Section 02085

ASBESTOS ABATEMENT ROCEDURES

PART 1 – GENERAL

1.01 DESCRIPTION OF WORK

A. General: This section includes all work necessary to reduce air concentrations of asbestos to the specified level and maintain the specified asbestos control limits during the life of the contract. It also includes removal, containment, and disposal of asbestos-containing material.

1. Work Area: The work areas include, would not be limited, to all buildings and locations include in this partition contract:

2. The following asbestos-containing materials are to be removed as needed to facilitate accomplishment of other work in this contract.

a. vinyl asbestos floor tile(VAT), including mastic

b. Asbestos containing pipe insulation.

c. Asbestos containing insulation on building mechanical equipment.

3. The following asbestos-containing materials are to be repaired, covered with wettable cloth lagging (lag cloth or the equivalent), or encapsulated with a bridging encapsulant:

a. Asbestos containing building materials identified in item 2 above as needed to facilitate accomplishment of other work in this contract.

4. The following asbestos-containing materials are to be encapsulated with a distinctively colored encapsulant:

a. Asbestos containing pipe insulation and asbestos containing insulation on building mechanical equipment as needed to facilitate accomplishment of other work in this contract.

5. The following asbestos containing materials are to be enclosed:

a. Vinyl asbestos floor tile (VAT), asbestos containing pipe insulation, and asbestos containing insulation on building mechanical equipment as needed to facilitate accomplishment of other work in this contract.

6. The following areas are to be cleaned up and decontaminated utilizing asbestos abatement work methods:

a. Work areas at locations identified in item 1 above as needed to facilitate accomplishment of other work in this contract.

b. Related Work Specified in Other Sections: Section 01546, “Safety and Health,” applies to all work by this section.

1.02 QUALITY ASSURANCE

A. Contractor Qualifications: The Contractor shall be licensed in the state of and shall be a firm of established reputation which is regularly engaged in, and which maintains a regular force of workman skilled in asbestos abatement, and shall have performed this work on previous projects. See “Submittals” paragraph for which must be submitted and approved.

B. Asbestos control Limits:

1. Inside Asbestos Work Area: Air concentrations of asbestos shall not exceed an average of 0.20 fibers per cubic centimeter of air and shall not exceed at any time the ceiling level of 1.0 fibers per cubic centimeter of air.
2. Outside Asbestos Work Area: Air concentrations of asbestos shall be maintained below 0.01 fibers per cubic centimeter of air. This applies to all areas adjacent to the work area while work is in progress and to the former work area after final cleanup.

1.02 REFERENCES;

A. American Society for Testing and materials (ASTM) Publication:

E 849-82 Safety and Health Requirements relating to Occupational Exposure to Asbestos

B. Code of Federal Regulations (CFR):

29 CFR 1910.1001 – Occupation Safety and Health Act (OHSA) 29 CFR 1910.20 – Subpart C; General safety and health Provisions 29 CFR 1926.58 – OSHA Standards for construction 40 CFR 61 – Subpart M: USEPA national emission Standards for Hazardous Air Pollutants(NESHAPS) 40 CFR 763 – Subpart E: Asbestos Containing Materials in Schools (AHERA regulations) 29 CFR 1910.134 – OSHA Respirator Requirements.

C. All applications state and local regulations.

1.04 SUBMITALS:

A. Submit the following prior to the start work date after award of a delivery order containing asbestos abatement line items.

1. Contractor Qualification Information: Approval by the Contracting Representative (COR) Officer’s is required of the following submittals:

a. Supervisory personnel.

Prepare a list showing each supervisor’s qualifications, training and certifications. Provide documentation showing that each supervisor has successfully completed the EPA approved training course for the supervision of asbestos projects.

b. Work procedures. List procedures for removal repair, packaging and disposal of ACM. Include details on specialized equipment and materials for asbestos work.

c. Medical Surveillance program. Provide a copy of the firm’s medical surveillance program.
d. Respiratory Protection Program. Provide a copy of the firm’s respiratory protection program.
e. Worker training program. Provide a copy of the firm’s written asbestos worker training program.
f. Manufacturer’s equipment Specifications. Provide a copy of the manufacturer’s specifications for all equipment to be used on the project site.
g. Specimen of Log Form. Submit for review copies of the proposed log forms required by the specifications.
h. Chemical and Equipment List. Provide a comprehensive list of chemicals and equipment to be used on the project site. Include manufacturer’s installation or use recommendations. Include material safety data sheets for caulks, encapsulants, paints, and similar materials.

2. Consulting/Testing company Qualifications. Submit proof of laboratory and personnel qualifications as follows:

a. Laboratory.

(1) Accredited by the American Industrial Hygiene Association (AIHA)for asbestos or show documented proof of equivalent technical qualifications.

(2) Accredited by the National Institute of Science and Technology (NIST) for conducting analyses of bulk ACM samples.

b. Asbestos Consultant.

(1) Shall have the following credentials: Certified Industrial Hygienist (C.I.H.), Registered Architect (R.A.), Professional Engineer (P.E.), or have a PhD in Industrial hygiene or related field.

(2) Three years experience in the asbestos abatement industry including asbestos abatement design, asbestos project supervision and field testing.

c. Field Personnel.

(1) Successful completed the NI0SH 582 course, or its equivalent.

(2) Participating in the NIOSH PAT program for analyzing asbestos air samples.

(3) Have one year experience in air monitoring and inspecting asbestos abatement projects.

B. Submittals Prior to Beginning Work: Do not start work until following have been approved:

1. Proposed Project Schedule. This shall be sufficiently detailed to show, at a minimum, the estimated times for area preparation, precleaning, abatement work, decontamination, and clearance testing. Also include the proposed number of shifts worked each day. The number of teams per shifts and number of persons per team.

2. Asbestos Worker Training. Provide documentation showing that all workers have completed the EPA approved training course for asbestos workers or have received at least 24 hours of in-house training in the following areas:

a. Hazards of Asbestos Exposure

b. Use and Fitting of Respirators

c. Protective Clothing

d. Entry and Exit from Work Area

e. Proper Asbestos Work Procedures

f. Non-asbestos Hazards in Work Areas

3. Medical Surveillance. Proof of compliance with medical surveillance requirements as set forth in 29 CFR 1928.56 for all employees.

4. Security/Emergency Procedures. Provide written descriptions, sketches, or combinations thereof for security procedures and procedures for fire egress and medical emergency.

5. Disposal Methods. Provide a detailed description of the methods and procedur3es for disposal of ACM and asbestos contaminated materials. Included in this shall be details on the method of packaging and wrapping the materials, details on the method of packaging and sketches showing desired locations for on site storage, methods for transporting materials both on site and off site, sketches showing temporary loading areas (if applicable), and a description of all procedures beginning with the removal of the material through the delivery of the material to the disposal site.

6. Work Area Enclosures. Provide written description, sketches, or combinations thereof for the isolation of work areas in compliance with this specification, applicable regulations, and security requirements.

7. Provide a copy of the asbestos project notification that was made to the state regulatory authority. The notification shall be delivered personally or by certified mail (return receipt requested, postage prepaid, and shall comply strictly with applicable state, local regulations and 40 CFR 61.146

8. Necessary Materials and Permits. Provide documentations or copies indication the following have been received and/or made and/or obtained:

a. All required permits

b. State asbestos project fee (where applicable)

c. Disposal site locations

d. Transportation and disposal of ACM

e. Abatement supplies

f. Any other items required under this section.

1.05 Contractor Responsibility: The Contractor shall assume full responsibility and liability for compliance with all applicable Federal, state, and local regulations pertaining to the protection of workers, visitors toe the site. The Contractor is responsible for providing medical examinations and maintaining medical records of personnel as required by the applicable Federal, state, and local regulations, and shall hold the government harmless for failure to comply with any applicable safety or health regulation on the part of himself, his employees, or his subcontractors.

A. Suspect Material. During the course of the project, if work involve disturbance of suspect material not identified in Part 1.01 of this section, the Contractor shall have the material tested for asbestos content. If the material tested contains asbestos, Parts 1.04B and 2.02 of Section 01546, Safety and Health”, shall apply.

B. Safety. The Contractor and the Contractor’s Asbestos Consultant shall jointly share full responsibility for the safe accomplishment of all asbestos abatement work included in this project.

1.06 PROJECT/SITE CONDITIONS:

A. Means of Egress. Established and maintain emergency and fire exits from the work area. The Contractor shall identify and mark all emergency exit from the work area shall be provided in addition to the exit through decontamination facility.

B. Use of Existing Facilities. The use of existing restroom or other facilities for decontamination is prohibited. After decontamination restroom facilities may be used as permitted by the Contracting Officer.

C. Air Handling Equipment. Air handling equipment serving the air handling zones where asbestos work will be accomplished must be locked off or must have both supply and return air positively sealed off from the time the asbestos removal work starts until satisfactory final clearance test results have been obtained.

C. Access to Work Areas. Access to work areas shall be through decontamination areas. Only the Contractor’s workers, government agency inspectors, authorized employees of the Government, the Contracting Officer and his representative, and testing laboratory personnel shall have access to work areas.

E. Environmental Conditions to be maintained. Heating or air conditioning and lighting must be operational for occupied areas of the building during normal working hours.

F. Use of Elevators.

1. Use elevator(s) specified by the GSA Field Office.

G. Contamination of Adjacent Areas. In the event any area in the building outside of a controlled work area should become contaminated as a result of the Contractor’s work, the Contractor shall thoroughly decontaminate the affected area until the area has been visually inspected and the airborne fiber counts are at or below the ambient reading taken before the work was started.

H. Security. At all times asbestos control measures are in effect. The Contractor shall provide adequate security to prevent any unauthorized entry into a work area. These work areas shall never be left unattended unless access can be positively blocked. Asbestos contaminated waste materials shall also be provided adequate security to prevent access to the materials by unauthorized persons.

I. Coordination of Work of all Trades. Coordinate the work of all trades to assure that their work is performed in accordance with the applicable regulations and that the asbestos control limits are maintained at all times both inside and outside the asbestos work area.

1.07 SEQUENCING/SCHEDULING:

A. Work that could generate airborne asbestos fibers must be accomplished during hours approved by the GSA Field Office Managers.

PART 2 – PRODUCTS

2.01 Equipment, including protective clothing and respirators, used in the execution of this contract and provided to visitors to the site, shall comply with ASTM E 849 and with the applicable Federal, State and local regulation. Respirators shall conform to the OSHA requirement in 29 CFR 1926.58.

A. Contaminated/Equipment Room. This room shall be separated fro the work area and the shower room by doorways which minimizes the release of asbestos from the work, area, and shall include storage for contaminated clothing and equipment as needed: disposal facilities for contaminated personal protective equipment; storage facilities for contaminated personal protective equipment and any clothing to be laundered: and a utility sink for decontamination of equipment, if needed.

B. Protective Clothing – Clothing for Containment Areas. Outer work clothes shall consist of full body coveralls, head covers and shoe covers, as either separate pieces or integrated coverings, and shall be disposable or, if reusable, have visible contamination removed prior to this being brought out of the containment area. If outer work clothes consist of separate pieces, the neck opening and the cuffs at the wrists and ankles shall be overlapped and sealed with duct tape or elastic straps. Shoes shall be suitable for the conditions of work, including toe/metatarsals protection as required by the 29 CFR 1910.136, and fully decontaminatable, unless they are to be kept in the containment area until disposal. As an alternative to the use of disposable shoe covers, impervious boots (such as rubber boots) may be used, provided that they are either left in the equipment room between uses or thoroughly decontaminated before removal from the containment area. Eye, face, head, hearing, and fall protection equipment shall be available and used as needed.

2. Clothing for Glove Bag Work, if a glove bag removal operation or an enclosure operation is used, work clothes shall include full body coveralls, head cover and shoe covers which are disposable or, if reusable, have visible contamination removed prior to its being brought out of the containment area, and placed in double labeled bags fro delivery to a notified laundry. Worker’s clothing may be worn under outer protective clothing if desired, and shall be visually decontaminated after removal or outer protective clothing. AS needed, eye, face, head, hearing and fall protection equipment shall be available and used.

3. Reusable Clothing, if reusable outer protective clothing is used, the Contractor shall examine it prior to each use and ensure that it will provide adequate protection and is or is not about to become ripped, torn, deteriorated, or damaged, and that it is not visibly contaminated. Clothing which has been used shall be tested for the effectiveness of asbestos laundering using nondestructive adhesive sampling of three or more randomly selected areas taken from within a portion of the clothing chest area and analysis of the samples by PCM. To allow the clothing to be used, samples must have an average fiber area concentration of 40 fibers or less; elevated samples may be analyzed by PLM and TEM for further definition of the nature of the fibers to determine whether the criterion is met with respect to asbestos fibers. Clothing contamination testing shall be performed under the environmental monitoring program of this Section, and include a quality control program specific to this testing which provides for testing at least 1 of 200 pieces of used clothing, and rejection of all pieces of a laundry batch in which any of the p9eces exceed the criterion (pending relaundering followed by testing).

4. Laundering of Clothing, if asbestos-contaminated clothing is to be laundered, submit a sample copy of the written notice required by OSHA for each person who launders such clothing, an on-site storage plan including containerizing of clothing prior to laundering. If such clothing is to be laundered on-site, submit manufacturer’s information regarding any on-site laundering equipment to be used. If such clothing is to be laundered off-site, certify that the protective clothing will be packaged as asbestos-contaminated material, transported to the laundry in intact containers and that the out-site facility will accept the material with the knowledge that this is asbestos-contaminated, that special laundering precautions are necessary, and tat laundering employees have been trained in accordance with OSHA and EPA requirements.

2.02 ENCAPSULATING MATERIALS:

A. Encapsulants shall be used following asbestos removal from a substrate to bond residual microscopic fibers to the substrate.

B. Encapsulants shall be manufactured by reputable established manufacturers of encapsulants, shall be approved specially for use in asbestos contaminated environments, and shall be compatibles for use with the applicable substrates and replacement materials in this project. Encapsulants shall always be used in compliance with the manufacturer’s instructions, unless otherwise specified for specific locations in Part 1.01 of this section, encapsulants shall have a distinctive coloration so as to be visible when dry.

PART 3 – EXECUTION

3.01 PREPARATION OF FULL WORK AREA ENCLOSURES:

A. Prior to commencing work the Contractor shall inspect, for prior damage, all items located in the intended work area and provide the Contracting Officer a written list and photographs of any existing damage.

B. Shut down then lock off all air handling equipment serving the intended work area. The Contractor shall retain the keys to locks to prevent the air handling equipment from being turned on prematurely before satisfactory final clearance air samples have been obtained after completion of the asbestos work.

C. Thoroughly preclean the work area. This shall include removal of all dust and debris from the work site. Use HEPA vacuum cleaners and wet wiping with amended water for the final effort. All wastes and scrap collected shall be considered asbestos contaminated and will be disposed of as asbestos waste.

D. Seal off all openings and fixtures in the work area including but not limited to electrical fixtures, heating and ventilation ducts, doorways, corridors and windows with plastic sheeting taped securely in place. Seal all penetrations in walls, ceilings and floors using expanding foam or other non-asbestos filler material.

1. If the work area involves an elevator lobby and the elevators cannot be shut off for the duration of the asbestos work, cover the elevator door openings with plywood, caulk around the edges of the plywood, then cover the plywood with two layers of plastic sheeting. The plastic sheeting should extend at least six inches beyond the plywood on the walls and floor then attached firmly in place with a moisture resistant tape, adhesive, or both.

E. Install critical barriers using overlapped layers of plastic sheeting at all entrances and exits so that the work area is always closed off by one barrier when workers enter or exit.

F. Except where ACM is to be removed, cover all non removable items of equipment and/ or furnishings with plastic sheeting taped securely in place.

G. Except for surfaces where ACM is to be removed, cover all ceilings, walls and floors with layers of plastic fixed firmly in place. Use at least two layers of 4-mil plastic on ceilings and walls. Use at least three layers of 6-milplastic on floors in occupied areas; two layers in mechanical areas. Property overlap layers at least twelve inches to prevent water intrusion under the plastic.

H. Install an approved decontamination unit with clean room, shower and equipment room. Shower water must be properly filtered to remove particles five microns in size or larger before discouraging the waste water into the sewage system. Where possible, also install separate decontamination facilities appropriate for cleansing containers of properly packaged asbestos waste as they are removed from the work area.

I. Install HEPA filter equipped ventilation equipment to maintain a pressure differential of 0.02 inches of water (as a goal) in the work area. Pressure differential must be sufficient to provide four air changes per hour in the work area. Testing company field technician shall smoke test to check seals and verify desired air flow form the outside to the inside of the work area through decontamination areas or other prepared locations. Once established, the pressure differential must be maintained continuously until the work area has passed final clearance air sampling. The exhaust from the HEPA ventilation equipment should be discharged to the outside building whenever possible. When this is not possible and the exhaust must be discharged inside of the building, the area into which the exhaust is discharged must be air monitored constantly to ensure airborne fiber counts do not exceed the asbestos control limits.

J. Install warning signs at all possible approaches to the work area to prevent persons not involved in the asbestos abatement from entering the vicinity of the work area enclosure. Signs shall be installed in accordance with 29 CFR 1926.58 and as directed by the Contracting Officer.

3.02 FULL ENCLOSURE WORK PROCEDURES:

A. General Procedures: Perform all asbestos related work and comply with the general safety and health provisions in conformance with 29 CFR 1926.58 and 29 CFR 1910.20, respectively.

B. Entering and leaving Work Areas. All workers, inspectors, testing technicians, and authorized visitors must enter and leave work areas through the decontamination unit. They shall don protective clothing and respirators on the way in and take a full shower on the way out following standard asbestos decontamination procedures. No inspector or authorized visitor shall use respirators with protection factors less than the respirators furnished to workers by the Contractor.

C. Wet Removal: Asbestos materials shall be removed utilizing wet removal methods. The contractor may use amended water, a commercially prepared removal encapsulant, or a combination of both. Materials removed shall be kept wet until bagged for removal from the work area.

1. Exception: In situations where wet removal is prohibitive due to unavoidable damage to equipment or safety hazards, written approval must be obtained from the appropriate enforcement authority for the method(s) proposed for dry removal. A copy of the written approval from the enforcement authority must be maintained at the worksite and available for inspection.

3.03 PREPARATION OF GLOVEBAG AREAS:

A. Prior to commencing work the Contractor shall inspect, for prior damage, all items located in the intended work area and provide the Contracting Officer a written list and photographs of any existing damage.

B. The following procedures in this part apply only when a negative differential pressure is to be maintained inside of each glove bag by means of a HEPA vacuum cleaner or similar HEPA equipped equipment. Otherwise full containment procedures must be followed.

C. Install critical barriers as needed to prevent any exchange of air between the work area and adjacent areas. Install warming signs at all critical barrier locations.

D. Pre-clean all vertical and horizontal surfaces within a fifteen foot radius of where each glove bag will be installed.

E. Cover any immovable items and equipment in the work area with plastic sheeting taped securely in place. Use at least 4-mil plastic.

F. Shut down and lock off any air handling equipment located in or serving the work area. If air handling equipment is located inside of the work area, ensure all openings on the equipment for return air are covered securely with plastic sheeting or other impermeable material. The Contractor shall retain the keys to unlock the air handlers after the asbestos work is complete and satisfactory final clearance air samples have been obtained.

G. Place a 10 x 10 foot drop cloth beneath each glove bag location. Use at least 6-mil plastic sheeting.

H. Install glove bag(s) following the manufacturer’s instructions. Install HEPA vacuum or other HEPA device to maintain negative pressure differential inside of glove bags. Testing company field technician shall challenge glove bag seals using smoke testing methods.

3.04 GLOVEBAG WORK PROCEDURES:

A. General. Perform all asbestos related work and comply with the general safety and health provisions in conformance with 29 CFR 1926.58 and 29 CFR 1910.20, respectively. In using the glove bag method for removing pipe insulation, a decontamination unit may not be required. However disposable clothing and respiratory protection will be required. Disposable clothing may be worn over street clothing as asbestos contaminated waste when leaving the work area.

B. Procedure. After the glove bag has been installed and tested cut covering on the insulation along the top seam to all wetting of the insulation, and cut cover all around section to be removed. Remove in small sections. Lower the insulation material carefully inside the glove bag. Do not permit it to drop. Ensure all material has been thoroughly saturated.

C. Removal of the Glove bag and Disposal.

1. Following removal of the insulation ensure that all visible material is inside the bag.

2. Spray all tools in glove bag with amended water while it is still attached.

3. Pull on of the gloves inside out to the outside of the glove bag and place cleaned tools in the glove.

4. Twist and tie off the glove in two places to facilitate keeping both tools and the glove bag sealed as the glove is cut between the ties to remove the glove.

5. Immerse the glove holding the tools in water. Remove the tools from the glove under water then re-clean the tools.

6. Evacuate the glove bag with a portable HEPA vacuum and while the bag is collapsed, squeeze bag below tool pouch, and twist bag. Seal bag with tape or locking ties, separating the waste from the removal area.

7. Vacuum the inside of the top of the glove bag and unsealed portion of the glove bag below. Keep HEPA vacuum connected until the glove bag is removed.

8. Cut the glove bag along the top and sides, and then remove from the pipe.

9. Wet pipe and wash the removal area thoroughly. Dispose of glove bag, material, and disposable equipment as contaminated waste.

10. Encapsulate surfaces formerly covered with ACM. Use a colored encapsulant that will be readily visible when dry.

3.05 VINYL ASBESTOS TILE (VAT) REMOVAL- SPECIAL PROCEDURES

A. Prior to commencing work the Contractor shall inspect, for prior damage, all items located in the intended work area and provide the contraction officer’s Representative a written list and photographs of any existing damage.

B. The following procedures shall apply when VAT is the only type of ACM to be removed within a specified area.

1. Install critical and supplemental barriers as needed so that a negative pressure differential can be established and maintained in the work area. Install warning signs at all critical barrier locations. Cover ceiling and walls at least one layer of 4mil plastic sheeting.

2. Cover any immovable furnishing and equipment in the work area with plastic sheeting taped securely in place. Use at least 4-mil plastic.

3. Shut down and lock off any air handling equipment serving the work area. Ensure all openings for supply and return air are covered securely with plastic sheeting or other impermeable material. The contractor shall retain the keys to unlock the air handlers after the asbestos work is complete and satisfactory final clearance air samples have been obtained.

4. Pre-clean the area using HEPA vacuum cleaners and wet wiping methods.

3.06 VAT WORK PROCEDURES:

A. General. Perform all asbestos related work and comply with the general safety and health provisions in conformance with the 29 CFR1926.58 and 29 CFR 1910.20, respectively. When VAT is the only ACM to be removed a decontamination unit may not be required. However, disposable clothing and respiratory protection will be required. Disposable clothing may be worn over street clothing as asbestos contaminated waste when leaving the work area.

B. Procedure. Keep VAT wet during removal work. Use amended water or a commercial preparation especially formulated for this type of work.

3.07 WORK AREAS OUTSIDE OF BUILDING (COOLING TOWERS AND ROOFS WITH ACM):

A. Preparation of work areas and removal procedures are as follows:

1. Coordinate sequence of work on roof to prevent water leakage into the building due to wet weather.

2. Post warning signs at all access points to the roof.

3. Post warning signs and privacy barrier around the perimeter of the work area.

(a) Exception. Asbestos warning ribbon may used around the work area in lieu of a privacy barrier when workers will not be visible from ground level.

4. Close, secure, and seal for duration of work all roof and wall openings and penetrations I work area except sanitary stack vents and storm water drains.

B. Removal of ACM from Cooling Tower.

1. General. Perform all asbestos related work and comply with the general safety and health provisions in conformance with the 29 CFR1926.58 and 29 CFR 1910.20, respectively. When work involves removal of a cooling tower with ACM a decontamination unit may not be required. Disposable clothing may be worn over street clothing.

2. Keep ACM moist by spray misting with amended water during removal. Material shall be kept wet until packaged disposal.

3. Avoid breaking up the material where possible.

4. Pieces of ACM to large to bag or with sharp points that could penetrate disposal bags shall be wrapped with a double layer of 6-mil plastic. Each layer shall be taped closed moisture tight. Label the outside layer with the appropriate warning sign.

5. Smaller pieces of ACM and debris that could be contaminated shall be double bagged in proper asbestos disposal bags then placed in rigid containers for transportation.

C. Removal of ACM Roofing Material.

1. General. Perform all asbestos related work and comply with the general safety and health provisions in conformance with the 29 CFR1926.58 and 29 CFR 1910.20, respectively. When work involves removal of roofing material containing asbestos, a decontamination unit may not be required. However disposable clothing and respiratory protection will be required. Disposable clothing may be worn over street clothing.

2. Cut wetted asbestos-containing roofing material with hand tools. Do not use power tools unless approved by local authority.

3. Remove the wetted material in small sections. Do no allow the material to dry out. As it is removed, place the saturated material in proper asbestos disposal bags. Double bag then place the material in rigid containers for transportation.

D. Special Safety Precautions. Discontinue all work on roof if either of the following conditions develops:

1. Wind velocities or gusts in the work area threaten the safety of workers or could blow loose objects to the ground.

2. Air samples taken downwind at the perimeter of the work area show airborne fiber counts 0.02 or greater

3.8 FIELD QUALITY CONTROL:

A. Air monitoring and Work Inspection:

1. Contractor shall responsible for conducting the personal monitoring required by 29 CFR 1926.58 for the contractor’s employees. The Contractor may also conduct other air monitoring as desired but at no expense to the Government.

2. The contracting Officer shall engage the services of an independent asbestos consultant/testing company (hereafter referred to as the contracting Officer’s authorized representative) to provide the following services:

a. Inspect and approve work area enclosures before work begins then inspect while work is in progress to monitor compliance with all applicable regulations and to ensure that workers are following approved work procedures. Perform final visual inspections prior to final clearance air monitoring.

b. Conduct all air monitoring except for the personal monitoring which is the responsibility of the Contractor. This includes ambient monitoring before preparation work is started; area monitoring while work is in progress, and final clearance monitoring. Then performance of personal monitoring for the contractor by contracting Officer’s authorized representative is strictly prohibited.

c. Air monitoring strategy for the sage accomplishment of the project shall be determined by the contracting officer’s authorized representative.

(1) If monitoring shows airborne concentrations greater than the asbestos control limits, the Contractor is required to stop all work and correct the conditions causing the excessive levels.

(2) When conditions causing excessive airborne fiber levels have been corrected to the satisfaction of the Contracting Officer’s authorized representative and the fiber levels have been lowered to below the control limits, work may resume. Such time delays shall be at the Contractor’s expense.

d. Determine satisfactory completion of the asbestos work through visual inspection and final clearance air monitoring then authorize removal of the work area enclosures.

e. Copies of all air monitoring reports shall be provided to the Contractor at no charge.

f. Air sample analysis shall routinely be by PCM. However, GSA reserves the option to utilize TEM at any time, including for final clearance monitoring.

B. Site Inspections:

1. While performing asbestos abatement work, in addition to inspection by the contracting Officer or their representative, the Contractor shall be subject to on site inspection by agency officials, by OSHA and EPA inspections, and state enforcement officials.

2. If found to be in violation of 40 CFR61 Subpart M, 29 CFR 1926.58, applicable state and local regulations, or not in compliance with these specifications, the Contractor shall cease all work immediately and until the violation or non compliance is resolved. Standby time and any additional air monitoring cost required to resolve the infraction shall be at the Contractor’s expense.

3. The contractor shall keep available two complete sets of equipment required for entry into the asbestos control area for use by compliance inspectors and other authorized visitors. The equipment shall be made available upon request after presentation of proper identification.

3.09 CLEANUP AND DISPOSAL

A. Housekeeping: Essential parts of asbestos dusts control actions are housekeeping and cleanup procedures. Maintain all surfaces in the work area free of accumulations of contaminated debris to prevent further dispersion. Use approved industrial vacuum cleaners equipped with HEPA filters to collect dust and small scrap. The blowing down of the spacer with compressed air is forbidden. Post appropriate asbestos hazard warning signs. In all possible instances, workmen shall cleanup asbestos scrap and waste with necessary respiratory equipment and protective clothing.

B. Disposal of Contaminated Waste:

1. Collect and dispose of friable asbestos waste, scrap, debris, bags, containers, consumable hand tools and asbestos-contaminated clothing which may produce airborne concentrations of asbestos fibers in sealed impermeable bags. Double bag prior to removing waste from work area. Prior to placing in bags, or containers, wet down asbestos wastes to minimize airborne fibers.

2. Asbestos waste materials shall be disposed of in accordance with all Federal regulations at a sanitary landfill approved for asbestos by the appropriate state or local authority.

3. Establish a temporary holding area approved by the Contracting Officer of properly packaged asbestos waste. Waste must be transported to the landfill in covered vehicle or in sealed, rigid, impermeable containers.

4. Utilize the Uniform Hazardous Waste manifest, EPA form 8700-22 (Rev. 4-85), or equivalent when transporting asbestos waste to the landfill and provide copies of all manifests to the Contracting Officer.

C. Final Cleaning and Visual Inspection:

1. All final cleaning shall be accomplished using HEPA vacuums and wet wiping methods. No visible dust or debris is allowed in the work area.

2. The final visual inspection will be conducted jointly by the Contractor and the Asbestos consultant. When the area has passed inspection the final clearance air sampling will be performed.

D. Final Clearance Monitoring and Removal of Enclosure:

1. Final clearance air samples shall be taken by the Contracting Officer’s authorized representative for analysis by PCM.

2. Five samples shall be taken in each work area. If any sample in a work area exceeds 0.01 f/cc, the work area must be re-cleaned and re-sampled. This will be repeated until satisfactory results are obtained.

a. Use aggressive sampling procedures in work areas where all ACM was removed.

b. Use passive sampling procedures in work areas where ACM was only selectively removed and some ACM still remains in the area.

c. When final clearance air samples meet the prescribed criteria of 0.01 f/cc or lower, all surfaces shall be encapsulated. Any pooling of encapsulant must be wiped up. The area must dry before the work area enclosure may be removed.

3. The Contracting Officer’s authorized representative shall determine satisfactory completion of the asbestos work through visual inspection and final clearance air monitoring. When the work has been determined as acceptable, the Contracting Officer’s authorized representative will authorize removal of the work area enclosures.

4. After the enclosure has been dismantled, re-clean the area of any common debris resulting from the work. Common cleaning methods may be used.

5. Warning signs and work area enclosures shall be removed when the work area has passed final visual inspection, satisfactory final air monitoring results have been obtained, and all encapsulated surfaces are dry.