This is Addendum 1 to the invitation for bids issued by Appoquinimink School District in Delaware for a roof recover project at Brick Mill Elementary School. The project involves installing a new 115-mil fleece-back EPDM membrane roof system covering approximately 67,422 square feet, with the base bid limited to Roof Area 5 and remaining roof areas available as an alternate. A mandatory pre-bid meeting was held on August 11, 2026, at 10:00 a.m. at Brick Mill Elementary School, followed by a site walkthrough. Sealed bids are due on August 26, 2026, at 10:00 a.m. at the Marion Proffitt Training Center, 118 South Sixth Street, Odessa, Delaware 19730. Substitution requests must be submitted by 4:00 p.m. on August 19, 2026, written questions are due by 2:00 p.m. on August 20, 2026, and the final addendum issuance date is August 24, 2026. The contract will be awarded to the lowest responsive and responsible bidder, with the successful contractor required to achieve substantial completion within a specified timeframe following the Notice to Proceed.

The bid includes a $15,000 general owner's allowance for owner-elected changes and two alternates: Alternate No. 1 covers lightning protection system removal and reinstallation, and Alternate No. 2 covers roof recover of all roof areas not included in the base bid. All work is subject to Delaware prevailing wage rates, with composition roofers classified at $36.41 per hour in New Castle County. Bid security equal to ten percent of the total bid amount is required, and the successful bidder must post performance and payment bonds equal to 100 percent of the contract price. Bidders must submit notarized bid forms, complete subcontractor lists including Delaware Business License numbers, a Non-Collusion Statement, an Affidavit of Employee Drug Testing Program, and an Affidavit of Contractor Qualifications. The contract documents indicate that an environmental asbestos inspection was previously performed, with a report attached to the addendum. Additional requirements include compliance with Delaware's mandatory drug testing policy for large public works projects, prohibition of smoking on school property, provision of porta-potties by the contractor during exterior construction, and compliance with Title 29, Chapter 69, Section 6962 regarding subcontractor substitution restrictions.

View the file

Other files

File Type Posted
ASD2622-BMFROOF_specs.pdf PDF
ASD2622-BMFROOF_epp.pdf PDF
ASD2622-BMFROOF_pw.pdf PDF
ASD2622-BMFROOF_itb.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R G Architects, LLC 200 West Main Street Middletown, DE 19709 302.376.8100 www.rgarchitects.net

RGA 26010

18 August 2026

ADDENDUM 1 Appoquinimink School District Brick Mill Elementary School Roof Recover 378 Brick Mill Road, Middletown, DE 19709

R G Architects 200 West Main Street Middletown, DE 19709 Phone: 302-376-8100 Email: jack@rgarchitects.net

BIDS DUE: 10:00am on Wednesday, 26 August 2026

LOCATION: Appoquinimink School District Marion Proffitt Training Center 118 South Sixth Street, Odessa, DE 19730

NOTICE TO ALL BIDDERS

1.0 GENERAL NOTES:

1.1 Bidders are hereby notified that this Addendum shall be and hereby becomes part of their Contract Documents and shall be attached to the Project Manual for this project.

1.2 The following items are intended to revise and clarify the Drawings and Project Manual and shall be included by the Bidder in their proposal.

1.3 Bidders shall verify that their Sub-bidders are in full receipt of the information contained herein.

1.4 A copy of the current bid set register is available upon request, indicating individuals that have purchased project documents from R G architects.

1.5 The pre-bid participant list sheet, along with Addendum 1, is being sent as a courtesy to all pre-bid meeting attendees; however, all future addenda will only be issued to registered plan holders.

1.6 All addenda will be sent out to the registered plan holders via email. Contractors are encouraged to monitor their email accounts during the bidding period for such updates.

2.0 PREBID MEETING:

2.1 A Prebid Meeting was held on Tuesday, 11 August 2026, at 10:00 a.m. at Brick Mill Elementary School.

A. Project Description: A brief overview of the Project was discussed. No changes to the scope of work at this time.

B. Project Schedule: On site construction commencement is anticipated to begin upon future notice to proceed.

C. Bid schedule is as follows:

1. The bids are due by Wednesday, 26 August, 2026, at 10:00am local time.

2. Substitution requests will be received until 4:00 p.m. on Wednesday, August 19, 2026.

Instructions for requesting substitutions are very specific and are contained mailto:jack@rgarchitects.net www.rgarchitects.net

26010 Appoquinimink School District

BRICK MILL ELEMENTARY SCHOOL ROOF RECOVER

ADDENDUM # 1

in the project manual. If the contractor does not follow the processes, it is automatic grounds for rejection.

3. Questions regarding the bid documents will be received until 2:00 p.m.

on Thursday August 20, 2026.

All questions must be submitted in writing (via email, addressed to jack@rgarchitects.net) to R G Architects. Neither R G Architects or the Owner will answer questions verbally.

4. The last day for addenda to be issued, if required, shall be Monday, August 24, 2026.

D. The project will require the contractors to utilize the State of Delaware Prevailing wage rates which are in the project manual.

E. Substitutions: If a specification lists one product manufacturer as well as listing “or equal”, the contractor is not obligated to submit for substitution prior to bid for that item. However, the contractor will still be responsible to meet the requirements of that product during the review process as per the specifications. If the product substituted as an equal does not meet ALL of the requirements of the specifications, as determined by the Architect, the Contractor is obligated to provide the specified product at no additional cost to the project.

F. Subcontractors List:

1. The subcontractors list to be noted on the bid form in the project manual was reviewed and agreed upon.

1. Roofing

2. On the Subcontractors List, the General Contractor must list the subcontractor that is providing the labor for 100% of the work in that category and as it is required by the laws on DE Title 29.

G. The subcontractor list is to be also completed, including a current Delaware Business License number.

H. Bidders were reminded to fill out the Bid Form completely & to not leave any areas to be filled out blank. Bidders are to also list the Addenda issued. If five (3) Addenda was issued the Bid Form must note “1,2,3”. Bid forms noting “1-3” will not be accepted.

I. RGA reminded all bidder that BID form itself needs to be notarized as well.

J. Bidders were also reminded to have the “Affidavit of Employees Drug Testing Program” form as part of their Bid.

K. Drug Testing Policy: RGA reminded the new Drug Testing Policy in place by State of Delaware. Contractors are to reference the Project Manual for additional policy procedures and Drug Testing Report Forms.

L. RGA reminded everyone that smoking is NOT permitted ANYWHERE on the school.

Contractors must leave the property to smoke during construction.

M. Bathrooms will not be available during exterior construction and Porta-potties will be required to be supplied by the contractor.

N. Electric Power Service: Use of Owner's existing electric power service will be permitted, as long as equipment is maintained in a condition acceptable to Owner.

O. The contractor’s site visit of the school roof to be recovered was held immediately after the pre-bid meeting concluded.

- 2 -mailto:jack@rgarchitects.net

26010 Appoquinimink School District

BRICK MILL ELEMENTARY SCHOOL ROOF RECOVER

ADDENDUM # 1

3.0 Revisions to the SPECIFICATIONS

3.1 Section 00 41 13 - BID FORMS has been edited to add ROOFING as a subcontractor category.

3.2 Section 00 12 00 – ALTERNATES has been edited to include two alternates.

4.0 Revisions to the DRAWINGS

4.1 None at this time

5.0 QUESTIONS & ANWSERS:

Q1 – Bid Advertisement indicated Area of recovery as 67,422 sq. ft., but the drawing indicates only Area 5 is Base Bid. Is the Rest of the area to be an Alternate??

A1 – The Base Bid will include only Roof Area 5, and yes, the balance of the roof areas is an alternate.

Q2 – Was an environmental (asbestos) inspection performed on the building?

A2 – Yes, an inspection was performed last year. The report is attached to this addendum.

6.0 SUBSTITUTION REQUEST:

6.1 None at this time

7.0 ATTACHMENT LIST:

7.1 Pre Bid Sign-In Sheet

7.2 Section 00 41 13 - BID FORMS.

7.3 Section 00 12 00 – ALTERNATES

- End of Addendum No.1 -

- 3 -

APPOQUINIMINK SCHOOL DISTRICT BRICK MILL ELEMENTARY SCHOOL ROOF RECOVER

APPOQUINIMINK SCHOOL DISTRICT

BRICK MILL ELEMENTARY SCHOOL ROOF RECOVER

378 BRICK MILL ROAD, MIDDLETOWN, DE 19709

BID FORM

For Bids Due: 10:00 AM on August 26, 2026 To: Appoquinimink School District Marion Proffitt Training Center 118 South Sixth Street Odessa, DE 19730

Name of Bidder:

Delaware Business License No.: Taxpayer ID No.:

(Other License Nos.):

Phone No.: ( ) - Fax No.: ( ) -

The undersigned, representing that he has read and understands the Bidding Documents and that this bid is made in accordance therewith, that he has visited the site and has familiarized himself with the local conditions under which the Work is to be performed, and that his bid is based upon the materials, systems and equipment described in the Bidding Documents without exception, hereby proposes and agrees to provide all labor, materials, plant, equipment, supplies, transport and other facilities required to execute the work described by the aforesaid documents for the lump sum itemized below:

ALLOWANCES

The base bid above includes all allowances specified in the contract documents.

Allowance No. 1: Include an allowance entitled “General Owner’s Allowance” in the amount of $15,000.00. This allowance will be utilized by the owner for owner-elected changes to the work. Any or all unused allowance monies shall be returned to the owner via a credit change order at the end of the project. This allowance shall be listed as an individual line item on the Application for Payment. Acknowledge/Initial: ______

ALTERNATES

Alternate prices conform to the applicable project specification section. Refer to specifications for a complete description of the following Alternates. An “ADD” or “DEDUCT” amount is indicated by the crossed-out part that does not apply.

ALTERNATE No. 1: Lightning Protection System Removal and Reinstallation

Add/Deduct:

ALTERNATE No. 2: Roof Recover of all roof areas not in the base Bid

Add/Deduct:

R G ARCHITECTS, LLC

26010

BID FORM

00 41 13 - 1 https://15,000.00

BRICK MILL ELEMENTARY SCHOOL ROOF RECOVER APPOQUINIMINK SCHOOL DISTRICT

BRICK MILL ELEMENTARY SCHOOL ROOF RECOVER

378 BRICK MILL ROAD, MIDDLETOWN, DE 19709

BID FORM

I/We acknowledge Addendums numbered and the price(s) submitted include any cost/schedule impact they may have.

This bid shall remain valid and cannot be withdrawn for thirty (30) days from the date of opening of bids (60 days for School Districts and Department of Education), and the undersigned shall abide by the Bid Security forfeiture provisions. Bid Security is attached to this Bid.

The Owner shall have the right to reject any or all bids, and to waive any informality or irregularity in any bid received.

This bid is based upon work being accomplished by the Sub-Contractors named on the list attached to this bid.

Should I/We be awarded this contract, I/We pledge to achieve substantial completion of all the work within calendar days of the Notice to Proceed.

The undersigned represents and warrants that he has complied and shall comply with all requirements of local, state, and national laws; that no legal requirement has been or shall be violated in making or accepting this bid, in awarding the contract to him or in the prosecution of the work required; that the bid is legal and firm; that he has not, directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken action in restraint of free competitive bidding.

Upon receipt of written notice of the acceptance of this Bid, the Bidder shall, within twenty (20) calendar days, execute the agreement in the required form and deliver the Contract Bonds, and Insurance Certificates, required by the Contract Documents.

I am / We are an Individual / a Partnership / a Corporation

By Trading as (Individual’s / General Partner’s / Corporate Name)

(State of Corporation)

Business Address:

Witness:

(SEAL)

By:

( Authorized Signature )

( Title ) Date:

ATTACHMENTS

Sub-Contractor List Non-Collusion Statement Affidavit of Employee Drug Testing Program Affidavit of Contractor Qualifications Bid Security (Others as Required by Project Manuals)

BID FORM R G ARCHITECTS, LLC

00 41 13 - 2 26010

BRICK MILL ELEMENTARY SCHOOL ROOF RECOVER

378 BRICK MILL ROAD, MIDDLETOWN, DE 19709

BID FORM

SUBCONTRACTOR LIST

In accordance with Title 29, Chapter 69, Section 6962(d)(10)b of the Delaware Code, the following subcontractor listing must accompany any bid submittal. The bidder must list in each category the full name and address (City & State) of the sub-contractor that the bidder will be using to perform the work and provide material for that subcontractor category. Should the bidder’s listed subcontractor intend to provide any of their subcontractor category of work through a third-tier contractor, the bidder shall list that third-tier contractor’s full name and address (City & State). If the bidder intends to perform any category of work itself, it must list its full name and address. For clarification, if the bidder intends to perform the work themselves, the bidder may not insert “not applicable”, “N/A”, “self” or anything other than its own full name and address (City & State). To do so shall cause the bid to be rejected. In addition, the failure to produce a completed subcontractor list with the bid submittal shall cause the bid to be rejected. If you have more than three (3) third-tier contractors to report in any subcontractor category, print out additional page(s) containing the appropriate category, complete the rest of your list of third-tier contractors for that category, notate the addition in parentheses as (CONTINUATION) next to the subcontractor category and an asterisk (*) next to any additional third-tier contractors, and submit it with your bid.

Subcontractor Category Subcontractor Address (City & State) Subcontractors tax-payer ID # or Delaware Business license #

1. ROOFING

A.

B.

C.

2.

A.

B.

C.

R G ARCHITECTS, LLC BID FORM

26010 00 41 13 - 3

BRICK MILL ELEMENTARY SCHOOL ROOF RECOVER

378 BRICK MILL ROAD, MIDDLETOWN, DE 19709

BID FORM

NON-COLLUSION STATEMENT

This is to certify that the undersigned bidder has neither directly nor indirectly, entered into any agreement, participated in any collusion or otherwise taken any action in restraint of free competitive bidding in connection with this proposal submitted this date (Appoquinimink School District.)

All the terms and conditions have been thoroughly examined and are understood.

NAME OF BIDDER:

AUTHORIZED REPRESENTATIVE

(TYPED):

AUTHORIZED REPRESENTATIVE

(SIGNATURE):

TITLE:

ADDRESS OF BIDDER:

E-MAIL: ______________________________________________________________

PHONE NUMBER:

Sworn to and Subscribed before me this day of 20 .

My Commission expires . NOTARY PUBLIC .

THIS PAGE MUST BE SIGNED AND NOTARIZED FOR YOUR BID TO BE CONSIDERED.

00 41 13 - 4 26010

BRICK MILL ELEMENTARY SCHOOL ROOF RECOVER

378 BRICK MILL ROAD, MIDDLETOWN, DE 19709

AFFIDAVIT

OF

EMPLOYEE DRUG TESTING PROGRAM

4104 Regulations for the Drug Testing of Contractor and Subcontractor Employees Working on Large Public Works Projects requires that Contractors and Subcontractors implement a program of mandatory drug testing for Employees who work on Large Public Works Contracts funded all or in part with public funds.

We hereby certify that we have in place or will implement during the entire term of the contract a Mandatory Drug Testing Program for our employees on the jobsite, including subcontractors, that complies with this regulation:

Contractor/Subcontractor Name:

Contractor/Subcontractor Address:

Authorized Representative (typed or printed):

Authorized Representative (signature):

Title:

Sworn to and Subscribed before me this day of 20 .

My Commission expires . NOTARY PUBLIC .

THIS PAGE MUST BE SIGNED AND NOTARIZED FOR YOUR BID TO BE CONSIDERED.

R G ARCHITECTS, LLC BID FORM

26010 00 41 13 - 5

BRICK MILL ELEMENTARY SCHOOL ROOF RECOVER

378 BRICK MILL ROAD, MIDDLETOWN, DE 19709

AFFIDAVIT

OF

CONTRACTOR QUALIFICATIONS

We hereby certify that we will abide by the contractor’s qualifications outlined in the construction bid specifications for the duration of the contract term.

In accordance with Title 29, Chapter 69, Section 6962(d)(10)b.3 of the Delaware Code, after a contract has been awarded the successful bidder shall not substitute another subcontractor whose name was submitted on the Subcontractor Form except for the reasons in the statute and not without written consent from the awarding agency. Failure to utilize the subcontractors on the list will subject the successful bidder to penalties as outlined in the General Requirements Section 5.2 of the contract.

Contractor Name:

Contractor Address:

Authorized Representative (typed or printed):

Authorized Representative (signature):

Title:

Sworn to and Subscribed before me this day of 20 .

My Commission expires . NOTARY PUBLIC .

THIS PAGE MUST BE SIGNED AND NOTARIZED FOR YOUR BID TO BE CONSIDERED.

00 41 13 - 6 26010

SECTION 01 23 00

ALTERNATES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section includes administrative and procedural requirements for alternates.

1.3 DEFINITIONS

A. Alternate: An amount proposed by bidders and stated on the Bid Form for certain work defined in the Bidding Requirements that may be added to or deducted from the Base Bid amount if Owner decides to accept a corresponding change either in the amount of construction to be completed or in the products, materials, equipment, systems, or installation methods described in the Contract Documents.

1. The cost or credit for each alternate is the net addition to or deduction from the Contract Sum to incorporate alternate into the Work. No other adjustments are made to the Contract Sum.

1.4 PROCEDURES

A. Coordination: Modify or adjust affected adjacent work as necessary to completely integrate work of the alternate into Project.

1. Include as part of each alternate, miscellaneous devices, accessory objects, and similar items incidental to or required for a complete installation whether or not indicated as part of alternate.

B. Notification: Immediately following award of the Contract, notify each party involved, in writing, of the status of each alternate. Indicate if alternates have been accepted, rejected, or deferred for later consideration. Include a complete description of negotiated modifications to alternates.

C. Execute accepted alternates under the same conditions as other work of the Contract.

D. Schedule: A Schedule of Alternates is included at the end of this Section. Specification Sections referenced in schedule contain requirements for materials necessary to achieve the work described under each alternate.

PART 2 - PRODUCTS (Not Used)

R G ARCHITECTS, LLC ALTERNATES

26010 01 23 00 - 1

3.1

PART 3 - EXECUTION

SCHEDULE OF ALTERNATES

A. Alternate No. 1: Lighting Protection System Reinstallation

1. The repair, reinstallation and certification of the existing lightning protection system.

B. Alternate No. 2: Additional Roof Areas

1. All material and labor associated with the roof recover of Roof Areas 1, 2, 3, 4, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, and 24.

END OF SECTION

ALTERNATES R G ARCHITECTS, LLC

01 23 00 - 2 26010