ASHE 20-1063_PH-2_CCEB_REV02 MDT.xlsx
XLSX spreadsheet 76 KB Posted
- Attached to
- ASHE 20-1063 RPR MEDIUM VOLTAGE SUBSTATIONS MULTI, PHASE II Federal contract opportunity
- Solicitation number
- FA568221R0009
About this file
This document is a pre-solicitation notice for project ASHE 20-1063 to repair medium voltage substations at Aviano Air Base in Italy, Phase 2 - Revision 2. The work includes replacement of protection relays, batteries, battery chargers, and other electrical components across various substations. The estimated value of construction is between $500,000 to $1,000,000. Offerors must have a current System for Award Management registration and Special Occupational Authorization certification in category OG11 at time of proposal submission and award. The performance will require completion of the project on a lump sum basis. The solicitation is expected to be issued in June 2021.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation - FA568221R0009.pdf | ||
| 2009_31st_RPR_MV_SUBS_PSC.pdf | ||
| ASHE 20-1063_PH-2_TECH-SPECS_REV02.pdf | ||
| ASHE 20-1063_PH-2_Rev1_DRAWINGS.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ASHE 20-1063 , PHASE 2
| GOVERNMENT COST ESTIMATE BREAKDOWN | |
| CONTRACTOR | ADDRESS |
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| RPR MEDIUM VOLTAGE SUBSTATIONS, MULTI (DSN) - AVIANO A.B., ITALY | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| ASHE 20-1063 (PHASE 2 - Rev#2) | ALL AREAS, AVIANO AIR BASE, ITALY | |||||||||
| MATERIAL COSTS | LABOR COSTS | |||||||||
| LINE NO. | ITEM | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | MANHOURS MANDAYS | AVERAGE RATE | TOTAL | OTHER DIRECT COSTS | LINE TOTAL |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) |
| A. | REPAIR WORKS / Lavori di Ristrutturazione | ||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni | |||
| Ie Electrical Demolition - Ia Demolizioni Impianti Elettrici | |||
| 1 | REMOVAL AND DISPOSAL OF THE 20 kV PROTECTION RELAY | ||
| Rimozione e smaltimento di relè di protezione 20 kV | IT. No. Art. n. | 1.01 | LS/AC |
| 1 | REMOVAL AND DISPOSAL OF EMERGENCY RECTIFIER 230Vac / 24Vdc, WITH LEAD ACID BATTERIES | ||
| Rimozione e smaltimento di raddrizzatore di emergenza 230Vac / 24Vcc, con batterie al piombo acido | IT. No. Art. n. | 2.01 | Ea/No |
| 2 | REMOVAL AND DISPOSAL OF Ni-Cd BATTERY PACKAGE, SUB F37 | ||
| Rimozione e smaltimento di batterie Ni-Cd, cabina F37 | IT. No. Art. n. | 2.02 | Ea/No |
| Total Electrical Demolitions - Totale Demolizioni Elettriche |
TOTAL PART I / Totale Parte I
| PART IV - ELECTRICAL WORK / Parte IV - Lavori Elettrici | |||
| REPLACEMENT OF 20 kV RELAYS | |||
| REPLACEMENT OF THE EXISTING OUT-OF-SERVICE RELAYS LOCATED ON THE 20 KV SWITCHBOARDS OF THE AVIANO A.B. SUBSTATIONS. THE REPLACEMENT INCLUDES FURNISHING AND INSTALLATION OF EACH DEVICE AND ITS ASSOCIATED AUXILIARY COMPONENTS, MODULES, CARDS, WIRING CONNECTION, THRESHOLDS SETTINGS, INSTRUMENTAL TESTS, COMMISSIONING, TO GUARANTEE THE FULLY RESTAURATION OF THE PROTECTION. | |||
| Sostituzione dei relè fuori-servizio dei quadri 20 kV nelle cabine della Base Aerea di Aviano. La sostituzione include la fornitura e la sostituzione di ogni dispositivo e relativi componenti associati, moduli, schede, cablaggi, tarature, test strumentali, messa in servizio, per garantire il completo ristoro delle protezioni. | 3 | ||
| AREA "F" | |||
| 3 | SUBSTATION F2 - REPLACEMENT RELAY S.E. model SEPAM 40 type S42 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F2 - Sostituzione relè S.E. modello SEPAM 40 tipo S42 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.01 | EA/NO |
| 4 | SUBSTATION F2 - REPLACEMENT RELAY S.E. model SEPAM 20 type T20 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F2 - Sostituzione relè S.E. modello SEPAM 20 tipo T20 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.02 | EA/NO |
| 5 | SUBSTATION F4A - REPLACEMENT RELAY S.E. model SEPAM 20 type S20 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F4A - Sostituzione relè S.E. modello SEPAM 20 tipo S20 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.03 | EA/NO |
| 6 | SUBSTATION F4A - REPLACEMENT RELAY S.E. model SEPAM 20 type T20 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F4A - Sostituzione relè S.E. modello SEPAM 20 tipo T20 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.04 | EA/NO |
| 7 | SUBSTATION F6 - REPLACEMENT RELAY S.E. model SEPAM 20 type S20 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F6 - Sostituzione relè S.E. modello SEPAM 20 tipo S20 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.05 | EA/NO |
| 8 | SUBSTATION F6 - REPLACEMENT RELAY S.E. model SEPAM 20 type T20 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F6 - Sostituzione relè S.E. modello SEPAM 20 tipo T20 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.06 | EA/NO |
| 9 | SUBSTATION F7 - REPLACEMENT RELAY S.E. model SEPAM 40 type S42 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F7 - Sostituzione relè S.E. modello SEPAM 40 tipo S42 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.07 | EA/NO |
| 10 | SUBSTATION F7 - REPLACEMENT RELAY S.E. model SEPAM 20 type T20 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F7 - Sostituzione relè S.E. modello SEPAM 20 tipo T20 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.08 | EA/NO |
| 11 | SUBSTATION F8 - REPLACEMENT RELAY S.E. model SEPAM 40 type S42 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F8 - Sostituzione relè S.E. modello SEPAM 40 tipo S42 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.09 | EA/NO |
| 12 | SUBSTATION F8 - REPLACEMENT RELAY S.E. model SEPAM 20 type T20 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F8 - Sostituzione relè S.E. modello SEPAM 20 tipo T20 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.10 | EA/NO |
| 13 | SUBSTATION F9 - REPLACEMENT RELAY S.E. model SEPAM 40 type S42 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F9 - Sostituzione relè S.E. modello SEPAM 40 tipo S42 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.11 | EA/NO |
| 14 | SUBSTATION F9 - REPLACEMENT RELAY S.E. model SEPAM 20 type T20 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F9 - Sostituzione relè S.E. modello SEPAM 20 tipo T20 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.12 | EA/NO |
| 15 | SUBSTATION F10 - REPLACEMENT RELAY S.E. model SEPAM 40 type S42 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F10 - Sostituzione relè S.E. modello SEPAM 40 tipo S42 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.13 | EA/NO |
| 16 | SUBSTATION F10 - REPLACEMENT RELAY S.E. model SEPAM 20 type T20 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F10 - Sostituzione relè S.E. modello SEPAM 20 tipo T20 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.14 | EA/NO |
| 17 | SUBSTATION F11 - REPLACEMENT RELAY S.E. model SEPAM 40 type S42 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F11 - Sostituzione relè S.E. modello SEPAM 40 tipo S42 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.15 | EA/NO |
| 18 | SUBSTATION F12 - REPLACEMENT RELAY S.E. model SEPAM 40 type S42 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F12 - Sostituzione relè S.E. modello SEPAM 40 tipo S42 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.16 | EA/NO |
| 19 | SUBSTATION F12 - REPLACEMENT RELAY S.E. model SEPAM 20 type T20 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F12 - Sostituzione relè S.E. modello SEPAM 20 tipo T20 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.17 | EA/NO |
| 20 | SUBSTATION F12A - REPLACEMENT RELAY S.E. model SEPAM 40 type S42 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F12A - Sostituzione relè S.E. modello SEPAM 40 tipo S42 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.18 | EA/NO |
| 21 | SUBSTATION F12A - REPLACEMENT RELAY S.E. model SEPAM 20 type T20 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F12A - Sostituzione relè S.E. modello SEPAM 20 tipo T20 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.19 | EA/NO |
| 22 | SUBSTATION F13 - REPLACEMENT RELAY S.E. model SEPAM 40 type S42 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F13 - Sostituzione relè S.E. modello SEPAM 40 tipo S42 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.20 | EA/NO |
| 23 | SUBSTATION F13 - REPLACEMENT RELAY S.E. model SEPAM 20 type T20 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F13 - Sostituzione relè S.E. modello SEPAM 20 tipo T20 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.21 | EA/NO |
| 24 | SUBSTATION F14 - REPLACEMENT RELAY S.E. model SEPAM 40 type S42 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F14 - Sostituzione relè S.E. modello SEPAM 40 tipo S42 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.22 | EA/NO |
| 25 | SUBSTATION F14 - REPLACEMENT RELAY S.E. model SEPAM 20 type T20 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F14 - Sostituzione relè S.E. modello SEPAM 20 tipo T20 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.23 | EA/NO |
| 26 | SUBSTATION F15 - REPLACEMENT RELAY S.E. model SEPAM 40 type S42 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F15 - Sostituzione relè S.E. modello SEPAM 40 tipo S42 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.24 | EA/NO |
| 27 | SUBSTATION F15 - REPLACEMENT RELAY S.E. model SEPAM 20 type T20 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F15 - Sostituzione relè S.E. modello SEPAM 20 tipo T20 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.25 | EA/NO |
| 28 | SUBSTATION F16 - REPLACEMENT RELAY S.E. model SEPAM 40 type S42 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F16 - Sostituzione relè S.E. modello SEPAM 40 tipo S42 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.26 | EA/NO |
| 29 | SUBSTATION F16 - REPLACEMENT RELAY S.E. model SEPAM 20 type T20 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F16 - Sostituzione relè S.E. modello SEPAM 20 tipo T20 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.27 | EA/NO |
| 30 | SUBSTATION F17 - REPLACEMENT RELAY S.E. model SEPAM 40 type S42 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F17 - Sostituzione relè S.E. modello SEPAM 40 tipo S42 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.28 | EA/NO |
| 31 | SUBSTATION F17 - REPLACEMENT RELAY S.E. model SEPAM 20 type T20 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F17 - Sostituzione relè S.E. modello SEPAM 20 tipo T20 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.29 | EA/NO |
| 32 | SUBSTATION F18 - REPLACEMENT RELAY S.E. model SEPAM 40 type S42 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F18 - Sostituzione relè S.E. modello SEPAM 40 tipo S42 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.30 | EA/NO |
| 33 | SUBSTATION F18 - REPLACEMENT RELAY S.E. model SEPAM 20 type T20 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F18 - Sostituzione relè S.E. modello SEPAM 20 tipo T20 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.31 | EA/NO |
| 34 | SUBSTATION F19 - REPLACEMENT RELAY S.E. model SEPAM 40 type S42 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F19 - Sostituzione relè S.E. modello SEPAM 40 tipo S42 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.32 | EA/NO |
| 35 | SUBSTATION F19 - REPLACEMENT RELAY S.E. model SEPAM 20 type T20 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F19 - Sostituzione relè S.E. modello SEPAM 20 tipo T20 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.33 | EA/NO |
| 36 | SUBSTATION F20 - REPLACEMENT RELAY S.E. model SEPAM 40 type S42 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F20 - Sostituzione relè S.E. modello SEPAM 40 tipo S42 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.34 | EA/NO |
| 37 | SUBSTATION F20 - REPLACEMENT RELAY S.E. model SEPAM 20 type T20 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F20 - Sostituzione relè S.E. modello SEPAM 20 tipo T20 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.35 | EA/NO |
| 38 | SUBSTATION F21 - REPLACEMENT RELAY S.E. model SEPAM 40 type S42 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F21 - Sostituzione relè S.E. modello SEPAM 40 tipo S42 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.36 | EA/NO |
| 39 | SUBSTATION F21 - REPLACEMENT RELAY S.E. model SEPAM 20 type T20 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F21 - Sostituzione relè S.E. modello SEPAM 20 tipo T20 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.37 | EA/NO |
| 40 | SUBSTATION F22 - REPLACEMENT RELAY S.E. model SEPAM 40 type S42 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F22 - Sostituzione relè S.E. modello SEPAM 40 tipo S42 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.38 | EA/NO |
| 41 | SUBSTATION F22 - REPLACEMENT RELAY S.E. model SEPAM 20 type T20 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F22 - Sostituzione relè S.E. modello SEPAM 20 tipo T20 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.39 | EA/NO |
| 42 | SUBSTATION F23 - REPLACEMENT RELAY S.E. model SEPAM 40 type S42 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F23 - Sostituzione relè S.E. modello SEPAM 40 tipo S42 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.40 | EA/NO |
| 43 | SUBSTATION F23 - REPLACEMENT RELAY S.E. model SEPAM 20 type T20 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F23 - Sostituzione relè S.E. modello SEPAM 20 tipo T20 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.41 | EA/NO |
| 44 | SUBSTATION F24 - REPLACEMENT RELAY S.E. model SEPAM 40 type S42 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F24 - Sostituzione relè S.E. modello SEPAM 40 tipo S42 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.42 | EA/NO |
| 45 | SUBSTATION F24 - REPLACEMENT RELAY S.E. model SEPAM 20 type T20 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F24 - Sostituzione relè S.E. modello SEPAM 20 tipo T20 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.43 | EA/NO |
| 46 | SUBSTATION F24A - REPLACEMENT RELAY S.E. model SEPAM 40 type S42 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F24A - Sostituzione relè S.E. modello SEPAM 40 tipo S42 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.44 | EA/NO |
| 47 | SUBSTATION F24A - REPLACEMENT RELAY S.E. model SEPAM 20 type T20 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F24A - Sostituzione relè S.E. modello SEPAM 20 tipo T20 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.45 | EA/NO |
| 48 | SUBSTATION F25 - REPLACEMENT RELAY S.E. model SEPAM 40 type S42 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F25 - Sostituzione relè S.E. modello SEPAM 40 tipo S42 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.46 | EA/NO |
| 49 | SUBSTATION F25 - REPLACEMENT RELAY S.E. model SEPAM 20 type T20 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F25 - Sostituzione relè S.E. modello SEPAM 20 tipo T20 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.47 | EA/NO |
| 50 | SUBSTATION F26 - REPLACEMENT RELAY S.E. model SEPAM 40 type S42 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F26 - Sostituzione relè S.E. modello SEPAM 40 tipo S42 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.48 | EA/NO |
| 51 | SUBSTATION F26 - REPLACEMENT RELAY S.E. model SEPAM 20 type T20 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F26 - Sostituzione relè S.E. modello SEPAM 20 tipo T20 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.49 | EA/NO |
| 52 | SUBSTATION F27 - REPLACEMENT RELAY S.E. model SEPAM 40 type S42 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F27 - Sostituzione relè S.E. modello SEPAM 40 tipo S42 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.50 | EA/NO |
| 53 | SUBSTATION F27 - REPLACEMENT RELAY S.E. model SEPAM 20 type T20 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F27 - Sostituzione relè S.E. modello SEPAM 20 tipo T20 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.51 | EA/NO |
| 54 | SUBSTATION F28 - REPLACEMENT RELAY S.E. model SEPAM 40 type S42 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F28 - Sostituzione relè S.E. modello SEPAM 40 tipo S42 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.52 | EA/NO |
| 55 | SUBSTATION F28 - REPLACEMENT RELAY S.E. model SEPAM 20 type T20 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F28 - Sostituzione relè S.E. modello SEPAM 20 tipo T20 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.53 | EA/NO |
| 56 | SUBSTATION F29 - REPLACEMENT RELAY S.E. model SEPAM 40 type S42 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F29 - Sostituzione relè S.E. modello SEPAM 40 tipo S42 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.54 | EA/NO |
| 57 | SUBSTATION F29 - REPLACEMENT RELAY S.E. model SEPAM 20 type T20 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F29 - Sostituzione relè S.E. modello SEPAM 20 tipo T20 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.55 | EA/NO |
| 58 | SUBSTATION F31 - REPLACEMENT RELAY S.E. model SEPAM 40 type S42 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F31 - Sostituzione relè S.E. modello SEPAM 40 tipo S42 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.56 | EA/NO |
| 59 | SUBSTATION F31 - REPLACEMENT RELAY S.E. model SEPAM 20 type T20 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F31 - Sostituzione relè S.E. modello SEPAM 20 tipo T20 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.57 | EA/NO |
| 60 | SUBSTATION F32 - REPLACEMENT RELAY S.E. model SEPAM 40 type S42 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F32 - Sostituzione relè S.E. modello SEPAM 40 tipo S42 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.58 | EA/NO |
| 61 | SUBSTATION F32 - REPLACEMENT RELAY S.E. model SEPAM 20 type T20 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F32 - Sostituzione relè S.E. modello SEPAM 20 tipo T20 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.59 | EA/NO |
| 62 | SUBSTATION F33 - REPLACEMENT RELAY S.E. model SEPAM 40 type S42 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F33 - Sostituzione relè S.E. modello SEPAM 40 tipo S42 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.60 | EA/NO |
| 63 | SUBSTATION F33 - REPLACEMENT RELAY S.E. model SEPAM 20 type T20 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F33 - Sostituzione relè S.E. modello SEPAM 20 tipo T20 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.61 | EA/NO |
| 64 | SUBSTATION F35 - REPLACEMENT RELAY S.E. model SEPAM 40 type S42 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F35 - Sostituzione relè S.E. modello SEPAM 40 tipo S42 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.62 | EA/NO |
| 65 | SUBSTATION F35 - REPLACEMENT RELAY S.E. model SEPAM 20 type T20 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F35 - Sostituzione relè S.E. modello SEPAM 20 tipo T20 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.63 | EA/NO |
| 66 | SUBSTATION F38 - REPLACEMENT RELAY S.E. model SEPAM 20 type T20 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F38 - Sostituzione relè S.E. modello SEPAM 20 tipo T20 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.64 | EA/NO |
| 67 | SUBSTATION F39 - REPLACEMENT RELAY S.E. model SEPAM 40 type S42 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F39 - Sostituzione relè S.E. modello SEPAM 40 tipo S42 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.65 | EA/NO |
| 68 | SUBSTATION F39 - REPLACEMENT RELAY S.E. model SEPAM 20 type S20 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F39 - Sostituzione relè S.E. modello SEPAM 20 tipo S20 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.66 | EA/NO |
| 69 | SUBSTATION F39 - REPLACEMENT RELAY S.E. model SEPAM 20 type T20 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F39 - Sostituzione relè S.E. modello SEPAM 20 tipo T20 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.67 | EA/NO |
| 70 | SUBSTATION F42 - REPLACEMENT RELAY S.E. model SEPAM 40 type S42 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F42 - Sostituzione relè S.E. modello SEPAM 40 tipo S42 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.68 | EA/NO |
| 71 | SUBSTATION F42 - REPLACEMENT RELAY S.E. model SEPAM 20 type T20 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica F42 - Sostituzione relè S.E. modello SEPAM 20 tipo T20 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.69 | EA/NO |
| AREA "A1" | |||
| 72 | SUBSTATION 151 - REPLACEMENT RELAY S.E. model SEPAM 40 type S42 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica 151 - Sostituzione relè S.E. modello SEPAM 40 tipo S42 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.70 | EA/NO |
| 73 | SUBSTATION 151 - REPLACEMENT RELAY S.E. model SEPAM 20 type T20 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica 151 - Sostituzione relè S.E. modello SEPAM 20 tipo T20 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.71 | EA/NO |
| 74 | SUBSTATION 177 - REPLACEMENT RELAY S.E. model SEPAM 40 type S42 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica 177 - Sostituzione relè S.E. modello SEPAM 40 tipo S42 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.72 | EA/NO |
| AREA "A2" | |||
| 72 | SUBSTATION 246 - REPLACEMENT RELAY S.E. model SEPAM 40 type S42 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica 246 - Sostituzione relè S.E. modello SEPAM 40 tipo S42 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.73 | EA/NO |
| 73 | SUBSTATION 246 - REPLACEMENT RELAY S.E. model SEPAM 20 type T20 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica 246 - Sostituzione relè S.E. modello SEPAM 20 tipo T20 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.74 | EA/NO |
| AREA "C" | |||
| 74 | SUBSTATION 420 - REPLACEMENT RELAY S.E. model SEPAM 40 type S42 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica 420 - Sostituzione relè S.E. modello SEPAM 40 tipo S42 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.75 | EA/NO |
| 75 | SUBSTATION 420 - REPLACEMENT RELAY S.E. model SEPAM 20 type T20 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica 420 - Sostituzione relè S.E. modello SEPAM 20 tipo T20 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.76 | EA/NO |
| AREA "E" | |||
| 76 | SUBSTATION 604 - REPLACEMENT RELAY S.E. model SEPAM 40 type S42 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica 604 - Sostituzione relè S.E. modello SEPAM 40 tipo S42 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.77 | EA/NO |
| AREA "G" | |||
| 77 | SUBSTATION 15703 - REPLACEMENT RELAY S.E. model SEPAM 40 type S42 e I/O module MES 114. Thresholds settings, instrumental test, commissioning. | ||
| Cabina elettrica 15703 - Sostituzione relè S.E. modello SEPAM 40 tipo S42 e modulo I/O MES 114. Impostazione soglie, test strumentale, messa in servizio. | IT. No. Art. n. | 3.78 | EA/NO |
| SPARE | |||
| 78 | SPARE RELAY - FURNISHING OF A SEPAM 40 type S42 RELAY AND DELIVER TO THE AVIANO A.B. PERSONNEL. | ||
| Rele' di riserva - Fornitura di un relè S.E. modello SEPAM 40 tipo S42 e consegna al personale della Base Aerea di Aviano. | IT. No. Art. n. | 3.79 | EA/NO |
| 79 | SPARE RELAY - FURNISHING OF A SEPAM 20 type T20 RELAY AND DELIVER TO THE AVIANO A.B. PERSONNEL. | ||
| Rele' di riserva - Fornitura di un relè S.E. modello SEPAM 20 tipo T20 e consegna al personale della Base Aerea di Aviano. | IT. No. Art. n. | 3.80 | EA/NO |
| LOGICAL BLOCKS AND SELECTIVITY INSTRUMENTAL TESTS |
| LOOP LOGICAL BLOCKS AND SELECTIVITY INSTRUMENTAL TESTS, TO VERIFY THE OPERATIVITY OF THE SYSTEM LOGIC-SELECTIVITY AFTER THE REPLACEMENT OF THE RELAYS ON LOOP. INCLUDED FINAL REPORT WITH ALL THE RESULTS. |
Test strumentale dei blocchi logici e della selettività dell'anello di meia tensione, per accertare l'operatività della selettivià logica del sistema dopo la sostituzione dei relè sull'anello. Inclusa report finale completo di ogni risultato.
| 80 | Area "A1-A2" logical blocks test and selectivity test on the MV loop | IT. No. Art. n. | 4.01 | LS/AC |
| 81 | Area "F" logical blocks test and selectivity test on the MV loop | IT. No. Art. n. | 4.02 | LS/AC |
| REPLACEMENT OF BATTERIES AND BATTERIES-CHARGERS | |||||
| REPLACEMENT OF THE EXISTING RECTIFIER WITH NEW ONE, SINGLE-BRANCH TYPE, INPUT 230Vac, OUTPUT 24Vdc 40 Amps, 90 minutes AUTONOMY, 12 YEARS EXPECTED-LIFE Pb (VRLA) BATTERIES. INCLUDED RECONNECTION OF THE EXISTING IN & OUT CIRCUITS. | |||||
| Sostituzione raddrizzatore esistente con nuovo, singolo ramo, ingresso 230Vca, uscita 24Vcc 40 Amp, autonomia 90 minuti, batterie Pb ermetico (VRLA) con vita attesa 12 anni. Compreso ricablaggio circuiti. | IT. No. Art. n. | 5 | |||
| 82 | Area "F" - SUBSTATION F26B (bldg 921) | IT. No. Art. n. | 5.01 | EA/NO | |
| 83 | Area "F" - SUBSTATION F40 "ARMY" (bldg 14357) | IT. No. Art. n. | 5.02 | EA/NO | |
| 84 | Area "1" - SUBSTATION 151 | IT. No. Art. n. | 5.03 | EA/NO | |
| 85 | Area "1" - SUBSTATION 165 | IT. No. Art. n. | 5.04 | EA/NO | |
| 86 | Area "1" - SUBSTATION 177 | IT. No. Art. n. | 5.05 | EA/NO | |
| 87 | Area "1" - SUBSTATION 1204 | IT. No. Art. n. | 5.06 | EA/NO | |
| 88 | Area "1" - SUBSTATION 15100 (17004) | IT. No. Art. n. | 5.07 | EA/NO | |
| 89 | Area "2" - SUBSTATION 246 | IT. No. Art. n. | 5.08 | EA/NO | |
| 90 | Area "2" - SUBSTATION 263 | IT. No. Art. n. | 5.09 | EA/NO | |
| 91 | Area "C" - SUBSTATION 420 | IT. No. Art. n. | 5.10 | EA/NO | |
| 92 | Area "E" - SUBSTATION 604 | IT. No. Art. n. | 5.11 | EA/NO | |
| 93 | Area "G" - SUBSTATION 15703 | IT. No. Art. n. | 5.12 | EA/NO |
| BATTERIES AND BATTERIES-CHARGES "SPD" PANEL | |||||
| EMERGENCY POWER SUPPLY EQUIPMENT SPD PANEL. FURNISHING AND INSTALLATION OF POWER SUPPLY EQUIPMENT PANEL FOR THE PROTECTION OF THE EQUIPMENT AGAINST SURGES. | |||||
| Quadro scaricatori per il sistema di alimentazione di emergenza. Fornitura ed installazione di quadro per la protezione contro le sovratensioni del sistema di alimentazione di emergenza. | IT. No. Art. n. | 6 | |||
| 94 | Area "F" - SUBSTATION F26B (bldg 921) | IT. No. Art. n. | 6.01 | LS/AC | |
| 95 | Area "F" - SUBSTATION F40 "ARMY" (bldg 14357) | IT. No. Art. n. | 6.02 | LS/AC | |
| 96 | Area "1" - SUBSTATION 151 | IT. No. Art. n. | 6.03 | LS/AC | |
| 97 | Area "1" - SUBSTATION 165 | IT. No. Art. n. | 6.04 | LS/AC | |
| 98 | Area "1" - SUBSTATION 177 | IT. No. Art. n. | 6.05 | LS/AC | |
| 99 | Area "1" - SUBSTATION 12104 | IT. No. Art. n. | 6.06 | LS/AC | |
| 100 | Area "1" - SUBSTATION 15100 | IT. No. Art. n. | 6.07 | LS/AC | |
| 101 | Area "2" - SUBSTATION 246 | IT. No. Art. n. | 6.08 | LS/AC | |
| 102 | Area "2" - SUBSTATION 263 | IT. No. Art. n. | 6.09 | LS/AC | |
| 103 | Area "C" - SUBSTATION 420 | IT. No. Art. n. | 6.10 | LS/AC | |
| 104 | Area "E" - SUBSTATION 604 | IT. No. Art. n. | 6.11 | LS/AC | |
| 105 | Area "G" - SUBSTATION 15703 | IT. No. Art. n. | 6.12 | LS/AC |
| LOW VOLTAGE PROTECTION RELAYS FUNCTIONING CHECKS | |||||
| FUNCTIONING CHECKS FOR LOW VOLTAGE (LV) CIRCUIT BREAKER PROTECTION RELAYS. | |||||
| Esecuzione delle verifiche funzionali degli relè di bassa tensione. | IT. No. Art. n. | 7 | |||
| 106 | Area "F" - SUBSTATION F1 | IT. No. Art. n. | 7.01 | LS/AC | |
| 107 | Area "F" - SUBSTATION F2 | IT. No. Art. n. | 7.02 | LS/AC | |
| 108 | Area "F" - SUBSTATION F3 | IT. No. Art. n. | 7.03 | LS/AC | |
| 109 | Area "F" - SUBSTATION F4A | IT. No. Art. n. | 7.04 | LS/AC | |
| 110 | Area "F" - SUBSTATION F5 | IT. No. Art. n. | 7.05 | LS/AC | |
| 111 | Area "F" - SUBSTATION F6 | IT. No. Art. n. | 7.06 | LS/AC | |
| 112 | Area "F" - SUBSTATION F7 | IT. No. Art. n. | 7.07 | LS/AC | |
| 113 | Area "F" - SUBSTATION F8 | IT. No. Art. n. | 7.08 | LS/AC | |
| 114 | Area "F" - SUBSTATION F9 | IT. No. Art. n. | 7.09 | LS/AC | |
| 115 | Area "F" - SUBSTATION F10 | IT. No. Art. n. | 7.10 | LS/AC | |
| 116 | Area "F" - SUBSTATION F11 | IT. No. Art. n. | 7.11 | LS/AC | |
| 117 | Area "F" - SUBSTATION F12 | IT. No. Art. n. | 7.12 | LS/AC | |
| 118 | Area "F" - SUBSTATION F12A | IT. No. Art. n. | 7.13 | LS/AC | |
| 119 | Area "F" - SUBSTATION F13 | IT. No. Art. n. | 7.14 | LS/AC | |
| 120 | Area "F" - SUBSTATION F14 | IT. No. Art. n. | 7.15 | LS/AC | |
| 121 | Area "F" - SUBSTATION F15 | IT. No. Art. n. | 7.16 | LS/AC | |
| 122 | Area "F" - SUBSTATION F16 | IT. No. Art. n. | 7.17 | LS/AC | |
| 123 | Area "F" - SUBSTATION F17 | IT. No. Art. n. | 7.18 | LS/AC | |
| 124 | Area "F" - SUBSTATION F18 | IT. No. Art. n. | 7.19 | LS/AC | |
| 125 | Area "F" - SUBSTATION F19 | IT. No. Art. n. | 7.20 | LS/AC | |
| 126 | Area "F" - SUBSTATION F20 | IT. No. Art. n. | 7.21 | LS/AC | |
| 127 | Area "F" - SUBSTATION F21 | IT. No. Art. n. | 7.22 | LS/AC | |
| 128 | Area "F" - SUBSTATION F22 | IT. No. Art. n. | 7.23 | LS/AC | |
| 129 | Area "F" - SUBSTATION F23 | IT. No. Art. n. | 7.24 | LS/AC | |
| 130 | Area "F" - SUBSTATION F24 | IT. No. Art. n. | 7.25 | LS/AC | |
| 131 | Area "F" - SUBSTATION F24A | IT. No. Art. n. | 7.26 | LS/AC | |
| 132 | Area "F" - SUBSTATION F25 | IT. No. Art. n. | 7.27 | LS/AC | |
| 133 | Area "F" - SUBSTATION F26 | IT. No. Art. n. | 7.28 | LS/AC | |
| 134 | Area "F" - SUBSTATION F26B | IT. No. Art. n. | 7.29 | LS/AC | |
| 135 | Area "F" - SUBSTATION F27 | IT. No. Art. n. | 7.30 | LS/AC | |
| 136 | Area "F" - SUBSTATION F28 | IT. No. Art. n. | 7.31 | LS/AC | |
| 137 | Area "F" - SUBSTATION F29 | IT. No. Art. n. | 7.32 | LS/AC | |
| 138 | Area "F" - SUBSTATION F30 | IT. No. Art. n. | 7.33 | LS/AC | |
| 139 | Area "F" - SUBSTATION F31 | IT. No. Art. n. | 7.34 | LS/AC | |
| 140 | Area "F" - SUBSTATION F32 | IT. No. Art. n. | 7.35 | LS/AC | |
| 141 | Area "F" - SUBSTATION F33 | IT. No. Art. n. | 7.36 | LS/AC | |
| 142 | Area "F" - SUBSTATION F34 | IT. No. Art. n. | 7.37 | LS/AC | |
| 143 | Area "F" - SUBSTATION F35 | IT. No. Art. n. | 7.38 | LS/AC | |
| 144 | Area "F" - SUBSTATION F36 | IT. No. Art. n. | 7.39 | LS/AC | |
| 145 | Area "F" - SUBSTATION F37 | IT. No. Art. n. | 7.40 | LS/AC | |
| 146 | Area "F" - SUBSTATION F38 | IT. No. Art. n. | 7.41 | LS/AC | |
| 147 | Area "F" - SUBSTATION F39 | IT. No. Art. n. | 7.42 | LS/AC | |
| 148 | Area "F" - SUBSTATION F40 | IT. No. Art. n. | 7.43 | LS/AC | |
| 149 | Area "F" - SUBSTATION F42 | IT. No. Art. n. | 7.44 | LS/AC | |
| 150 | Area "A1" - SUBSTATION 151 | IT. No. Art. n. | 7.45 | LS/AC | |
| 151 | Area "A1" - SUBSTATION 165 | IT. No. Art. n. | 7.46 | LS/AC | |
| 152 | Area "A1" - SUBSTATION 177 | IT. No. Art. n. | 7.47 | LS/AC | |
| 153 | Area "A1" - SUBSTATION 1204 | IT. No. Art. n. | 7.48 | LS/AC | |
| 154 | Area "A1" - SUBSTATION 15100 (17004) | IT. No. Art. n. | 7.49 | LS/AC | |
| 155 | Area "A2" - SUBSTATION 246 | IT. No. Art. n. | 7.50 | LS/AC | |
| 156 | Area "A2" - SUBSTATION 263 | IT. No. Art. n. | 7.51 | LS/AC | |
| 157 | Area "C" - SUBSTATION 420 | IT. No. Art. n. | 7.52 | LS/AC | |
| 158 | Area "E" - SUBSTATION 604 | IT. No. Art. n. | 7.53 | LS/AC | |
| 159 | Area "G" - SUBSTATION 15703 | IT. No. Art. n. | 7.54 | LS/AC |
| MV RELAYS VERIFICATION AND TEST | |||||
| VERIFICATION AND TEST OF THE MV RELAYS NOT INCLUDED IN THE SUBSTATIONS LIST OF THE ARTICLE #3. | |||||
| Esecuzione delle verifiche dei relè 20 kV non inclusi nell'elenco delle cabine dell'articolo n°3. | IT. No. Art. n. | 8 | |||
| 160 | Area "F", substation F1 | IT. No. Art. n. | 8.01 | LS/AC | |
| 161 | Area "F", substation F3 | IT. No. Art. n. | 8.02 | LS/AC | |
| 162 | Area "F", substation F5 | IT. No. Art. n. | 8.03 | LS/AC | |
| 163 | Area "F", substation F26B | IT. No. Art. n. | 8.04 | LS/AC | |
| 164 | Area "F", substation F30 | IT. No. Art. n. | 8.05 | LS/AC | |
| 165 | Area "F", substation F36 | IT. No. Art. n. | 8.06 | LS/AC | |
| 166 | Area "F", substation F37 | IT. No. Art. n. | 8.07 | LS/AC | |
| 167 | Area "F", substation F40 | IT. No. Art. n. | 8.08 | LS/AC | |
| 168 | Area "A1", substation 165 | IT. No. Art. n. | 8.09 | LS/AC | |
| 169 | Area "A1", substation 1204 | IT. No. Art. n. | 8.10 | LS/AC | |
| 170 | Area "A1", substation 15100 (17004) | IT. No. Art. n. | 8.11 | LS/AC | |
| 171 | Area "A2", substation 263 | IT. No. Art. n. | 8.12 | LS/AC |
| LV RELAYS REPLACEMENT | |||||
| REPLACEMENT OF LV VOLTAGE PROTECTION RELAYS AND BREAKERS THAT ARE NOT LONGER OPERATIVE. | |||||
| Sostituzione dei relè di bassa tensione e degli interruttori che non sono più funzionanti. | IT. No. Art. n. | 9 | |||
| 172 | Area "F", substation F4A | IT. No. Art. n. | 9.01 | Ea/NO | |
| 173 | Area "F", substation F5 | IT. No. Art. n. | 9.02 | Ea/NO | |
| 174 | Area "F", substation F20 | IT. No. Art. n. | 9.03 | Ea/NO | |
| 175 | Area "F", substation F22 | IT. No. Art. n. | 9.04 | Ea/NO | |
| 176 | Area "F", substation F23 | IT. No. Art. n. | 9.05 | Ea/NO | |
| 177 | Area "F", substation F24 | IT. No. Art. n. | 9.06 | Ea/NO | |
| 178 | Area "F", substation F28 | IT. No. Art. n. | 9.07 | Ea/NO | |
| 179 | Area "F", substation F39 | IT. No. Art. n. | 9.08 | Ea/NO | |
| 180 | Area "F", substation F42 | IT. No. Art. n. | 9.09 | Ea/NO | |
| 181 | Area "F", substation F42 | IT. No. Art. n. | 9.10 | Ea/NO | |
| 182 | Area "F", substation F42 | IT. No. Art. n. | 9.11 | Ea/NO | |
| 183 | Area "A1", substation 165 | IT. No. Art. n. | 9.12 | Ea/NO | |
| 184 | Area "A1", substation 165 | IT. No. Art. n. | 9.13 | Ea/NO | |
| 185 | Area "A1", substation 177 | IT. No. Art. n. | 9.14 | Ea/NO | |
| 186 | Area "A1", substation 1204 | IT. No. Art. n. | 9.15 | Ea/NO | |
| 187 | Area "A1", substation 1204 | IT. No. Art. n. | 9.16 | Ea/NO | |
| 188 | Area "A1", substation 15100 (17004) | IT. No. Art. n. | 9.17 | Ea/NO | |
| 189 | Area "A2", substation 246 | IT. No. Art. n. | 9.18 | Ea/NO | |
| 190 | Area "A2", substation 246 | IT. No. Art. n. | 9.19 | Ea/NO | |
| 191 | Area "A2", substation 246 | IT. No. Art. n. | 9.20 | Ea/NO | |
| 192 | Area "A2", substation 246 | IT. No. Art. n. | 9.21 | Ea/NO | |
| 193 | Area "A2", substation 246 | IT. No. Art. n. | 9.22 | Ea/NO | |
| 194 | Area "C, substation 420 | IT. No. Art. n. | 9.23 | Ea/NO | |
| 195 | Area "E", substation 604 | IT. No. Art. n. | 9.24 | Ea/NO | |
| 196 | Area "G", substation 15703 | IT. No. Art. n. | 9.25 | Ea/NO | |
| 197 | Area "G", substation 15703 | IT. No. Art. n. | 9.26 | Ea/NO |
| MV MEASURE VOLTAGE TRANSFORMER REPLACEMENT | |||||
| REPLACEMENT OF MV MEASURE VOLTAGE TRANSFORMER. | |||||
| Sostituzione di trasformatore di tensione di misura, lato MT | IT. No. Art. n. | 10 | |||
| 198 | Area "F", substation F4A | IT. No. Art. n. | 10.01 | Ea/NO | |
| 199 | Area "F", substation F24A | IT. No. Art. n. | 10.02 | Ea/NO |
| MV FUSES REPLACEMENT | |||||
| REPLACEMENT OF MV FUSES. | |||||
| Sostituzione di fusibili lato MT | IT. No. Art. n. | 11 | |||
| 200 | Area "F", substation F8 | IT. No. Art. n. | 11.01 | Ea/NO | |
| 201 | Area "F", substation F37 | IT. No. Art. n. | 11.02 | Ea/NO |
| TEMPERATURE CONTROL UNIT FOR MV/LV TRANSFORMERS | |||||
| REPLACEMENT OF THE EXISTING OUT-OF-SERVICE TEMPERATURE CONTROL UNITS FOR MV/LV CAST-RESIN TRANSFORMERS. | |||||
| Sostituzione di centraline di controllo temperatura non funzionanti, idonee per trasformatori in resina. | IT. No. Art. n. | 12 | |||
| 202 | Area "F", substation F3 | IT. No. Art. n. | 12.01 | Ea/NO | |
| 203 | Area "F", substation F19 | IT. No. Art. n. | 12.02 | Ea/NO | |
| 204 | Area "F", substation F25 | IT. No. Art. n. | 12.03 | Ea/NO | |
| 205 | Area "F", substation F39 | IT. No. Art. n. | 12.04 | Ea/NO |
| DOCUMENTATION AND DRAWINGS | |||
| 206 | DRAWINGS AND DOCUMENTATIONS OF THE NEW AND EXISTING SYSTEM, DIVIDED PER SINGLE SUBSTATION. | ||
| Disegni e documenti degli impianti nuovi ed esistenti, divisi per ciascuna cabina. | IT. No. Art. n. | 13 | LS/AC |
| LAPTOP AND PROGRAMMING SOFTWARE | |||
| 207 | FURNISHING OF A LAPTOP WITH WITH INSTALLED SOFTWARE FOR THE PROGRAMMING OF THE RELAYS. INCLUDED TRAINING ON THE USE OF THE SOFTWARE. | ||
| Fornitura di un computer portatile con installati i software di programmazione dei relè. Inclusa formazione sull'uso dei software. | IT. No. Art. n. | 14 | LS/AC |
| ORDINARY MAINTENANCE OF FUNCTIONING BATTERY CHARGERS | |||
| 208 | ORDINARY MAINTENANCE OF #43 FUNCTIONING EMERGENCY POWER SUPPLY EQUIPMENT, INCLUDED LIQUID REFILLING OF THE Ni-Cd BATTERIES. | ||
| Manutenzione ordinaria di n°43 sistemi alimentazione di emergenza funzionanti, compreso il rabbocco del liquido delle batterie Ni-Cd. | IT. No. Art. n. | 15 | LS/AC |
| "e-distribuzione" FEES | |||
| 209 | RELEVANT FEES PAYMENT TO “e-distribuzione” TO SWITCH THE POINT OF DELIVERY, AND COORDINATION TO SCHEDULE AND ORGANIZE THE ACTIVITY. | ||
| Oneri e rapporti con "e-distribuzione" per commutare il punto di consegna. | IT. No. Art. n. | 16 | LS/AC |
| DECLARATION OF COMPLIANCE "DI.DA." | |||||
| ISSUED OF THE DECLARATION OF COMPLIANCE "DI.DA." FOR THE SUBSTATIONS SUBJECTED TO THE REPLACEMENT OF THE GENERAL PROTECTION SYSTEM (SPG). | |||||
| Emissione della Dichiarazione di Adeguatezza "DI.DA." per le cabine soggette alla sostituzione del Sistema Protezione Generale (SPG). | IT. No. Art. n. | 17 | |||
| 210 | Area "F", substation F12A | IT. No. Art. n. | 17.01 | LS/AC | |
| 211 | Area "A2", substation #246 | IT. No. Art. n. | 17.02 | LS/AC | |
| 212 | Area "C", substation #420 | IT. No. Art. n. | 17.03 | LS/AC | |
| 213 | Area "E", substation #604 | IT. No. Art. n. | 17.04 | LS/AC | |
| 214 | Area "G", substation #15703 | IT. No. Art. n. | 17.05 | LS/AC |
Total electrical - Totale Elettrico
TOTAL PART IV / Totale Parte IV
| REPAIR WORKS SUMMARY / Riepilogo Lavori di Ristrutturazione | ||||
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS | ||||
| PART IV - ELECTRICAL WORK | ||||
| TOTAL PRICE / Costo Totale | 0.00 | 0.00 | 0.00 | 0.00 |
OR US DOLLARS (RATE 1$ = 0,8978€)
| Total Summary / Riepilogo Complessivo | |
| A. | REPAIR WORKS / Lavori di Ristrutturazione |
| PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS | |
| PART IV - ELECTRICAL WORK | |
| SUB TOTAL A / Subtotale A |
TOTAL PRICE / Costo Totale
OR US DOLLARS (RATE FY21 1$ = 0,8978€)
&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY
&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY Sheet &P of &N
GRAND TOTAL
| ASHE 20-1063 - REPAIR MV SUBSTATIONS, MULTI - PHASE 2 REV02 | 0.8978 |
| INSTRUCTIONS FOR COMPLETING AF FORM 3052 |
TOTAL MATERIAL COSTS € 0.00 $ 0.00
TOTAL LABOR COSTS € 0.00 $ 0.00
TOTAL OTHER DIRECT COSTS € 0.00 $ 0.00
TOTAL DIRECT COSTS € 0.00 $ 0.00
OVERHEAD % € 0.00 $ 0.00
€ 0.00 $ 0.00
PROFIT % € 0.00 $ 0.00
TOTAL PRICE € 0.00 $ 0.00
DATE FIRM NAME
TITLE BY
INSTRUCTIONS TO OFFERORS
&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY
&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).
Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). Item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.
Col 10 Line. Self-explanatory.
Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).
2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from know data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.
File details come from the government source that posted it. Updated .