About this file
This document package includes drawings and diagrams for repairs to medium voltage substations at Aviano Air Base in Italy, along with a pre-solicitation notice for the related federal contract opportunity. The pre-solicitation is for repairs to medium voltage substations at multiple locations under project ASHE 20-1063 at Aviano Air Base in Phase 2, with an estimated value between $500,000 and $1,000,000. Interested vendors must have a current System for Award Management registration and Special Occupational Area certification for Category OG11 at time of proposal submission and award. The work will be performed in Italy according to Defense Federal Acquisition Regulation Supplement requirements. A site visit will be scheduled for potential offerors to meet at the parking area of LVIS Gate in Area F Flightline. The solicitation is tentatively scheduled for issuance in June 2021.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 2009_31st_RPR_MV_SUBS_PSC.pdf | ||
| Solicitation - FA568221R0009.pdf | ||
| ASHE 20-1063_PH-2_TECH-SPECS_REV02.pdf | ||
| ASHE 20-1063_PH-2_CCEB_REV02 MDT.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UBICAZIONE DEL PROGETTO
PROJECT LOCATION
AREA "F"
AREA "D"
AREA "A1+A2"
AREA "G"
AREA "E"
AREA "C"
PROJECT: ASHE 20-1063
US AIR FORCE
31ST CES/CENM
AVIANO AIR BASE
REPAIRS MEDIUM VOLTAGE SUBSTATIONS
AREA "A1, A2, C, E, F, G", AVIANO A.B., ITALY
PHASE 2, REVISION #1: November the 18 , 2020
Zappala'
G-001
LOCATION MAP
MAPPA GENERALE
LOCAL AREA MAP
INQUADRAMENTO AREA
A
B
C
D
1 2 3 4 5 st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
PHASE 2
Engineering Tools Srl
Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 536333
FAX: +39 0434 542813
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
A
B
C
D
1 2 3 4 5
G-002
A
B
C
D
1 2 3 4 5 st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
PHASE 2
Engineering Tools Srl
Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 536333
FAX: +39 0434 542813
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
A
B
C
D
1 2 3 4 5
INDEX OF DRAWINGS
INDICE DEI DISEGNI
GENERAL SYMBOLS LEGEND
LEGENDA SIMBOLI GENERALI
N
TITOLO
TITLE
TITLE
A1
TITOLO
N
A1
A1
A1
(6 mm, Swiss721 BT.TTF, 0.8 width.)
TITLE TYPICAL
GENERAL / GENERALI
ELECTRICAL / ELETTRICO
B
C
D
1 2 3 4 5 st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
PHASE 2
Engineering Tools Srl
Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 536333
FAX: +39 0434 542813
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
A
B
C
D
1 2 3 4 5
E-101
N
PLANIMETRIA - POSIZIONE DELLE CABINE
SITE PLAN - LOCATION OF THE SUBSTATIONS
SCALE /
F1 / 903
Z1 / 14301
Z6 / 14306
Z13 / 14313
F39 / 1465 CD
F28 / 77190
70905
F29
F27 / 947 AVIONICS
F31 / 946
F26
F25 / 918
F24A / 10106F24 / 1028
C. CITY
F32 / 13040
F22 / 1064
F23 / 1065AIR TERMINAL
F33 / 10789
AMU
F34 / 11371
F21 / 71098F19 / 71188
F20 / 71183F18 / 71189F17 / 71193
F16 / 71121
F15 / 71192F14 / 71198
HUSH HOUSE
F35 / 11607
F13 / 71196
Vault "B"
F11 / 1217
78702
F12A
F12 / 78701 F9 / 78030 F8 / 1201 GOLF C.I.
F7 / 71270
F36 / 1396
RAPCON
F4A / 1304
F3 / 1362
SCALA
F6 / 78270
F10 / 1243
GOLF
F37 / 1309
Vault "A"
F5 / 1305
F2 / 78350 PAHA
F42 / 1448
Z15 / 14315
Z14 / 14314
Z2 / 14302Z3 / 14303
F30 / 71388
Z4 / 14304
Z5 / 14305
F38 / 14033 CSC
Z8 / 14308
Z7 / 14307
Z10 / 14310
Z9 / 14309
Z11 / 14311
Z12 / 14312
ARMY
F40 / 14357
F26B
B
C
D
1 2 3 4 5 st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
PHASE 2
Engineering Tools Srl
Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 536333
FAX: +39 0434 542813
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
A
B
C
D
1 2 3 4 5
SCALA
SITE PLAN
PLANIMETRIA GENERALE
SCALE
E-102
S/S #15100 (17004)
S/S #177
S/S #165
S/S #1204
S/S #121
S/S #25403
S/S #246
S/S #263
GENERAL NOTES
NOTE GENERALI
DEMOLISHED
DEMOLITA
ENEL ENTRY
F21
ENEL
F19
F18
F17
F16
F15
F13
F14
F35
F12A
F20
F12 F9 F11 F10 F8 F7 F36 F6 F5 F37 F3
F4A
F38
F30
F2
F42
F40 (ARMY)
F39
F1
ENEL
F28
F27
F29
F29
40/RSU
F26
F26BF26A
F31F25F24AF24F32F23F22F33
F34 (AMU)
Flightline "F" LOOP Zappala' "Z" LOOP
Z13
Z12
Z11
Z14
Z1
Z1
ENEL
Z2
Z3
Z4
Z5
Z6Z7
Z10
Z9
Z8
E-601
A
B
C
D
1 2 3 4 5 st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
PHASE 2
Engineering Tools Srl
Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 536333
FAX: +39 0434 542813
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
A
B
C
D
1 2 3 4 5
AREA "F" ELECTRICAL SUBSTATION - FLOW CHART
CABINE ELETTRICHE AREA "F" - SCHEMA A BLOCCHI
#17004 (ENEL ENTRY #1)
#151 (DODD SCHOOL)
#263 (WATER PLANT)
#177
#1204 (MTF) #165
#121 (CLINIC)
#246 (ENEL ENTRY #2) #25403 (DORMITORY)
QUADRO GENERALE B.T.
LV SWITCHBOARD
QUADRO GENERALE B.T.
LV SWITCHBOARD
QUADRO GENERALE B.T.
LV SWITCHBOARD
QUADRO GENERALE B.T.
LV SWITCHBOARD
QUADRO GENERALE B.T.
LV SWITCHBOARD
#15100
QUADRO GENERALE B.T.
LV SWITCHBOARD
QUADRO GENERALE B.T.
LV SWITCHBOARD
QUADRO GENERALE B.T.
LV SWITCHBOARD
A
B
C
D
1 2 3 4 5 st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
PHASE 2
Engineering Tools Srl
Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 536333
FAX: +39 0434 542813
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
A
B
C
D
E-602
24Vdc
QF1
SPD
QF1
-FU1
BATT
OUT
QF2 QF3 QF4 QF5 QF6 QF7
A
B
C
D
1 2 3 4 5 st
C E
S /C
E N
M st F
IG
H
TE
R
W
IN
G
PHASE 2
Engineering Tools Srl
Via del Makò n. 33
33084 Cordenons (PN)
TEL.: +39 0434 536333
FAX: +39 0434 542813
E-mail: info@engtools.eu
PEC: info@pec.engtools.eu
A
B
C
D
E-608
| ASHE-20-1063_Phase2_G-001_cover |
| ASHE-20-1063_Phase2_G-002_index |
| ASHE-20-1063_Phase2_E-101_AreaF_siteplan |
| ASHE-20-1063_Phase2_E-102_AreaA1-A2_siteplan |
| ASHE-20-1063_Phase2_E-601_AreaF_MV_flowchart |
| ASHE-20-1063_Phase2_E-602_AreaA1-A2_flowchart |
| ASHE-20-1063_Phase2_E-603_AreaF_MV_diagrams |
| Area-F_E-603_MV_diagrams_cover |
| Area-F_MV_diagram_subF01 |
| Area-F_MV_diagram_subF02 |
| Area-F_MV_diagram_subF03 |
| Area-F_MV_diagram_subF04A |
| Area-F_MV_diagram_subF05 |
| Area-F_MV_diagram_subF06 |
| Area-F_MV_diagram_subF07 |
| Area-F_MV_diagram_subF08 |
| Area-F_MV_diagram_subF09 |
| Area-F_MV_diagram_subF10 |
| Area-F_MV_diagram_subF11 |
| Area-F_MV_diagram_subF12 |
| Area-F_MV_diagram_subF12A |
| Area-F_MV_diagram_subF13 |
| Area-F_MV_diagram_subF14 |
| Area-F_MV_diagram_subF15 |
| Area-F_MV_diagram_subF16 |
| Area-F_MV_diagram_subF17 |
| Area-F_MV_diagram_subF18 |
| Area-F_MV_diagram_subF19 |
| Area-F_MV_diagram_subF20 |
| Area-F_MV_diagram_subF21 |
| Area-F_MV_diagram_subF22 |
| Area-F_MV_diagram_subF23 |
| Area-F_MV_diagram_subF24 |
| Area-F_MV_diagram_subF24A |
| Area-F_MV_diagram_subF25 |
| Area-F_MV_diagram_subF26 |
| Area-F_MV_diagram_subF26B(921) |
| Area-F_MV_diagram_subF27 |
| Area-F_MV_diagram_subF28 |
| Area-F_MV_diagram_subF29 |
| Area-F_MV_diagram_subF30 |
| Area-F_MV_diagram_subF31 |
| Area-F_MV_diagram_subF32 |
| Area-F_MV_diagram_subF33 |
| Area-F_MV_diagram_subF34-AMU |
| Area-F_MV_diagram_subF35 |
| Area-F_MV_diagram_subF36 |
| Area-F_MV_diagram_subF37 |
| Area-F_MV_diagram_subF38 |
| Area-F_MV_diagram_subF39 |
| Area-F_MV_diagram_subF40-ARMY |
| Area-F_MV_diagram_subF42 |
| ASHE-20-1063_Phase2_E-604_AreaA1-A2_diagrams |
| Area-A1-A2_E-604_MV_diagrams_cover |
| Area-A1_MV_diagram_sub121 |
| Area-A1_MV_diagram_sub151 |
| Area-A1_MV_diagram_sub165 |
| Area-A1_MV_diagram_sub177 |
| Area-A1_MV_diagram_sub1204 |
| Area-A1_MV_diagram_sub15100-(17004) |
| Area-A2_MV_diagram_sub246 |
| Area-A2_MV_diagram_sub263 |
| Area-A2_MV_diagram_sub25403 |
| ASHE-20-1063_Phase2_E-605_AreaC_diagrams |
| Area-C_E-605_MV_diagrams_cover |
| Area-C_MV_diagram_sub420 |
| Area-C_SitePlan |
| ASHE-20-1063_Phase2_E-606_AreaE_diagrams |
| Area-E_E-606_MV_diagrams_cover |
| Area-E_MV_diagram_sub604 |
| Area-E_SitePlan |
| ASHE-20-1063_Phase2_E-607_AreaG_diagrams |
| Area-G_E-607_MV_diagrams_cover |
| Area-G_MV_diagram_sub15703 |
| Area-G_SitePlan |
ASHE-20-1063_Phase2_E-608_BatteryCharger
File details come from the government source that posted it. Updated .