ASHE 20-1068A CCEB UPDATED.xls

XLS spreadsheet 3 MB Posted

Attached to
ASHE 20-1068A REPAIR ELECTRICAL M. V. SUBSTATIONS IN FLIGHTLINE LOOP, Aviano AB, Italy
Solicitation number
FA568224R0006
Issued by

About this file

This document is a Construction Cost Estimate Breakdown for project ASHE 20-1068A REPAIR ELECTRICAL M.V. SUBSTATIONS IN FLIGHTLINE LOOP at Aviano Air Base, Italy. The project involves repairs and maintenance of electrical medium voltage substations and related electrical infrastructure at the base. The document provides detailed cost estimates for various work items across categories such as demolition, architectural/civil, mechanical, and electrical work. Specific items include painting, plaster work, lighting fixtures, grounding system repair, switchgear maintenance, and emergency lighting system upgrades. The document indicates this is a lump sum contract, and the contractor will be responsible for completing the full scope of work. The anticipated solicitation date for this project is April 2024.

View the file

Other files

File Type Posted
ASHE 20-1068A DWGS.pdf PDF
ASHE20-1068A_TECH_SPECS.pdf PDF
ASHE20-1068A_PSC.pdf PDF
ATCH_ASHE20-1068A_Maintenance_Annex.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F03 - 1362

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)SUB F03 - 1362PROPOSED TOTAL CONTRACT PRICE
REPAIR ELECTRICAL MEDIUM VOLTAGE SUBSTATIONS IN FLIGT LINE LOOP, MULTI
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
ASHE 20-1068AAREA F - AVIANO AIR BASE
MATERIAL COSTSLABOR COSTS
LINE NO.ITEMUNIT OF MEASUREQUANTITYUNITTOTALMANHOURS MANDAYSAVERAGE RATETOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni
Ia Architectural Demolition - Ia Demolizioni Architettoniche
1TREE PRUNING
Potatura alberiIT. No. Art. n.1LS/AC
Total Architettonico - Totale Architettonico
Ib Mechanical Demolitions - Ib Demolizioni Meccaniche
Not applicable / Non Applicabile
Ic Electrical Demolitions - Ic Demolizioni Elettriche
2REMOVAL OF EMERGENCY LIGHTING FIXTURES
rimozione lampade di emergenzaIT. No. Art. n.2LS/AC
3REMOVAL OF TVLV DISPLAY
rimozione Display TVLVIT. No. Art. n.3LS/AC
Total Electrical - Totale Elettrico
TOTAL PART I / Totale Parte I
PART II - ARCHITECTURAL AND CIVIL WORKS / Parte II - Lavori Architettonici e Civili
4PAINTING OF EXTERIOR WALL SURFACES
Tinteggiatura delle superfici esterneIT. No. Art. n.1SQM/MQ
5PAINTING OF INTERIOR SURFACES
Tinteggiatura delle superfici interneIT. No. Art. n.2SQM/MQ
6PAINTING OF EXTERIOR METAL SURFACE
Pitturazione di superfici metalliche esterneIT. No. Art. n.3SQM/MQ
7NEW CEMENT BASED PLASTER ON EXT/INT WALL
Nuovo intonaco a base di cemento sulle pareti int/estIT. No. Art. n.4SQM/MQ
8NEW METAL LOUVER
Nuova griglia metallicaIT. No. Art. n.5EA/NO
9EXISTING DOOR RENOVATION
Manutenzione porte esistentiIT. No. Art. n.6LS/AC
10NEW MOUSE SCREEN, INCL, FRAME
Nuova rete antitopo, incluso telaioIT. No. Art. n.7LS/AC
11PANIC HARDWARE BAR INSTALLATION
Installazione barra antipanicoIT. No. Art. n.8Ea/No
TOTAL PART II / Totale Parte II
PART III - MECHANICAL WORK / Parte III - Lavori Meccanici
12NO.1 ROOF CENTRIFIGAL FANS ROOF
No.1 torrini di estrazioneIT. No. Art. n.1LS/AC
TOTAL PART III / Totale Parte III
PART VI- ELECTRICAL WORK / Parte VI - Lavori Elettrici
IVa MAINTENANCE/ IVa Manutenzione
13MV SWITCHGEAR MAINTENANCE
Manutenzione apparecchiature MTIT. No. Art. n.1LS/AC
14LV SWITCHGEAR MAINTENANCE
Manutenzione apparecchiature BTIT. No. Art. n.2LS/AC
15MV/LV TRANSFORMER MAINTENANCE
Manutenzione trasformatore MT/BTIT. No. Art. n.3LS/AC
16MISCELLANEOUS ITEMS MAINTENANCE
Manutenzione articoli variIT. No. Art. n.4LS/AC
17CABLEDUCTS MAINTENANCE
Manutenzione cavidottiIT. No. Art. n.5LS/AC
TOTAL MAINTENANCE - Totale Manutenzione
IVb REPAIRS/ IVb Riparazioni
18REPAIR OF EXISTING GROUNDING SYSTEM
Ripristino dell'impianto di terra esistenteIT. No. Art. n.1LS/AC
19NEW EXTERIOR LIGHTING SWITCH
Nuovo interruttoreluce esternoIT. No. Art. n.2EA/NO1.3
20NEW SPD
Nuovo SPDIT. No. Art. n.3EA/NO
21NEW PILOT LED LAMPS
Nuove lampade LED presenza tensioneIT. No. Art. n.4EA/NO
22NEW RESISTANCE HEATER
Nuova resistenza anticondensaIT. No. Art. n.5EA/NO
23NEW MICRO CIRCUIT BREAKERS
Nuovi interruttori modulareIT. No. Art. n.6EA/NO
24ONE LINE DIAGRAMS CASE
Quadro schemi unifilariIT. No. Art. n.7LS/AC
25INOX WALL BOX 60X75X35 CM
Contenitore a parete Inox 60X75X35 cmIT. No. Art. n.8EA/NO
26LABELS AND CABLES MARKINGS
Targhette e contrassegno caviIT. No. Art. n.9LS/AC
TOTAL REPAIRS/ Totale Riparazioni
IVc SAFETY/ IVc Sicurezza
27NEW FIRE EXTINGUISHER
Nuovo estintoreIT. No. Art. n.1LS/AC
28REMOVAL OF DOOR GROUNDING CONNECTION
Rimozione collegamento di terra dalle porteIT. No. Art. n.2LS/AC
29NEW EMERGENCY LIGHTING SYSTEM
Nuovi sistema luci di emergenzaIT. No. Art. n.3aEA/NO
30NEW MAINTAINED EXIT SIGN
Nuovle luci uscita emergenzaIT. No. Art. n.3bEA/NO
31NEW EMERGENCY LIGHTING SYSTEM PUSH BUTTON
Nuovi pulsante controllo sistema luci di emergenzaIT. No. Art. n.4LS/AC
TOTAL SAFETY/ Totale Sicurezza
IVd NEW WORKS/ IVd Nuovi Lavori
32CONNECTION OF TV TO EXISTING TELEMONIT. SYS.
Connessione del TV all'esistente sist. TelegestioneIT. No. Art. n.1LS/AC
33CONNECTION OF SPD TO EXISTING TELEMONIT. SYS.
Connessione del SPD al sist. TelegestioneIT. No. Art. n.2LS/AC
TOTAL NEW WORKS/ Totale Nuovi Lavori
IVe TEST AND CERTIFICATIONS/ IVe Prove e Certificazioni
34GROUNDING TEST
Prove di terraIT. No. Art. n.1LS/AC
35AS BUILT DRAWINGS
disegni as builtIT. No. Art. n.2aLS/AC
36TEST AND CERTIFICATIONS
Collaudo e certificazioniIT. No. Art. n.2bLS/AC
37DECLARATION OF CONFORMITY DI.CO.
Dichiarazione di conformità Di.Co,IT. No. Art. n.2cLS/AC
38MAINTENANCE REGISTER
Registro manutenzioneIT. No. Art. n.2dLS/AC
39DPR 462/01 INSPECTION CERTIFICATIONS
Certificazione ispezione DPR 462/01IT. No. Art. n.2eLS/AC
TOTAL TEST AND CERTIFICATIONS/ Totale Prove e Certificazioni
IVf PV SYSTEM/ IVf Impianto fotovoltaico00.000.00
Not applicable / Non Applicabile0.0000.000.000.00
TOTAL PART IV / Totale Parte IV0.000.000.000.00
SUMMARY / Riepilogo
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS€ - 0€ - 0€ - 0€ - 0
PARTII - ARCHITECTURAL AND CIVIL WORKS€ - 0€ - 0€ - 0€ - 0
PARTIII - MECHANICAL WORKS€ - 0€ - 0€ - 0€ - 0
PART IV - ELECTRICAL WORK€ - 0€ - 0€ - 0€ - 0
TOTAL PRICE / Costo Totale€ - 0€ - 0€ - 0€ - 0
OR US DOLLARS (RATE 1$ = 0,9798 €)$ - 0$ - 0$ - 0$ - 0

&C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY &C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY&R&P of &N

F06 - 78270

CONSTRUCTION COST ESTIMATE BREAKDOWN0
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)SUB F06 - 78270PROPOSED TOTAL CONTRACT PRICE
REPAIR ELECTRICAL MEDIUM VOLTAGE SUBSTATIONS IN FLIGT LINE LOOP, MULTI
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
ASHE 20-1068AAREA F - AVIANO AIR BASE
MATERIAL COSTSLABOR COSTS
LINE NO.ITEMUNIT OF MEASUREQUANTITYUNITTOTALMANHOURS MANDAYSAVERAGE RATETOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni
Ia Architectural Demolition - Ia Demolizioni Architettoniche
2REMOVAL OF STEEL DOOR FRAME
Rimozione di telaio porta in accaioIT. No. Art. n.2LS/AC1.30
Total Architettonico - Totale Architettonico
Ib Mechanical Demolitions - Ib Demolizioni Meccaniche
Not applicable / Non Applicabile
Ic Electrical Demolitions - Ic Demolizioni Elettriche
3REMOVAL OF EMERGENCY LIGHTING FIXTURES
rimozione lampade di emergenzaIT. No. Art. n.3LS/AC
Total Electrical - Totale Elettrico
TOTAL PART I / Totale Parte I
PART II - ARCHITECTURAL AND CIVIL WORKS / Parte II - Lavori Architettonici e Civili
4PAINTING OF EXTERIOR WALL SURFACES
Tinteggiatura delle superfici esterneIT. No. Art. n.1SQM/MQ
5PAINTING OF INTERIOR SURFACES
Tinteggiatura delle superfici interneIT. No. Art. n.2SQM/MQ
6PAINTING OF EXTERIOR METAL SURFACE
Pitturazione di superfici metalliche esterneIT. No. Art. n.3SQM/MQ
7NEW CEMENT BASED PLASTER ON EXT/INT WALL
Nuovo intonaco a base di cemento sulle pareti int/estIT. No. Art. n.4SQM/MQ
8NEW STEEL SHEET FLASHING
Nuove scossaline metallicaIT. No. Art. n.5LM/ML
9NEW ROOF WATERPROOFING LAYER
Nuova impermeabilizzazione coperturaIT. No. Art. n.6SQM/MQ
10NEW METAL DOWNSPOUTS, INCL CAST IRON BOOT
Nuovi discendenti di gronda, incluso terminali in ghisaIT. No. Art. n.7LS/AC
11EXISTING EXT CNC PAVEMENT REPAIR
Ripristino pavimentazione esterna esistente in clsIT. No. Art. n.8SQM/MQ
12NEW MOUSE SCREEN, INCL, FRAME
Nuova rete antitopo, incluso telaioIT. No. Art. n.9EA/NO
13EXISTING DOOR RENOVATION
Manutenzione porte esistentiIT. No. Art. n.10LS/AC
14NEW PANIC BAR
Nuova barra antipanicoIT. No. Art. n.11EA/NO
TOTAL PART II / Totale Parte II
PART III - MECHANICAL WORK / Parte III - Lavori Meccanici
15NO.1 ROOF CENTRIFIGAL ROOF FAN
No.1 torrini di estrazioneIT. No. Art. n.1LS/AC
TOTAL PART III / Totale Parte III
PART VI- ELECTRICAL WORK / Parte VI - Lavori Elettrici
IVa MAINTENANCE/ IVa Manutenzione
16MV SWITCHGEAR MAINTENANCE
Manutenzione apparecchiature MTIT. No. Art. n.1EA/NO
17LV SWITCHGEAR MAINTENANCE
Manutenzione apparecchiature BTIT. No. Art. n.2EA/NO
18MV/LV TRANSFORMER MAINTENANCE
Manutenzione trasformatore MT/BTIT. No. Art. n.3EA/NO
19MISCELLANEOUS ITEMS MAINTENANCE
Manutenzione articoli variIT. No. Art. n.4EA/NO
20CABLEDUCTS MAINTENANCE
Manutenzione cavidottiIT. No. Art. n.5EA/NO
TOTAL MAINTENANCE - Totale Manutenzione
IVb REPAIRS/ IVb Riparazioni
21REPAIR OF EXISTING GROUNDING SYSTEM
Ripristino dell'impianto di terra esistenteIT. No. Art. n.1LS/AC
22NEW SPD
Nuovo SPDIT. No. Art. n.2EA/NO
23NEW PILOT LED LAMPS
Nuove lampade LED presenza tensioneIT. No. Art. n.3EA/NO
24NEW RESISTANCE HEATER
Nuova resistenza anticondensaIT. No. Art. n.4EA/NO
25NEW MICRO CIRCUIT BREAKERS
Nuovi interruttori modulareIT. No. Art. n.5EA/NO
26ONE LINE DIAGRAMS CASE
Quadro schemi unifilariIT. No. Art. n.6LS/AC
27INOX WALL BOX 60X75X35 CM
Contenitore a parete Inox 60X75X35 cmIT. No. Art. n.7EA/NO
28LABELS AND CABLES MARKINGS
Targhette e contrassegno caviIT. No. Art. n.8LS/AC
TOTAL REPAIRS/ Totale Riparazioni
IVc SAFETY/ IVc Sicurezza
29NEW FIRE EXTINGUISHER
Nuovo estintoreIT. No. Art. n.1LS/AC
30NEW MONITORING WARNING SIGNS
Nuovi cartelli monitoriIT. No. Art. n.2LS/AC
31NEW EMERGENCY LIGHTING SYSTEM
Nuovi sistema luci di emergenzaIT. No. Art. n.3aEA/NO
32NEW MAINTAINED EXIT SIGN
Nuovle luci uscita emergenzaIT. No. Art. n.3bEA/NO
33NEW EMERGENCY LIGHTING SYSTEM PUSH BUTTON
Nuovi pulsante controllo sistema luci di emergenzaIT. No. Art. n.4EA/NO
TOTAL SAFETY/ Totale Sicurezza
IVd NEW WORKS/ IVd Nuovi Lavori
34CONNECTION OF TV TO EXISTING TELEMONIT. SYS.
Connessione del TV all'esistente sist. TelegestioneIT. No. Art. n.1LS/AC
35CONNECTION OF SPD TO EXISTING TELEMONIT. SYS.
Connessione del SPD al sist. TelegestioneIT. No. Art. n.2LS/AC
TOTAL NEW WORKS/ Totale Nuovi Lavori
IVe TEST AND CERTIFICATIONS/ IVe Prove e Certificazioni
36GROUNDING TEST
Prove di terraIT. No. Art. n.1LS/AC
37AS BUILT DRAWINGS
disegni as builtIT. No. Art. n.2aLS/AC
38TEST AND CERTIFICATIONS
Collaudo e certificazioniIT. No. Art. n.2bLS/AC
39DECLARATION OF CONFORMITY DI.CO.
Dichiarazione di conformità Di.Co,IT. No. Art. n.2cLS/AC
40MAINTENANCE REGISTER
Registro manutenzioneIT. No. Art. n.2dLS/AC
41DPR 462/01 INSPECTION CERTIFICATIONS
Certificazione ispezione DPR 462/01IT. No. Art. n.2eLS/AC
TOTAL TEST AND CERTIFICATIONS/ Totale Prove e Certificazioni
IVf PV SYSTEM/ IVf Impianto fotovoltaico0.000.00
Not applicable / Non Applicabile0.000.000.000.00
TOTAL PART IV / Totale Parte IV0.000.000.000.00
SUMMARY / Riepilogo
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS€ - 0€ - 0€ - 0€ - 0
PARTII - ARCHITECTURAL AND CIVIL WORKS€ - 0€ - 0€ - 0€ - 0
PARTIII - MECHANICAL WORKS€ - 0€ - 0€ - 0€ - 0
PART IV - ELECTRICAL WORK€ - 0€ - 0€ - 0€ - 0
TOTAL PRICE / Costo Totale€ - 0€ - 0€ - 0€ - 0
OR US DOLLARS (RATE 1$ = 0,9798€)$ - 0$ - 0$ - 0$ - 0

&C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY &C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY&R&P of &N

F09 - 78030

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)SUB F09 - 78030PROPOSED TOTAL CONTRACT PRICE
REPAIR ELECTRICAL MEDIUM VOLTAGE SUBSTATIONS IN FLIGT LINE LOOP, MULTI
PURCHASE REQUEST NUMBERPROJECT NUMBER0WORK LOCATION
ASHE 20-1068AAREA F - AVIANO AIR BASE
MATERIAL COSTSLABOR COSTS
LINE NO.ITEMUNIT OF MEASUREQUANTITYUNITTOTALMANHOURS MANDAYSAVERAGE RATETOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni
Ia Architectural Demolition - Ia Demolizioni Architettoniche
Not applicable / Non Applicabile0.000.000.000.00
Ib Mechanical Demolitions - Ib Demolizioni Meccaniche0.000.000.00
Not applicable / Non Applicabile
Ic Electrical Demolitions - Ic Demolizioni Elettriche0.000.00
2REMOVAL OF EMERGENCY LIGHTING FIXTURES
rimozione lampade di emergenzaIT. No. Art. n.2LS/AC1.3
Total Electrical - Totale Elettrico
TOTAL PART I / Totale Parte I
PART II - ARCHITECTURAL AND CIVIL WORKS / Parte II - Lavori Architettonici e Civili
3PAINTING OF EXTERIOR WALL SURFACES
Tinteggiatura delle superfici esterneIT. No. Art. n.1SQM/MQ
4PAINTING OF INTERIOR SURFACES
Tinteggiatura delle superfici interneIT. No. Art. n.2SQM/MQ
5PAINTING OF METAL SURFACE
Pitturazione di superfici metallicheIT. No. Art. n.3SQM/MQ
6EXISTING EXT CNC PAVEMENT REPAIR
Ripristino pavimentazione esterna esistente in clsIT. No. Art. n.4SQM/MQ
7NEW ROOF WATERPROOFING LAYER
Nuova impermeabilizzazione coperturaIT. No. Art. n.5SQM/MQ
8NEW MOUSE SCREEN, INCL, FRAME
Nuova rete antitopo, incluso telaioIT. No. Art. n.6EA/NO
9EXISTING DOOR RENOVATION
Manutenzione porte esistentiIT. No. Art. n.7LS/AC
10NEW PANIC BAR
Nuova barra antipanicoIT. No. Art. n.8EA/NO
TOTAL PART II / Totale Parte II
PART III - MECHANICAL WORK / Parte III - Lavori Meccanici
11NO.1 ROOF CENTRIFIGAL FANS ROOF
No.1 torrini di estrazioneIT. No. Art. n.1LS/AC
TOTAL PART III / Totale Parte III
PART VI- ELECTRICAL WORK / Parte VI - Lavori Elettrici
IVa MAINTENANCE/ IVa Manutenzione
12MV SWITCHGEAR MAINTENANCE
Manutenzione apparecchiature MTIT. No. Art. n.1EA/NO
13LV SWITCHGEAR MAINTENANCE
Manutenzione apparecchiature BTIT. No. Art. n.2EA/NO
14MV/LV TRANSFORMER MAINTENANCE
Manutenzione trasformatore MT/BTIT. No. Art. n.3EA/NO
15MISCELLANEOUS ITEMS MAINTENANCE
Manutenzione articoli variIT. No. Art. n.4EA/NO
16CABLEDUCTS MAINTENANCE
Manutenzione cavidottiIT. No. Art. n.5LS/AC
TOTAL MAINTENANCE - Totale Manutenzione
IVb REPAIRS/ IVb Riparazioni
17REPAIR OF EXISTING GROUNDING SYSTEM
Ripristino dell'impianto di terra esistenteIT. No. Art. n.1LS/AC
18NEW SPD
Nuovo SPDIT. No. Art. n.2EA/NO
19NEW PILOT LED LAMPS
Nuove lampade LED presenza tensioneIT. No. Art. n.3EA/NO
20NEW RESISTANCE HEATER
Nuova resistenza anticondensaIT. No. Art. n.4EA/NO
21NEW MICRO CIRCUIT BREAKERS
Nuovi interruttori modulareIT. No. Art. n.5EA/NO
22ONE LINE DIAGRAMS CASE
Quadro schemi unifilariIT. No. Art. n.6LS/AC
23INOX WALL BOX 60X75X35 CM
Contenitore a parete Inox 60X75X35 cmIT. No. Art. n.7EA/NO
24LABELS AND CABLES MARKINGS
Targhette e contrassegno caviIT. No. Art. n.8LS/AC
TOTAL REPAIRS/ Totale Riparazioni
IVc SAFETY/ IVc Sicurezza
25NEW FIRE EXTINGUISHER
Nuovo estintoreIT. No. Art. n.1LS/AC
26NEW EMERGENCY LIGHTING SYSTEM
Nuovi sistema luci di emergenzaIT. No. Art. n.2aEA/NO
27NEW MAINTAINED EXIT SIGN
Nuovle luci uscita emergenzaIT. No. Art. n.2bEA/NO
28NEW EMERGENCY LIGHTING SYSTEM PUSH BUTTON
Nuovi pulsante controllo sistema luci di emergenzaIT. No. Art. n.3EA/NO
TOTAL SAFETY/ Totale Sicurezza
IVd NEW WORKS/ IVd Nuovi Lavori
29CONNECTION OF TV TO EXISTING TELEMONIT. SYS.
Connessione del TV all'esistente sist. TelegestioneIT. No. Art. n.1LS/AC
30CONNECTION OF SPD TO EXISTING TELEMONIT. SYS.
Connessione del SPD al sist. TelegestioneIT. No. Art. n.2LS/AC
TOTAL NEW WORKS/ Totale Nuovi Lavori
IVe TEST AND CERTIFICATIONS/ IVe Prove e Certificazioni
31GROUNDING TEST
Prove di terraIT. No. Art. n.1LS/AC
32AS BUILT DRAWINGS
disegni as builtIT. No. Art. n.2aLS/AC
33TEST AND CERTIFICATIONS
Collaudo e certificazioniIT. No. Art. n.2bLS/AC
34DECLARATION OF CONFORMITY DI.CO.
Dichiarazione di conformità Di.Co,IT. No. Art. n.2cLS/AC
35MAINTENANCE REGISTER
Registro manutenzioneIT. No. Art. n.2dLS/AC
36DPR 462/01 INSPECTION CERTIFICATIONS
Certificazione ispezione DPR 462/01IT. No. Art. n.2eLS/AC
TOTAL TEST AND CERTIFICATIONS/ Totale Prove e Certificazioni
IVf PV SYSTEM/ IVf Impianto fotovoltaico
Not applicable / Non Applicabile
TOTAL PART IV / Totale Parte IV
SUMMARY / Riepilogo
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS€ - 0€ - 0€ - 0€ - 0
PARTII - ARCHITECTURAL AND CIVIL WORKS€ - 0€ - 0€ - 0€ - 0
PARTIII - MECHANICAL WORKS€ - 0€ - 0€ - 0€ - 0
PART IV - ELECTRICAL WORK€ - 0€ - 0€ - 0€ - 0
TOTAL PRICE / Costo Totale€ - 0€ - 0€ - 0€ - 0
OR US DOLLARS (RATE 1$ = 0,9798€)$ - 0$ - 0$ - 0$ - 0

&C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY &C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY&R&P of &N

F11 - 1217

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)SUB F11 - 1217PROPOSED TOTAL CONTRACT PRICE
REPAIR ELECTRICAL MEDIUM VOLTAGE SUBSTATIONS IN FLIGT LINE LOOP, MULTI
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
ASHE 20-1068AAREA F - AVIANO AIR BASE
MATERIAL COSTSLABOR COSTS
LINE NO.ITEMUNIT OF MEASUREQUANTITYUNITTOTALMANHOURS MANDAYSAVERAGE RATETOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni
Ia Architectural Demolition - Ia Demolizioni Architettoniche
Not applicable / Non Applicabile
Ib Mechanical Demolitions - Ib Demolizioni Meccaniche0.000.000.00
Not applicable / Non Applicabile
Ic Electrical Demolitions - Ic Demolizioni Elettriche0.000.00
1REMOVAL OF EMERGENCY LIGHTING FIXTURES
rimozione lampade di emergenzaIT. No. Art. n.1LS/AC1.3
2REMOVAL OF TVLV DISPLAY
rimozione Display TVLVIT. No. Art. n.2LS/AC
Total Electrical - Totale Elettrico
TOTAL PART I / Totale Parte I
PART II - ARCHITECTURAL AND CIVIL WORKS / Parte II - Lavori Architettonici e Civili
3PAINTING OF EXTERIOR WALL SURFACES
Tinteggiatura delle superfici esterneIT. No. Art. n.1SQM/MQ
4PAINTING OF INTERIOR SURFACES
Tinteggiatura delle superfici interneIT. No. Art. n.2SQM/MQ
5PAINTING OF METAL SURFACE
Pitturazione di superfici metallicheIT. No. Art. n.3SQM/MQ
6NEW MOUSE SCREEN, INCL, FRAME
Nuova rete antitopo, incluso telaioIT. No. Art. n.4EA/NO
7PANIC BAR
Barra antipanicoIT. No. Art. n.5EA/NO
TOTAL PART II / Totale Parte II
PART III - MECHANICAL WORK / Parte III - Lavori Meccanici
8NO.1 ROOF CENTRIFIGAL FANS ROOF
No.1 torrini di estrazioneIT. No. Art. n.1LS/AC
TOTAL PART III / Totale Parte III
PART VI- ELECTRICAL WORK / Parte VI - Lavori Elettrici
IVa MAINTENANCE/ IVa Manutenzione
9MV SWITCHGEAR MAINTENANCE
Manutenzione apparecchiature MTIT. No. Art. n.1EA/NO
10LV SWITCHGEAR MAINTENANCE
Manutenzione apparecchiature BTIT. No. Art. n.2EA/NO
11MV/LV TRANSFORMER MAINTENANCE
Manutenzione trasformatore MT/BTIT. No. Art. n.3EA/NO
12MISCELLANEOUS ITEMS MAINTENANCE
Manutenzione articoli variIT. No. Art. n.4EA/NO
13CABLEDUCTS MAINTENANCE
Manutenzione cavidottiIT. No. Art. n.5LS/AC
TOTAL MAINTENANCE - Totale Manutenzione
IVb REPAIRS/ IVb Riparazioni
14REPAIR OF EXISTING GROUNDING SYSTEM
Ripristino dell'impianto di terra esistenteIT. No. Art. n.1LS/AC
15NEW INTERIOR LIGHTING FIXTURES
Nuovi apparecchi illuminanti PER INTERNOIT. No. Art. n.2EA/NO
16NEW SPD
Nuovo SPDIT. No. Art. n.3EA/NO
17NEW PILOT LED LAMPS
Nuove lampade LED presenza tensioneIT. No. Art. n.4EA/NO
18NEW RESISTANCE HEATER
Nuova resistenza anticondensaIT. No. Art. n.5EA/NO
19NEW MICRO CIRCUIT BREAKERS
Nuovi interruttori modulareIT. No. Art. n.6EA/NO
20ONE LINE DIAGRAMS CASE
Quadro schemi unifilariIT. No. Art. n.7LS/AC
21INOX WALL BOX 60X75X35 CM
Contenitore a parete Inox 60X75X35 cmIT. No. Art. n.8EA/NO
22LABELS AND CABLES MARKINGS
Targhette e contrassegno caviIT. No. Art. n.9LS/AC
TOTAL REPAIRS/ Totale Riparazioni
IVc SAFETY/ IVc Sicurezza
23NEW FIRE EXTINGUISHER
Nuovo estintoreIT. No. Art. n.1LS/AC
24NEW MONITORING WARNING SIGNS
Nuovi cartelli monitoriIT. No. Art. n.2EA/NO
25NEW EMERGENCY LIGHTING SYSTEM
Nuovi sistema luci di emergenzaIT. No. Art. n.3aEA/NO
26NEW MAINTAINED EXIT SIGN
Nuovle luci uscita emergenzaIT. No. Art. n.3bEA/NO
27NEW EMERGENCY LIGHTING SYSTEM PUSH BUTTON
Nuovi pulsante controllo sistema luci di emergenzaIT. No. Art. n.4EA/NO
TOTAL SAFETY/ Totale Sicurezza
IVd NEW WORKS/ IVd Nuovi Lavori
28CONNECTION OF TV TO EXISTING TELEMONIT. SYS.
Connessione del TV all'esistente sist. TelegestioneIT. No. Art. n.1LS/AC
29CONNECTION OF SPD TO EXISTING TELEMONIT. SYS.
Connessione del SPD al sist. TelegestioneIT. No. Art. n.2LS/AC
TOTAL NEW WORKS/ Totale Nuovi Lavori
IVe TEST AND CERTIFICATIONS/ IVe Prove e Certificazioni
30GROUNDING TEST
Prove di terraIT. No. Art. n.1LS/AC
31AS BUILT DRAWINGS
disegni as builtIT. No. Art. n.2aLS/AC
32TEST AND CERTIFICATIONS
Collaudo e certificazioniIT. No. Art. n.2bLS/AC
33DECLARATION OF CONFORMITY DI.CO.
Dichiarazione di conformità Di.Co,IT. No. Art. n.2cLS/AC
34MAINTENANCE REGISTER
Registro manutenzioneIT. No. Art. n.2dLS/AC
35DPR 462/01 INSPECTION CERTIFICATIONS
Certificazione ispezione DPR 462/01IT. No. Art. n.2eLS/AC
TOTAL TEST AND CERTIFICATIONS/ Totale Prove e Certificazioni
IVf PV SYSTEM/ IVf Impianto fotovoltaico
Not applicable / Non Applicabile
TOTAL PART IV / Totale Parte IV0.000.000.000.000.00
SUMMARY / Riepilogo
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS€ - 0€ - 0€ - 0€ - 0
PARTII - ARCHITECTURAL AND CIVIL WORKS€ - 0€ - 0€ - 0€ - 0
PARTIII - MECHANICAL WORKS€ - 0€ - 0€ - 0€ - 0
PART IV - ELECTRICAL WORK€ - 0€ - 0€ - 0€ - 0
TOTAL PRICE / Costo Totale€ - 0€ - 0€ - 0€ - 0
OR US DOLLARS (RATE 1$ = 0,9798€)$ - 0$ - 0$ - 0$ - 0

&C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY &C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY&R&P of &N

F13 - 71196

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)SUB F13 - 71196PROPOSED TOTAL CONTRACT PRICE
REPAIR ELECTRICAL MEDIUM VOLTAGE SUBSTATIONS IN FLIGT LINE LOOP, MULTI
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
ASHE 20-1068AAREA F - AVIANO AIR BASE
MATERIAL COSTSLABOR COSTS
LINE NO.ITEMUNIT OF MEASUREQUANTITYUNITTOTALMANHOURS MANDAYSAVERAGE RATETOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni
Ia Architectural Demolition - Ia Demolizioni Architettoniche
Not applicable / Non Applicabile
Ib Mechanical Demolitions - Ib Demolizioni Meccaniche0.000.000.00
Not applicable / Non Applicabile
Ic Electrical Demolitions - Ic Demolizioni Elettriche0.000.00
1REMOVAL OF EMERGENCY LIGHTING FIXTURES
rimozione lampade di emergenzaIT. No. Art. n.1LS/AC1.3
2REMOVAL OF TVLV DISPLAY
rimozione Display TVLVIT. No. Art. n.2LS/AC
Total Electrical - Totale Elettrico
TOTAL PART I / Totale Parte I
PART II - ARCHITECTURAL AND CIVIL WORKS / Parte II - Lavori Architettonici e Civili
3PAINTING OF EXTERIOR WALL SURFACES
Tinteggiatura delle superfici esterneIT. No. Art. n.1SQM/MQ
4PAINTING OF INTERIOR SURFACES
Tinteggiatura delle superfici interneIT. No. Art. n.2SQM/MQ
5NEW CEMENT BASED PLASTER ON EXT/INT WALL
Nuovo intonaco a base di cemento sulle pareti int/estIT. No. Art. n.3SQM/MQ
6NEW CNC EXTERNAL PAVEMENT, INCL EXCAVATION
Nuova pavimentazione esterna in cls, incluso scavoIT. No. Art. n.4SQM/MQ
7NEW MOUSE SCREEN, INCL, FRAME
Nuova rete antitopo, incluso telaioIT. No. Art. n.5LS/AC
8NEW PANIC BAR
Nuova barra antipanicoIT. No. Art. n.6Ea/No
TOTAL PART II / Totale Parte II
PART III - MECHANICAL WORK / Parte III - Lavori Meccanici
8NO.1 ROOF CENTRIFIGAL FANS ROOF
No.1 torrini di estrazioneIT. No. Art. n.1LS/AC
TOTAL PART III / Totale Parte III
PART VI- ELECTRICAL WORK / Parte VI - Lavori Elettrici
IVa MAINTENANCE/ IVa Manutenzione
9MV SWITCHGEAR MAINTENANCE
Manutenzione apparecchiature MTIT. No. Art. n.1EA/NO
10LV SWITCHGEAR MAINTENANCE
Manutenzione apparecchiature BTIT. No. Art. n.2EA/NO
11MV/LV TRANSFORMER MAINTENANCE
Manutenzione trasformatore MT/BTIT. No. Art. n.3EA/NO
12MISCELLANEOUS ITEMS MAINTENANCE
Manutenzione articoli variIT. No. Art. n.4EA/NO
13CABLEDUCTS MAINTENANCE
Manutenzione cavidottiIT. No. Art. n.5LS/AC
TOTAL MAINTENANCE - Totale Manutenzione
IVb REPAIRS/ IVb Riparazioni
14REPAIR OF EXISTING GROUNDING SYSTEM
Ripristino dell'impianto di terra esistenteIT. No. Art. n.1LS/AC
15NEW EXTERIOR LIGHTING SWITCH
Nuovo interruttore luce esternaIT. No. Art. n.2EA/NO
16NEW SPD
Nuovo SPDIT. No. Art. n.3EA/NO
17NEW PILOT LED LAMPS
Nuove lampade LED presenza tensioneIT. No. Art. n.4EA/NO
18NEW RESISTANCE HEATER
Nuova resistenza anticondensaIT. No. Art. n.5EA/NO
19NEW MICRO CIRCUIT BREAKERS
Nuovi interruttori modulareIT. No. Art. n.6EA/NO
20ONE LINE DIAGRAMS CASE
Quadro schemi unifilariIT. No. Art. n.7LS/AC
21INOX WALL BOX 60X75X35 CM
Contenitore a parete Inox 60X75X35 cmIT. No. Art. n.8EA/NO
22LABELS AND CABLES MARKINGS
Targhette e contrassegno caviIT. No. Art. n.9LS/AC
TOTAL REPAIRS/ Totale Riparazioni
IVc SAFETY/ IVc Sicurezza
23NEW FIRE EXTINGUISHER
Nuovo estintoreIT. No. Art. n.1LS/AC
24REMOVAL OF DOOR GROUNDING CONNECTION
Rimozione collegamento di terra dalle porteIT. No. Art. n.2LS/AC
24NEW EMERGENCY LIGHTING SYSTEM
Nuovi sistema luci di emergenzaIT. No. Art. n.2aEA/NO
25NEW MAINTAINED EXIT SIGN
Nuovle luci uscita emergenzaIT. No. Art. n.2bEA/NO
26NEW EMERGENCY LIGHTING SYSTEM PUSH BUTTON
Nuovi pulsante controllo sistema luci di emergenzaIT. No. Art. n.3EA/NO
TOTAL SAFETY/ Totale Sicurezza
IVd NEW WORKS/ IVd Nuovi Lavori
27CONNECTION OF TV TO EXISTING TELEMONIT. SYS.
Connessione del TV all'esistente sist. TelegestioneIT. No. Art. n.1LS/AC
28CONNECTION OF SPD TO EXISTING TELEMONIT. SYS.
Connessione del SPD al sist. TelegestioneIT. No. Art. n.2LS/AC
TOTAL NEW WORKS/ Totale Nuovi Lavori
IVe TEST AND CERTIFICATIONS/ IVe Prove e Certificazioni
29GROUNDING TEST
Prove di terraIT. No. Art. n.1LS/AC
30AS BUILT DRAWINGS
disegni as builtIT. No. Art. n.2aLS/AC
31TEST AND CERTIFICATIONS
Collaudo e certificazioniIT. No. Art. n.2bLS/AC
32DECLARATION OF CONFORMITY DI.CO.
Dichiarazione di conformità Di.Co,IT. No. Art. n.2cLS/AC
33MAINTENANCE REGISTER
Registro manutenzioneIT. No. Art. n.2dLS/AC
34DPR 462/01 INSPECTION CERTIFICATIONS
Certificazione ispezione DPR 462/01IT. No. Art. n.2eLS/AC
TOTAL TEST AND CERTIFICATIONS/ Totale Prove e Certificazioni
IVf PV SYSTEM/ IVf Impianto fotovoltaico
Not applicable / Non Applicabile
TOTAL PART IV / Totale Parte IV0.000.000.000.00
SUMMARY / Riepilogo
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS€ - 0€ - 0€ - 0€ - 0
PARTII - ARCHITECTURAL AND CIVIL WORKS€ - 0€ - 0€ - 0€ - 0
PARTIII - MECHANICAL WORKS€ - 0€ - 0€ - 0€ - 0
PART IV - ELECTRICAL WORK€ - 0€ - 0€ - 0€ - 0
TOTAL PRICE / Costo Totale€ - 0€ - 0€ - 0€ - 0
OR US DOLLARS (RATE 1$ = 0,9798€)$ - 0$ - 0$ - 0$ - 0

&C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY &C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY&R&P of &N

F14 - 71198

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)SUB F14 - 71198PROPOSED TOTAL CONTRACT PRICE
REPAIR ELECTRICAL MEDIUM VOLTAGE SUBSTATIONS IN FLIGT LINE LOOP, MULTI
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
ASHE 20-1068AAREA F - AVIANO AIR BASE
MATERIAL COSTSLABOR COSTS
LINE NO.ITEMUNIT OF MEASUREQUANTITYUNITTOTALMANHOURS MANDAYSAVERAGE RATETOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni
Ia Architectural Demolition - Ia Demolizioni Architettoniche
Not applicable / Non Applicabile
Ib Mechanical Demolitions - Ib Demolizioni Meccaniche0.000.000.00
Not applicable / Non Applicabile
Ic Electrical Demolitions - Ic Demolizioni Elettriche0.000.00
1REMOVAL OF EMERGENCY LIGHTING FIXTURES
rimozione lampade di emergenzaIT. No. Art. n.1LS/AC1.3
Total Electrical - Totale Elettrico
TOTAL PART I / Totale Parte I
PART II - ARCHITECTURAL AND CIVIL WORKS / Parte II - Lavori Architettonici e Civili
2PAINTING OF INTERIOR SURFACES
Tinteggiatura delle superfici interneIT. No. Art. n.1SQM/MQ
3NEW CEMENT BASED PLASTER ON EXT/INT WALL
Nuovo intonaco a base di cemento sulle pareti int/estIT. No. Art. n.2SQM/MQ
4NEW MOUSE SCREEN, INCL, FRAME
Nuova rete antitopo, incluso telaioIT. No. Art. n.3LS/AC
5EXISTING DOOR RENOVATION
Manutenzione porte esistentiIT. No. Art. n.4LS/AC
6PANIC BAR
Barra antipanicoIT. No. Art. n.5EA/NO
TOTAL PART II / Totale Parte II
PART III - MECHANICAL WORK / Parte III - Lavori Meccanici
7NO.1 ROOF CENTRIFIGAL FANS ROOF
No.1 torrini di estrazioneIT. No. Art. n.1LS/AC
TOTAL PART III / Totale Parte III
PART VI- ELECTRICAL WORK / Parte VI - Lavori Elettrici
IVa MAINTENANCE/ IVa Manutenzione
8MV SWITCHGEAR MAINTENANCE
Manutenzione apparecchiature MTIT. No. Art. n.1EA/NO
9LV SWITCHGEAR MAINTENANCE
Manutenzione apparecchiature BTIT. No. Art. n.2EA/NO
10MV/LV TRANSFORMER MAINTENANCE
Manutenzione trasformatore MT/BTIT. No. Art. n.3EA/NO
11MISCELLANEOUS ITEMS MAINTENANCE
Manutenzione articoli variIT. No. Art. n.4EA/NO
12CABLEDUCTS MAINTENANCE
Manutenzione cavidottiIT. No. Art. n.5LS/AC
TOTAL MAINTENANCE - Totale Manutenzione
IVb REPAIRS/ IVb Riparazioni
13REPAIR OF EXISTING GROUNDING SYSTEM
Ripristino dell'impianto di terra esistenteIT. No. Art. n.1LS/AC
14NEW EXTERIOR LIGHTING SWITCH
Nuovo interruttore luce esternaIT. No. Art. n.2EA/NO
15NEW SPD
Nuovo SPDIT. No. Art. n.3EA/NO
16NEW PILOT LED LAMPS
Nuove lampade LED presenza tensioneIT. No. Art. n.4EA/NO
17NEW RESISTANCE HEATER
Nuova resistenza anticondensaIT. No. Art. n.5EA/NO
18NEW MICRO CIRCUIT BREAKERS
Nuovi interruttori modulareIT. No. Art. n.6EA/NO
19ONE LINE DIAGRAMS CASE
Quadro schemi unifilariIT. No. Art. n.7LS/AC
20INOX WALL BOX 60X75X35 CM
Contenitore a parete Inox 60X75X35 cmIT. No. Art. n.8EA/NO
21LABELS AND CABLES MARKINGS
Targhette e contrassegno caviIT. No. Art. n.9LS/AC
22NEW MANUAL CHANGEOVER SWITCH
Nuovo commutatore manualeIT. No. Art. n.10EA/NO
TOTAL REPAIRS/ Totale Riparazioni
IVc SAFETY/ IVc Sicurezza
23NEW FIRE EXTINGUISHER
Nuovi estintoreIT. No. Art. n.1LS/AC
24REMOVAL OF DOOR GROUNDING CONNECTION
Rimozione collegamento di terra dalle porteIT. No. Art. n.2LS/AC
25NEW EMERGENCY LIGHTING SYSTEM
Nuovi sistema luci di emergenzaIT. No. Art. n.3aEA/NO
26NEW MAINTAINED EXIT SIGN
Nuovle luci uscita emergenzaIT. No. Art. n.3bEA/NO
27NEW EMERGENCY LIGHTING SYSTEM PUSH BUTTON
Nuovi pulsante controllo sistema luci di emergenzaIT. No. Art. n.4EA/NO
28NEW LABEL ON CIRCUIT BREAKER
Nuova targhetta indicativa su interruttoreIT. No. Art. n.5LS/AC
TOTAL SAFETY/ Totale Sicurezza
IVd NEW WORKS/ IVd Nuovi Lavori
29CONNECTION OF TV TO EXISTING TELEMONIT. SYS.
Connessione del TV all'esistente sist. TelegestioneIT. No. Art. n.1LS/AC
30CONNECTION OF SPD TO EXISTING TELEMONIT. SYS.
Connessione del SPD al sist. TelegestioneIT. No. Art. n.2LS/AC
TOTAL NEW WORKS/ Totale Nuovi Lavori
IVe TEST AND CERTIFICATIONS/ IVe Prove e Certificazioni
31GROUNDING TEST
Prove di terraIT. No. Art. n.1LS/AC
32AS BUILT DRAWINGS
disegni as builtIT. No. Art. n.2aLS/AC
33TEST AND CERTIFICATIONS
Collaudo e certificazioniIT. No. Art. n.2bLS/AC
34DECLARATION OF CONFORMITY DI.CO.
Dichiarazione di conformità Di.Co,IT. No. Art. n.2cLS/AC
35MAINTENANCE REGISTER
Registro manutenzioneIT. No. Art. n.2dLS/AC
36DPR 462/01 INSPECTION CERTIFICATIONS
Certificazione ispezione DPR 462/01IT. No. Art. n.2eLS/AC
TOTAL TEST AND CERTIFICATIONS/ Totale Prove e Certificazioni
IVf PV SYSTEM/ IVf Impianto fotovoltaico
Not applicable / Non Applicabile
TOTAL PART IV / Totale Parte IV0.000.000.000.00
SUMMARY / Riepilogo
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS€ - 0€ - 0€ - 0€ - 0
PARTII - ARCHITECTURAL AND CIVIL WORKS€ - 0€ - 0€ - 0€ - 0
PARTIII - MECHANICAL WORKS€ - 0€ - 0€ - 0€ - 0
PART IV - ELECTRICAL WORK€ - 0€ - 0€ - 0€ - 0
TOTAL PRICE / Costo Totale€ - 0€ - 0€ - 0€ - 0
OR US DOLLARS (RATE 1$ = 0,9381€)$ - 0$ - 0$ - 0$ - 0

&C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY &C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY&R&P of &N

F15 - 71192

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)SUB F15 - 71192PROPOSED TOTAL CONTRACT PRICE
REPAIR ELECTRICAL MEDIUM VOLTAGE SUBSTATIONS IN FLIGT LINE LOOP, MULTI
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
ASHE 20-1068AAREA F - AVIANO AIR BASE
MATERIAL COSTSLABOR COSTS
LINE NO.ITEMUNIT OF MEASUREQUANTITYUNITTOTALMANHOURS MANDAYSAVERAGE RATETOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni
Ia Architectural Demolition - Ia Demolizioni Architettoniche
Not applicable / Non Applicabile
Ib Mechanical Demolitions - Ib Demolizioni Meccaniche0.000.000.00
Not applicable / Non Applicabile
Ic Electrical Demolitions - Ic Demolizioni Elettriche0.000.00
1REMOVAL OF EMERGENCY LIGHTING FIXTURES
rimozione lampade di emergenzaIT. No. Art. n.1LS/AC
2REMOVAL OF LIGHTING SWITCH
rimozione INTERRUTTORE LUCIIT. No. Art. n.2LS/AC
Total Electrical - Totale Elettrico
TOTAL PART I / Totale Parte I
PART II - ARCHITECTURAL AND CIVIL WORKS / Parte II - Lavori Architettonici e Civili
3PAINTING OF INTERIOR SURFACES
Tinteggiatura delle superfici interneIT. No. Art. n.1SQM/MQ1.3
4NEW CEMENT BASED PLASTER ON EXT/INT WALL
Nuovo intonaco a base di cemento sulle pareti int/estIT. No. Art. n.2SQM/MQ
5NEW MOUSE SCREEN, INCL, FRAME
Nuova rete antitopo, incluso telaioIT. No. Art. n.3LS/AC
6EXISTING DOOR RENOVATION
Manutenzione porte esistentiIT. No. Art. n.4LS/AC
7PANIC BAR
Barra antipanicoIT. No. Art. n.5EA/NO
8NEW METAL JOINT COVER
Nuovo coprigiunto in metalloIT. No. Art. n.6LM/ML
9SUBSTATION CLEANING
Pulizia cabinaIT. No. Art. n.7LS/AC
TOTAL PART II / Totale Parte II
PART III - MECHANICAL WORK / Parte III - Lavori Meccanici
10NO.1 ROOF CENTRIFIGAL FANS ROOF
No.1 torrini di estrazioneIT. No. Art. n.1LS/AC
TOTAL PART III / Totale Parte III
PART VI- ELECTRICAL WORK / Parte VI - Lavori Elettrici
IVa MAINTENANCE/ IVa Manutenzione
11MV SWITCHGEAR MAINTENANCE
Manutenzione apparecchiature MTIT. No. Art. n.1EA/NO
12LV SWITCHGEAR MAINTENANCE
Manutenzione apparecchiature BTIT. No. Art. n.2EA/NO
13MV/LV TRANSFORMER MAINTENANCE
Manutenzione trasformatore MT/BTIT. No. Art. n.3EA/NO
14MISCELLANEOUS ITEMS MAINTENANCE
Manutenzione articoli variIT. No. Art. n.4EA/NO
15CABLEDUCTS MAINTENANCE
Manutenzione cavidottiIT. No. Art. n.5LS/AC
TOTAL MAINTENANCE - Totale Manutenzione
IVb REPAIRS/ IVb Riparazioni
16REPAIR OF EXISTING GROUNDING SYSTEM
Ripristino dell'impianto di terra esistenteIT. No. Art. n.1LS/AC
17NEW EXTERNAL LIGHTING SWITCH
Nuovo interruttore esterno luciIT. No. Art. n.2EA/NO
18NEW SPD
Nuovo SPDIT. No. Art. n.3EA/NO
19NEW PILOT LED LAMPS
Nuove lampade LED presenza tensioneIT. No. Art. n.4EA/NO
20NEW RESISTANCE HEATER
Nuova resistenza anticondensaIT. No. Art. n.5EA/NO
21NEW MICRO CIRCUIT BREAKERS
Nuovi interruttori modulareIT. No. Art. n.6EA/NO
22ONE LINE DIAGRAMS CASE
Quadro schemi unifilariIT. No. Art. n.7LS/AC
23INOX WALL BOX 60X75X35 CM
Contenitore a parete Inox 60X75X35 cmIT. No. Art. n.8EA/NO
24LABELS AND CABLES MARKINGS
Targhette e contrassegno caviIT. No. Art. n.9LS/AC
TOTAL REPAIRS/ Totale Riparazioni
IVc SAFETY/ IVc Sicurezza
25NEW FIRE EXTINGUISHER
Nuovi estintoreIT. No. Art. n.1LS/AC
26NEW EMERGENCY LIGHTING SYSTEM
Nuovi sistema luci di emergenzaIT. No. Art. n.2aEA/NO
27NEW MAINTAINED EXIT SIGN
Nuovle luci uscita emergenzaIT. No. Art. n.2bEA/NO
28NEW EMERGENCY LIGHTING SYSTEM PUSH BUTTON
Nuovi pulsante controllo sistema luci di emergenzaIT. No. Art. n.3EA/NO
TOTAL SAFETY/ Totale Sicurezza
IVd NEW WORKS/ IVd Nuovi Lavori
29CONNECTION OF TV TO EXISTING TELEMONIT. SYS.
Connessione del TV all'esistente sist. TelegestioneIT. No. Art. n.1LS/AC
30CONNECTION OF SPD TO EXISTING TELEMONIT. SYS.
Connessione del SPD al sist. TelegestioneIT. No. Art. n.2LS/AC
TOTAL NEW WORKS/ Totale Nuovi Lavori
IVe TEST AND CERTIFICATIONS/ IVe Prove e Certificazioni
31GROUNDING TEST
Prove di terraIT. No. Art. n.1LS/AC
32AS BUILT DRAWINGS
disegni as builtIT. No. Art. n.2aLS/AC
33TEST AND CERTIFICATIONS
Collaudo e certificazioniIT. No. Art. n.2bLS/AC
34DECLARATION OF CONFORMITY DI.CO.
Dichiarazione di conformità Di.Co,IT. No. Art. n.2cLS/AC
35MAINTENANCE REGISTER
Registro manutenzioneIT. No. Art. n.2dLS/AC
36DPR 462/01 INSPECTION CERTIFICATIONS
Certificazione ispezione DPR 462/01IT. No. Art. n.2eLS/AC
TOTAL TEST AND CERTIFICATIONS/ Totale Prove e Certificazioni
IVf PV SYSTEM/ IVf Impianto fotovoltaico
Not applicable / Non Applicabile
TOTAL PART IV / Totale Parte IV0.0000.000.000.00
SUMMARY / Riepilogo
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS€ - 0€ - 0€ - 0€ - 0
PARTII - ARCHITECTURAL AND CIVIL WORKS€ - 0€ - 0€ - 0€ - 0
PARTIII - MECHANICAL WORKS€ - 0€ - 0€ - 0€ - 0
PART IV - ELECTRICAL WORK€ - 0€ - 0€ - 0€ - 0
TOTAL PRICE / Costo Totale€ - 0€ - 0€ - 0€ - 0
OR US DOLLARS (RATE 1$ = 0,9798€)$ - 0$ - 0$ - 0$ - 0

&C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY &C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY&R&P of &N

F16 - 71121

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)SUB F16 - 71121PROPOSED TOTAL CONTRACT PRICE
REPAIR ELECTRICAL MEDIUM VOLTAGE SUBSTATIONS IN FLIGT LINE LOOP, MULTI
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
ASHE 20-1068AAREA F - AVIANO AIR BASE
MATERIAL COSTSLABOR COSTS
LINE NO.ITEMUNIT OF MEASUREQUANTITYUNITTOTALMANHOURS MANDAYSAVERAGE RATETOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni
Ia Architectural Demolition - Ia Demolizioni Architettoniche
Not applicable / Non Applicabile
Ib Mechanical Demolitions - Ib Demolizioni Meccaniche0.000.000.00
Not applicable / Non Applicabile
Ic Electrical Demolitions - Ic Demolizioni Elettriche0.000.00
1REMOVAL OF EMERGENCY LIGHTING FIXTURES
rimozione lampade di emergenzaIT. No. Art. n.1LS/AC
2REMOVAL OF LIGHTING SWITCH
rimozione INTERRUTTORE LUCIIT. No. Art. n.2LS/AC
Total Electrical - Totale Elettrico
TOTAL PART I / Totale Parte I
PART II - ARCHITECTURAL AND CIVIL WORKS / Parte II - Lavori Architettonici e Civili
3PAINTING OF INTERIOR SURFACES
Tinteggiatura delle superfici interneIT. No. Art. n.1SQM/MQ
4PAINTING OF EXTERIOR METAL SURFACE
Pitturazione di superfici metalliche esterneIT. No. Art. n.2SQM/MQ
5NEW MOUSE SCREEN, INCL, FRAME
Nuova rete antitopo, incluso telaioIT. No. Art. n.3EA/NO
6EXISTING DOOR RENOVATION
Manutenzione porte esistentiIT. No. Art. n.4LS/AC
7NEW PANIC BAR HARDWARE
Nuova barra antipanicoIT. No. Art. n.5EA/NO
8NEW ROOF WATERPROOFING LAYER
Nuova impermeabilizzazione coperturaIT. No. Art. n.6SQM/MQ
TOTAL PART II / Totale Parte II
PART III - MECHANICAL WORK / Parte III - Lavori Meccanici
9NO.1 ROOF CENTRIFIGAL FANS ROOF
No.1 torrini di estrazioneIT. No. Art. n.1LS/AC
TOTAL PART III / Totale Parte III
PART VI- ELECTRICAL WORK / Parte VI - Lavori Elettrici
IVa MAINTENANCE/ IVa Manutenzione
10MV SWITCHGEAR MAINTENANCE
Manutenzione apparecchiature MTIT. No. Art. n.1EA/NO
11LV SWITCHGEAR MAINTENANCE
Manutenzione apparecchiature BTIT. No. Art. n.2EA/NO
12MV/LV TRANSFORMER MAINTENANCE
Manutenzione trasformatore MT/BTIT. No. Art. n.3EA/NO
13MISCELLANEOUS ITEMS MAINTENANCE
Manutenzione articoli variIT. No. Art. n.4EA/NO
14CABLEDUCTS MAINTENANCE
Manutenzione cavidottiIT. No. Art. n.5LS/AC
TOTAL MAINTENANCE - Totale Manutenzione
IVb REPAIRS/ IVb Riparazioni
15REPAIR OF EXISTING GROUNDING SYSTEM
Ripristino dell'impianto di terra esistenteIT. No. Art. n.1LS/AC
16NEW INTERIOR LIGHTING FIXTURES
Nuovi apparecchi illuminanti per internoIT. No. Art. n.2EA/NO
17NEW SPD
Nuovo SPDIT. No. Art. n.3EA/NO
18NEW PILOT LED LAMPS
Nuove lampade LED presenza tensioneIT. No. Art. n.4EA/NO
19NEW RESISTANCE HEATER
Nuova resistenza anticondensaIT. No. Art. n.5EA/NO
20NEW MICRO CIRCUIT BREAKERS
Nuovi interruttori modulareIT. No. Art. n.6EA/NO
21ONE LINE DIAGRAMS CASE
Quadro schemi unifilariIT. No. Art. n.7LS/AC
22INOX WALL BOX 60X75X35 CM
Contenitore a parete Inox 60X75X35 cmIT. No. Art. n.8EA/NO
23LABELS AND CABLES MARKINGS
Targhette e contrassegno caviIT. No. Art. n.9LS/AC
TOTAL REPAIRS/ Totale Riparazioni
IVc SAFETY/ IVc Sicurezza
24NEW FIRE EXTINGUISHER
Nuovi estintoreIT. No. Art. n.1LS/AC
25NEW EMERGENCY LIGHTING SYSTEM
Nuovi sistema luci di emergenzaIT. No. Art. n.2aEA/NO
26NEW MAINTAINED EXIT SIGN
Nuovle luci uscita emergenzaIT. No. Art. n.2bEA/NO
27NEW EMERGENCY LIGHTING SYSTEM PUSH BUTTON
Nuovi pulsante controllo sistema luci di emergenzaIT. No. Art. n.3EA/NO
TOTAL SAFETY/ Totale Sicurezza
IVd NEW WORKS/ IVd Nuovi Lavori
28CONNECTION OF TV TO EXISTING TELEMONIT. SYS.
Connessione del TV all'esistente sist. TelegestioneIT. No. Art. n.1LS/AC
29CONNECTION OF SPD TO EXISTING TELEMONIT. SYS.
Connessione del SPD al sist. TelegestioneIT. No. Art. n.2LS/AC
TOTAL NEW WORKS/ Totale Nuovi Lavori
IVe TEST AND CERTIFICATIONS/ IVe Prove e Certificazioni
30GROUNDING TEST
Prove di terraIT. No. Art. n.1LS/AC
31AS BUILT DRAWINGS
disegni as builtIT. No. Art. n.2aLS/AC
32TEST AND CERTIFICATIONS
Collaudo e certificazioniIT. No. Art. n.2bLS/AC

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .