ASD2622-BMFROOF_specs.pdf
PDF 12 MB Posted
- Attached to
- Brick Mill Elementary School - Roof Recover
- Solicitation number
- ASD2622-BMROOF
- Issued by
- New Castle County, Delaware
About this file
Summary
This is a specifications and bidding document package for the Appoquinimink School District in Delaware for a roof recover project at Brick Mill Elementary School located at 378 Brick Mill Road, Middletown, Delaware 19709. The project scope consists of a full EPDM single-ply roof recover over the existing modified asphalt bitumen roof, covering approximately 67,422 square feet. The new roof assembly will utilize 115-mil fleece-back EPDM directly adhered to the existing roof with a two-component, extrusion or spray-applied, low-rise adhesive. All existing roof edge metals and rooftop mechanical/electrical devices will remain in place unless removal and reinstallation is necessary to perform the roof work. A mandatory pre-bid meeting is scheduled for August 11, 2026, at 10:00 AM at Brick Mill Elementary School, with a site walkthrough to follow immediately. Sealed bids are due by 10:00 AM on August 26, 2026, at the Marion Proffitt Training Center, 118 South Sixth Street, Odessa, Delaware 19730. The contract will be awarded to the lowest responsive and responsible bidder within 60 days of the bid opening in accordance with Delaware public school district requirements. One alternate bid option is included for lightning protection system reinstallation and recertification.
Bidders must submit a bid security equal to ten percent of the bid amount plus all additive alternates, with successful bidders required to provide performance and payment bonds equal to 100 percent of the contract price. The contract documents include a $15,000 general owner's allowance for owner-elected changes. All work is subject to prevailing wage requirements under Delaware Code Title 29, Section 6960, and bidders must submit a subcontractor list naming one subcontractor per trade category, affidavits regarding drug testing programs and craft training compliance, and a non-collusion statement. An infrared roof scan performed in May 2026 identified one small wet insulation area of 16 square feet (0.0002 percent of total roof area) and several water blisters on the existing roof system. Contract documents are available from R G Architects, LLC for a non-refundable fee of $50 per set via electronic delivery.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ASD2622-BMFROOF_epp.pdf | ||
| ASD2622-BMFROOF_ad1.pdf | ||
| ASD2622-BMFROOF_pw.pdf | ||
| ASD2622-BMFROOF_itb.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF DELAWARE
APPOQUINIMINK SCHOOL DISTRICT
SPECIFICATIONS
FOR
BRICK MILL ELEMENTARY SCHOOL
ROOF RECOVER
AT
378 BRICK MILL ROAD
MIDDLETOWN, DELAWARE 19709
PREPARED
BY
R G ARCHITECTS, LLC.
200 WEST MAIN STREET
RGA PROJECT NO. #26010
ISSUED FOR BIDDING
JULY 2026
NOT FOR BIDDING PURPOSES
APPOQUINIMINK SCHOOL DISTRICT BRICK MILL ELEMENTARY SCHOOL ROOF RECOVER
R G ARCHITECTS, LLC PROJECT TITLE PAGE
26010 00 01 01 - 1
SPECIFICATIONS
FOR
ROOF RECOVER
AT
378 BRICK MILL ROAD
PREPARED
BY
R G ARCHITECTS, LLC.
200 WEST MAIN STREET
RGA PROJECT NO. #26010
ISSUED FOR BIDDING
JULY 2026
BRICK MILL ELEMENTARY SCHOOL ROOF RECOVER APPOQUINIMINK SCHOOL DISTRICT
PROJECT TITLE PAGE R G ARCHITECTS, LLC
00 01 01 - 2 26010
THIS PAGE INTENTIONALLY LEFT BLANK
R G ARCHITECTS, LLC SEALS PAGE
26010 00 01 07 - 1
SECTION 00 01 07
SEALS PAGE
1.1 DESIGNS PROFESSIONALS OF RECORD SEAL
A. ARCHITECT:
1. ROBERT A. GROVE, PRINCIPAL, AIA
2. (LICENSE #S5-08320)
3. R G ARCHITECTS, LLC.
4. 200 W. MAIN STREET
MIDDLETOWN, DE 19709
5. (302) 376-8100
6. Responsible for Division 00-09 Sections as applicable except where indicated as prepared by other design professionals of record.
END OF SECTION
SEALS PAGE R G ARCHITECTS, LLC
00 01 07 - 2 26010
R G ARCHITECTS, LLC TABLE OF CONTENTS
26010 00 01 10 - 1
SECTION 00 01 10
TABLE OF CONTENTS
A. Specifications for this project are arranged in accordance with the Construction Specification Institute numbering system and format. Section numbering is discontinuous and all numbers not appearing in the Table of Contents are not used for this Project.
B. DOCUMENTS BOUND HEREWITH
DIVISION 00 – PROCUREMENT AND CONTRACT REQUIREMENTS
INTRODUCTORY INFORMATION
00 01 01 – PROJECT TITLE PAGE
00 01 07 – SEALS PAGE
00 01 10 – TABLE OF CONTENTS
00 01 15 – LIST OF DRAWING SHEETS
PROCUREMENT REQUIREMENTS
00 11 16 – INVITATION TO BID
00 21 13 – INSTRUCTIONS TO BIDDERS
00 31 25.29 – ROOF INFRARED REPORT
00 41 13 – BID FORM
00 43 13 – BID BOND
CONTRACTING REQUIREMENTS
00 52 13 – STANDARD FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR
(SAMPLE AIA A101-2017)
(SAMPLE AIA A101-2017 – EXHIBIT A)
00 54 13 – SUPPLEMENT TO AGREEMENT BETWEEN OWNER & CONTRACTOR A101-2017
00 54 14 – SUPPLEMENT TO A101-2017 – EXHIBIT A – INSURANCE & BONDS
00 61 13.13 – PERFORMANCE BOND
00 61 13.16 – PAYMENT BOND
00 62 76 – APPLICATION AND CERTIFICATE FOR PAYMENT FORMS
(SAMPLE AIA G702 & G703)
00 72 13 – GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION A201-2017
(SAMPLE AIA A201-2017)
00 73 13 – SUPPLEMENTARY GENERAL CONDITIONS A201 – 2017
00 73 13.10 – SCHEDULING GUIDELINES
TABLE OF CONTENTS R G ARCHITECTS, LLC
00 01 10 - 2 26010
00 73 46 – WAGE DETERMINATION SCHEDULE
00 81 13 – GENERAL REQUIREMENTS
00 81 14 – DRUG TESTING FORMS
00 81 15 – AFFIDAVIT OF CRAFT TRAINING COMPLIANCE
DIVISION 01 – GENERAL REQUIREMENTS
01 10 00 – SUMMARY
01 21 00 – ALLOWANCES
01 21 16 – ALLOWANCE AUTHORIZATION FORM
01 23 00 – ALTERNATES
01 25 00 – SUBSTITUTION PROCEDURES
01 26 00 – CONTRACT MODIFICATION PROCEDURES
01 29 00 – PAYMENT PROCEDURES
01 31 00 – PROJECT MANAGEMENT AND COORDINATION
01 32 00 – CONSTRUCTION PROGRESS DOCUMENTATION
01 32 33 – PHOTOGRAPHIC DOCUMENTATION
01 33 00 – SUBMITTAL PROCEDURES
01 33 01 – SUBMITTAL COVER SHEET
01 40 00 – QUALITY REQUIREMENTS
01 50 00 – TEMPORARY FACILITIES AND CONTROLS
01 60 00 – PRODUCT REQUIREMENTS
01 73 00 – EXECUTION
01 73 29 – CUTTING AND PATCHING
01 74 19 – CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 77 00 – CLOSEOUT PROCEDURES
01 78 39 – PROJECT RECORD DOCUMENTS
DIVISION 02 – EXISTING CONDITIONS
02 41 19 – SELECTIVE DEMOLITION
DIVISION 06 – WOOD, PLASTICS & COMPOSITES
06 10 53 – MISCELLANEOUS ROUGH CARPENTRY
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
R G ARCHITECTS, LLC TABLE OF CONTENTS
26010 00 01 10 - 3
07 53 01 – EPDM SINGLE-PLY ROOFING RECOVER
TABLE OF CONTENTS R G ARCHITECTS, LLC
00 01 10 - 4 26010
R G ARCHITECTS, LLC LIST OF DRAWING SHEETS
26010 00 01 15 - 1
SECTION 00 01 15
LIST OF DRAWING SHEETS
GENERAL
00.1 COVER SHEET
00.2 PROJECT NOTES & ABBREVIAITONS
ARCHITECTURAL
a0.0 OVERALL FLOOR PLAN a1.1 PARTIAL DEMOLITION ROOF PLAN a1.2 PARTIAL DEMOLITION ROOF PLAN a1.3 PARTIAL DEMOLITION ROOF PLAN a2.1 PARTIAL RENOVATION ROOF PLAN a2.2 PARTIAL RENOVATION ROOF PLAN a2.3 PARTIAL RENOVATION ROOF PLAN a3.1 ROOF DETAILS a3.2 ROOF DETAILS a3.3 ROOF DETAILS a3.4 ROOF DETAILS a3.5 ROOF DETAILS a3.6 ROOF DETAILS a3.7 ALTERNATE #1: ROOF DETAILS
LIST OF DRAWING SHEETS R G ARCHITECTS, LLC
00 01 15 - 2 26010
R G ARCHITECTS, LLC INVITATION TO BID
26010 00 11 16 - 1
SECTION 00 11 16
INVITATION TO BID
Sealed bids for Appoquinimink School District – Brick Mill Elementary School Roof Recover will be received by the Appoquinimink School District, Marion Proffitt Training Center, 118 South Sixth Street
Odessa, DE 19730, until 10:00 AM local time on August 26, 2026, at which time they will be publicly opened and read aloud. Bidders bear the risk of late delivery. Any bids received after the stated time will be rejected and returned unopened.
Sealed bids shall be addressed to the Appoquinimink School District, ATTN: Andy Walton, Supervisor, Facilities & Maintenance, 118 South Sixth Street, Odessa, DE 19730. The outer envelope should clearly indicate: “ASD BRICK MILL ELEMENTARY SCHOOL ROOF RECOVER – SEALED BID – DO
NOT OPEN.”
The scope of the project consists of a full EPDM roof recover over the existing modified Asphalt
Bitumen roof. A total of +/- 67,422 s.f. The roof recover assembly will be of a new 115-mil Fleece-
Back EPDM directly adhered over to the existing modified BUR roof with a two component, extrusion or spray applied, low-rise adhesive as described in the attached new work sheets. All existing roof edge metals will remain in place unless required to be removed / reinstalled to perform new roof recover work. All existing mechanical / electrical roof top devices, units, etc. to remain in their entirety and only to be modified / removed & reinstalled as required to perform new roof work.
The one project alternate is to reinstall and re certify the existing building wide lightning protection system in its original location.
A MANDATORY Pre-Bid Meeting will be held on August 11, 2026, at 10:00 AM at Brick Mill
Elementary School, 378 Brick Mill Rd, Middletown, DE 19709 for the purpose of establishing the list of subcontractors and answering questions. Upon arrival, attendees are to check in at front desk for directions to pre-bid meeting room. A site walkthrough will take place immediately following the pre-bid meeting.
Representatives of each party to any Joint Venture must attend this meeting. ATTENDANCE OF THIS
MEETING IS A PREREQUISITE FOR BIDDING ON THIS CONTRACT.
Contract documents may be obtained by contacting the office of R G Architects, LLC via email to jack@rgarchitects.net and becca@rgarchitects.net. Upon receipt of $50.00 per set/non-refundable, the documents will be sent to you via electronic delivery. Checks are to be made payable to” R G Architects, LLC” 200 West Main Street, Middletown, DE 19709”.
Bidders will not be subject to discrimination on the basis of race, creed, color, sex, sexual orientation, gender identity or national origin in consideration of this award, and Minority Business Enterprises, Disadvantaged Business Enterprises, Women-Owned Business Enterprises and Veteran-Owned Business
Enterprises will be afforded full opportunity to submit bids on this contract. Each bid must be accompanied by a bid security equivalent to ten percent of the bid amount and all additive alternates. The successful bidder must post a performance bond and payment bond in a sum equal to 100 percent of the contract price upon execution of the contract. The Owner reserves the right to reject any or all bids and to waive any informalities therein. The Owner may extend the time and place for the opening of the bids from that described in the advertisement, with not less than two calendar days’ notice by certified delivery, facsimile machine or other electronic means to those bidders’ receiving plans.
mailto:jack@rgarchitects.net mailto:becca@rgarchitects.net
INVITATION TO BID R G ARCHITECTS, LLC
00 11 16 - 2 26010
R G ARCHITECTS, LLC INSTRUCTIONS TO BIDDERS
26010 00 21 13 - 1
SECTION 00 21 13
INSTRUCTIONS TO BIDDERS
TABLE OF ARTICLES
1. GENERAL
2. BIDDER’S REPRESENTATION
3. BIDDING DOCUMENTS
4. BIDDING PROCEDURES
5. CONSIDERATION OF BIDS
6. POST-BID INFORMATION
7. PERFORMANCE BOND AND PAYMENT BOND
8. FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR
INSTRUCTIONS TO BIDDERS R G ARCHITECTS, LLC
00 21 13 - 2 26010
ARTICLE 1: GENERAL
1.1 DEFINITIONS
1.1.1 Whenever the following terms are used, their intent and meaning shall be interpreted as follows:
1.2 STATE: The State of Delaware.
1.3 AGENCY: Contracting State Agency as noted on cover sheet.
1.4 DESIGNATED OFFICIAL: The agent authorized to act for the Agency.
1.5 BIDDING DOCUMENTS: Bidding Documents include the Bidding Requirements and the proposed Contract Documents. The Bidding Requirements consist of the Advertisement for Bid, Invitation to Bid, Instructions to Bidders, Supplementary Instructions to Bidders (if any), General Conditions, Supplementary General Conditions, General Requirements, Special Provisions (if any), the Bid Form (including the Non-collusion Statement), and other sample bidding and contract forms. The proposed Contract Documents consist of the form of Agreement between the Owner and Contractor, as well as the Drawings, Specifications (Project Manual) and all Addenda issued prior to execution of the Contract.
1.6 CONTRACT DOCUMENTS: The Contract Documents consist of the Instructions to
Bidders, Supplementary Instructions to Bidders (if any), General Conditions, Supplementary General Conditions, General Requirements, Special Provisions (if any), the form of agreement between the Owner and the Contractor, Drawings (if any), Specifications (Project Manual), and all addenda.
1.7 AGREEMENT: The form of the Agreement shall be AIA Document A101, Standard Form of
Agreement between Owner and Contractor where the basis of payment is a STIPULATED SUM. In the case of conflict between the instructions contained therein and the General Requirements herein, these General Requirements shall prevail.
1.8 GENERAL REQUIREMENTS (or CONDITIONS): General Requirements (or conditions) are instructions pertaining to the Bidding Documents and to contracts in general. They contain, in summary, requirements of laws of the State; policies of the Agency and instructions to bidders.
1.9 SPECIAL PROVISIONS: Special Provisions are specific conditions or requirements peculiar to the bidding documents and to the contract under consideration and are supplemental to the General Requirements. Should the Special Provisions conflict with the General Requirements, the Special Provisions shall prevail.
1.10 ADDENDA: Written or graphic instruments issued by the Owner/Architect prior to the execution of the contract which modify or interpret the Bidding Documents by additions, deletions, clarifications or corrections.
1.11 BIDDER OR VENDOR: A person or entity who formally submits a Bid for the material or
Work contemplated, acting directly or through a duly authorized representative who meets the requirements set forth in the Bidding Documents.
1.12 SUB-BIDDER: A person or entity who submits a Bid to a Bidder for materials or labor, or both for a portion of the Work.
1.13 BID: A complete and properly executed proposal to do the Work for the sums stipulated therein, submitted in accordance with the Bidding Documents.
26010 00 21 13 - 3
1.14 BASE BID: The sum stated in the Bid for which the Bidder offers to perform the Work described in the Bidding Documents as the base, to which Work may be added or from which Work may be deleted for sums stated in Alternate Bids (if any are required to be stated in the bid).
1.15 ALTERNATE BID (or ALTERNATE): An amount stated in the Bid, where applicable, to be added to or deducted from the amount of the Base Bid if the corresponding change in the Work, as described in the Bidding Documents is accepted.
1.16 UNIT PRICE: An amount stated in the Bid, where applicable, as a price per unit of measurement for materials, equipment or services or a portion of the Work as described in the Bidding Documents.
1.17 SURETY: The corporate body which is bound with and for the Contract, or which is liable, and which engages to be responsible for the Contractor's payments of all debts pertaining to and for his acceptable performance of the Work for which he has contracted.
1.18 BIDDER'S DEPOSIT: The security designated in the Bid to be furnished by the Bidder as a guaranty of good faith to enter into a contract with the Agency if the Work to be performed or the material or equipment to be furnished is awarded to him.
1.19 CONTRACT: The written agreement covering the furnishing and delivery of material or work to be performed.
1.20 CONTRACTOR: Any individual, firm or corporation with whom a contract is made by the
Agency.
1.21 SUBCONTRACTOR: An individual, partnership or corporation which has a direct contract with a contractor to furnish labor and materials at the job site, or to perform construction labor and furnish material in connection with such labor at the job site.
1.22 CONTRACT BOND: The approved form of security furnished by the contractor and his surety as a guaranty of good faith on the part of the contractor to execute the work in accordance with the terms of the contract.
1.23 CUSTOM FABRICATION: As defined in 29 Del. C. § 6902, the term “custom fabrication” means the offsite fabrication, assembly, or other production of non-standard goods or materials, including components, fixtures or parts thereof, specifically for a public works project. Such goods and materials shall include those used in the following trades or systems: (1) Plumbing or pipe fitting systems, including heating, ventilating, air-conditioning, refrigeration systems, sheet metal or other duct systems; (2) Electrical systems; (3) Mechanical insulation work; (4) Ornamental iron work; and (5) Commercial signage that does not attempt or appear to direct the movement of traffic on highways or roadways or interfere with, imitate, or resemble any official traffic sign, signal or device.
ARTICLE 2: BIDDER'S REPRESENTATION
2.1 PRE-BID MEETING
2.1.1 A pre-bid meeting for this project will be held at the time and place designated. Attendance at this meeting is a pre-requisite for submitting a Bid, unless this requirement is specifically waived elsewhere in the Bid Documents.
2.2 By submitting a Bid, the Bidder represents that:
00 21 13 - 4 26010
2.2.1 The Bidder has read and understands the Bidding Documents and that the Bid is made in accordance therewith.
2.2.2 The Bidder has visited the site, become familiar with existing conditions under which the
Work is to be performed, and has correlated the Bidder’s personal observations with the requirements of the proposed Contract Documents.
2.2.3 The Bid is based upon the materials, equipment, and systems required by the Bidding
Documents without exception.
2.3 JOINT VENTURE REQUIREMENTS
2.3.1 For Public Works Contracts, each Joint Venturer shall be qualified and capable to complete the Work with their own forces.
2.3.2 Included with the Bid submission, and as a requirement to bid, a copy of the executed Joint
Venture Agreement shall be submitted and signed by all Joint Venturers involved.
2.3.3 All required Bid Bonds, Performance Bonds, Material and Labor Payment Bonds must be executed by both Joint Venturers and be placed in both of their names.
2.3.4 All required insurance certificates shall name both Joint Venturers.
2.3.5 Both Joint Venturers shall sign the Bid Form.
2.3.6 Both Joint Venturers shall include their Federal E.I. Number with the Bid.
2.3.7 In the event of a mandatory Pre-bid Meeting, each Joint Venturer shall have a representative in attendance.
2.3.8 Due to exceptional circumstances and for good cause shown, one or more of these provisions may be waived at the discretion of the State.
2.4 ASSIGNMENT OF ANTITRUST CLAIMS
2.4.1 As consideration for the award and execution by the Owner of this contract, the Contractor hereby grants, conveys, sells, assigns and transfers to the State of Delaware all of its right, title and interests in and to all known or unknown causes of action it presently has or may now or hereafter acquire under the antitrust laws of the United States and the State of Delaware, relating to the particular goods or services purchased or acquired by the Owner pursuant to this contract.
ARTICLE 3: BIDDING DOCUMENTS
3.1 COPIES OF BID DOCUMENTS
3.1.1 Bidders may obtain complete sets of the Bidding Documents from the
Architectural/Engineering firm designated in the Advertisement or Invitation to Bid in the number and for the deposit sum, if any, stated therein.
3.1.2 Bidders shall use complete sets of Bidding Documents for preparation of Bids. The issuing
Agency nor the Architect assumes no responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.
26010 00 21 13 - 5
3.1.3 Any errors, inconsistencies or omissions discovered shall be reported to the Architect immediately.
3.1.4 The Agency and Architect may make copies of the Bidding Documents available on the above terms for the purpose of obtaining Bids on the Work. No license or grant of use is conferred by issuance of copies of the Bidding Documents.
3.2 INTERPRETATION OR CORRECTION OF BIDDING DOCUMENTS
3.2.1 The Bidder shall carefully study and compare the Bidding Documents with each other, and with other work being bid concurrently or presently under construction to the extent that it relates to the Work for which the Bid is submitted, shall examine the site and local conditions, and shall report any errors, inconsistencies, or ambiguities discovered to the Architect.
3.2.2 Bidders or Sub-bidders requiring clarification or interpretation of the Bidding Documents shall make a written request to the Architect at least seven days prior to the date for receipt of Bids. Interpretations, corrections and changes to the Bidding Documents will be made by written Addendum. Interpretations, corrections, or changes to the Bidding Documents made in any other manner shall not be binding.
3.2.3 The apparent silence of the specifications as to any detail, or the apparent omission from it of detailed description concerning any point, shall be regarded as meaning that only the best commercial practice is to prevail and only material and workmanship of the first quality are to be used. Proof of specification compliance will be the responsibility of the Bidder.
3.2.4 Unless otherwise provided in the Contract Documents, the Contractor shall provide and pay for all permits, labor, materials, equipment, tools, construction equipment and machinery, water, heat, utilities, transportation, and other facilities and services necessary for the proper execution and completion of the Work.
3.2.5 The Owner will bear the costs for all impact and user fees associated with the project.
3.3 SUBSTITUTIONS
3.3.1 The materials, products and equipment described in the Bidding Documents establish a standard of quality, required function, dimension, and appearance to be met by any proposed substitution. The specification of a particular manufacturer or model number is not intended to be proprietary in any way. Substitutions of products for those named will be considered, providing that the Vendor certifies that the function, quality, and performance characteristics of the material offered is equal or superior to that specified. It shall be the Bidder's responsibility to assure that the proposed substitution will not affect the intent of the design, and to make any installation modifications required to accommodate the substitution.
3.3.2 Requests for substitutions shall be made in writing to the Architect at least ten days prior to the date of the Bid Opening. Such requests shall include a complete description of the proposed substitution, drawings, performance and test data, explanation of required installation modifications due the substitution, and any other information necessary for an evaluation. The burden of proof of the merit of the proposed substitution is upon the proposer. The Architect’s decision of approval or disapproval shall be final. The Architect is to notify Owner prior to any approvals.
3.3.3 If the Architect approves a substitution prior to the receipt of Bids, such approval shall be set forth in an Addendum. Approvals made in any other manner shall not be binding.
00 21 13 - 6 26010
3.3.4 The Architect shall have no obligation to consider any substitutions after the Contract award.
3.4 ADDENDA
3.4.1 Addenda will be mailed or delivered to all who are known by the Architect to have received a complete set of the Bidding Documents.
3.4.2 Copies of Addenda will be made available for inspection wherever Bidding Documents are on file for that purpose.
3.4.3 No Addenda will be issued later than 2 calendar days prior to the date for receipt of Bids except an Addendum withdrawing the request for Bids or one which extends the time or changes the location for the opening of bids.
3.4.4 Each bidder shall ascertain prior to submitting his Bid that they have received all Addenda issued, and shall acknowledge their receipt in their Bid in the appropriate space. Not acknowledging an issued Addenda could be grounds for determining a bid to be non-responsive.
ARTICLE 4: BIDDING PROCEDURES
4.1 PREPARATION OF BIDS
4.1.1 Submit the bids on the Bid Forms included with the Bidding Documents.
4.1.2 Submit the original Bid Form for each bid. Bid Forms may be removed from the project manual for this purpose.
4.1.3 Execute all blanks on the Bid Form in a non-erasable medium (typewriter or manually in ink).
4.1.4 Where so indicated by the makeup on the Bid Form, express sums in both words and figures, in case of discrepancy between the two, the written amount shall govern.
4.1.5 Interlineations, alterations or erasures must be initialed by the signer of the Bid.
4.1.6 BID ALL REQUESTED ALTERNATES AND UNIT PRICES, IF ANY. If there is no change in the Base Bid for an Alternate, enter “No Change”. The Contractor is responsible for verifying that they have received all addenda issued during the bidding period. Work required by Addenda shall automatically become part of the Contract.
4.1.7 Make no additional stipulations on the Bid Form and do not qualify the Bid in any other manner.
4.1.8 Each copy of the Bid shall include the legal name of the Bidder and a statement whether the
Bidder is a sole proprietor, a partnership, a corporation, or any legal entity, and each copy shall be signed by the person or persons legally authorized to bind the Bidder to a contract.
A Bid by a corporation shall further give the state of incorporation and have the corporate seal affixed. A Bid submitted by an agent shall have a current Power of Attorney attached, certifying agent's authority to bind the Bidder.
4.1.9 Bidder shall complete the Non-Collusion Statement form included with the Bid Forms and include it with their Bid.
4.1.10 In the construction of all Public Works projects for the State of Delaware or any agency thereof, preference in employment of laborers, workers or mechanics shall be given to bona
26010 00 21 13 - 7 fide legal citizens of the State who have established citizenship by residence of at least 90 days in the State.
4.1.11 Each bidder shall include a signed Affidavit for the Bidder certifying compliance with OMB
Regulation 4104 - “Regulations for the Drug Testing of Contractor and Subcontractor Employees Working on “Large Public Works Projects.” “Large Public Works” is based upon the current threshold required for bidding Public Works as set by the Purchasing and Contracting Advisory Council.
4.2 BID SECURITY
4.2.1 All bids shall be accompanied by a deposit of either a good and sufficient bond to the agency for the benefit of the agency, with corporate surety authorized to do business in this State, the form of the bond and the surety to be approved by the agency, or a security of the bidder assigned to the agency, for a sum equal to at least 10% of the bid plus all add alternates, or in lieu of the bid bond a security deposit in the form of a certified check, bank treasurer’s check, cashier’s check, money order, or other prior approved secured deposit assigned to the State. The bid bond need not be for a specific sum, but may be stated to be for a sum equal to 10% of the bid plus all add alternates to which it relates and not to exceed a certain stated sum, if said sum is equal to at least 10% of the bid. The Bid Bond form used shall be the standard OMB form (attached).
4.2.2 The Agency has the right to retain the bid security of Bidders to whom an award is being considered until either a formal contract has been executed and bonds have been furnished or the specified time has elapsed so the Bids may be withdrawn or all Bids have been rejected.
4.2.3 In the event of any successful Bidder refusing or neglecting to execute a formal contract and bond within 20 days of the awarding of the contract, the bid bond or security deposited by the successful bidder shall be forfeited.
4.3 SUBCONTRACTOR LIST
4.3.1 In accordance with Title 29, Chapter 69, Section 6962(d)(10)b of the Delaware Code, each Bidder shall submit with their Bid a completed List of Sub-Contractors included with the Bid Form. NAME ONLY ONE SUBCONTRACTOR FOR EACH TRADE. The bidder must list in each category the full name and address (City & State) of the sub-contractor that the Bidder will be using to perform the work and provide material for that subcontractor category. Should the Bidder’s listed subcontractor intend to provide any of their subcontractor category of work through a third-tier contractor, the Bidder shall list that third-tier contractor’s full name and address (City & State). If the Bidder intends to perform any category of work itself, it must list its full name and address. For clarification, if the Bidder intends to perform the work themselves, the Bidder may not insert “not applicable”, “N/A”, “self” or anything other than its own full name and address (City & State). To do so shall cause the bid to be rejected. In addition, the failure to produce a completed subcontractor list with the bid submittal shall cause the bid to be rejected. If you have more than three (3) third-tier contractors to report in any subcontractor category, print out additional page(s) containing the appropriate category, complete the rest of your list of third-tier contractors for that category, notate the addition in parentheses as (CONTINUATION) next to the subcontractor category and an asterisk (*) next to any additional third-tier contractors, and submit it with your bid.
4.3.2 It is the responsibility of the Contractor to ensure that their Subcontractors are in compliance with the provisions of this law. Also, if a Contractor elects to list themselves as a Subcontractor for any category, they must specifically name themselves on the Bid Form
00 21 13 - 8 26010 and be able to document their capability to act as Subcontractor in that category in accordance with this law.
4.4 AFFIDAVIT OF CONTRACTOR QUALIFICATIONS
4.4.1 In accordance with Title 29, Chapter 69, Section 6962(d)(10)b.3 of the Delaware Code, each Bidder shall submit with their Bid the Affidavit of Contractor Qualifications certifying that the Bidder will abide by the contractor’s qualifications outlined in the construction bid specifications for the duration of the contract term. After a contract has been awarded the successful bidder shall not substitute another subcontractor whose name was submitted on the Subcontractor Form except for the reasons in the statute and not without written consent from the awarding agency. Failure to utilize the subcontractors on the list will subject the successful bidder to penalties as outlined in the General Requirements Section 5.2 of the contract.
4.5 AFFIDAVIT OF CRAFT TRAINING COMPLIANCE
4.5.1 In accordance with Title 29, Chapter 69, Section 6962(c)(13) of the Delaware Code, contractors and subcontractors must provide craft training for journeyman and apprentice levels if all of the following apply:
A. A project meets the prevailing wage requirement under Title 29, Chapter 69, Section 6960 of the Delaware Code.
B. The contractor employs 10 or more total employees.
C. The project is not a federal highway project
Failure to provide required craft training on the project may subject the successful contractor and/or subcontractor(s) to penalties as outlined in Title 29, Chapter 69, Section 6962(c)(13) of the Delaware Code.
Bidders shall submit the Affidavit of Craft Training Compliance prior to contract execution.
4.6 EQUALITY OF EMPLOYMENT OPPORTUNITY ON PUBLIC WORKS
4.6.1 During the performance of this contract, the contractor agrees as follows:
A. The Contractor will not discriminate against any employee or applicant for employment because of race, creed, sex, color, sexual orientation, gender identity or national origin. The Contractor will take affirmative action to ensure the applicants are employed, and that employees are treated during employment, without regard to their race, creed, sex, color, sexual orientation, gender identity or national origin. Such action shall include, but not be limited to, the following:
Employment, upgrading, demotion or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The Contractor agrees to post in conspicuous places available to employees and applicants for employment notices to be provided by the contracting agency setting forth this nondiscrimination clause.
B. The Contractor will, in all solicitations or advertisements for employees placed by or on behalf of the Contractor, state that all qualified applicants will receive consideration for employment without regard to race, creed, sex, color, sexual orientation, gender identity or national origin."
4.7 PREVAILING WAGE REQUIREMENT
26010 00 21 13 - 9
4.7.1 Wage Provisions: For renovation and new construction projects whose costs exceed the thresholds contained in Delaware Code, Title 29, Section 6960, the minimum wage rates for various classes of laborers and mechanics shall be as determined by the Department of Labor, Division of Industrial Affairs of the State of Delaware.
4.7.2 The employer shall pay all mechanics and labors employed directly upon the site of work, or engaged in custom fabrication work, as that term is defined in Article 1.23 herein and as also as defined in 29 Del. C § 6902 and described in 29 Del. C. § 6960(b), regardless of where the work is performed, unconditionally and not less often than once a week and without subsequent deduction or rebate on any account, the full amounts accrued at time of payment, computed at wage rates not less than those stated in the specifications, regardless of any contractual relationship which may be alleged to exist between the employer and such laborers and mechanics.
4.7.3 As per 29 Del. C. § 6960(b), the scale of the wages to be paid must be posted by the employer in a prominent and easily accessible place at the site of the work. There may be withheld from the employer so much of accrued payments as may be considered necessary by the Department of Labor to pay laborers and mechanics employed by the employer the difference between the rates of wages required by the contract to be paid laborers and mechanics on the work and rates of wages received by such laborers and mechanics to be remitted to the Department of Labor for distribution upon resolution of any claims.
4.7.4 Every contract based upon these specifications shall contain a stipulation that sworn payroll information, as required by the Department of Labor, be furnished weekly. The Department of Labor shall keep and maintain the sworn payroll information for a period of 6 months from the last day of the work week covered by the payroll.
4.8 SUBMISSION OF BIDS
4.8.1 Enclose the Bid, the Bid Security, and any other documents required to be submitted with the Bid in a sealed opaque envelope. Address the envelope to the party receiving the Bids.
Identify with the project name, project number, and the Bidder's name and address. If the Bid is sent by mail, enclose the sealed envelope in a separate mailing envelope with the notation "BID ENCLOSED" on the face thereof. The State is not responsible for the opening of bids prior to bid opening date and time that are not properly marked.
4.8.2 Deposit Bids at the designated location prior to the time and date for receipt of bids indicated in the Advertisement for Bids. Bids received after the time and date for receipt of bids will be marked “LATE BID” and returned.
4.8.3 Bidder assumes full responsibility for timely delivery at location designated for receipt of bids.
4.8.4 Oral, telephonic or telegraphic bids are invalid and will not receive consideration.
4.8.5 Withdrawn Bids may be resubmitted up to the date and time designated for the receipt of
Bids, provided that they are then fully in compliance with these Instructions to Bidders.
4.9 MODIFICATION OR WITHDRAW OF BIDS
4.9.1 Prior to the closing date for receipt of Bids, a Bidder may withdraw a Bid by personal request and by showing proper identification to the Architect. A request for withdraw by letter or fax, if the Architect is notified in writing prior to receipt of fax, is acceptable. A fax directing a modification in the bid price will render the Bid informal, causing it to be ineligible for
00 21 13 - 10 26010 consideration of award. Telephone directives for modification of the bid price shall not be permitted and will have no bearing on the submitted proposal in any manner.
4.9.2 Bidders submitting Bids that are late shall be notified as soon as practicable and the bid shall be returned.
4.9.3 A Bid may not be modified, withdrawn or canceled by the Bidder during a thirty (30) day period following the time and date designated for the receipt and opening of Bids, and Bidder so agrees in submitting their Bid. Bids shall be binding for 30 days after the date of the Bid opening.
ARTICLE 5: CONSIDERATION OF BIDS
5.1 OPENING/REJECTION OF BIDS
5.1.1 Unless otherwise stated, Bids received on time will be publicly opened and will be read aloud. An abstract of the Bids will be made available to Bidders.
5.1.2 The Agency shall have the right to reject any and all Bids. A Bid not accompanied by a required Bid Security or by other data required by the Bidding Documents, or a Bid which is in any way incomplete or irregular is subject to rejection.
5.1.3 If the Bids are rejected, it will be done within thirty (30) calendar day of the Bid opening.
5.2 COMPARISON OF BIDS
5.2.1 After the Bids have been opened and read, the bid prices will be compared and the result of such comparisons will be made available to the public. Comparisons of the Bids may be based on the Base Bid plus desired Alternates. The Agency shall have the right to accept Alternates in any order or combination.
5.2.2 The Agency reserves the right to waive technicalities, to reject any or all Bids, or any portion thereof, to advertise for new Bids, to proceed to do the Work otherwise, or to abandon the Work, if in the judgment of the Agency or its agent(s), it is in the best interest of the State.
5.2.3 An increase or decrease in the quantity for any item is not sufficient grounds for an increase or decrease in the Unit Price.
5.2.4 The prices quoted are to be those for which the material will be furnished F.O.B. Job Site and include all charges that may be imposed during the period of the Contract.
5.2.5 No qualifying letter or statements in or attached to the Bid, or separate discounts will be considered in determining the low Bid except as may be otherwise herein noted. Cash or separate discounts should be computed and incorporated into Unit Bid Price(s).
5.3 DISQUALIFICATION OF BIDDERS
5.3.1 An agency shall determine that each Bidder on any Public Works Contract is responsible before awarding the Contract. Factors to be considered in determining the responsibility of a Bidder include:
A. The Bidder’s financial, physical, personnel or other resources including
Subcontracts;
B. The Bidder’s record of performance on past public or private construction projects, including, but not limited to, defaults and/or final adjudication or
26010 00 21 13 - 11 admission of violations of the Prevailing Wage Laws in Delaware or any other state;
C. The Bidder’s written safety plan;
D. Whether the Bidder is qualified legally to contract with the State;
E. Whether the Bidder supplied all necessary information concerning its responsibility; and, F. Any other specific criteria for a particular procurement, which an agency may establish; provided however, that, the criteria be set forth in the Invitation to Bid and is otherwise in conformity with State and/or Federal law.
5.3.2 If an agency determines that a Bidder is nonresponsive and/or nonresponsible, the determination shall be in writing and set forth the basis for the determination. A copy of the determination shall be sent to the affected Bidder within five (5) working days of said determination.
5.3.3 In addition, any one or more of the following causes may be considered as sufficient for the disqualification of a Bidder and the rejection of their Bid or Bids.
5.3.3.1 More than one Bid for the same Contract from an individual, firm or corporation under the same or different names.
5.3.3.2 Evidence of collusion among Bidders.
5.3.3.3 Unsatisfactory performance record as evidenced by past experience.
5.3.3.4 If the Unit Prices are obviously unbalanced either in excess or below reasonable cost analysis values.
5.3.3.5 If there are any unauthorized additions, interlineation, conditional or alternate bids or irregularities of any kind which may tend to make the Bid incomplete, indefinite or ambiguous as to its meaning.
5.3.3.6 If the Bid is not accompanied by the required Bid Security and other data required by the
Bidding Documents.
5.3.3.7 If any exceptions or qualifications of the Bid are noted on the Bid Form.
5.4 ACCEPTANCE OF BID AND AWARD OF CONTRACT
5.4.1 A formal Contract shall be executed with the successful Bidder within twenty (20) calendar days after the award of the Contract.
5.4.2 Per Section 6962(d)(13)a., Title 29, Delaware Code, “The contracting agency shall award any public works contract within thirty (30) days of the bid opening to the lowest responsive and responsible Bidder, unless the Agency elects to award on the basis of best value, in which case the election to award on the basis of best value shall be stated in the Invitation To Bid. Any public school district and its board shall award public works contracts in accordance with this section’s requirements except it shall award the contract within 60 days of the bid opening.”
00 21 13 - 12 26010
5.4.3 Each Bid on any Public Works Contract must be deemed responsive by the Agency to be considered for award. A responsive Bid shall conform in all material respects to the requirements and criteria set forth in the Contract Documents and specifications.
5.4.4 The Agency shall have the right to accept Alternates in any order or combination, and to determine the low Bidder on the basis of the sum of the Base Bid, plus accepted Alternates.
5.4.5 The successful Bidder shall execute a formal contract, submit the required Insurance
Certificate, and furnish good and sufficient bonds, unless specifically waived in the General Requirements, in accordance with the General Requirement, within twenty (20) days of official notice of contract award. The successful Bidder shall provide, at least two business days prior to contract execution, copies of the Employee Drug Testing Program for the Bidder and all listed Subcontractors. Bonds shall be for the benefit of the Agency with surety in the amount of 100% of the total contract award. Said Bonds shall be conditioned upon the faithful performance of the contract. Bonds shall remain in affect for period of two (2) years after the date of the Certificate of Final Payment.
5.4.6 If the successful Bidder fails to execute the required Contract, Bond and all required information, as aforesaid, within twenty (20) calendar days after the date of official Notice of the Award of the Contract, their Bid guaranty shall immediately be taken and become the property of the State for the benefit of the Agency as liquidated damages, and not as a forfeiture or as a penalty. Award will then be made to the next lowest qualified Bidder of the Work or readvertised, as the Agency may decide.
5.4.7 Each bidder shall supply with its bid its taxpayer identification number (i.e., federal employer identification number or social security number) and should the vendor be awarded a contract, such vendor shall provide to the agency the taxpayer identification license numbers of such subcontractors. Such numbers shall be provided on the later of the date on which such subcontractor is required to be identified or the time the contract is executed.
The successful Bidder shall provide to the agency to which it is contracting, within 30 days of entering into such public works contract, copies of all Delaware Business licenses of subcontractors and/or independent contractors that will perform work for such public works contract. However, if a subcontractor or independent contractor is hired or contracted more than 20 days after the Bidder entered the public works contract the Delaware Business license of such subcontractor or independent contractor shall be provided to the agency within 10 days of being contracted or hired.
5.4.8 The Bid Security shall be returned to the successful Bidder upon the execution of the formal contract. The Bid Securities of unsuccessful bidders shall be returned within thirty (30) calendar days after the opening of the Bids.
ARTICLE 6: POST-BID INFORMATION
6.1 CONTRACTOR’S QUALIFICATION STATEMENT
6.1.1 Bidders to whom an award of a Contract is under consideration shall, if requested by the
Agency, submit a properly executed AIA Document A305, Contractor’s Qualification Statement, unless such a statement has been previously required and submitted.
6.2 Bidders to whom an award of a Contract has been made must produce their Delaware
Business License before the Contract can be executed.
ARTICLE 7: PERFORMANCE BOND AND PAYMENT BOND
7.1 BOND REQUIREMENTS
26010 00 21 13 - 13
7.1.1 The cost of furnishing the required Bonds, that are stipulated in the Bidding Documents, shall be included in the Bid.
7.1.2 If the Bidder is required by the Agency to secure a bond from other than the Bidder’s usual sources, changes in cost will be adjusted as provide in the Contract Documents.
7.1.3 The Performance and Payment Bond forms used shall be the standard OMB forms
(attached).
7.2 TIME OF DELIVERY AND FORM OF BONDS
7.2.1 The bonds shall be dated on or after the date of the Contract.
7.2.2 The Bidder shall require the attorney-in-fact who executes the required bonds on behalf of the surety to affix a certified and current copy of the power of attorney.
ARTICLE 8: FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR
8.1 Unless otherwise required in the Bidding Documents, the Agreement for the Work will be written on AIA Document A101, Standard Form of Agreement Between Owner and Contractor Where the Basis of Payment is a Stipulated Sum.
00 21 13 - 14 26010
R G ARCHITECTS, LLC ROOF INFRARED REPORT
26010 00 31 25.29 - 1
SECTION 00 31 25.29
ROOF INFRARED REPORT
See Continuation Sheets Attached Document.
ROOF INFRARED REPORT R G ARCHITECTS, LLC
00 31 25.29 - 2 26010
Brick Mill Elementary School
378 Brick Mill RD
Middletown, DE 19709
Infrared Scan
378 BRICK MILL RD
MIDDLETOWN, DE 19709
TABLE OF CONTENTS
- Introduc�on and Findings 3
- Photo Documenta�on 4
- Tabula�ons 8
- Appendix I - Roof Plan
- Appendix II - Principles of Scanning
INTRODUCTION AND FINDINGS
On Tuesday, May 19th, 2026, personnel from Roofing Resources, Inc. (RRI) a0empted to performed a nigh>me infrared roof scan of designated low sloped roof sec?ons at the Brick
Mill Elementary School. Shortly before sunset, a rain event occurred and the scan was postponed un?l Thursday, May 29th, 2026. The purpose of RRI’s infrared survey was to inves?gate the exis?ng roof system to detect any areas were moisture is suspected to have infiltrated the system. The results of the infrared survey can be used to iden?fy areas of wet insula?on and assist with the proper installa?on of a new roof system or coa?ng systems over the exis?ng membrane.
Day?me temperatures reached a high of approximately 80 degrees F during the day on May
28th. The warm day?me temperatures coupled with the cooler nigh>me temperatures provided reasonable condi?ons for performing the infrared scan. During the infrared scan, RRI discovered one (1) area of wet insula?on and several water blisters. Water blisters occur when water gets trapped between the plies on mul?-ply roofing system. These blister may never present as a leak within the building however, they are a symptom of the decline in the effec?veness of the overall roof system. The exterior façade of the building was constructed using a mixture of split faced block and an EIF (exterior insulated and finish) system. The upper sec?ons of roof are adorned with a decora?ve water table constructed using the EIFS materials. Openings in the seams at the water table were no?ced and IR images of the walls appeared to show the presence of water infiltra?on within the wall system. Scanning the façade and eleva?ons was not part of RRI’s scope for this project, but we provided a cursory review as it seemed per?nent to a poten?al source of water infiltra?on and should be discussed further by the project team.
Where wet insula?on was iden?fied, RRI personnel marked the area with highly visible paint for future reference. RRI also used the drawings provided to mark the loca?ons of the wet area and water blisters discovered. A Delmhorst moisture meter was used to confirm the presence of moisture in the areas iden?fied by the IR camera. Five (5) probes were taken, one
(1) confirmed the presence of moisture. All probe loca?ons were properly repaired.
The following pages contain photo documenta?on of the findings along with a roof plan indica?ng the loca?on of the wet insula?on, water blisters and moisture probe.
Water Blister 01 IR Water Blister 01 Day�me
Water Blister 02 IR Water Blister 02 Day�me
Wet Area #01 Day�me Wet Area #01 IR
PHOTO DOCUMENTATION
Probe #02 Dry Probe #01 Dry
Probe #03 Confirmed Wet Probe #03 Wet
Probe #04 Dry Probe #05 Dry
IR Overview Photo IR Overview Photo
IR Overview Photo IR Overview Photo
IR Overview Photo IR Overview Photo
Façade Photos IR Façade Photos Day�me
Façade Photos IR Façade Photos Day�me
Façade Photos IR Façade Photos IR
TABULATIONS
Roof Area #1 SF = Square Feet
Wet Area # Square Footage
1 16 SF
Total 16 SF
Total Roof SF: 67,500 SF
Total Percentage of Wet Insula?on: 0.0002%
APPENDIX I - ROOF PLAN
APPENDIX II - PRINCIPLES OF SCANNING
The complete, self-contained thermal measurement and image recording system.
Using advanced computer technology Flir's B200 infrared thermal measurement and imaging system gives you the capability to undertake accurate predictive maintenance programs.
Condition monitoring with infrared thermography
Through infrared thermal imaging, potential problems can be easily identified and evaluated -often months in advance of becoming visually apparent. This allows the replacement of components and equipment to be carried out as part of a structured maintenance plan. The Flir B200 can be used for a whole range of applications in many different industries. For example, the B200 system will scan large scale electrical installations, such as overhead power lines and substations, or refractory installations, such as cat crackers, blast furnaces and pipework. For the drone flight we used a FLIR Vue Pro 640x512 Radiometric infrared scanner.
Safe, rapid and highly accurate inspection
The Flir B200 is a completely portable package - comprising the scanner unit and a belt mounted rechargeable battery pack. Easy to handle and simple to use, the B200 gives remote imaging and measurement - with high sensitivity even when planning quickly. Thermoelectric cooling eliminates the handling and storage problems associated with liquid nitrogen or gas cooled systems.
The B200 is built to operate in demanding environments - such as offshore applications and steelworks. As well as being splashproof, the scanner is IEC bump and vibration tested and can operate in areas where electromagnetic fields are present, for example, close to induction furnaces. The B200 measures temperatures from - 20° C to +500° C with high accuracy in extremes of ambient temperature.
Optional filters include a flame filter, which can be used to extend the measurement ranges to +1500° C or as a spectral filter to eliminate the influence of combustion gases and an anti-solar reflection filter.
THE PRINCIPLES OF SCANNING
Infrared Thermography is based on the remote thermal sensing of temperature differentials on the roof surface to locate areas of wet insulation. Commonly, there are two types of infrared scanning. The first is called “solar” scanning which is based on the ultra-violet rays of the sun heating the roof surface. As the roof becomes warm, the water in the insulation will become hot because the water has a higher heating capacity. At night, as the roof cools, dry insulation cools off relatively fast, where as the wet insulation retains the heat longer. The infrared cameras that are used are accurate to 1/10 of a degree Centigrade, and are able to “see” the differences in temperature. The areas of wet insulation are then verified by a moisture conductance meter due to areas of heavy gravel and bitumen which will also hold heat. Once a confirmation of wet is made, anomalies are reduced to a nuisance rather than a factor.
Sun heats up wet insulation during the daytime
Heat is radiated at night by the wet insulation
Solar Scanning
Moisture Wet Insulation
THE PRINCIPLES OF SCANNING CONTINUED
The second type of infrared…