This document is Pre-Bid Meeting Minutes and Addendum No. 1 for the Biden Microgrid project issued by the Delaware Army National Guard on October 22, 2026. The project involves designing, engineering, and installing a new microgrid system to support the Biden Headquarters, Duncan Readiness Center, Army Aviation Support Facility (AASF), AASF Cold Storage Building, and AASF Fire Pump House located at 1 Vavala Way, New Castle, Delaware 19720. The scope includes site work, photovoltaic solar arrays, battery energy storage systems, electrical distribution, switchgear, SCADA controls, cybersecurity infrastructure, structured cabling, natural gas distribution, water utility piping, fencing, and directional boring services. A mandatory pre-bid meeting was held on October 14, 2026 at 10:00 a.m., with forty-seven representatives from various construction firms and engineering companies in attendance. Sealed bids are due November 10, 2026 at 1:00 p.m. at the Delaware Army National Guard's main lobby, with bids to be publicly opened and read aloud immediately thereafter. A follow-up site walk-through was tentatively scheduled for October 21, 2026 at 11:00 a.m. The deadline for submission of contractor questions and substitution requests is October 31, 2026 at 1:00 p.m. The contract will be awarded to the lowest responsive and responsible bidder and executed within twenty calendar days of award notice.

The base bid includes all work shown on the contract documents with a $1,000,000 allowance for utility company charges and impact fees. Alternate Bid No. 1 provides the option to use directional boring instead of open cut excavation, which the contractor must clearly identify as an ADD or DEDUCT. Bid security equal to ten percent of the bid amount is required, with the successful contractor required to furnish performance and payment bonds equal to one hundred percent of the contract price. Contractors must be registered plan holders to submit bids, submit bids in duplicate (one original, one copy), and include a completed subcontractor list identifying all electrical, mechanical, concrete, directional boring, site work, structured cabling, fencing, cybersecurity, and PV solar subcontractors. Contractors must comply with Delaware prevailing wage requirements for New Castle County building construction classification and implement a mandatory drug testing program for all employees and subcontractors on the jobsite. Only State contractors currently under contract with the Department of Technology and Information may perform fiber and structured cabling work. Work is restricted to Monday through Thursday, 7:00 a.m. to 5:00 p.m., with facility shutdowns permitted only on weekends or holidays at the owner's convenience. All staff must pass background checks for access to the military facility. The contractor is responsible for all third-party testing and inspection coordination, temporary toilet facilities, equipment security, and material storage under their control. A two-year warranty on all work and materials is required beginning on the date of substantial completion.

View the file

Other files

File Type Posted
ARNG2318-BIDENMICROGRID_pw.pdf PDF
ARNG2318-BIDENMICROGRID_specs.pdf PDF
ARNG2318-BIDENMICROGRID_epp.pdf PDF
ARNG2318-BIDENMICROGRID_itb.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRE-BID MEETING MINUTES - ADDENDUM NO. 1

BIDEN MICROGRID

DELAWARE ARMY NATIONAL GUARD

1 VAVALA WAY, NEW CASTLE, DE 19720

DE ARNG PROJECT: 2023-18

NGB PN 100110/94951

A Mandatory Pre-Bid Meeting for the referenced project was held in the Biden NG/ Reserve Center 2nd Floor Conference Room on Wednesday, October 14, 2026, at 10:00 a.m. Those in attendance were:

Nikia Wongus Delaware Army National Guard Eugene Bledsoe Delaware Army National Guard Jermey Minner Delaware Army National Guard Tom Wysocki Wysocki Electric Savio Antao Dekla, Inc.

Guru Mony Dekla, Inc.

Teagan DiRusso Bayline Construction Bryan Smith Filec Services Andrew Timmons The Ultra Solar Group Brandon Caprarola The Ultra Solar Group Jeff O’Conner Radius Systems, LLC Jon Pugh Fidelity Power Systems Thomas O’Flynn Superior Electric Jimmie Fitzsimmons Superior Electric Scott Baker Eaton Jaska Tarkka Eaton Matt Koepke Eaton Douglas Wilson Preferred Electric Garett Corn Dvorak, LLC James Foraker Battaglia Rob Bolen Battaglia Josh Morris B.W. Electric, Inc Lewis Kimball Kimball Construction Co.

Jason Holdren A-Del Construction David Roberts Bancroft Construction Chris Hoeger Carr & Duff Kim Lombardi Amakor, Inc.

Chidozie Dike DK Construction Services, LLC Ian Fairorth, P.E. Verdantas, Inc.

Brady Brodsho, P.E. WSP Engineers, Inc.

Ring Lardner, P.E. Davis, Bowen & Friedel, Inc.

Matthew Galinskie, AEE Fayda Engineering & Energy Solutions, LLC Heather Fayda Fayda Engineering & Energy Solutions, LLC Edward Fayda, P.E. Fayda Engineering & Energy Solutions, LLC

Pre-Bid Meeting Minutes & Addendum No. 1 Biden Microgrid DE ARNG Project # 2023-18-NGB PN 100110/94951

Date of Report: October 22, 2026 FE&ES Comm. No.: 24-1614

Items of Discussion:

1.0 These Pre-Bid Meeting Minutes, Addendum No. 1, shall be made part of the Project Manual and

Drawings dated September 2026 for the “ Biden Microgrid”.

2.0 Sealed bids for ARNG2318 – BIDEN MICROGRID will be received by the Delaware Army National

Guard by mail at the Security Officers Desk in the Main Lobby of the Biden National Guard/Reserve Center, 1 Vavala Way, New Castle, Delaware 19720 1:00 PM local time on Tuesday, November 10, 2026, at which time they will be publicly read aloud in the Multi-Purpose Room.

Sealed bids shall be mailed and addressed to the Delaware Army National Guard, 1 Vavala Way, New Castle, Delaware 19720; ATTN: Nikia Wongus, Business Manager. The outer envelope should clearly indicate: “ARNG2318 – BIDEN MICROGRID; – BIDEN MICROGRID – SEALED BID – DO NOT

OPEN.”

3.0 This is a mandatory pre-bid meeting and prime bidders are limited to those in attendance. A copy of the sign-in sheet is attached.

4.0 For further bidding information relating to the Project Manual and Drawings, the contractors are directed to contact Edward Fayda, P.E., Project Manager at Fayda Engineering & Energy Solutions, LLC at telephone: 302-999-1060. Contractor Requests for Clarification or Interpretation shall be delivered electronically (by email) to efayda@faydaees.com with copy to mgalinskie@faydaees.com. Ensure the project title, contractor’s name and RFI # are in the subject line. (Example: DE ARNG Biden Microgrid “Contractor Name”- RFI#1).

5.0 The wage rates for this Project are Delaware Department of Labor and Division of Industrial Affairs for New Castle County, Building Construction Classification. A certified copy of the prevailing wage rates for this specific project has been determined by the Department of Labor and is included in the Project Manual. This approved scale of wages must be posted by the Contractor in a prominent and easily accessible place at the work site.

6.0 Contractors are reminded that if they are a recognized contractor that customarily performs the work of a given subcontractor classification; that they can list themselves on the line for that particular subcontractor category. DO NOT LEAVE ANY BLANKS ON THE BID FORM. DO NOT ADD

ANY ADDITIONAL VERBIAGE OTHER THAN WHAT IS REQUESTED. FAILURE TO DO SO MAY

DISQUALIFY YOUR BID. As an example, if you are an electrical contractor that will self-perform the electrical work, that you list your company on the Electrical Subcontractor line on the bid form.

Ensure your address, business license, etc. is also included.

7.0 The prime contractor and all listed subcontractors must have a drug testing program in place.

There is an Affidavit included with the Bid Form.

DE ARNG Project # 2023-18-NGB PN 100110/94951

8.0 Project Summary

Project scope: This project will provide a new microgrid to support the Biden Headquarters, Duncan Readiness Center, Army Aviation Support Facility (AASF), AASF Cold Storage Building and AASF Fire Pump House.

Base Bid:

1. Provide all work shown on the contract documents.

Alternates:

1. Alternate #1 is to provide underground services via directional boring in lieu of open cut excavation.

Contractor must clearly identify if this Alternate is an ADD or a DEDUCT on Bid Form.

Unit Prices:

1. There are no Unit Prices.

Allowances:

Allowance #1: Include an allowance amount equal to $1,000,000.00 in the Base Bid for Utility Company Costs.

9.0 Contractor must be a registered plan holder in order to submit a bid. Bid Form shall be submitted in duplicate (one original, one copy). Only those registered plan holders will be sent future addenda.

10.0 A two (2) year warranty is required on work and materials beginning on the date of substantial completion. Refer to Division 25-27 Specifications for additional equipment warranty requirements

11.0 One of the purposes of the pre bid is to establish a list of subcontractors. The attached bid form will include all those to be included.

1. Electrical

2. Mechanical

3. Concrete

4. Directional Boring

5. Site Work

6. Structured Cabling

7. Fencing

8. Cyber Security

9. PV Solar

Any subcontractors used but not specifically named must also be listed as a 3rd tier subcontractor under the listed subcontractor category. The omission of a required 3rd tier subcontractor may render your bid non-responsive. When in doubt, list it.

12.0 The following sections of the specifications were reviewed:

Section Article Title

--- Advertisement for Bids 00 21 13 3.3 Instructions to Bidders 00 41 13 --- Bid Form & Subcontractor Listing 00 81 14 --- Drug Testing Report Forms

DE ARNG Project # 2023-18-NGB PN 100110/94951

01 10 00 1.03 Project Summary 01 21 00 3.03 Allowances

13.0 The design drawings were generally reviewed to present the intent of the contract documents.

Two (2) reference drawings were reviewed as part of the presentation to provide a general overview of the Buildings and associated services that will be affected by this project. These drawings have been included as an Attachment to this Addendum for reference purposes only.

14.0 The following items were discussed in detail:

A. In accordance with Specification Section 27 60 00 Structured Cabling System, only those

State contractors who are currently under contract with the Department of Technology and Information shall perform all fiber and structured cabling work on the project.

B. Working Restrictions:

1. This is a Military Facility. Restricted access is required 24/7/365. Work shall only be performed during normal working hours and during DE ARNG operating hours; except for facility shutdowns. Shutdowns must be performed on Saturdays, Sundays and/or

Holidays; and at the convenience of the DE ARNG.

2. Only staff that have submitted and received approval of a background check will be permitted on site.

3. On-Site Work Hours: Limit work at the facility to normal business working hours of 7:00 a.m. to 5:00 p.m.; Monday thru Thursday. Additional hours shall be coordinated with the owner in advance.

C. All materials and equipment should be in the contractor’s possession prior to mobilization.

D. Contractors are to contact the Department of Labor if they have any questions with regard to the State Prevailing Wage Law or clarifications on payroll reporting. Telephone number is 302-451-3423.

E. Substitution Requests: A standard of design is identified in the specifications along with pre-approved equals. Any manufacturer other than the Standard of Design will be required to submit a complete submission for review for acceptance and posting via

Addendum. The deadline for substitutions is 10 days prior to receipt of bids, or 1:00

PM, on October 31, 2026.

F. All questions should be directed in writing to the Engineer. Contractors are encouraged to submit questions as soon as possible. All answers to questions not in addendum format will not be binding. In the case of a conflict between the specifications and drawings or

DE ARNG Project # 2023-18-NGB PN 100110/94951 within each not answered by addendum, the greater quantity or better quality shall be provided. The deadline for questions shall be Wednesday, November 4, 2026 at 1:00 PM.

G. Contractor will be responsible for the 3rd Party testing and inspection. DE ARNG will contract directly with a third-party testing and inspection agency for subgrade compaction, rebar inspection, concrete testing, etc. services. Prime contractor will be responsible for coordination of testing and inspection requirements with third-party agency.

H. Billing for stored material will not be paid unless the material is on the jobsite and in a secure location under the contractor’s control. DE ARNG will assist with providing area for materials storage; however, it may not be a secured area.

I. Contractors will not be given access to toilet facilities. Contractor shall include costs for a temporary toilet for the duration of on-site construction.

J. Vehicles & other equipment shall not be left unattended and shall be secured at all times.

K. The facility is tobacco free. No form of tobacco is permitted on site; including e-cigarettes.

L. Contractors are reminded that it will be unlikely that the bid due date will change.

15.0 The successful contractor shall designate one job foreman who will remain as the main point of contact throughout the duration of the project. This foreman must be on-site whenever any sub-contractors are on-site.

16.0 A copy of the DE ARNG 2027 Work Schedule is included for reference. Contractors are advised to review the schedule to identify which days the Facility will be closed and will not be accessible for work.

17.0 Reminder: For your bid to be deemed responsive, you need to include:

1. Bid Form - One (1) Original & One (1) Copy; fully executed, no blanks use the latest version published by Addenda.

2. Bid Bond or Certified check in the amount of 10% of your bid.

3. Drug Testing Affidavit for Prime Contractor.

4. DE Business License for the Prime Contractor. This is a DE ARNG Requirement.

18.0 A site review of the project site was performed. A follow up walk-thru is tentatively scheduled for October 21, 2026 @ 11:00am for all registered attendees. Contact Matt Galinskie at 302- 690-4626 prior to October 19, 2026 to register for the walk- thru. If no one registers, the walk through will be cancelled.

DE ARNG Project # 2023-18-NGB PN 100110/94951

19.0 Changes to Specifications

19.1 Section 00 41 13 Bid Form:

a. Replace Bid Form in project manual with one attached to these minutes. Unless a subsequent bid form is issued by addenda, this one will be the one to be used with the contractor’s bid.

20.0 Changes to Drawings

20.1 Drawing E-33

a. Add Drawing E-33 in its entirety.

21.0 Questions/Clarifications

21.1 Will the Facility provide a water source for site work or construction purposes?

Reply: No, contractor shall provide all water required for construction.

21.2 What is the existing BAS control system at the Biden Headquarters?

Reply: The existing system is by Automated Logic.

21.3 Who is responsible for inspections of excavated materials?

Reply: The contractor shall be responsible for all inspections and proper disposal of excavated materials. Refer to Project Manual Appendix B: Contaminated Materials Management Plan (CMMP) for site conditions reports and required procedures.

______Original Signature on File________ Edward Fayda, P.E.

EF/ef 23-1583 Pre Bid Meeting Minutes - Addendum #1

Attachments: 1. Pre-Bid Meeting Sign-In Sheet

2. Revised Bid Form

3. 2027 DE ARNG Work Schedule

4. Drawing E-33

5. Presentation Reference Drawings REF-1, REF-2 cc: All in Attendance All Registered Plan Holders

P File

Pre-Bid Meeting Minutes-Addendum #1

DELAWARE ARMY NATIONAL GUARD BIDEN MICROGRID

DE ARNG PROJECT #: 2023-18- NGB PN 100110/94951

BIDEN MICROGRID

BIDEN HEADQUARTERS, AASF BUILDING, AASF COLD STORAGE BUILDING,

AASF FIRE PUMP HOUSE, DUNCAN READINESS CENTER

DE ARNG PROJECT#: 2023-18, NGB PN 100110/94951

BID FORM

FAYDA ENGINEERING & ENERGY SOLUTIONS BID FORM

FE&ES Comm.: 23-1583 00 41 13-1

For Bids Due: 1:00 PM, Local Time; November 10, 2026 To: Nikia Wongus, Business Manager Delaware Army National Guard Biden National Guard/Reserve Center 1 Vavala Way.

New Castle, DE 19720

Name of Bidder:

Delaware Business License No.: Taxpayer ID No.:

(Other License Nos.):

Phone No.: ( ) - Fax No.: ( ) -

The undersigned, representing that he has read and understands the Bidding Documents and that this bid is made in accordance therewith, that he has visited the site and has familiarized himself with the local conditions under which the Work is to be performed, and that his bid is based upon the materials, systems and equipment described in the Bidding Documents without exception, hereby proposes and agrees to provide all labor, materials, plant, equipment, supplies, transport and other facilities required to execute the work described by the aforesaid documents for the lump sum itemized below:

Base Bid: PROVIDE ALL WORK SHOWN ON THE CONTRACT DOCUMENTS.

Amount: ($ )

ALTERNATES

Alternate prices conform to applicable project specification section. Refer to specifications for a complete description of the following Alternates. An “ADD” or “DEDUCT” amount is indicated by the crossed-out part that does not apply.

Alternate #1: Directional Drilling/Boring in lieu of Open Cut Excavation per Civil Drawings.

Add/Deduct Amount: _________________________________________________________________ ($ )

ALLOWANCES:

ALLOWANCE #1-UTILITY COMPANY ALLOWANCE: We have included an allowance amount equal to $1,000,000 in the Base Bid for all costs for utility company charges/impact fees. I/We have reviewed and familiarized ourselves with the requirements contained in Specification Section 01 21 00 Allowances.

Acknowledged by: __________________________________________________

UNIT PRICES

Unit prices conform to applicable project specification section. Refer to the specifications for a complete description of the following Unit Prices:

There are No Unit Prices

Pre-Bid Meeting Minutes-Addendum #1

BIDEN MICROGRID DELAWARE ARMY NATIONAL GUARD

DE ARNG PROJECT #: 2023-18-NGB PN 100110/94951

BIDEN MICROGRID

BIDEN HEADQUARTERS, AASF BUILDING, AASF COLD STORAGE BUILDING,

AASF FIRE PUMP HOUSE, DUNCAN READINESS CENTER

DE ARNG PROJECT#: 2023-18, NGB PN 100110/94951

BID FORM

BID FORM FAYDA ENGINEERING & ENERGY SOLUTIONS

00 41 13-2 FE&ES Comm.: 23-1583

I/We acknowledge Addendums numbered and the price(s) submitted include any cost/schedule impact they may have.

This bid shall remain valid and cannot be withdrawn for thirty (30) days from the date of opening of bids (60 days for School Districts and Department of Education), and the undersigned shall abide by the Bid Security forfeiture provisions. Bid Security is attached to this Bid.

The Owner shall have the right to reject any or all bids, and to waive any informality or irregularity in any bid received.

This bid is based upon work being accomplished by the Sub-Contractors named on the list attached to this bid.

Should I/We be awarded this contract, I/We pledge to achieve substantial completion of all the work within calendar days of the Notice to Proceed.

The undersigned represents and warrants that he has complied and shall comply with all requirements of local, state, and national laws;

that no legal requirement has been or shall be violated in making or accepting this bid, in awarding the contract to him or in the prosecution of the work required; that the bid is legal and firm; that he has not, directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken action in restraint of free competitive bidding.

Upon receipt of written notice of the acceptance of this Bid, the Bidder shall, within twenty (20) calendar days, execute the agreement in the required form and deliver the Contract Bonds, and Insurance Certificates, required by the Contract Documents.

I am / We are an Individual / a Partnership / a Corporation

By Trading as (Individual’s / General Partner’s / Corporate Name)

(State of Corporation)

Business Address:

Witness: By:

( Authorized Signature )

(SEAL)

( Title )

Date:

ATTACHMENTS

Sub-Contractor List Non-Collusion Statement

Affidavit of Employee Drug Testing Program Affidavit of Contractor Qualifications

Bid Security (Others as Required by Project Manuals)

Pre-Bid Meeting Minutes-Addendum #1

BIDEN MICROGRID

BIDEN HEADQUARTERS, AASF BUILDING, AASF COLD STORAGE BUILDING,

AASF FIRE PUMP HOUSE, DUNCAN READINESS CENTER

DE ARNG PROJECT#: 2023-18, NGB PN 100110/94951

BID FORM

FAYDA ENGINEERING & ENERGY SOLUTIONS BID FORM

FE&ES Comm.: 23-1583 00 41 13-3

SUBCONTRACTOR LIST

In accordance with Title 29, Chapter 69, Section 6962(d)(10)b of the Delaware Code, the following subcontractor listing must accompany any bid submittal. The bidder must list in each category the full name and address (City & State) of the sub-contractor that the bidder will be using to perform the work and provide material for that subcontractor category. Should the bidder’s listed subcontractor intend to provide any of their subcontractor category of work through a third-tier contractor, the bidder shall list that third-tier contractor’s full name and address (City & State). If the bidder intends to perform any category of work itself, it must list its full name and address. For clarification, if the bidder intends to perform the work themselves, the bidder may not insert “not applicable”, “N/A”, “self” or anything other than its own full name and address (City & State). To do so shall cause the bid to be rejected. In addition, the failure to produce a completed subcontractor list with the bid submittal shall cause the bid to be rejected. If you have more than three (3) third-tier contractors to report in any subcontractor category, print out additional page(s) containing the appropriate category, complete the rest of your list of third-tier contractors for that category, notate the addition in parentheses as (CONTINUATION) next to the subcontractor category and an asterisk (*) next to any additional third-tier contractors, and submit it with your bid.

Subcontractor Category Subcontractor Address (City & State) Subcontractors tax-payer ID # or Delaware Business license #

1. Electrical

A.

B.

C.

2. Mechanical

A.

B.

C.

Pre-Bid Meeting Minutes-Addendum #1

BIDEN MICROGRID

BIDEN HEADQUARTERS, AASF BUILDING, AASF COLD STORAGE BUILDING,

AASF FIRE PUMP HOUSE, DUNCAN READINESS CENTER

DE ARNG PROJECT#: 2023-18, NGB PN 100110/94951

BID FORM

BID FORM FAYDA ENGINEERING & ENERGY SOLUTIONS

00 41 13-4 FE&ES Comm.: 23-1583

3. Concrete

A.

B.

C.

4. Directional Boring

A.

B.

C.

5. Site Work

A.

B.

C.

Pre-Bid Meeting Minutes-Addendum #1

BIDEN MICROGRID

BIDEN HEADQUARTERS, AASF BUILDING, AASF COLD STORAGE BUILDING,

AASF FIRE PUMP HOUSE, DUNCAN READINESS CENTER

DE ARNG PROJECT#: 2023-18, NGB PN 100110/94951

BID FORM

FAYDA ENGINEERING & ENERGY SOLUTIONS BID FORM

FE&ES Comm.: 23-1583 00 41 13-5

6. Structured Cabling

A.

B.

C.

7. Fencing

A.

B.

C.

8. Cyber Security

A.

B.

C.

Pre-Bid Meeting Minutes-Addendum #1

BIDEN MICROGRID

BIDEN HEADQUARTERS, AASF BUILDING, AASF COLD STORAGE BUILDING,

AASF FIRE PUMP HOUSE, DUNCAN READINESS CENTER

DE ARNG PROJECT#: 2023-18, NGB PN 100110/94951

BID FORM

BID FORM FAYDA ENGINEERING & ENERGY SOLUTIONS

00 41 13-6 FE&ES Comm.: 23-1583

9. PV Solar

A.

B.

C.

Pre-Bid Meeting Minutes-Addendum #1

BIDEN MICROGRID

BIDEN HEADQUARTERS, AASF BUILDING, AASF COLD STORAGE BUILDING,

AASF FIRE PUMP HOUSE, DUNCAN READINESS CENTER

DE ARNG PROJECT#: 2023-18, NGB PN 100110/94951

BID FORM

FAYDA ENGINEERING & ENERGY SOLUTIONS BID FORM

FE&ES Comm.: 23-1583 00 41 13-7

NON-COLLUSION STATEMENT

This is to certify that the undersigned bidder has neither directly nor indirectly, entered into any agreement, participated in any collusion or otherwise taken any action in restraint of free competitive bidding in connection with this proposal submitted this date (to the Delaware Army National Guard).

AFFIRMATION: Within the past five years, has your firm, any affiliate, any predecessor company or entity, owner, Director, officer, partner or proprietor been the subject of a Federal, State, Local government suspension or debarment?

YES_____________ NO_____________ If yes, please explain (use separate page and include with Bid Form.) YES, include with bid form.

All the terms and conditions of DE ARNG PROJECT: 2023-18, NGB PN 100110/94951 have been thoroughly examined and are understood.

NAME OF BIDDER:

AUTHORIZED REPRESENTATIVE

(TYPED):

AUTHORIZED REPRESENTATIVE

(SIGNATURE):

TITLE:

ADDRESS OF BIDDER:

E-MAIL: ______________________________________________________________

PHONE NUMBER:

Sworn to and Subscribed before me this day of 20 .

My Commission expires . NOTARY PUBLIC .

THIS PAGE MUST BE SIGNED AND NOTARIZED FOR YOUR BID TO BE CONSIDERED.

Pre-Bid Meeting Minutes-Addendum #1

BIDEN MICROGRID

BIDEN HEADQUARTERS, AASF BUILDING, AASF COLD STORAGE BUILDING,

AASF FIRE PUMP HOUSE, DUNCAN READINESS CENTER

DE ARNG PROJECT#: 2023-18, NGB PN 100110/94951

BID FORM

BID FORM FAYDA ENGINEERING & ENERGY SOLUTIONS

00 41 13-8 FE&ES Comm.: 23-1583

AFFIDAVIT

OF

EMPLOYEE DRUG TESTING PROGRAM

4104 Regulations for the Drug Testing of Contractor and Subcontractor Employees Working on Large Public Works Projects requires that Contractors and Subcontractors implement a program of mandatory drug testing for Employees who work on Large Public Works Contracts funded all or in part with public funds.

We hereby certify that we have in place or will implement during the entire term of the contract a Mandatory Drug Testing Program for our employees on the jobsite, including subcontractors, that complies with this regulation:

Contractor/Subcontractor Name:

Contractor/Subcontractor Address:

Authorized Representative (typed or printed):

Authorized Representative (signature):

Title:

Sworn to and Subscribed before me this day of 20 .

My Commission expires . NOTARY PUBLIC .

THIS PAGE MUST BE SIGNED AND NOTARIZED FOR YOUR BID TO BE CONSIDERED.

Pre-Bid Meeting Minutes-Addendum #1

BIDEN MICROGRID

BIDEN HEADQUARTERS, AASF BUILDING, AASF COLD STORAGE BUILDING,

AASF FIRE PUMP HOUSE, DUNCAN READINESS CENTER

DE ARNG PROJECT#: 2023-18, NGB PN 100110/94951

BID FORM

FAYDA ENGINEERING & ENERGY SOLUTIONS BID FORM

FE&ES Comm.: 23-1583 00 41 13-9

AFFIDAVIT

OF

CONTRACTOR QUALIFICATIONS

We hereby certify that we will abide by the contractor’s qualifications outlined in the construction bid specifications for the duration of the contract term.

In accordance with Title 29, Chapter 69, Section 6962(d)(10)b.3 of the Delaware Code, after a contract has been awarded the successful bidder shall not substitute another subcontractor whose name was submitted on the Subcontractor Form except for the reasons in the statute and not without written consent from the awarding agency. Failure to utilize the subcontractors on the list will subject the successful bidder to penalties as outlined in the General Requirements Section 5.2 of the contract.

Contractor Name:

Contractor Address:

Authorized Representative (typed or printed):

Authorized Representative (signature):

Title:

Sworn to and Subscribed before me this day of 20 .

My Commission expires . NOTARY PUBLIC .

THIS PAGE MUST BE SIGNED AND NOTARIZED FOR YOUR BID TO BE CONSIDERED.

Pre-Bid Meeting Minutes-Addendum #1

BIDEN MICROGRID

BIDEN HEADQUARTERS, AASF BUILDING, AASF COLD STORAGE BUILDING,

AASF FIRE PUMP HOUSE, DUNCAN READINESS CENTER

DE ARNG PROJECT#: 2023-18, NGB PN 100110/94951

BID FORM

BID FORM FAYDA ENGINEERING & ENERGY SOLUTIONS

00 41 13-10 FE&ES Comm.: 23-1583

THIS PAGE INTENTIONALLY LEFT BLANK

Pre-Bid Meeting Minutes-Addendum #1

S M T W T F S S M T W T F S

27 28 29 30 31 1 2 1 2 3 3 4 5 6 7 8 9 4 5 6 7 8 9 10 10 11 12 13 14 15 16 11 12 13 14 15 16 17 17 18 19 20 21 22 23 18 19 20 21 22 23 24 24 25 26 27 28 29 30 25 26 27 28 29 30 31

1 2 3 4 5 6 7 1 2 3 4 5 6 8 9 10 11 12 13 14

7 8 9 10 11 12 13 15 16 17 18 19 20 21 14 15 16 17 18 19 20 22 23 24 25 26 27 28 21 22 23 24 25 26 27 29 30 31

1 2 3 4 1 2 3 4 5 6 5 6 7 8 9 10 11

7 8 9 10 11 12 13 12 13 14 15 16 17 18 14 15 16 17 18 19 20 19 20 21 22 23 24 25 21 22 23 24 25 26 27 26 27 28 29 30 28 29 30 31

1 2 1 2 3 3 4 5 6 7 8 9

4 5 6 7 8 9 10 10 11 12 13 14 15 16 11 12 13 14 15 16 17 17 18 19 20 21 22 23 18 19 20 21 22 23 24 24 25 26 27 28 29 30 25 26 27 28 29 30 31

1 1 2 3 4 5 6 2 3 4 5 6 7 8 7 8 9 10 11 12 13 9 10 11 12 13 14 15 14 15 16 17 18 19 20 16 17 18 19 20 21 22 21 22 23 24 25 26 27 23 24 25 26 27 28 29 28 29 30 30 31

1 2 3 4 1 2 3 4 5 5 6 7 8 9 10 11

6 7 8 9 10 11 12 12 13 14 15 16 17 18 13 14 15 16 17 18 19 19 20 21 22 23 24 25 20 21 22 23 24 25 26 26 27 28 29 30 31 1 27 28 29 30 2 3 4 5 6 7 8 S M T W T F S S M T W T F S

ARMY MUTA dates IAW Appendix 16, Tab B to Annex C of OPORD GRIFFIN. AIR RSD dates IAW SO M-01 dtd 19

AUG 2025. Verify MUTA/RSD dates with your individual unit of assignment. Air RSD not scheduled beyond

September as of calendar publishing.

MAY

DECEMBER

NOVEMBER

JULY

JUNE

6 - Labor Day

30 - New Year's Day (obs)

2027 FTS Schedule 4/10

5 - Independence Day (obs)

OCTOBER

17 - Juneteenth Nat'l Independence Day (obs)

OCTOBER

JANUARY

18 - Birthday of MLK, Jr.

DEC 31 - New Year's Day (obs)

FEBRUARY

JUNE

SEPTEMBER

JULYLEGEND

AIR FED PAY

AIR (ONLY) RSD

ARMY (ONLY) MUTA

AUGUST

PAY PERIODS BRACKETED

11 - Columbus Day

FTS REGULAR DAY OFF

2027 DELAWARE NATIONAL GUARD CALENDAR (4/10)

JANUARY

FEBRUARY

MARCH

APRIL

15 - Washington's Birthday

MAY

31 - Memorial Day

ARMY & AIR DRILL

ARMY FED PAY

FEDERAL HOLIDAYS

FEDERAL HOLIDAY

CHANGES TO OFFICIAL SCHEDULE MUST BE APPROVED BY HRO

NOVEMBER

11 - Veterans Day

23 - Christmas Day (obs)

DECEMBER

SEPTEMBER

25 - Thanksgiving Day

Pre-Bid Meeting Minutes-Addendum #1

23-1583 Pre Bid Meeting Minutes - Addendum #1
Pre-Bid Sign-in sheet
00 41 13 Bid Form (2022)
2027 DENG Calendar 4-10
Sheet1
E-33
Sheets and Views
E-33

. Presentation_IFB Drawings

File details come from the government source that posted it. Updated .