - 0 | € - 0 | € - 0 | € - 0 | ||||||||
| TOTAL PRICE / Costo Totale | € - 0 | € - 0 | € - 0 | € - 0 | ||||||||
| OR US DOLLARS (RATE 1$ = 0,9798€) | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
&C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY &C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY&R&P of &N
F14 - 71198
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||||
| CONTRACTOR | ADDRESS | |||||||||||
| CONTRACT FOR (Work to be performed) | SUB F14 - 71198 | PROPOSED TOTAL CONTRACT PRICE | ||||||||||
| REPAIR ELECTRICAL MEDIUM VOLTAGE SUBSTATIONS IN FLIGT LINE LOOP, MULTI | ||||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||||
| ASHE 20-1068A | AREA F - AVIANO AIR BASE | |||||||||||
| MATERIAL COSTS | LABOR COSTS | |||||||||||
| LINE NO. | ITEM | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | MANHOURS MANDAYS | AVERAGE RATE | TOTAL | OTHER DIRECT COSTS | LINE TOTAL | ||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni | ||||||||||||
| Ia Architectural Demolition - Ia Demolizioni Architettoniche | ||||||||||||
| Not applicable / Non Applicabile | ||||||||||||
| Ib Mechanical Demolitions - Ib Demolizioni Meccaniche | 0.00 | 0.00 | 0.00 | |||||||||
| Not applicable / Non Applicabile | ||||||||||||
| Ic Electrical Demolitions - Ic Demolizioni Elettriche | 0.00 | 0.00 | ||||||||||
| 1 | REMOVAL OF EMERGENCY LIGHTING FIXTURES | |||||||||||
| rimozione lampade di emergenza | IT. No. Art. n. | 1 | LS/AC | 1.3 | ||||||||
| Total Electrical - Totale Elettrico | ||||||||||||
| TOTAL PART I / Totale Parte I | ||||||||||||
| PART II - ARCHITECTURAL AND CIVIL WORKS / Parte II - Lavori Architettonici e Civili | ||||||||||||
| 2 | PAINTING OF INTERIOR SURFACES | |||||||||||
| Tinteggiatura delle superfici interne | IT. No. Art. n. | 1 | SQM/MQ | |||||||||
| 3 | NEW CEMENT BASED PLASTER ON EXT/INT WALL | |||||||||||
| Nuovo intonaco a base di cemento sulle pareti int/est | IT. No. Art. n. | 2 | SQM/MQ | |||||||||
| 4 | NEW MOUSE SCREEN, INCL, FRAME | |||||||||||
| Nuova rete antitopo, incluso telaio | IT. No. Art. n. | 3 | LS/AC | |||||||||
| 5 | EXISTING DOOR RENOVATION | |||||||||||
| Manutenzione porte esistenti | IT. No. Art. n. | 4 | LS/AC | |||||||||
| 6 | PANIC BAR | |||||||||||
| Barra antipanico | IT. No. Art. n. | 5 | EA/NO | |||||||||
| TOTAL PART II / Totale Parte II | ||||||||||||
| PART III - MECHANICAL WORK / Parte III - Lavori Meccanici | ||||||||||||
| 7 | NO.1 ROOF CENTRIFIGAL FANS ROOF | |||||||||||
| No.1 torrini di estrazione | IT. No. Art. n. | 1 | LS/AC | |||||||||
| TOTAL PART III / Totale Parte III | ||||||||||||
| PART VI- ELECTRICAL WORK / Parte VI - Lavori Elettrici | ||||||||||||
| IVa MAINTENANCE/ IVa Manutenzione | ||||||||||||
| 8 | MV SWITCHGEAR MAINTENANCE | |||||||||||
| Manutenzione apparecchiature MT | IT. No. Art. n. | 1 | EA/NO | |||||||||
| 9 | LV SWITCHGEAR MAINTENANCE | |||||||||||
| Manutenzione apparecchiature BT | IT. No. Art. n. | 2 | EA/NO | |||||||||
| 10 | MV/LV TRANSFORMER MAINTENANCE | |||||||||||
| Manutenzione trasformatore MT/BT | IT. No. Art. n. | 3 | EA/NO | |||||||||
| 11 | MISCELLANEOUS ITEMS MAINTENANCE | |||||||||||
| Manutenzione articoli vari | IT. No. Art. n. | 4 | EA/NO | |||||||||
| 12 | CABLEDUCTS MAINTENANCE | |||||||||||
| Manutenzione cavidotti | IT. No. Art. n. | 5 | LS/AC | |||||||||
| TOTAL MAINTENANCE - Totale Manutenzione | ||||||||||||
| IVb REPAIRS/ IVb Riparazioni | ||||||||||||
| 13 | REPAIR OF EXISTING GROUNDING SYSTEM | |||||||||||
| Ripristino dell'impianto di terra esistente | IT. No. Art. n. | 1 | LS/AC | |||||||||
| 14 | NEW EXTERIOR LIGHTING SWITCH | |||||||||||
| Nuovo interruttore luce esterna | IT. No. Art. n. | 2 | EA/NO | |||||||||
| 15 | NEW SPD | |||||||||||
| Nuovo SPD | IT. No. Art. n. | 3 | EA/NO | |||||||||
| 16 | NEW PILOT LED LAMPS | |||||||||||
| Nuove lampade LED presenza tensione | IT. No. Art. n. | 4 | EA/NO | |||||||||
| 17 | NEW RESISTANCE HEATER | |||||||||||
| Nuova resistenza anticondensa | IT. No. Art. n. | 5 | EA/NO | |||||||||
| 18 | NEW MICRO CIRCUIT BREAKERS | |||||||||||
| Nuovi interruttori modulare | IT. No. Art. n. | 6 | EA/NO | |||||||||
| 19 | ONE LINE DIAGRAMS CASE | |||||||||||
| Quadro schemi unifilari | IT. No. Art. n. | 7 | LS/AC | |||||||||
| 20 | INOX WALL BOX 60X75X35 CM | |||||||||||
| Contenitore a parete Inox 60X75X35 cm | IT. No. Art. n. | 8 | EA/NO | |||||||||
| 21 | LABELS AND CABLES MARKINGS | |||||||||||
| Targhette e contrassegno cavi | IT. No. Art. n. | 9 | LS/AC | |||||||||
| 22 | NEW MANUAL CHANGEOVER SWITCH | |||||||||||
| Nuovo commutatore manuale | IT. No. Art. n. | 10 | EA/NO | |||||||||
| TOTAL REPAIRS/ Totale Riparazioni | ||||||||||||
| IVc SAFETY/ IVc Sicurezza | ||||||||||||
| 23 | NEW FIRE EXTINGUISHER | |||||||||||
| Nuovi estintore | IT. No. Art. n. | 1 | LS/AC | |||||||||
| 24 | REMOVAL OF DOOR GROUNDING CONNECTION | |||||||||||
| Rimozione collegamento di terra dalle porte | IT. No. Art. n. | 2 | LS/AC | |||||||||
| 25 | NEW EMERGENCY LIGHTING SYSTEM | |||||||||||
| Nuovi sistema luci di emergenza | IT. No. Art. n. | 3a | EA/NO | |||||||||
| 26 | NEW MAINTAINED EXIT SIGN | |||||||||||
| Nuovle luci uscita emergenza | IT. No. Art. n. | 3b | EA/NO | |||||||||
| 27 | NEW EMERGENCY LIGHTING SYSTEM PUSH BUTTON | |||||||||||
| Nuovi pulsante controllo sistema luci di emergenza | IT. No. Art. n. | 4 | EA/NO | |||||||||
| 28 | NEW LABEL ON CIRCUIT BREAKER | |||||||||||
| Nuova targhetta indicativa su interruttore | IT. No. Art. n. | 5 | LS/AC | |||||||||
| TOTAL SAFETY/ Totale Sicurezza | ||||||||||||
| IVd NEW WORKS/ IVd Nuovi Lavori | ||||||||||||
| 29 | CONNECTION OF TV TO EXISTING TELEMONIT. SYS. | |||||||||||
| Connessione del TV all'esistente sist. Telegestione | IT. No. Art. n. | 1 | LS/AC | |||||||||
| 30 | CONNECTION OF SPD TO EXISTING TELEMONIT. SYS. | |||||||||||
| Connessione del SPD al sist. Telegestione | IT. No. Art. n. | 2 | LS/AC | |||||||||
| TOTAL NEW WORKS/ Totale Nuovi Lavori | ||||||||||||
| IVe TEST AND CERTIFICATIONS/ IVe Prove e Certificazioni | ||||||||||||
| 31 | GROUNDING TEST | |||||||||||
| Prove di terra | IT. No. Art. n. | 1 | LS/AC | |||||||||
| 32 | AS BUILT DRAWINGS | |||||||||||
| disegni as built | IT. No. Art. n. | 2a | LS/AC | |||||||||
| 33 | TEST AND CERTIFICATIONS | |||||||||||
| Collaudo e certificazioni | IT. No. Art. n. | 2b | LS/AC | |||||||||
| 34 | DECLARATION OF CONFORMITY DI.CO. | |||||||||||
| Dichiarazione di conformità Di.Co, | IT. No. Art. n. | 2c | LS/AC | |||||||||
| 35 | MAINTENANCE REGISTER | |||||||||||
| Registro manutenzione | IT. No. Art. n. | 2d | LS/AC | |||||||||
| 36 | DPR 462/01 INSPECTION CERTIFICATIONS | |||||||||||
| Certificazione ispezione DPR 462/01 | IT. No. Art. n. | 2e | LS/AC | |||||||||
| TOTAL TEST AND CERTIFICATIONS/ Totale Prove e Certificazioni | ||||||||||||
| IVf PV SYSTEM/ IVf Impianto fotovoltaico | ||||||||||||
| Not applicable / Non Applicabile | ||||||||||||
| TOTAL PART IV / Totale Parte IV | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||
| SUMMARY / Riepilogo | ||||||||||||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS | € - 0 | € - 0 | € - 0 | € - 0 | ||||||||
| PARTII - ARCHITECTURAL AND CIVIL WORKS | € - 0 | € - 0 | € - 0 | € - 0 | ||||||||
| PARTIII - MECHANICAL WORKS | € - 0 | € - 0 | € - 0 | € - 0 | ||||||||
| PART IV - ELECTRICAL WORK | € - 0 | € - 0 | € - 0 | € - 0 | ||||||||
| TOTAL PRICE / Costo Totale | € - 0 | € - 0 | € - 0 | € - 0 | ||||||||
| OR US DOLLARS (RATE 1$ = 0,9381€) | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
&C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY &C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY&R&P of &N
F15 - 71192
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||||
| CONTRACTOR | ADDRESS | |||||||||||
| CONTRACT FOR (Work to be performed) | SUB F15 - 71192 | PROPOSED TOTAL CONTRACT PRICE | ||||||||||
| REPAIR ELECTRICAL MEDIUM VOLTAGE SUBSTATIONS IN FLIGT LINE LOOP, MULTI | ||||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||||
| ASHE 20-1068A | AREA F - AVIANO AIR BASE | |||||||||||
| MATERIAL COSTS | LABOR COSTS | |||||||||||
| LINE NO. | ITEM | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | MANHOURS MANDAYS | AVERAGE RATE | TOTAL | OTHER DIRECT COSTS | LINE TOTAL | ||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni | ||||||||||||
| Ia Architectural Demolition - Ia Demolizioni Architettoniche | ||||||||||||
| Not applicable / Non Applicabile | ||||||||||||
| Ib Mechanical Demolitions - Ib Demolizioni Meccaniche | 0.00 | 0.00 | 0.00 | |||||||||
| Not applicable / Non Applicabile | ||||||||||||
| Ic Electrical Demolitions - Ic Demolizioni Elettriche | 0.00 | 0.00 | ||||||||||
| 1 | REMOVAL OF EMERGENCY LIGHTING FIXTURES | |||||||||||
| rimozione lampade di emergenza | IT. No. Art. n. | 1 | LS/AC | |||||||||
| 2 | REMOVAL OF LIGHTING SWITCH | |||||||||||
| rimozione INTERRUTTORE LUCI | IT. No. Art. n. | 2 | LS/AC | |||||||||
| Total Electrical - Totale Elettrico | ||||||||||||
| TOTAL PART I / Totale Parte I | ||||||||||||
| PART II - ARCHITECTURAL AND CIVIL WORKS / Parte II - Lavori Architettonici e Civili | ||||||||||||
| 3 | PAINTING OF INTERIOR SURFACES | |||||||||||
| Tinteggiatura delle superfici interne | IT. No. Art. n. | 1 | SQM/MQ | 1.3 | ||||||||
| 4 | NEW CEMENT BASED PLASTER ON EXT/INT WALL | |||||||||||
| Nuovo intonaco a base di cemento sulle pareti int/est | IT. No. Art. n. | 2 | SQM/MQ | |||||||||
| 5 | NEW MOUSE SCREEN, INCL, FRAME | |||||||||||
| Nuova rete antitopo, incluso telaio | IT. No. Art. n. | 3 | LS/AC | |||||||||
| 6 | EXISTING DOOR RENOVATION | |||||||||||
| Manutenzione porte esistenti | IT. No. Art. n. | 4 | LS/AC | |||||||||
| 7 | PANIC BAR | |||||||||||
| Barra antipanico | IT. No. Art. n. | 5 | EA/NO | |||||||||
| 8 | NEW METAL JOINT COVER | |||||||||||
| Nuovo coprigiunto in metallo | IT. No. Art. n. | 6 | LM/ML | |||||||||
| 9 | SUBSTATION CLEANING | |||||||||||
| Pulizia cabina | IT. No. Art. n. | 7 | LS/AC | |||||||||
| TOTAL PART II / Totale Parte II | ||||||||||||
| PART III - MECHANICAL WORK / Parte III - Lavori Meccanici | ||||||||||||
| 10 | NO.1 ROOF CENTRIFIGAL FANS ROOF | |||||||||||
| No.1 torrini di estrazione | IT. No. Art. n. | 1 | LS/AC | |||||||||
| TOTAL PART III / Totale Parte III | ||||||||||||
| PART VI- ELECTRICAL WORK / Parte VI - Lavori Elettrici | ||||||||||||
| IVa MAINTENANCE/ IVa Manutenzione | ||||||||||||
| 11 | MV SWITCHGEAR MAINTENANCE | |||||||||||
| Manutenzione apparecchiature MT | IT. No. Art. n. | 1 | EA/NO | |||||||||
| 12 | LV SWITCHGEAR MAINTENANCE | |||||||||||
| Manutenzione apparecchiature BT | IT. No. Art. n. | 2 | EA/NO | |||||||||
| 13 | MV/LV TRANSFORMER MAINTENANCE | |||||||||||
| Manutenzione trasformatore MT/BT | IT. No. Art. n. | 3 | EA/NO | |||||||||
| 14 | MISCELLANEOUS ITEMS MAINTENANCE | |||||||||||
| Manutenzione articoli vari | IT. No. Art. n. | 4 | EA/NO | |||||||||
| 15 | CABLEDUCTS MAINTENANCE | |||||||||||
| Manutenzione cavidotti | IT. No. Art. n. | 5 | LS/AC | |||||||||
| TOTAL MAINTENANCE - Totale Manutenzione | ||||||||||||
| IVb REPAIRS/ IVb Riparazioni | ||||||||||||
| 16 | REPAIR OF EXISTING GROUNDING SYSTEM | |||||||||||
| Ripristino dell'impianto di terra esistente | IT. No. Art. n. | 1 | LS/AC | |||||||||
| 17 | NEW EXTERNAL LIGHTING SWITCH | |||||||||||
| Nuovo interruttore esterno luci | IT. No. Art. n. | 2 | EA/NO | |||||||||
| 18 | NEW SPD | |||||||||||
| Nuovo SPD | IT. No. Art. n. | 3 | EA/NO | |||||||||
| 19 | NEW PILOT LED LAMPS | |||||||||||
| Nuove lampade LED presenza tensione | IT. No. Art. n. | 4 | EA/NO | |||||||||
| 20 | NEW RESISTANCE HEATER | |||||||||||
| Nuova resistenza anticondensa | IT. No. Art. n. | 5 | EA/NO | |||||||||
| 21 | NEW MICRO CIRCUIT BREAKERS | |||||||||||
| Nuovi interruttori modulare | IT. No. Art. n. | 6 | EA/NO | |||||||||
| 22 | ONE LINE DIAGRAMS CASE | |||||||||||
| Quadro schemi unifilari | IT. No. Art. n. | 7 | LS/AC | |||||||||
| 23 | INOX WALL BOX 60X75X35 CM | |||||||||||
| Contenitore a parete Inox 60X75X35 cm | IT. No. Art. n. | 8 | EA/NO | |||||||||
| 24 | LABELS AND CABLES MARKINGS | |||||||||||
| Targhette e contrassegno cavi | IT. No. Art. n. | 9 | LS/AC | |||||||||
| TOTAL REPAIRS/ Totale Riparazioni | ||||||||||||
| IVc SAFETY/ IVc Sicurezza | ||||||||||||
| 25 | NEW FIRE EXTINGUISHER | |||||||||||
| Nuovi estintore | IT. No. Art. n. | 1 | LS/AC | |||||||||
| 26 | NEW EMERGENCY LIGHTING SYSTEM | |||||||||||
| Nuovi sistema luci di emergenza | IT. No. Art. n. | 2a | EA/NO | |||||||||
| 27 | NEW MAINTAINED EXIT SIGN | |||||||||||
| Nuovle luci uscita emergenza | IT. No. Art. n. | 2b | EA/NO | |||||||||
| 28 | NEW EMERGENCY LIGHTING SYSTEM PUSH BUTTON | |||||||||||
| Nuovi pulsante controllo sistema luci di emergenza | IT. No. Art. n. | 3 | EA/NO | |||||||||
| TOTAL SAFETY/ Totale Sicurezza | ||||||||||||
| IVd NEW WORKS/ IVd Nuovi Lavori | ||||||||||||
| 29 | CONNECTION OF TV TO EXISTING TELEMONIT. SYS. | |||||||||||
| Connessione del TV all'esistente sist. Telegestione | IT. No. Art. n. | 1 | LS/AC | |||||||||
| 30 | CONNECTION OF SPD TO EXISTING TELEMONIT. SYS. | |||||||||||
| Connessione del SPD al sist. Telegestione | IT. No. Art. n. | 2 | LS/AC | |||||||||
| TOTAL NEW WORKS/ Totale Nuovi Lavori | ||||||||||||
| IVe TEST AND CERTIFICATIONS/ IVe Prove e Certificazioni | ||||||||||||
| 31 | GROUNDING TEST | |||||||||||
| Prove di terra | IT. No. Art. n. | 1 | LS/AC | |||||||||
| 32 | AS BUILT DRAWINGS | |||||||||||
| disegni as built | IT. No. Art. n. | 2a | LS/AC | |||||||||
| 33 | TEST AND CERTIFICATIONS | |||||||||||
| Collaudo e certificazioni | IT. No. Art. n. | 2b | LS/AC | |||||||||
| 34 | DECLARATION OF CONFORMITY DI.CO. | |||||||||||
| Dichiarazione di conformità Di.Co, | IT. No. Art. n. | 2c | LS/AC | |||||||||
| 35 | MAINTENANCE REGISTER | |||||||||||
| Registro manutenzione | IT. No. Art. n. | 2d | LS/AC | |||||||||
| 36 | DPR 462/01 INSPECTION CERTIFICATIONS | |||||||||||
| Certificazione ispezione DPR 462/01 | IT. No. Art. n. | 2e | LS/AC | |||||||||
| TOTAL TEST AND CERTIFICATIONS/ Totale Prove e Certificazioni | ||||||||||||
| IVf PV SYSTEM/ IVf Impianto fotovoltaico | ||||||||||||
| Not applicable / Non Applicabile | ||||||||||||
| TOTAL PART IV / Totale Parte IV | 0.00 | 0 | 0.00 | 0.00 | 0.00 | |||||||
| SUMMARY / Riepilogo | ||||||||||||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS | € - 0 | € - 0 | € - 0 | € - 0 | ||||||||
| PARTII - ARCHITECTURAL AND CIVIL WORKS | € - 0 | € - 0 | € - 0 | € - 0 | ||||||||
| PARTIII - MECHANICAL WORKS | € - 0 | € - 0 | € - 0 | € - 0 | ||||||||
| PART IV - ELECTRICAL WORK | € - 0 | € - 0 | € - 0 | € - 0 | ||||||||
| TOTAL PRICE / Costo Totale | € - 0 | € - 0 | € - 0 | € - 0 | ||||||||
| OR US DOLLARS (RATE 1$ = 0,9798€) | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
&C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY &C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY&R&P of &N
F16 - 71121
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||||
| CONTRACTOR | ADDRESS | |||||||||||
| CONTRACT FOR (Work to be performed) | SUB F16 - 71121 | PROPOSED TOTAL CONTRACT PRICE | ||||||||||
| REPAIR ELECTRICAL MEDIUM VOLTAGE SUBSTATIONS IN FLIGT LINE LOOP, MULTI | ||||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||||
| ASHE 20-1068A | AREA F - AVIANO AIR BASE | |||||||||||
| MATERIAL COSTS | LABOR COSTS | |||||||||||
| LINE NO. | ITEM | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | MANHOURS MANDAYS | AVERAGE RATE | TOTAL | OTHER DIRECT COSTS | LINE TOTAL | ||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni | ||||||||||||
| Ia Architectural Demolition - Ia Demolizioni Architettoniche | ||||||||||||
| Not applicable / Non Applicabile | ||||||||||||
| Ib Mechanical Demolitions - Ib Demolizioni Meccaniche | 0.00 | 0.00 | 0.00 | |||||||||
| Not applicable / Non Applicabile | ||||||||||||
| Ic Electrical Demolitions - Ic Demolizioni Elettriche | 0.00 | 0.00 | ||||||||||
| 1 | REMOVAL OF EMERGENCY LIGHTING FIXTURES | |||||||||||
| rimozione lampade di emergenza | IT. No. Art. n. | 1 | LS/AC | |||||||||
| 2 | REMOVAL OF LIGHTING SWITCH | |||||||||||
| rimozione INTERRUTTORE LUCI | IT. No. Art. n. | 2 | LS/AC | |||||||||
| Total Electrical - Totale Elettrico | ||||||||||||
| TOTAL PART I / Totale Parte I | ||||||||||||
| PART II - ARCHITECTURAL AND CIVIL WORKS / Parte II - Lavori Architettonici e Civili | ||||||||||||
| 3 | PAINTING OF INTERIOR SURFACES | |||||||||||
| Tinteggiatura delle superfici interne | IT. No. Art. n. | 1 | SQM/MQ | |||||||||
| 4 | PAINTING OF EXTERIOR METAL SURFACE | |||||||||||
| Pitturazione di superfici metalliche esterne | IT. No. Art. n. | 2 | SQM/MQ | |||||||||
| 5 | NEW MOUSE SCREEN, INCL, FRAME | |||||||||||
| Nuova rete antitopo, incluso telaio | IT. No. Art. n. | 3 | EA/NO | |||||||||
| 6 | EXISTING DOOR RENOVATION | |||||||||||
| Manutenzione porte esistenti | IT. No. Art. n. | 4 | LS/AC | |||||||||
| 7 | NEW PANIC BAR HARDWARE | |||||||||||
| Nuova barra antipanico | IT. No. Art. n. | 5 | EA/NO | |||||||||
| 8 | NEW ROOF WATERPROOFING LAYER | |||||||||||
| Nuova impermeabilizzazione copertura | IT. No. Art. n. | 6 | SQM/MQ | |||||||||
| TOTAL PART II / Totale Parte II | ||||||||||||
| PART III - MECHANICAL WORK / Parte III - Lavori Meccanici | ||||||||||||
| 9 | NO.1 ROOF CENTRIFIGAL FANS ROOF | |||||||||||
| No.1 torrini di estrazione | IT. No. Art. n. | 1 | LS/AC | |||||||||
| TOTAL PART III / Totale Parte III | ||||||||||||
| PART VI- ELECTRICAL WORK / Parte VI - Lavori Elettrici | ||||||||||||
| IVa MAINTENANCE/ IVa Manutenzione | ||||||||||||
| 10 | MV SWITCHGEAR MAINTENANCE | |||||||||||
| Manutenzione apparecchiature MT | IT. No. Art. n. | 1 | EA/NO | |||||||||
| 11 | LV SWITCHGEAR MAINTENANCE | |||||||||||
| Manutenzione apparecchiature BT | IT. No. Art. n. | 2 | EA/NO | |||||||||
| 12 | MV/LV TRANSFORMER MAINTENANCE | |||||||||||
| Manutenzione trasformatore MT/BT | IT. No. Art. n. | 3 | EA/NO | |||||||||
| 13 | MISCELLANEOUS ITEMS MAINTENANCE | |||||||||||
| Manutenzione articoli vari | IT. No. Art. n. | 4 | EA/NO | |||||||||
| 14 | CABLEDUCTS MAINTENANCE | |||||||||||
| Manutenzione cavidotti | IT. No. Art. n. | 5 | LS/AC | |||||||||
| TOTAL MAINTENANCE - Totale Manutenzione | ||||||||||||
| IVb REPAIRS/ IVb Riparazioni | ||||||||||||
| 15 | REPAIR OF EXISTING GROUNDING SYSTEM | |||||||||||
| Ripristino dell'impianto di terra esistente | IT. No. Art. n. | 1 | LS/AC | |||||||||
| 16 | NEW INTERIOR LIGHTING FIXTURES | |||||||||||
| Nuovi apparecchi illuminanti per interno | IT. No. Art. n. | 2 | EA/NO | |||||||||
| 17 | NEW SPD | |||||||||||
| Nuovo SPD | IT. No. Art. n. | 3 | EA/NO | |||||||||
| 18 | NEW PILOT LED LAMPS | |||||||||||
| Nuove lampade LED presenza tensione | IT. No. Art. n. | 4 | EA/NO | |||||||||
| 19 | NEW RESISTANCE HEATER | |||||||||||
| Nuova resistenza anticondensa | IT. No. Art. n. | 5 | EA/NO | |||||||||
| 20 | NEW MICRO CIRCUIT BREAKERS | |||||||||||
| Nuovi interruttori modulare | IT. No. Art. n. | 6 | EA/NO | |||||||||
| 21 | ONE LINE DIAGRAMS CASE | |||||||||||
| Quadro schemi unifilari | IT. No. Art. n. | 7 | LS/AC | |||||||||
| 22 | INOX WALL BOX 60X75X35 CM | |||||||||||
| Contenitore a parete Inox 60X75X35 cm | IT. No. Art. n. | 8 | EA/NO | |||||||||
| 23 | LABELS AND CABLES MARKINGS | |||||||||||
| Targhette e contrassegno cavi | IT. No. Art. n. | 9 | LS/AC | |||||||||
| TOTAL REPAIRS/ Totale Riparazioni | ||||||||||||
| IVc SAFETY/ IVc Sicurezza | ||||||||||||
| 24 | NEW FIRE EXTINGUISHER | |||||||||||
| Nuovi estintore | IT. No. Art. n. | 1 | LS/AC | |||||||||
| 25 | NEW EMERGENCY LIGHTING SYSTEM | |||||||||||
| Nuovi sistema luci di emergenza | IT. No. Art. n. | 2a | EA/NO | |||||||||
| 26 | NEW MAINTAINED EXIT SIGN | |||||||||||
| Nuovle luci uscita emergenza | IT. No. Art. n. | 2b | EA/NO | |||||||||
| 27 | NEW EMERGENCY LIGHTING SYSTEM PUSH BUTTON | |||||||||||
| Nuovi pulsante controllo sistema luci di emergenza | IT. No. Art. n. | 3 | EA/NO | |||||||||
| TOTAL SAFETY/ Totale Sicurezza | ||||||||||||
| IVd NEW WORKS/ IVd Nuovi Lavori | ||||||||||||
| 28 | CONNECTION OF TV TO EXISTING TELEMONIT. SYS. | |||||||||||
| Connessione del TV all'esistente sist. Telegestione | IT. No. Art. n. | 1 | LS/AC | |||||||||
| 29 | CONNECTION OF SPD TO EXISTING TELEMONIT. SYS. | |||||||||||
| Connessione del SPD al sist. Telegestione | IT. No. Art. n. | 2 | LS/AC | |||||||||
| TOTAL NEW WORKS/ Totale Nuovi Lavori | ||||||||||||
| IVe TEST AND CERTIFICATIONS/ IVe Prove e Certificazioni | ||||||||||||
| 30 | GROUNDING TEST | |||||||||||
| Prove di terra | IT. No. Art. n. | 1 | LS/AC | |||||||||
| 31 | AS BUILT DRAWINGS | |||||||||||
| disegni as built | IT. No. Art. n. | 2a | LS/AC | |||||||||
| 32 | TEST AND CERTIFICATIONS | |||||||||||
| Collaudo e certificazioni | IT. No. Art. n. | 2b | LS/AC |
This is the start of the file's text. The full file is on GovTribe.