GSA Southeast Sunbelt Region

Solicitation Questions

Date: September 17, 2020

RE:Solicitation Number 47PE0619R0049
North Carolina Partition Contract
Asheville, Charlotte, Raleigh-North Carolina

1. The Past Performance Questionnaire is attached to the amendment. Attached

2. Can the experience on similar projects have a total project construction cost at award of $250,000.00 since that is the maximum project size? Yes

3. On Page 78, the Solicitation states that “The Offeror must provide a GC Reference Form for each reference (a person or persons who may be contacted regarding the quality of the Offeror’s past performance).” Does this GC Reference Form follow a specific format, or is it a separate document that the Offeror is expected to download and fill out for each reference. And if so, is there GC Reference Form that can be downloaded from SAM or another source? Attached

4. The solicitation requires each resume for key personnel to have “project assignment” listed, can you please describe what this means? A detailed list of projects, or cross reference the projects listed with your Key Personnel.

5. I am also unable to locate the RFI deadline date, can you please disclose the cutoff date? RFI cutoff date is September 23, 2020 4:00 PM EST

6. What is the required page count for the proposal? No minimum page count but most responses should not exceed 2 to 3 pages per question.

7. 11.D. Technical Proposal” states: The Offeror must demonstrate successful experience as a General Construction (GC)Contractor responsible for the construction of at least two (2) similar projects substantially completed within the last five (5) years. A “similar project” is defined as a project that is comparable in nature, type, and complexity as defined by all of the following characteristics:

● Project involved the renovation or the modernization of a comparably sized structure;

● Project was performed in an occupied and functioning office building;

● Project involved all of the following disciplines - architectural, civil, structural, HVAC, plumbing, electrical, fire alarm, elevator, and telecommunications;

● Project included historic restoration and repair of a building listed or eligible to be listed on the National Register of Historic Places;

● Project included Hazardous Material abatement (e.g., asbestos, lead, PCBs, mold, etc).

● Project included requirements for noise control

● The total project construction cost at award of the construction contract(s) was not less than $10 million. Should be $10K to $250K.

8. Does the last characteristic “The total project construction cost at award of the construction contract(s) was not less than $10 million, still apply to this IDIW as a requirement? Should be $10K to $250K.

image1.jpeg