This document is a set of technical construction plans and specifications for a Geotube Pad upgrade project by the West Virginia Department of Environmental Protection (WVDEP), Office of Special Reclamation, located in Monongalia County. The project involves upgrading an existing Geotube Pad (Permit # D-79-82) near Morgantown, with specific technical requirements including revegetation (4 acres), silt fence installation (650 linear feet), pipe installation (SDR 35 8-inch and 6-inch HDPE DR 17), geotube pad liner upgrade, and road construction (350 linear feet). The project is scheduled for March 2025 and includes detailed engineering specifications for sediment and erosion control, drainage, electrical work, utilities, and structural considerations.
The project involves significant environmental restoration and infrastructure improvement, with specific technical requirements for liner installation, drainage systems, and site preparation. Borrow material for constructing the new pad and berm will be sourced from old sludge cells at the top of the hill, with all disturbed areas to be revegetated. The upgrade includes installing a new 60 mil HDPE Super Gripnet liner, building new berms with 2:1 slopes, relocating existing manifolds, and creating a new access road. The plan requires careful attention to environmental controls, including sediment management, drainage systems, and slope stabilization, with specific technical specifications for each component of the upgrade.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOCATION MAP
WEST VIRGINIA COUNTY HIGHWAY MAP
VICINITY MAP
MORGANTOWN SOUTH USGS 7.5' QUADRANGLE
MORGANTOWN
OFFICE OF SPECIAL RECLAMATION
DIVISION OF LAND RESTORATION
West Virginia Department of Environmental Protection
HAROLD D. WARD, CABINET SECRETARY
MONONGALIA COUNTY, WEST VIRGINIA
PROJECT
AREA
MONONGALIA
COUNTY
LAT. 39 ° 32' 00" N
PROJECT
AREA
OMEGA GEOTUBE PAD
MONONGALIA COUNTYLON. 79 ° 56' 07" W
MARCH 2025
DRAWING INDEX
DESCRIPTION SHEET NO. DESCRIPTION SHEET NO.
TITLE PAGE 1
SUMMARY OF QUANTITIES 2
GENERAL AND STRUCTURAL NOTES 3
SEDIMENT AND EROSION CONTROL 4
EXISTING GEOTUBE PAD CONDITIONS 5
UPGRADED GEOTUBE PAD AREA 6
GEOTUBE PAD PROFILE 7
PERMIT # D-79-82
PROJECT
AREA
Digitally signed by: Daniel Q.
Aucremanne DN: CN = Daniel Q. Aucremanne email = daniel.q.aucremanne@wv.gov C = US O = WV Department of Environmental Protection OU = WVDEP OSR Date: 2025.03.31 16:36:20 -04'00'
Daniel Q.
Aucremanne
THE QUANTITIES SHOWN ON THE SUMMARY OF QUANTITIES REPRESENT THE AMOUNTS AS
DIRECTLY MEASURED IN THE PLANS. WHEN BIDDING IN WVOASIS THE COMMODITY LINES MAY BE
DIFFERENT AMOUNTS FROM THE PLANS TO ACCOMMODATE ANY UNFORESEEN CHANGES IN THE
FIELD. THEREFORE, ALWAYS BID ON THE QUANTITIES LISTED IN WVOASIS.
TECHNICAL SPECIFICATIONS DESCRIPTION QUANTITY UNIT
REVEGETATION TYPE 16-1 4 AC
LF
LF
LS
TN
LF
LS
SILT FENCE6-2
SDR 35 8 INCH PIPE10-14
6 INCH HDPE DR 1710-15
GEOTUBE PAD UPGRADE6-5
GEOTUBE PAD LINER8-7
GEOTUBE PAD ROAD7-1, 5-3
INCIDENTAL STONE7-3
350 LF
SUMMARY OF QUANTITIES
TOTAL
SHT. NO.
OFFICE OF SPECIAL RECLAMATION
SCALE: NTS
47 SCHOOL STREET, SUITE 301
PHILIPPI, WV 26416
OFFICE: 1-304-457-3219
FAX: 1-304-457-5613
Division of Land Restoration Office of Special Reclamation
West Virginia Department of Environmental Protection
DATE: MARCH 2025
OMEGA GEOTUBE PAD
PERMIT # D-79-82
MONONGALIA COUNTY, WEST VIRGINIA
SEDIMENT AND EROSION CONTROL
THE FIRST ORDER OF WORK FOR THE CONTRACTOR IS TO INSTALL SEDIMENT
CONTROL STRUCTURES TO ESTABLISH EROSION CONTROL AT THE EARLIEST POSSIBLE
DATE. INITIAL CLEARING AND GRUBBING IS TO ONLY BE WHAT IS NECESSARY IN
ORDER TO ACCOMPLISH THESE OPERATIONS.
WVDEP SHALL CONDUCT PERIODIC INSPECTION OF SEDIMENT AND EROSION CONTROL
MEASURES TO INSURE PROPER OPERATION AND COMPLIANCE.
IN THE EVENT THAT THE TEMPORARY EROSION AND POLLUTION CONTROL MEASURES
ARE ORDERED BY THE PROJECT CONTACT DUE TO THE CONTRACTOR'S NEGLIGENCE,
CARELESSNESS, OR FAILURE TO INSTALL PERMANENT CONTROLS AS PART OF THE
WORK AS SCHEDULED, SUCH WORK SHALL BE PERFORMED BY THE CONTRACTOR AT
THE CONTRACTOR'S EXPENSE.
WASTE AND BORROW SITES
WHEN REQUIRED, WASTE AND BORROW SITES SHALL BE DEPICTED ON THE PROJECT
PLANS. DURING THE CONTRACT, IF ADDITIONAL WASTE AND BORROW SITES ARE
REQUIRED, THE CONTRACTOR SHALL CONTACT THE PROJECT CONTACT.
NO WASTE OR BORROW SITES SHALL BE PERMITTED WITHIN ANY FLOODPLAIN,
WETLANDS, OR HIGHLY SENSITIVE CULTURAL RESOURCES.
EXISTING PIPE REMOVAL
ANY EXISTING PIPES THAT ARE REMOVED DURING CONSTRUCTION SHALL BECOME
THE PROPERTY OF THE WVDEP, UNLESS OTHERWISE NOTED. THE COST OF THE
REMOVAL OF EXISTING PIPES SHALL BE INCLUDED IN THE COMMODITY LINE ITEM "SITE
PREPARATION" AND SHALL INCLUDE REMOVAL, DISPOSAL, AND BACKFILL WITH
SUITABLE MATERIAL.
CONSTRUCTION ENTRANCE AND ROADS
CONSTRUCTION ENTRANCE(S) SHALL BE INSTALLED AT THE LOCATION(S) SHOWN ON
THE PROJECT PLANS.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING THE ROADS IN A CLEAN
AND DUST FREE CONDITION.
AGGREGATE BASE COURSE SHALL BE APPLIED IMMEDIATELY FOLLOWING ROUGH
GRADING PER PROJECT PLAN DETAILS.
ELECTRICAL
THE CONTRACTOR SHALL FOLLOW ALL LATEST LOCAL, STATE, AND FEDERAL
ELECTRICAL CODES, INCLUDING THE NATIONAL ELECTRICAL CODE (NEC).
ALL ELECTRICAL WORK PERFORMED SHALL BE EITHER COMPLETED BY OR UNDER THE
DIRECT SUPERVISION OF A MASTER ELECTRICIAN.
THE GENERAL CONTRACTOR OR AN ELECTRICAL SUBCONTRACTOR SHALL BE
LICENSED IN THE STATE OF WEST VIRGINIA TO PERFORM ELECTRICAL WORK. THE
COMPANY PERFORMING THE ELECTRICAL WORK SHALL HAVE A MINIMUM OF FIVE (5)
YEARS OF EXPERIENCE IN THE INSTALLATION OF ELECTRICAL SYSTEMS FOR WATER
TREATMENT FACILITIES. THE COMPANY MAY EMPLOY WEST VIRGINIA LICENSED
JOURNEYMAN ELECTRICIANS WORKING UNDER THE SUPERVISION OF THE MASTER
ELECTRICIAN. HOWEVER, NO MORE THAN ONE APPRENTICE PER JOURNEYMAN SHALL
BE PERMITTED.
UTILITIES
THE LOCATIONS OF ALL KNOWN UTILITIES ARE SHOWN ON THE PROJECT PLANS AND
FIELD INFORMATION. THE CONTRACTOR IS RESPONSIBLE TO ASCERTAIN THE STATUS
AND LOCATION OF EACH UTILITY WHEN PERFORMING WORK WHICH MAY AFFECT THE
FACILITIES, INCLUDING CALLING WV 811, PROBING, EXCAVATION, OR ANY OTHER
PRECAUTION REQUIRED TO CONFIRM LOCATION. THE CONTRACTOR WILL BE
RESPONSIBLE FOR ANY DAMAGE OR DISRUPTION TO UTILITY LINES WHICH ARE KNOWN
ACTIVE AND ARE TO REMAIN IN OPERATION.
DRAINAGE
THE CONTRACTOR SHALL MAINTAIN WORKING STORM DRAINAGE SYSTEMS THROUGH THE WORK
AREAS AT ALL TIMES DURING CONSTRUCTION. THE WORKING SYSTEM MAY CONSIST OF THE
EXISTING STORM DRAINAGE SYSTEM, THE PROPOSED STORM DRAINAGE SYSTEM OR COMBINATION
THEREOF.
BENCH MARKS
THE CONTRACTOR SHALL BE RESPONSIBLE FOR HOLDING BENCH MARK LOCATIONS THROUGHOUT
THE LIFE OF THE CONTRACT. IN THE EVENT THAT A BENCH MARK IS DISTURBED, THE
CONTRACTOR, AS DIRECTED BY THE PROJECT CONTACT, WILL RELOCATE OR RE-ESTABLISH THE
BENCH MARK. NO ADDITIONAL PAYMENT OR COMPENSATION WILL BE MADE FOR THIS WORK.
VERIFICATION OF DIMENSIONS
THE CONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF ALL PLAN AND ELEVATION DIMENSIONS
PRIOR TO ORDERING MATERIALS FOR THE CONSTRUCTION OF THE VARIOUS COMMODITY LINE
ITEMS IN THIS CONTRACT.
NOTICE TO CONTRACTORS
REPRESENTATIVES OF THE FOLLOWING STATE AND FEDERAL AGENCIES MAY BE IN THE AREA ON
OCCASION TO OBSERVE, INSPECT AND MONITOR THE CONSTRUCTION ACTIVITIES:
WEST VIRGINIA DEPARTMENT OF ENVIRONMENTAL PROTECTION, (WVDEP)
WEST VIRGINIA DIVISION OF NATURAL RESOURCES, (WVDNR)
WEST VIRGINIA STATE HISTORIC PRESERVATION OFFICE, (WVSHPO)
UNITED STATES FISH AND WILDLIFE SERVICES, (USFWS)
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY, (USEPA)
UNITED STATES ARMY CORPS OF ENGINEERS, (USACE)
UNITED STATES NATURAL RESOURCES CONSERVATION SERVICE,(USNRCS)
ADVISORY COUNCIL OF HISTORIC PRESERVATION, (ACHP)
UNITED STATES DEPARTMENT OF AGRICULTURE, FOREST SERVICE, (USDA, FS)
OFFICE OF SURFACE MINING (OSM)
SHOP DRAWINGS
SHOP DRAWINGS SHALL BE SENT TO THE ATTENTION OF THE PROJECT CONTACT.
GEOTECHNICAL REPORT
WHEN SITE CONDITIONS REQUIRE A GEOTECHNICAL REPORT, REFER TO TECHNICAL SPECIFICATION
SECTION 14-1 GEOTECHNICAL REPORT. ANY INQUIRIES SHALL BE DIRECTED TO THE PROJECT
CONTACT.
ELEVATIONS
ALL ELEVATIONS SHOWN REFER TO THE NORTH AMERICAN VERTICAL DATUM OF 1988. (NAD88)
COORDINATES
THE PROJECT PLAN DATUMS ARE BASED UPON THE NORTH OR SOUTH ZONE OF THE WEST
VIRGINIA STATE PLANE SYSTEM. THE HORIZONTAL DATUM IS BASED ON THE NORTH\
AMERICAN DATUM OF 1983 (NAD 83). GRID FACTORS ARE NOT REQUIRED WHEN MAKING FIELD
MEASUREMENTS.
CROSS-SECTION VIEWS
ALL CROSS SECTIONS ARE TO BE VIEWED IN THE DIRECTION OF THE ARROW.
VIEWING DIRECTION
FOUNDATIONS
1. THE CONTRACTOR SHALL REVIEW THE SUBSURFACE INVESTIGATION
REPORT, IF AVAILABLE, BEFORE THE START OF CONSTRUCTION.
2. THE CONTRACTOR SHALL NOT PLACE ANY FOUNDATION UNTIL THE
SUBGRADE HAS BEEN ACCEPTED BY THE PROJECT CONTACT.
STRUCTURAL STEEL
1. ALL STEEL SHALL CONFORM TO THE AISC "SPECIFICATIONS FOR THE
DESIGN, FABRICATION AND ERECTION OF STRUCTURAL STEEL FOR
BUILDINGS", LATEST EDITION.
2. WELDED CONNECTIONS SHALL CONFORM TO THE LATEST EDITION OF
AMERICAN WELDING SOCIETY, AWS D1.1.
3. ALL EXTERIOR STRUCTURAL STEEL SHALL BE PAINTED IN ACCORDANCE
WITH TECHNICAL SPECIFICATION SECTION 13-15 PAINTING METAL
STRUCTURES.
CAST-IN-PLACE CONCRETE
1. ALL CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH AT
TWETNY-EIGHT (28) DAYS OF FOUR THOUSAND (4,000) PSI UNLESS OTHERWISE
NOTED.
2. ALL CONCRETE WORK SHALL BE CONSTRUCTED IN ACCORDANCE WITH
"BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE" ACI 350-01.
3. ALL EMBEDDED ITEMS ARE NOT SHOWN ON THE PROJECT PLANS. THE
CONTRACTOR SHALL REVIEW THE PROJECT PLANS OF THE VARIOUS TRADES
AND COORDINATE PLACEMENT OF EMBEDDED ITEMS.
4. CONSTRUCTION JOINTS ARE SHOWN ON THE PROJECT PLANS. ANY CHANGES
OR ADDITIONS SHALL BE SUBMITTED TO THE PROJECT CONTACT BEFORE
CONCRETE PLACEMENT. USE TWO (2) INCH X FOUR (4) INCH KEY FOR LESS
THAN EIGHTEEN (18) INCH WALL OR SLAB THICKNESS AND TWO (2) INCH X SIX
(6) INCH KEY FOR THICKNESS OF EIGHTEEN (18) INCHES AND GREATER.
5. PROVIDE FORM COVER WITH A MINIMUM OF TWO (2) INCH OF CONCRETE FROM
THE OUTSIDE SURFACE. TIES FOR WALLS SUBJECT TO HYDROSTATIC
PRESSURE SHALL HAVE WATERSTOPS.
6. PROVIDE ROUGH BROOM FINISH FOR EXTERIOR SLABS AND STEEL TROWEL
FINISH FOR INTERIOR SLABS UNLESS NOTED OTHERWISE.
REINFORCING STEEL
1. ASTM, A615, A616, OR A617, GRADE 60, MINIMUM YIELD STRENGTH SIXTY
THOUSAND (60,000) PSI.
2. REINFORCING DETAILS SHALL CONFORM TO ACI "DETAILING MANUAL - 1994"
OR AS SHOWN ON THE PROJECT PLANS.
3. MINIMUM BAR LAPS
TOP OTHER
#9 BAR 90 INCHES 65 INCHES
#8 BAR 71 INCHES 51 INCHES
#7 BAR 54 INCHES 39 INCHES
#6 BAR 43 INCHES 31 INCHES
#5 BAR 36 INCHES 26 INCHES
#4 BAR 28 INCHES 20 INCHES
4. MINIMUM CLEARANCE
a. CAST AGAINST EARTH - 3"
b. #6 BARS AND LARGER - 2"
c. #5 BARS AND SMALLER - 2"
STRUCTURAL LINTELS
UNLESS SHOWN OTHERWISE, PROVIDE THE FOLLOWING LINTEL ANGLES:
MASONRY OPENING ANGLE & SIZE BEARING
4'-0" TO LESS (2) 3 12 X 3 12 X 5
16 6"
4'-1" TO 6'-0" (2) 4 X 3 12 X 5
16 LLV 6"
6'-1" TO 7'-0" (2) 5 X 3 12 X 38 LLV 6"
7'-1" TO 3'-0" (2) 6 X 3 12 X 38 LLV 6"
8'-1" TO 9'-0" (2) 7 X 4 X 38 LLV 6"
1. ALL LINTELS SHALL BE GALVANIZED.
2. ALL LINTELS SHALL HAVE TWELVE (12) INCHES OF SOLID MASONRY BELOW
BEARING END.
BLOCK CONSTRUCTION
1. MASONRY WORK SHALL CONFORM TO THE LATEST EDITION OF THE "NATIONAL
CONCRETE MASONRY ASSOCIATION."
2. HOLLOW LOAD-BEARING CONCRETE MASONRY UNITS SHALL MEET THE
REQUIREMENTS OF ASTM C90 AND HAVE A TWO (2) HOUR FIRE RATING.
3. MORTAR SHALL BE TYPE S IN ACCORDANCE WITH ASTM C-270 AND HAVE A
MINIMUM COMPRESSIVE STRENGTH OF ONE THOUSAND EIGHT HUNDERED
(1,800) PSI AT TWENTY-EIGHT (28) DAYS, GROUT SHALL HAVE A MINIMUM
COMPRESSIVE STRENGTH OF TWO THOUSAND FIVE HUNDRED (2,500) PSI AT
TWENTY-EIGHT (28) DAYS.
4. REINFORCING STEEL SHALL BE ASTM, A615, A616, OR A617 YIELD GRADE 60.
MINMUM STRENGTH SIXTY THOUSAND (60,000) PSI.
5. REINFORCING STEEL SHALL BE LAPPED AS SPECIFIED ON THIS SHEET. (REF
REINFORCING STEEL, SUB 3)
6. BLOCK MANUFACTURER SHALL PROVIDE A CONTROL JOINT DETAIL TO BE
REVIEWED AND APPROVED BY THE PROJECT CONTACT DURING
CONSTRUCTION.
GENERAL NOTES STRUCTURAL NOTES
GENERAL AND STRUCTURAL NOTES
TOTAL
SHT. NO.
GENERAL STEEL NOTES
1. STEEL FABRICATION AND ERECTION SHALL COMPLY WITH THE LATEST EDITIONS
OF THE FOLLOWING CODES & STANDARDS:
A. AMERICAN INSITUTE OF STEEL CONSTRUCTION (AISC) SPECIFICATION FOR
STRUCTURAL STEEL BUILDINGS.
B. RESEARCH COUNCIL ON STRUCTURAL CONNECTIONS (RCSC) SPECIFICATION
FOR STRUCTURAL STEEL JOINTS USING HIGH-STRENGTH BOLTS.
C. WELDING AS PER AMERICAN WELDING SOCIETY (AWS) D1.1 "STRUCTURAL
WELDING CODE.
D. STATE BUILDING CODE - LATEST EDITION.
E. FEDERAL REGULATIONS OT THE OCCUPATIONAL SAFETY AND HEALTH
ADMINISTRATION (OSHA) OF THE U.S. DEPARTMENT OF LABOR, TITLE 29.
F. ASTM INTERNATIONAL (ASTM) A992 STANDARD SPECIFICATION FOR
STRUCTURAL STEEL SHAPES.
G. ASTM A36 STANDARD SPECIFICATION FOR CARBON STEEL STRUCTURAL
STEEL.
H. PAINTING TO BE IN ACCORDANCE WITH THE SSPC PAINTING MANUAL:
1. VOLUME 1 - GOOD PAINTING PRACTICE
2. VOLUME 2 - SYSTEMS AND SPECIFICATIONS.
2. C SHAPES & ANGLE SHALL BE ASTM A992.
3. ALL OTHER PLATES AND SHAPES SHALL BE ASTM A36.
4. BOLT ASSEMBLY SHALL BE 3/4" ASTM F3125, GRADE A325 BOLTS; ASTM A563 NUTS,
GRADE C PLAIN; ASTM F436 WASHER, PLAIN.
5. THE STRUCTURAL STEEL DETAILER IS RESPONSIBLE FOR THE DESIGN OF ALL
CONNECTIONS, EXCEPT THOSE SPECIFICALLY SHOWN ON THE DESIGN DRAWINGS.
6. ALL BOLTED CONNECTIONS SHALL BE FULLY PRE TENSIONED.
7. ALL BOLTED CONNECTIONS SHALL HAVE A MINIMUM OF TWO (2) BOLTS.
8. FABRICATOR SHALL FURNISH ALL FIELD BOLTS, NUTS AND WASHERS NECESSARY.
9. WHERE FIELD WELD IS SPECIFIED, THE FABRICATOR SHALL FURNISH ALL
NECESSARY CLIPS AND BOLTS.
10. ALL GRATING TO BE MOLDED FIBERGLASS AS MANUFACTURED BY MCNICHOLS OR
EQ.
A. SERIES TYPE TO BE MS-S-150.
B. CONSTRUCTION TYPE TO BE MOLDED
C. GRID SHAPE TO BE SQUARE.
D. PRIMARY MATERIAL TO BE FIBERGLASS
E. RESIN TO BE SGF POLYESTER RESIN (SGF)
F. GRID SIZE TO BE 1 1/2" x 1 1/2" ON CENTER.
G. GRID HEIGHT TO BE 1 1/2".
H. GRID THICKNESS TO BE 1/4".
I. COLOR TO BE YELLOW.
J. GRATING SHALL BE ATTACHED WITH STAINLESS STEEL, TYPE 316 FRICTION
TYPE GRATING CLIPS.
OFFICE OF SPECIAL RECLAMATION
SCALE: NTS
47 SCHOOL STREET, SUITE 301
PHILIPPI, WV 26416
OFFICE: 1-304-457-3219
FAX: 1-304-457-5613
Division of Land Restoration Office of Special Reclamation
West Virginia Department of Environmental Protection 03OMEGA GEOTUBE PAD
MONONGALIA COUNTY, WEST VIRGINIA 07DATE: MARCH 2025
OUTLET CROSS-SECTIONUP-SLOPE FACE
R3-ROCK
AASHTO #57
6" MIN.
1 MIN.
1 MIN.
FILTER FABRIC OR
STRAW BALESWOOD POSTS
1 MIN.
HEIGHT OF ROCK FILTER = 5/6
HEIGHT OF FILTER FABRIC FENCE
OR STRAW BALES
3' MIN.
AASHTO #57
% SLOPE
L
1'
3"
FLOW
RUN
R
IS
E
9"
3" MIN.
SECTION A-A' SECTION C-C'
NOTE:
1. SPACING OF PREFABRICATED DITCH CHECKS
SHALL BE THE SAME AS STONE DITCH CHECKS.
2. AASHTO #1 (2-4 INCH) SHALL BE USED, AND MAY
BE REINFORCED WITH 3 TO 6 INCH RIPRAP.
3. THE MINIMUM DITCH DEPTH IS 1.0'.DITCH MAY BE
TRAPEZOIDAL OR V-DITCH.
A
A'
C
C'
LL= (160/S), WITH A 100' MAX
WHERE,
L= SPACING IN FEET
S= % SLOPE= (RISE/RUN) X 100
9"
3" MIN.
ROCK CHECK DAM
NTS
3"
2"-5"
12"
6"
2.4.
5.
3B.
1.
3A.
CRITICAL POINTS
A. OVERLAPS AND SEAMS
B. PROJECTED WATER LINE
C. CHANNEL BOTTOM/SIDE
SLOPE VERTICES
* HORIZONTAL STAPLE SPACING SHOULD BE ALTERED
IF NECESSARY TO ALLOW STAPLES TO SECURE THE
CRITICAL POINTS ALONG THE CHANNEL SURFACE.
A
A
B C
B C
** IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE
OR STAKE LENGTHS GREATER THAN 6" MAY BE
12"
6"
6"
6"
4"-6"
4"
(15 cm)
NOTE:
NECESSARY TO PROPERLY ANCHOR THE BLANKETS.
4"
2"-5"1.
6.
7.
2.
5.
4.8.
3.
6"
" M
IN
4" MIN
FLOW
EMBED FILTER FABRIC
MIN. 6" INTO GROUND
FILTER FABRIC
FILTER FABRIC
THE FENCE POSTS AND EXTEND
IT INTO THE DITCH.
EXTENSION OF FABRIC INTO TRENCH
FENCE POST
THE EXCAVATED SOIL.
48" MIN. FENCE
OF FILTER ABOVE
GROUND SURFACE
30" MIN. HEIGHT
FLOW
FLOW
10' MAX. C/O2. ATTACH THE FILTER FABRIC TO
A 4" X 4" TRENCH UPSLOPE
ALONG THE LINE OF POSTS.
1. SET POSTS AND EXCAVATE 3. BACKFILL AND COMPACT
POST
48" HIGH (MIN.) FENCE POSTS
NOTE:
SILT FENCE SHALL BE INSTALLED IN THE LOCATIONS SHOWN ON THE PROJECT PLANS AND IN
ACCORDANCE WITH THE DRAWING DETAILS SHOWN:
1. A TRENCH SHALL BE PLOWED OR OTHERWISE EXCAVATED TO THE REQUIRED DEPTH
WITH LITTLE, IF ANY, DISTURBANCE TO THE DOWN SLOPE SIDE OF THE TRENCH. THE
BOTTOM OF THE TRENCH AND THE FENCE TOP SHALL BE PLACED ON A LEVEL GRADE.
WHEN IT IS NECESSARY TO CROSS SMALL DEPRESSIONS, THE TRENCH BOTTOM AND
FENCE TOP MAY DEVIATE SLIGHTLY FROM THE LEVEL GRADE. GRADES IN SUCH
SECTIONS WILL NOT EXCEED 1%, NOR WILL THE DEVIATION EXTEND
FOR MORE THEN TWENTY-FIVE (25) FEET.
2. SUPPORT STAKES WILL BE DRIVEN TO THE REQUIRED DEPTH BELOW THE EXISTING
GROUND SURFACE AT THE SPECIFIED INTERVALS.
3. STRETCH AND FASTEN FABRIC TO THE UP-SLOPE SIDE OF THE SUPPORT STAKES.
4. WHERE THE ENDS OF THE FABRIC COME TOGETHER, THEY BE BE OVERLAPPED,
FOLDED, AND STAPLED TO PREVENT SEDIMENT BYPASS.
5. THE TOE ANCHOR WILL BE BACKFILLED AND COMPACTED TO A DENSITY EQUAL TO THE
SURROUNDING SOILS.
6. FILTER FABRIC IS TO BE FASTENED SECURELY TO POSTS WITH WIRE TIES OR STAPLES.
7. WHEN TWO SECTIONS OF FILTER FABRIC ADJOIN EACH OTHER, THEY SHALL BE
OVERLAPPED BY SIX INCHES AND FOLDED.
8. MAINTENANCE SHALL BE PERFORMED AS NEEDED AND INSPECTED FOR DAMAGE
AFTER RAINS.
9. POSTS SHALL BE CONSTRUCTED OF TWO (2) INCH X TWO (2) INCH HARDWOOD, THREE
(3) FEET LONG.
10. APPROVED PREFABRICATED UNITS INCLUDE "GEOFAB", "ENVIROFENCE", OR APPROVED
EQUAL.
11. REFER TO TECHNICAL SPECIFICATION SECTION 6-2 SEDIMENT CONTROL FOR MORE
DETAILS.
1. PREPARE SOIL BEFORE INSTALLATION BLANKETS, INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. WHEN USING
EROSION MATTING.
2. BEGIN AT THE TOP OF THE CHANNEL BY ANCHORING THE BLANKET IN A SIX (6) INCH DEEP X SIX (6) INCH WIDE TRENCH THAT WITH APPROXIMATELY TWELVE (12) INCHES OF BLANKET EXTENDED BEYOND THE UP-SLOPE PORTION OF THE TRENCH. ANCHOR THE BLANKET WITH A ROW OF STAPLES/STAKES APPROXIMATELY TWELVE (12) INCHES APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING TWELVE (12) INCH PORTION OF BLANKET BACK OVER SEED AND COMPACTED SOIL. SECURE BLANKET OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY
TWELVE (12) INCHES ACROSS THE WIDTH OF THE BLANKET.
3. ROLL CENTER BLANKET IN DIRECTION OF WATER FLOW IN BOTTOM OF CHANNEL. BLANKETS WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL BLANKETS MUST BE SECURELY FASTENED TO THE SOIL SURFACE BY PLACING STAPLES/STAKES IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING THE DOT SYSTEM, STAPLES/STAKES SHOULD BE PLACED THROUGH
EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN.
4. PLACE CONSECUTIVE BLANKETS END OVER END (SHINGLE STYLE) WITH A FOUR (4) INCH TO SIX (6) INCH OVERLAP. USE A DOUBLE ROW OF STAPLES STAGGERED FOUR (4) INCHES APART AND FOUR (4) INCH ON CENTER TO SECURE BLANKETS.
5. FULL LENGTH EDGE OF BLANKETS AT TOP OF SIDE SLOPES MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES APPROXIMATELY TWELVE
(12) INCHES APART IN A SIX (6) INCH DEEP X SIX (6) INCH WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING.
6. ADJACENT BLANKETS MUST BE OVERLAPPED APPROXIMATELY TWO (2) TO FIVE (5) INCHES (DEPENDING ON BLANKET TYPE) AND STAPLED.
7. IN HIGH FLOW CHANNEL APPLICATIONS, A STAPLE CHECK SLOT IS RECOMMENDED AT THIRTY (30) TO FORTY (40) FOOT INTERVALS. USE A
DOUBLE ROW OF STAPLES STAGGERED FOUR (4) INCHES APART AND FOUR (4) INCH ON CENTER THE ENTIRE WIDTH OF THE CHANNEL.
8. THE TERMINAL END OF THE BLANKETS MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES APPROXIMATELY TWELVE (12) INCHES APART IN
A SIX (6) INCH DEEP X SIX (6) INCH WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING.
1. PREPARE SOIL BEFORE INSTALLATION BLANKETS, INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. WHEN USING
EROSION MATTING.
2. BEGIN AT THE TOP OF THE CHANNEL BY ANCHORING THE BLANKET IN A SIX (6) INCH DEEP X SIX (6) INCH WIDE TRENCH THAT WITH APPROXIMATELY TWELVE (12) INCHES OF BLANKET EXTENDED BEYOND THE UP-SLOPE PORTION OF THE TRENCH. ANCHOR THE BLANKET WITH A ROW OF STAPLES/STAKES APPROXIMATELY TWELVE (12) INCHES APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING TWELVE (12) INCH PORTION OF BLANKET BACK OVER SEED AND COMPACTED SOIL. SECURE BLANKET OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY
TWELVE (12) INCHES ACROSS THE WIDTH OF THE BLANKET.
3. ROLL CENTER BLANKET IN DIRECTION OF WATER FLOW IN BOTTOM OF CHANNEL. BLANKETS WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL BLANKETS MUST BE SECURELY FASTENED TO THE SOIL SURFACE BY PLACING STAPLES/STAKES IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING THE DOT SYSTEM, STAPLES/STAKES SHOULD BE PLACED THROUGH
EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN.
4. THE EDGES OF PARALLEL BLANKETS MUST BE STAPLED WITH APPROXIMATELY TWO (2) INCH TO FIVE (5) INCH OVERLAP DEPENDING ON
BLANKET TYPE.
5. CONSECUTIVE BLANKETS SPLICED DOWN THE SLOPE MUST BE PLACED END OVER END (SHINGLE STYLE) WITH AN APPROXIMATE THREE (3) INCH OVERLAP. STAPLE THROUGH OVERLAPPED AREA, APPROXIMATELY TWELVE (12) INCHES APART ACROSS THE ENTIRE BLANKET WIDTH.
6. IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGHTS GREATER THAN SIX (6) INCHES MAY BE NECESSARY TO PROPERLY
SECURE THE BLANKETS.
1' 1'
EROSION MATTING
NTS
ROCK FILTER OUTLETS
NTS
SILT FENCE DETAIL
NTS
CONSTRUCTION DETAIL
INSTALLATION DETAIL
SLOPE INSTALLATION
CHANNEL INSTALLATION
STORAGE TANKCOMPACTED
SOIL COMPACTED
SOIL
10 MIL PLASTIC LINER
EARTHEN BASIN
4 SIDES
LOOSE SAND TO PROTECT
PLASTIC LINER FROM PUNCTURE
BURY "ENDS" OR WEIGHT
TO SECURE LINER (TYP.)
(H) MIN 2'
6'4'
2" SS - NPT
MALE THREAD
2" BANJO BALL VALVE OR
APPROVED EQUIVALENT
SEAL TO LINER BY MEANS
OF MECHANICAL FITTINGS
OR WELDING
SPILL CONTAINMENT DETAIL
NTS
NOTES:
1. SELECTED HEIGHT (H) OF EARTHEN BERM IS TO BE A TWO (2) FOOT MINIMUM OR 110% OF THE CAPACITY OF THE TANK(S) TOTAL VOLUME WITHIN THE BERM. A SIX (6) INCH FREEBOARD MUST BE INCLUDED.
2. A TWO (2) INCH WATER REMOVAL DRAIN SHALL BE LOCATED AT THE LOWEST POINT IN THE BOTTOM OF THE CONTAINMENT VOLUME. IT SHALL CONNECT TO A NORMALLY CLOSED VALVE OUTSIDE THE DIKE.
THE VALVE SHALL BE MANUALLY OPERATED AND PROTECTED FROM UNAUTHORIZED OPERATION.
RAINWATER CONTAINED WITHIN THIS DIKE SHALL BE EXAMINED PRIOR TO RELEASE TO ENSURE THAT HARMFUL QUANTITIES OF FUELS AND LUBRICANTS ARE NOT DISCHARGED. ALTERNATE METHODS OF
WATER REMOVAL WILL BE CONSIDERED FOR APPROVAL.
3. TANKS WITH SECONDARY CONTAINMENT MAY BE USED AS AN ALTERNATIVE.
SECTION A-A'
A
A'
8'
6'
2'
3"
MIN
Flow
SEDIMENT SUMP DETAIL
NTS
STRAW OR HAY BALE DIKE DETAILS
NTS
NOTES:
1. BALES SHALL BE PLACED IN A ROW WITH ENDS TIGHTLY ABUTTING THE ADJACENT BALES.
2. ALL BALES SHALL BE EMBEDDED IN THE SOIL A MINIMUM OF FOUR (4) INCHES OR BALES COVERED WITH A FILTER MAT, WITH EARTH TAMPED
ON THE UPSTREAM SIDE TO PREVENT PIPING.
3. BALES SHALL BE SECURELY ANCHORED IN PLACE BY STAKES DRIVEN THROUGH THE BALES. THE FIRST STAKE IN EACH BALE SHALL BE
DRIVEN TOWARD PREVIOUSLY LAID BALE TO FORCE BALES TOGETHER.
4. BALES SHALL BE REMOVED AS DIRECTED BY THE ENGINEER.
ANCHORING DETAIL END VIEW
FLOW
EMBEDDED AS SITE
CONDITIONS DICTATE TO
PREVENT FLOW UNDER
BALES.
SOIL COMPACTED TO
PREVENT PIPING
ANGLE FIRST STAKE TOWARD
PREVIOUSLY LAID BALE
BOUND BALES
PLACED ON CONTOUR
2" X 2" STAKES MINIMUM OF 1 FT. INTO GROUND
SEDIMENT AND EROSION CONTROL
TOTAL
SHT. NO.
OFFICE OF SPECIAL RECLAMATION
SCALE: NTS
47 SCHOOL STREET, SUITE 301
PHILIPPI, WV 26416
OFFICE: 1-304-457-3219
FAX: 1-304-457-5613
Division of Land Restoration Office of Special Reclamation
West Virginia Department of Environmental Protection 04OMEGA GEOTUBE PAD
MONONGALIA COUNTY, WEST VIRGINIA 07DATE: MARCH 2025
BA
G
.0
FT
BA
G
.0
FT
BA
G
.0
FT
BA
G
.0
FT
BA
G
.0
FT
BA
G
.0
FT
BA
G
.0
FT
BA
G
.0
FT
BA
G
.0
FT
BA
G
.0
FT
BA
G
.0
FT
BA
G
.0
FT
BA
G
.0
FT
.0
FT
.0
FT
EXISTING GEOTUBE PAD CONDITIONS
TOTAL
SHT. NO.
OFFICE OF SPECIAL RECLAMATION
SCALE: 1:20
47 SCHOOL STREET, SUITE 301
PHILIPPI, WV 26416
OFFICE: 1-304-457-3219
FAX: 1-304-457-5613
Division of Land Restoration Office of Special Reclamation
West Virginia Department of Environmental Protection
DATE: MONTH 2025
OMEGA GEOTUBE PAD
BA
G
.0
FT
BA
G
.0
FT
BA
G
.0
FT
BA
G
.0
FT
BA
G
.0
FT
BA
G
.0
FT
BA
G
.0
FT
BA
G
.0
FT
BA
G
.0
FT
BA
G
.0
FT
BA
G
.0
FT
BA
G
.0
FT
BA
G
.0
FT
.0
FT
.0
FT
Notes:
1. Fold existing liner onto geotubes.
2. Build new berm to key in new liner.
3. Existing drains need a 3' perforated riser w/ stone around the riser (3).
4. Manifold, sludge line, drain lines, and access road all may be field adjusted. Extend existing manifold with HDPE SDR17 to the new manifold location.
5. Borrow material to construct new pad and berm will be taken from the old sludge cells at the top of the hill.
The borrow area will be shown during the pre-bid. All disturbed borrow areas shall be revegetated.
6. New Geotube Pad Liner shall be HDPE Super Gripnet as specified in the specifications.
7. Top of berm to be 10 feet wide.
8. Liner to be pinned to highwall.
Edge of Highwall
Berm
New Road
Pad Access Lined 4:1
Relocate Existing Manifold to Inside of Road with HDPE
DR 17
2:1 Slope
2:1 Slope Berm
Berm
Existing Drain
Existing Drain
Existing Drain
Cap Riser Drains (2)
Build Mound Around Manifold (Field Adjust)Bottom of Pad
Drains Connected by 8 inch SDR-35
Bottom of Pad 2:
Sl op e
Grass Berm
A
A'
B'
B
UPGRADED GEOTUBE PAD AREA
TOTAL
SHT. NO.
OFFICE OF SPECIAL RECLAMATION
SCALE: 1:20
47 SCHOOL STREET, SUITE 301
PHILIPPI, WV 26416
OFFICE: 1-304-457-3219
FAX: 1-304-457-5613
Division of Land Restoration Office of Special Reclamation
West Virginia Department of Environmental Protection
DATE: MONTH 2025
OMEGA GEOTUBE PAD
GEO TUBE PAD
SECTION A-A'
THE PAD SHALL BE LEVEL
60 mL HDPE SUPER GRIPNET LINER
LINER KEYTOP OF BERM
12.00' 296.00'
ELE. - 1540.00'
GEO TUBE PAD
SECTION B-B'
THE PAD SHALL BE LEVEL
60 mL HDPE SUPER GRIPNET LINER
LINER KEYNEW ACCESS ROAD
110.00'
ELE. - 1540.00'
HIGHWALL
ELE. - 1532.00'
12.00'
ELE. - 1532.00'
ADD ENOUGH FILL MATERIAL
OVER THE EXISTING GEOTUBE
BAGS TO COVER AND PROVIDE
A FLAT/LEVEL SURFACE AT
ELEVATION 1532'.
PIN LINER TO
HIGHWALL
GEOTUBE PAD PROFILE
TOTAL
SHT. NO.
OFFICE OF SPECIAL RECLAMATION
SCALE: NTS DATE: MARCH 2025
47 SCHOOL STREET, SUITE 301
PHILIPPI, WV 26416
OFFICE: 1-304-457-3219
FAX: 1-304-457-5613
OMEGA GEOTUBE PAD
PERMIT # D-79-82
MONONGALIA COUNTY, WEST VIRGINIA
Division of Land Restoration
Office of Special Reclamation
West Virginia Department of Environmental Protection
File details come from the government source that posted it. Updated .