Arriba - Advertisement.pdf
PDF 412 KB Posted
- Attached to
- Arriba Rest Area Remodel
- Solicitation number
- 25422
- Issued by
- Kit Carson County, Colorado
About this file
This is an Advertisement for Bids (AFB) issued by the Colorado Department of Transportation (CDOT) for the Arriba Rest Area Remodel project, a design/bid/build construction opportunity. The project involves remodeling the Arriba Rest Area, which includes replacing all finishes, fixtures, and updating plumbing and electrical systems to current codes. A minor structural repair for a small exterior CMU structure portion is required, along with installing a new domestic water line to the annex restrooms. The project scope covers two restrooms and select lobby areas, with an estimated contract cost of $250,000. A mandatory pre-bid meeting is scheduled for July 17, 2024, at 11:00 AM at the job site, and sealed electronic bids are due by July 31, 2024, at 2:00 PM. The project timeline anticipates contract approval by August 30, 2024, a notice to proceed on September 3, 2024, substantial completion by January 1, 2025, and final acceptance by February 14, 2025.
Bidders must meet specific minimum requirements, including having provided general contracting services for at least two projects over $250,000 in the last three years, demonstrating experience in similar project scopes, and showing bonding capability of up to $250,000. The project is subject to Davis-Bacon wage requirements, and a bid bond of at least 5% of the total bid is required for contracts valued at $50,000 or more. Preference will be given to Colorado resident bidders and Colorado labor. Bidding documents can be obtained through BidNet.com, and the solicitation includes multiple appendices covering information for bidders, bid forms, wage rates, performance bonds, and other relevant documentation.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OSA-AFB-1
REV 7/2021
ADVERTISEMENT FOR BIDS
Design/Bid/Build State of Colorado
Colorado Department of Transportation Notice Number: 25422
Project No: 25422 Project Title: Arriba Rest Area Remodel Estimated Contract Cost: $250,000.00
Project Description
Qualified General Contractors (GCs) are invited to bid on the remodel of the Arriba Rest Area. The remodel will replace all finishes, fixtures and update all plumbing and electrical to current codes. A minor structural fix is required for a small exterior portion of the CMU structure. A plumbing domestic water line will need to be run to the annex restrooms. The remodel will include the two restrooms and select areas in the lobby.
Minimum Requirements
Notice is hereby given to all interested parties that all firms will be required to meet all minimum requirements to be considered for this project. To be considered as qualified, interested firms shall have, as a minimum:
1. Provided General Contracting services within the last three (3) years for at least two (2) projects each in excess of $250,000.00 (hard costs), utilizing the expertise present in their Colorado Office;
and
2. Demonstrated specific General Contracting experience in projects of similar scope and complexity; and
3. Demonstrated bonding capability up to $250,000.00 for an individual project coincidentally with current and anticipated workloads; provide letter from surety that affirms this capacity; and
4. Attended and signed in at the Mandatory Pre-Bid Conference
5. Not previously terminated by CDOT for non-performance or disqualified as a non-responsible bidder on a State Buildings contract or procurement.
Firms meeting the minimum requirements may obtain the bidding documents on the website accompanying this advertisement.
BidNet.com
Other Information
1. The contract shall be awarded with reasonable promptness by written notice to the low responsible bidder whose bid meets the requirements and criteria set forth in the invitation for bids. In the event that all bids for a State Buildings project exceed available funds, as certified by the appropriate fiscal officer, the responsible officer is authorized, in situations where time or economic considerations preclude resolicitation of work of a reduced scope, to negotiate an adjustment of the bid price with the low responsible bidder in order to bring the bid within the amount of available funds; except that the functional specifications integral to completion of the project may not be reduced in scope, taking into account the project plan, design, and specifications and quality of materials. (Procurement Code 24-92-103 (7)
2. CDOT reserves the right to waive informalities or irregularities and to reject any and all Bids.
3. Preference shall be given to Colorado resident bidders and for Colorado labor, as provided by law.
4. The Principal Representative has determined that the entire project shall be substantially complete within 120 calendar days from the date of the Notice to Proceed and the project shall be finally complete, including the delivery of any or all guarantees and warranties, the submittal of sales and use tax payment forms, the completion of the final punch list and the calling for final inspection, within 44 calendar days, if applicable, from the date of substantial completion.
In accordance with Article 46 of the General Conditions of the Contract, Time of Completion and Liquidated Damages, failure to complete the work within the agreed number of calendar days shall be considered breach of contract and subject the bidder to liquidated damages to the extent specified in Article 54D of the General Conditions of the Contract. If this project is awarded under $150,000 and a Purchase Order is used in lieu of a State Buildings Contract, then Liquidated Damages will not apply.
5. C.R.S. §24-92-202 applies to this Advertisement for Bid because it advertises a Colorado Department of Transportation public project, as defined by C.R.S. §24-92- 201(5). All employees of the selected Bidder/Proposer/Vendor and all employees of any subcontractor who perform work under the contract issued pursuant to this Advertisement for Bid must be paid in accordance with the wage requirements of the federal Davis-Bacon Act, 40 U.S.C. §3141 et. seq., and Related Federal Acts, see also 40 U.S.C. §276(a), 29 C.F.R. Parts 1, 3, 5, 6, and 7, collectively referred to as “DBRA” and receive the minimum compensation as required by the DBRA. Any DBRA requirement that addresses the payment of wages, including when wages and overtime must be paid, will be required. Any requirement of DBRA that addresses reporting is not required. CDOT will require the contractor to fill out, sign and submit the Contractor Wage Compliance Certification with each Pay Application. The minimum DBRA wages to be paid are established by the U.S. Department of Labor. The applicable DBRA wages for the Public Project work to be performed pursuant to this Solicitation are attached as Appendix E. All subcontracts must contain this requirement and the selected Bidder/Proposer/Vendor shall, and shall ensure that all subcontractors, maintain and make available for review, inspection, and audit by the State all project records as are necessary to document compliance with applicable portions of the DBRA.
6. Labor and Material, Performance Bonds (if bid is over $150,000), Certificates of Insurance, Labor Burden Spreadsheet will be required at contract signing.
7. For all projects with a total dollar value above $150,000 Notice of Final Settlement is required by C.R.S. §38-26-107(1). Final Settlement, if required, will be advertised in the same location as the original solicitation.
8. Per C.R.S. §24-105-201 If the contract value is $50,000 or greater a Bid Bond and Power of Attorney or Proposal Guaranty is required in an amount not less than 5% of the total Bid.
Pre-Bid Meeting
A mandatory Pre-Bid Meeting will be held at the job site located at the Arriba Rest Area.
Address: I-70 Frontage Road, Arriba, Colorado Room: Outside of the Rest Area building Date/Time: Wednesday July 17, 2024 11:00 AM
Schedule/Submission Details
1. The schedule of events for the AFB process and an outline of the schedule for the balance of the project is as follows:
Advertisement 07/10/2024 Mandatory Pre-Bid Conference and Tour 07/17/2024 Date Email Questions Due 07/24/2024 Date Email Answers Issued 07/25/2024 Sealed Bids Due/Public Bid Opening 07/31/2024 Anticipated Contract Approval 08/30/2024 Anticipated Notice to Proceed 09/03/2024 Anticipated Substantial Completion (120 days) 01/01/2025 Anticipated Final Acceptance (44 days) 02/14/2025
2. One (1) electronic copy of the sealed bid are due Wednesday July 31, 2024 and shall be received no later than 2:00 PM (MD/ST), and shall be submitted/accepted via BidNet at the following address:
Agency: Colorado Department of Transportation Contact Name: Robert Wilson Address: www.bidnet.com
Comments: Late sealed bids will be rejected without consideration. The Colorado Department of Transportation and the State of Colorado assume no responsibility for costs related to the preparation of submittals.
3. The above schedule is tentative. Responding firms shall be notified of revisions in a timely manner by email or posted on BidNet.com. Respondents may elect to verify times and dates by email, but no earlier than 36 hours before the scheduled date and time.
Point of Contact/Clarification
Name: Robert L. Wilson Agency: Colorado Department of Transportation (CDOT) Phone: 303-548-6819 Email: Robert.L.Wilson@state.co.us
This Notice is also available on the web at:
www.Bidnet.com Publication Dates: 07/10/2024 – 07/31/2024
APPENDICES:
Appendix A: Information for Bidders (SBP-6.12)
Appendix B: Bid Form (SBP-6.13) – required bid submittal
Appendix B1: Bid Bond (SBP-6.14) – required bid submittal
Appendix C: Direct Labor Burden Calculation (SBP-6.18)
Appendix D: Applicable Prevailing Wage Rates
Appendix E: Contractor Wage Compliance Statement
Appendix F: Performance Bond (if over $150,000)
Appendix G: Labor and Material Bond (if over $150,000)
Appendix H: Sample Contract
Appendix I: Procedural Docs
Appendix J: Scope of Work
Appendix K: Construction Drawings
Appendix L: Construction Specifications
Appendix M: Storm Water Management Plan
Appendix N: Structural Observation Report http://www.bidnet.com/