ARFQ DEP1700000072 Addendum 1.pdf
PDF 34 MB Posted
- Solicitation number
- ARFQ-0313-DEP1700000072-3
- Issued by
- Raleigh County, West Virginia
About this file
This document is Addendum 1 to Solicitation ARFQ DEP1700000072 for the OSR Muddy Creek Restoration Project in West Virginia. The addendum provides clarifications and modifications to the original solicitation. It includes changes to the specifications, corrections to the project description, and revisions to the bid due date. The addendum also includes an updated bidder's conference attendee list. The original bid submission deadline of January 17, 2023 has been extended to January 24, 2023.
The addendum does not contain any information about pricing terms, set asides, incumbents, funding requirements, or other salient financial details. It focuses solely on the administrative changes and clarifications to the solicitation.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AGENCY SOLICITATION NUMBER – ARFQ DEP1700000072
Addendum Number: _1___
The Purpose of this addendum is to modify the solicitation identified as (“Agency Solicitation”) to reflect the change(s) identified and described below.
Applicable Addendum Category:
[X] Modify bid closing date and time
[X] Modify specification of product or service being sought
[X] Attachment of vendor questions and responses
[X] Attachment of pre-bid sign-in sheet
[ ] Correction of error
[X ] Other
Description of Modification to Solicitation:
This Addendum issued to publish and distribute the attached documentation to the vendor community.
1. Change the bid close date to 6-28-2017 @ 10:30am.
2. Attach pre-bid sign in sheet.
3. Vendor Questions & Answers
4. Revised Specifications/Special Provisions
5. Revisions to Estimated Quantities on items #32 and #44
Additional Documentation: Documentation related to this Addendum (if any) has been included herewith as Attachment A and is specifically incorporated herein by reference.
Terms and Conditions:
1. All provision of the Agency Solicitation and other addenda not modified herein shall remain in full force and effect.
2. Vendor should acknowledge receipt of all addenda issued for this Agency Solicitation by completing an Addendum Acknowledgement, a copy of which is included herewith.
Failure to acknowledge addenda may result in bid disqualification. The addendum acknowledgement should be submitted with the bid to expedite document processing.
Addendum #1 - Questions During The Pre-Bid Conference For Viking Coal, Permit UO-519; Preston Energy, Permit UO-235;
Rockville Mining, Permit S-91-85 Muddy Creek Restoration Project
The following questions were identified at the Pre-Bid Conference (PBC) conducted on-site on June 6, 2017 and questions received from DEP Procurement. The answers and clarifications provided herein take precedence over verbal answers at the PBC and previously provided specifications and descriptions provided in the Solicitation should there be any conflicts between the two.
Q 1: Is the Contractor required to provide any pre-video?
A 1: No pre-video of the construction site is required.
Q 2: Are the goetube cut and fills balanced as far as cubic yard of material?
A 2: Yes, the cut and fills are very close to being equal.
Q 3: Where is the electrical tie in to the T&T project to be made?
A 3: Tie in for the electrical is in the electrical manhole north of the treatment plant.
Q 4: What is the cover depth on the creek crossings?
A 4: 36 inch minimum cover with 2 feet layer of riprap.
Q 5: Does the 10 inch HDPE force main line run inside or outside the Dream Mountain fence, down at the Woolen Mills Rd?
A 5: Access is through the double gate and the force main would run on the inside of the fence along the bench, but may cross under the fence in places.
Q 6: Have the trees been removed inside the Dream Mountain fence?
A 6: No, as long as you follow the bench, there shouldn’t be very many trees to remove.
Q 7: How is the fiber optic cable to the pump station to be paid?
A 7: The direct bury fiber optic cable is incidental to the force main.
Q 8: Can C900 pipe be used instead of HDPE on the force main?
A 8: No, HDPE SDR 9 fusion pipe must be used.
Rockville Mining, Permit S-91-85 Muddy Creek Restoration Project
Q 9: Is there a detail for the type of material to be used for bedding the gravity piping?
A 9: Yes, sheet 67 is the detail sheet; however, the details call for #57 gravel. Limestone dust shall be used not # 57 or site material that is suitable for bedding may be used if approved by WVDEP Representative.
Q 10: Do the existing ponds at Viking get removed?
A 10: Only the raw water pond gets reclaimed.
Q 11: Is there a geotechnical report available for this project?
A 11: No.
Q 12: Are there profiles of all gravity lines?
A 12: Yes, see Plan Sheets 29-41.
Q 13: Is there a 3rd party electrical contractor to do all electrical work?
A 13: See Technical Specification 11-00 for information pertaining to the electrical contractor.
Q 14: Why is the Contract Term only 150 days?
A 14: Job funding requires treating the AMD water by December 31, 2017.
Q 15: What is involved in removing the old mine seals, such as pipe and stone? Does it need to be hauled away?
A 15: Clean out old seal and install new seal per plans. No spoil area has been designated for the old stone. WVDEP inspector will work with the contractor to dispose of the stone to a nearby location.
Q 16: Does suppliers need to be approved prior to or after the opening of the contract?
A 16: Bid as per the specifications, the contractor that is awarded the bid must follow Special Provision 0-13.
Rockville Mining, Permit S-91-85 Muddy Creek Restoration Project
The following changes have been made in the Technical Specifications.
C1: Technical Specifications Table of Contents has been updated.
C2: Technical Specification 12-35 Check Valves has been added.
C3: Technical Specification 12-36 Sanitary Sewer and Water Pipe has been added.
C4: Technical Specification 12-47 HDPE Air Relief Valve has been revised.
C5: Technical Specification 12-91 Fiberglass Metering Manhole has been added.
C6: Technical Specification 12-93 Flow Meter Equipment has been revised.
C7: Technical Specification 11-67 Standby Generator has been deleted.
The following changes have been made in the Special Provisions.
C1: Special Provision Section 0-0
C2: Special Provision Section 0-2
C3: Special Provision Section 0-5
C4: Special Provision Section 0-11
The following Plan Sheets have been updated and are included with this addendum.
R1: Plan Sheets 16, 19, 22, 26, 29, 32, 35, 36, 38, 39, 47, 49, 50, 52, 53, 53C, 54, 55, 58, 63, 67, and 70 have all been revised.
Rockville Mining, Permit S-91-85 Muddy Creek Restoration Project
The following notes/explanations are provided.
Note 1: The bid schedule has been revised to show additional fence gates for the Dream Mountain fence gate at Woolen Mills road.
Note 2: Three (3) air relief valves at the pump station are paid incidental to “Pump Station”.
Note 3: All discharge piping and fittings from the siphon tank shall be paid incidental to “Siphon Tank”.
Note 4: All 18 inch gravity pipe is PVC SDR 35.
Note 5: Windrowing of timber is permissible on this project.
Note 6: The stainless-steel ball valves with the air relief valves, are considered to be isolation valves.
Note 7: There was a discrepancy in Technical Specification 11-67 Standby Generator and the Plans. Technical Specification 11-67 has been deleted. See Plan Sheet 59 and Technical Specification 11-00 for the corrected generator size.
0.0 - 1
0-0 PROJECT INFORMATION
1.0 LOCATION / SITE DESCRIPTION
The project is located in Preston County, West Virginia (WV) near the community of Ruthbelle. The project is located off WV Route 26.
The project will involve but is not limited to the construction of AMD collection lines, geotube pads, pump station, mine seals and installation and maintenance of road systems.
DIRECTIONS TO THE SITE:
From Morgantown, WV follow I-68 (Bruceton Mills exit) take WV Route 26 South for approximately 6 miles to Valley Point, WV. The project runs from Valley Point along WV Route 26 and ends approximately ½ mile past the intersection of Muddy Fork Road (Preston County Route 17 and WV Route 2
2.0 WORK PERFORMANCE PERIOD
The “Contract Period” for the project is 150 calendar days commencing on the date as defined in the Notice to Proceed letter. This period is defined as the amount of contract time allowed by the WVDEP for substantial completion of the project.
The “Contract Period” shall comply with Standard Specifications Section 14 Determination and Extension of Contract Time.
3.0 CONTRACT TERM
The “Contract Term” for the project is 15 months commencing on the date as defined in the Notice to Proceed letter. The Contract Term defines the beginning and end dates of the contract, and shall remain valid beyond the “Contract Period” for administrative purposes.
4.0 REFERENCE SPECIFICATIONS / DEFINITIONS
All references to "Owner" in these Specifications shall mean West Virginia Department of Environmental Protection, Office of Special Reclamation (WVDEP).
All references to "Engineer" in these Specifications shall mean the WVDEP's Engineer or authorized representative.
All references to "ASTM" shall mean the American Society of Testing and Material Specifications, Latest Edition unless otherwise noted.
0.0 - 2
All references to "AASHTO Specifications" shall mean the Standard Specifications for Transportation Materials and Methods of Sampling and Testing by the American Association of State Highway and Transportation Officials, latest edition, and all subsequent addenda thereto.
All references to "WVDOH Standard Specifications" shall mean State of West Virginia Department of Transportation, Division of Highways Standard Specifications for Roads and Bridges, adopted 2010, and all-subsequent addenda thereto.
All references to the "Contractor" shall be understood to mean the successful bidder and or firm or corporation undertaking the execution of the work under the terms of these Specifications.
All references to "OSHA" shall be understood to mean The Occupational Safety and Health Administration and the standards set in the Occupational Safety and Health Act of 1970.
All references to “AMD” shall be understood to mean all acid mine drainage discharges from the project site.
5.0 SCOPE OF WORK
The Contractor shall perform all operations necessary for:
• clearing and grubbing at the site and removal or burning of debris, trash, tree roots, and associated materials;
• providing erosion and sediment control with best management practices to include, but not limited to silt fence, check dams, and rocked culvert outlet protection;
• construction and installation of support areas;
• installation and maintenance of road systems;
• construction and installation of drainage control items;
• installation of mine seals and underdrains;
• construction of geotube pads;
• construction of pump station;
• construction of siphon system with piping;
• construction of AMD collection lines;
0.0 - 3
The Contractor shall also be responsible for surveying, including establishing construction baseline, measuring and developing all completed quantities on the job, and for ordering, purchase and delivery of any and all materials required for construction or required for development of support areas. The Contractor shall perform all other operations as incidental to the program as specified herein.
6.0 SCHEDULE OF WORK
Before commencing work on this project, the Contractor shall prepare and submit a schedule of construction activities for approval by the WVDEP. The WVDEP requires that minimal treatment of the acid mine drainage continue during the construction of the facility. The sequence of construction is listed in Section 6.0 of this Specification. The Contractor will be required to maintain access at all times to the facility, and upon completion of the project the access road condition shall be equal to or better than existed upon mobilization activities.
The Contractor shall provide adequate supervision, labor, tools, equipment, and materials to prosecute the work energetically and complete the work within the time specified. The Contractor shall demonstrate to the Engineer that sufficient sized and quantity of equipment shall be mobilized to ensure this Project is completed within specified time frames or sooner. The required Schedule to be submitted (mentioned above) shall include a list of said properly sized and quantity of equipment, along with projected earth moving and excavation capabilities as well as hauling, and grading rates to complete the tasks herein specified within stated time frames.
The WVDEP has no intention to delay the work for the checking of lines or grades, but if necessary, working operations shall be suspended for such reasonable time as the Engineer may require for the purpose. No special compensation shall be paid for the cost to the Contractor for any of the work or delay occasioned by checking lines and grades, by making other necessary measurements, or by inspection.
7.0 SEQUENCE OF CONSTRUCTION
1. Mobilization of Equipment onto job site.
2. Immediately prepare and submit all project submittals to the Engineer for approval.
3. Install electric drop for the Lift Station.
4. Installation of the Force Main and Mine Seals.
5. Installation of the Lift Station. All components except pumps, depending on manufacturer delivery time.
6. Installation of Ruth Bell (Preston Energy UO-235) Collection System.
7. Installation of Fickey Run Collection System.
8. Installation of Dike System and new Stream Channel at Fickey Run headwaters.
9. Installation of siphon system with associated seep collector and piping.
0.0 - 4
10. Installation of geo pad.
11. Demobilization of Equipment off job site inclusive of removing all debris, silt fence, etc
8.0 BORROW (DISPOSAL) AREAS
All borrow (disposal) areas must be approved by WVDEP. Should the Contractor decide to obtain and utilize any borrow areas outside of construction limits, or move material from one property owner to another (unless designated), the Contractor shall be responsible to obtain (from the property owner(s) of the borrow areas) all necessary rights of entry, including rights of entry for WVDEP and OSMRE for inspection purposes. The said rights of entry agreement must state that the property owner(s) indemnify and hold harmless the WVDEP for Contractor’s action for any injury or damages whatsoever resulting from the use of the property.
The Contractor also shall submit borrow or waste area reclamation plans for prior approval by WVDEP. The Contractor shall observe the following NEPA compliance schedule relative to selecting and utilizing any off site borrow areas and or any waste disposal areas.
A. No borrow (disposal) site operations will affect a site listed in, eligible or proposed to be listed in the National Register of Historic Places.
B. No borrow (disposal) operations will be located within one-quarter mile of any federally listed established or prospective component of the National Wild and Scenic River System under 16 USC 1274 and 1276.
C. Borrow (disposal) site operations will not cause a significant encroachment within the base floodplain (CE.O. 11988: Floodplain Management).
D. Borrow (disposal) site operations will not be located in or affect a critical habitat of a Federally listed endangered or threatened species under 16 USC 1531, et. seq.
E. No borrow (disposal) operations will occur in wetland areas which are designated by appropriate agencies.
F. Borrow (disposal) site operations will be consistent with any approved plans governing ambient air quality.
G. Adherence to these mitigation measures does not relieve the Contractor of the obligation or responsibility to obtain any other Federal, State, or local approvals required to use borrow (disposal) areas and conduct such activities.
H. Documentation: Copies of borrow (disposal) site approvals and concurrences
0.0 - 5 will be submitted to the WVDEP prior to the commencement of reclamation
I. Site Monitoring: Borrow (disposal) activities will be monitored by the State to ensure compliance with contractual requirements, applicable Federal, State, and local laws, and any permit conditions.
9.0 DISPOSAL OF UNSUITABLE MATERIAL
All disposal areas shall be obtained in accordance with Section 7.0 of this Specification. All unsuitable materials (wood, trash, debris, and garbage) as determined by the Engineer, shall be wasted by the Contractor, at the Contractor’s expense, outside the limits of work conforming to the requirements of the applicable sub-sections of Section 7.0 of this Specification. Wood may be burned in designated areas in conformity with Technical Specifications Section 4-01 Site Preparation. Coal, coal refuse, black or dark gray shales, and exposed coal seams and other similar potentially toxic (acidic) materials shall be soil covered on-site and in accordance with these Specifications.
The Contractor shall observe the NEPA compliance schedule relative to selecting and utilizing any off-site disposal areas in accordance with Section 7.0 of this Specification.
10.0 WATER SUPPLY
There is no potable water available at the site. Arrangements for water supply shall be made by the Contractor, and all costs for such arrangements shall be borne by the Contractor at no additional cost to the department.
11.0 UTILITIES AND OTHER OBSTRUCTIONS
The name, address, and phone number of the WVMIS Utility location service and of the utility companies are as follows:
WV 811 Formally WV Miss Utility 811 or 1-800-245-4848
MonPower 237 Hartman Run Road
Morgantown, WV 26505 1-800-686-0022
Frontier Communications 214 Monroe Street
Fairmont, WV 26554 1-304-935-3121
0.0 - 6
Chesapeake Energy (Natural Gas Co.)
1-888-460-0003
12.0 CITATION OF OTHER SPECIFICATIONS
Whenever the Specifications for this Contract refer to the specifications of any society, institute, association or government organization, then such specifications cited shall become a part of this Contract as if written in full. Commonly used abbreviations have the following meanings:
ASTM - American Society for Testing Materials
ASA - American Standards Association
AWWA - American Water Works Association
AASHTO - American Association of State Highway and Transportation Officials
ACI - American Concrete Institute
USFHWA – United States Federal Highway Administration
Where reference is made to a specification, it shall be the latest revision at the time called for bids, except as noted on the Plans or elsewhere herein.
END OF SECTION
0.2-1
0-2 COORDINATION AND MEETINGS
1.0 GENERAL
1.1 DESCRIPTION
A. This Section includes general requirements for the conduct and coordinating responsibility of routine and special meetings which will occur throughout the completion of the Work.
1.2 RELATED SECTIONS
A. General Conditions
1.3 COORDINATION
A. The Contractor shall coordinate scheduling, notifications, submittals, and
Work of the various Sections of Technical Specifications to assure efficient and orderly sequence of installation of interdependent construction elements. The Contractor shall be responsible for the Work of Sub-Contractors and insure that the Work is in accordance with the Contract Documents.
B. The Contactor shall verify that utility requirement characteristics of operating equipment are compatible with building utilities. Coordinate work of various Sections having interdependent responsibilities for installing, connecting to, and placing in service, such equipment.
C. The Contractor shall coordinate space requirements and installation of mechanical and electrical work which are indicated diagrammatically on Drawings. Follow routing shown for pipes, ducts, and conduit, as closely as practicable; place runs parallel with line of building. Utilize spaces efficiently to maximize accessibility for other installations, for maintenance, and for repairs.
D. In finished areas, the Contractor shall conceal pipes, ducts, and wiring within the construction. Coordinate locations of fixtures and outlets with finish elements.
E. The Contractor shall coordinate completion and clean up of Work of separate Sections in preparation for Substantial Completion and for portions of Work designated for WVDEP occupancy.
F. After WVDEP occupancy of premises, the Contractor shall coordinate access to site for correction of defective Work and Work not in
0.2-2 accordance with Contract Documents, to minimize disruption of WVDEP's
G. The Contractor shall coordinate the notification and scheduling of all inspections and testing of the Work.
1.4 PRE-CONSTRUCTION CONFERENCE
A. The purpose of the Pre-Construction Conference is to review and assure understanding of the requirements of the construction Contract; to establish clear lines of communication among the various parties involved in the construction; and to introduce the administrative procedures and level of responsibility which will govern the relationship among the parties during the course of the Work.
B. The Contractor shall provide submittals required, be prepared to discuss all items on the agenda, and notify the Subcontractors and Suppliers.
C. Attendance Required:
1. WVDEP Engineer.
2. WVDEP Inspector.
3. Contractor’s Onsite Foreman or Superintendent.
4. Representatives of Government Agencies having any form of jurisdiction, if Applicable.
D. Agenda:
1. Contractor shall provide a list of Sub-Contractors.
2. Contractor shall provide a list of Suppliers.
3. Contractor shall provide a Schedule of Work.
4. Contractor shall provide a Schedule of Values.
5. Contractor shall provide a list of equipment or materials to be submitted as Engineer Approved Equals. See Special Provision Section 0-13 Alternatives (Engineer Approved Equal).
6. Discussion of Contract Documents.
7. Coordination, procedures, and processing of field decisions, submittals, applications for payments, and Change Orders.
8. Scheduling, progress meeting requirements and milestone dates, if
Applicable.
9. Procedures for inspection and testing of Work. Contractor shall supply list of inspection and testing firms. Scheduling activities of inspection, testing and geotechnical consultants, if Applicable.
10. Review the WVDEP and Contractor’s occupancy and use of the project site, If Applicable.
11. Field offices and temporary utilities, if Applicable.
0.2-3
12. Safety, Security and housekeeping procedures.
13. Procedures for maintaining record documents, if Applicable.
14. Requirements for start-up of equipment, if Applicable.
15. Contract Closeout Requirements.
1.5 PROGRESS MEETINGS
A. The purpose of the meetings is to monitor and maintain the progress of the Work quality and schedule; and to facilitate the analysis, discussion, and planning of solutions for problems that might arise in the execution of the Work.
B. The WVDEP Inspector shall schedule and administer progress meetings during the project at intervals as otherwise determined by project size, and prepare and supply the meeting agenda to the WVDEP Engineer and the Contractor’s Superintendent or Foreman. To the maximum extent possible, the Contractor and the WVDEP Inspector shall identify items to be added to the agenda at least 24 hours in advance of the Contract meeting regarding all items to be added to the agenda.
C. The Contractor shall make arrangements for the meetings. The WVDEP
Inspector will preside at meetings and record notes on daily inspection log. The daily log will be available to the Contractor upon request. To the maximum extent practical, the progress meetings shall be held at the Contractor’s field office on the site, when a field office is utilized.
D. Contractor shall provide an itemized list of Work completed since the last progress meeting. Items on the list shall be tied to the detailed construction network.
E. Attendance Required:
1. Contractor Superintendent or Foreman.
2. WVDEP Inspector.
3. WVDEP Engineer.
F. Agenda:
1. Review of Work progress to date and Construction Schedule compliance.
2. Field observations, problems, and decisions.
a. WVDEP Inspector’s Comments.
b. WVDEP Engineer’s Comments.
c. Contractor’s Comments.
3. Proposed Changes and Clarifications.
4. Review of submittals schedule and status of submittals.
0.2-4
5. Review of Major Equipment and off-site fabrication delivery schedules, if Applicable.
6. Quality Control, if Applicable
a. Defective/Deficient Items
b. Inspection and Testing Reports
7. Construction Schedule
a. Planned progress for the next 2 and 4 succeeding weeks.
b. Corrective measures to regain projected schedules.
c. Coordination of projected progress.
8. Action Items
a. Proposed Changes
b. Corrective Measures
c. Submittals
9. Other business relating to Work.
G. The Contractor is responsible for any and all discussions and relations between subcontractors and material suppliers. These discussions or relations shall not be a part of progress meeting contents.
H. The individual designated by the Contractor to attend and participate in progress meetings shall have all required authority to commit the Contractor to solutions as agreed upon in the progress meetings.
1.6 PRE-INSTALLATION CONFERENCES
A. When required in individual Technical Specification Section, convene a pre-installation conference at work site prior to commencing Work of the Section.
B. Required attendance:
1. Contractor Superintendent or Foreman.
2. WVDEP Inspector or Engineer.
C. The Contractor shall notify the WVDEP Engineer and the WVDEP
Inspector five days in advance of meeting date.
D. The Contractor shall prepare the agenda and preside at conference. The
WVDEP Inspector shall record pertinent meeting information on the daily inspection report.
E. Review conditions of installation, preparation and installation procedures, and coordination with related work.
0.2-5
2.0 EXECUTION
2.1 SMOKING
All meetings, including casual meetings, shall be non-smoking occasions.
Smoking will not be permitted in field offices, other offices, and lunch/break rooms, and shall be restricted to designated physically separate smoking areas.
All conference rooms, conference areas, and computer and control equipment installation areas shall be non-smoking areas. Smoking in existing facilities or work areas shall be only in approved areas designated by the WVDEP Inspector.
All smoking shall also be restricted by applicable law or regulation which may exceed the requirements of this paragraph.
0.5-1
0-5 ENVIRONMENTAL CONTROL
1.1 RELATED DOCUMENTS
A. Standard Specifications, Design Drawings, Technical Specifications, and Special Provisions of the Contract, apply to work of this Section.
B. Seeding and mulching specifications for permanent seeding, including soil amendments, found in Technical Specifications Section 6-0 Revegetation are applicable to temporary seeding.
C. Description of Work
1. Environmental Protection
2. Land Resources Protection
3. Noise Control
4. Dust Control
5. Debris Control
6. Water Pollution Control
7. Sediment Control Plan
8. Erosion Control
9. Air Pollution
10. Protection of Archeological and Historical Findings
2.0 PRODUCTS
2.1 TEMPORARY SEEDING PRODUCTS
A. Seed, mulch and soil amendments used for temporary seeding shall be in accordance with the specifications for permanent seeding found in Technical Specifications Section 6-0 Revegetation.
3.0 EXECUTION
3.1 APPLICATION
A. Environmental Protection
1. In order to prevent, and to provide for abatement and control of, any environmental pollution arising from the Contractor’s construction activities, the Contractor shall comply with all applicable Federal, State, and Local laws and regulations concerning environmental pollution control and abatements, as well as all specific requirements
0.5-2 stated elsewhere in the contract specifications.
2. The WVDEP will notify the Contractor in writing of any non-compliance with the foregoing provisions and the action to be taken.
The Contractor shall, after receipt of such notice, immediately take corrective action. Such notice, when delivered to the Contractor or the Contractor’s authorized representative at the site of the work, shall be deemed sufficient for the purpose. If the Contractor fails or refuses to comply promptly, the WVDEP may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time loss due to any such stop orders shall be made the subject of a claim for extension of time or for excess costs or damages by the Contractor unless determination was made that the Contractor was in compliance.
a. The Contractor shall obliterate all signs of temporary construction facilities such as work areas, structures, foundations or temporary structures, stock-piles of excess waste materials, or any other vestiges of construction as directed. Any spoil above grade around the crown of trees and shrubs shall be removed. The disturbed areas shall be graded and filled as required, and seeded as specified herein.
b. During the life of this contract, the Contractor shall maintain all facilities constructed for pollution control under this contract as long as the operations creating the particular pollutant are being carried out or until the material concerned has become stabilized to the extent that pollution is no longer being created. During the construction period the Contractor should conduct frequent training courses for maintenance personnel.
The curricula should include methods of detection of pollution, familiarity with pollution standards, and installation and care of vegetation covers, plants and other facilities to prevent and correct environmental pollution.
B. Land Resources Protection
1. The intent is that the land resources within the project boundaries and outside the limits of permanent work performed under this contract be preserved to present condition or be restored to a condition after completion of construction that will appear to be natural and not detract from the appearance of the project. Insofar as possible, the Contractor shall confine the construction activities to areas defined by the plans and specifications.
C. Noise Control
1. Contractor shall comply with all Federal, State, or Local laws and
0.5-3 regulations concerning noise control.
D. Dust Control
1. The Contractor will be required to maintain all work sites, excavations, embankments, stockpiles, haul roads, permanent access roads, plant sites, waste areas, borrow areas, and all other work areas within or without the project boundaries free from dust which would cause a hazard or nuisance to others. Approved temporary methods of stabilization consisting of sprinkling, chemical treatment, light bituminous treatment, or similar methods will be permitted to control dust. Sprinkling, to be approved, must be repeated at such intervals as to keep all parts of the disturbed area at least damp at all times, and the Contractor shall have sufficient competent equipment on the job to accomplish this. Dust control shall be performed as the work proceeds and whenever a dust nuisance or hazard occurs.
2. Calcium chloride shall not be used for dust control.
E. Debris Control
1. The Contractor shall keep all work areas involved in the project free from all trash and debris, including excess or unusable materials.
2. All areas shall be cleaned up and made orderly on a weekly basis;
however, should the Engineer determine that the health or safety of the public is threatened due to an unkept work area, the Engineer may order the project, or a part of the project, shut down until such time as the area in question is cleaned up.
F. Water Pollution Control
1. The Contractor shall submit a Dewatering Plan to the WVDEP-OSR prior to any release of a mine pool, pond, or impounded water by means of pumping or gravity discharge to the waters of West Virginia.
The Contractor’s Dewatering Plan must be approved in writing by the Engineer prior to the release of said water. The Contractor shall be responsible and liable for the control and treatment of said water. The Contractor shall at all times comply with the Clean Water Act as the Act pertains to these type of discharges.
a. The Dewatering Plan shall include a Daily Discharge
Monitoring Log to be maintained by the Contractor to include but not limited to flow and field pH. Additional constituents may be added dependent on raw water quality and/or the receiving stream.
b. The Dewatering Plan shall include a site-specific Emergency Spill Procedure document that outlines the measures to be taken in the event of accidental discharges that could be
0.5-4 considered in violation WVDEP’s Environmental Enforcement standards for stream impairment.
1. This section of the Dewatering Plan shall include emergency treatment measures that the Contractor shall implement in the event of an emergency spill.
2. In the event that any unauthorized discharge occurs to any receiving stream, the Contractor shall immediately notify the WVDEP Spill Hotline and WVDEP Project Representative(s). The WVDEP Spill Hotline number is 1-800-642-3074.
3. The Contractor is required to file a written report with the WVDEP within 5 days explaining the cause of the spill, remediation procedures, and plan of action to eliminate similar events in the future.
2. The Contractor shall be responsible for the treatment and/or the installation of a treatment system to treat the said water to meet water quality standards as provided in the following chart.
The Masteller Coal Company S-10-85 Effluent Limitations pH 6.0 – 9.0 S.U.
Settleable Solids 0.50 ML/L Iron, Total 3.00 MG/L Aluminum, Total 0.43 MG/L
Raw Water Quality Flow 20 GPM pH 4.0 – 5.0 S.U.
Iron, Total 30 MG/L Aluminum, Total 30 MG/L
Additional Information: Acid Mine Drainage Water Treatment is not required on the Masteller Coal Company S-125-84 site.
3. The Contractor shall remain on site during the discharge of any said water, unless the WVDEP-OSR states otherwise in writing.
4. The Contractor shall not pollute any rivers or streams with fuels, oils, bitumens, calcium chloride, acids, or harmful materials. The Contractor is responsible to investigate and comply with applicable Federal, State, and Local laws concerning pollution of rivers and streams. All work under this contract shall be performed in such a manner that objectionable conditions will not be created.
5. At all times of the year, special measures shall be taken to prevent chemicals, fuels, oils, greases, bituminous materials, waste washings, herbicides, and cement drainage from entering public waters.
6. Disposal of any materials, wastes, effluents, trash garbage, oil, grease, chemicals, etc., in areas adjacent to streams will be subject to
0.5-5 approval. If any waste material is dumped in unauthorized areas, the Contractor shall remove the material and restore the area to the condition of the adjacent undisturbed area. If necessary, contaminated ground shall be excavated, disposed of as directed, and replaced with suitable fill material, compacted and finished with topsoil all at the expense of the Contractor.
7. The Contractor shall at all times perform all work and take such steps required to minimize the severity and duration of any interferences or disturbances to fish and wildlife. The Contractor will not be permitted to disturb native habitat adjacent to the project area which, in the opinion of the WVDEP, are critical to fish and wildlife. Fouling or polluting of water will not be permitted. Wash waters and wastes shall be processed, filtered, ponded, or otherwise treated prior to release into the streams.
G. Sediment Control Plan
1. The WVDEP-OSR has a NPDES permit with the WVDEP. The
Contractor shall follow the requirements set forth in the Best Management Practices Manual, at all times during construction.
2. The required Sediment Control Plan is a plan for controlling erosion and sediment during construction in compliance with the laws, ordinances, and the Construction Best Management Practice Manual available from the Division of Environmental Protection - Water Resources Division, Planning Branch in Charleston, West Virginia.
The Contractor shall follow the "Best Management Practices" during construction, consisting of utilizing the best selection of erosion control practices and sediment trapping facilities in conjunction with adequate levels of control.
3. General requirements of the Sediment Control Plan include, but are not limited to the following:
a. Revegetation - All work areas will be seeded and mulched within two (2) weeks of completing construction for that specific area. Permanent vegetative cover should be compatible with adjacent land and/or restored to original condition. All areas where temporary seeding or mulching has been applied will be permanently seeded and mulched immediately after final grading to establish vegetative cover compatible with adjacent land. See Landscape Work specifications for complete seeding requirements.
b. Other Construction Practices - Any water pumped from excavated areas shall not be discharged directly into any watercourse. Adequate provisions must be taken to prevent sediment and erosion from entering the watercourse.
0.5-6
H. Erosion Control
1. Prior to any major construction, the Contractor shall be responsible for reviewing, if any existing erosion control measures and/or structures on the construction that are available for use. The Contractor shall be responsible for surface drainage from cuts and fills within the construction limits, whether or not completed, and from waste disposal areas. In the event turbidity producing materials are present, the Contractor shall be responsible to control erosion with WVDEP approved methods with no increase or additions to the contract. The area of bare soil exposed at any one time by construction operations shall be held to a minimum. Fills and waste areas shall be constructed by selective placement to eliminate silts or clays on the surface that will erode and contaminate the streams.
I. Air Pollution
1. The Contractor shall exercise every reasonable precaution throughout the life of the project to keep air pollution to a minimum. The Contractor shall also comply with the applicable regulations of the WVDEP Division of Air Quality. During times of limited dispersion, construction operations may be suspended.
2. Time lost due to a suspension of work under this item shall be added on to the Contract Time.
J. Protection of Archeological and Historical Findings
1. Should the Contractor's excavation operations encounter remains of prehistoric people's dwelling sites or artifacts of historical or archeological significance, the operation in that locality shall be temporarily discontinued. The Engineer will contact appropriate authorities to determine the disposition thereof.
2. When directed by the Engineer, the Contractor shall excavate the site in such a manner as to preserve the artifacts encountered and shall remove them for delivery to the custody of the proper State authorities. Such excavation will be considered as an extra amount of work, and shall be paid for with a Change order.
3. The time lost due to a temporary work stoppage under this item shall be added on to the Contract Time.
0.11-1
0-11 SUBMITTALS
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of Contract apply to this Section.
1.2 SUMMARY
A. This Section specifies administrative and procedural requirements for submittals required for performance of the Work, including;
1. Contractor's construction schedule.
2. Schedule of values.
3. Weekly construction reports.
4. Certified Payroll.
5. Incidental Stone Truck Tickets
6. Shop Drawings, If Applicable.
7. Product Data, If Applicable.
8. Samples, If Applicable.
9. Operation and Maintenance Manuals, If Applicable.
10. Warranties.
B. Administrative Submittals: Refer to other Contract Specifications and other Contract Documents for requirements for administrative submittals. Such submittals may include, but are not limited to:
1. Permits.
2. Applications for payment.
3. Bonding.
4. Insurance certificates.
5. List of Subcontractors.
C. Inspection and test reports are included in Technical Specifications Section
3-0 Quality Control Services.
1.3 SUBMITTAL PROCEDURES
A. Coordination: Coordinate preparation and processing of submittals with performance of construction activities. Transmit each submittal sufficiently in advance of performance of related construction activities to avoid delay.
1. Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals and related activities that require sequential
0.11-2 activity.
2. Coordinate transmittal of different types of submittals for related elements of the Work so processing will not be delayed by the need to review submittals concurrently for coordination.
a. The Engineer reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.
3. Processing: Allow sufficient review time so that installation will not be delayed as a result of the time required to process submittals, including time for resubmittal.
a. Allow two weeks for initial review. Allow additional time if processing must be delayed to permit coordination with subsequent submittals. The Engineer will promptly advise the Contractor when a submittal being processed must be delayed for coordination.
b. If an intermediate submittal is necessary, process the same as the initial submittal.
c. Allow two weeks for reprocessing each submittal.
d. No extension of Contract Time will be authorized because of failure to transmit submittals to the Engineer sufficiently in advance of the Work to permit processing.
B. Submittal Preparation: Place a permanent label or title block on each submittal for identification. Indicate the name of the entity that prepared each submittal on the label or title block.
1. Provide a space approximately 4" x 5" on the label or beside the title block on Shop Drawings to record the Contractor's review and approval markings and the action taken.
2. Include the following information on the label for processing and recording action taken.
a. Project name.
b. Date.
c. Name and address of Engineer.
d. Name and address of Contractor.
e. Name and address of subcontractor.
f. Name and address of supplier.
g. Name of manufacturer.
h. Number and title of appropriate Specification Section.
i. Drawing number and detail references, as appropriate.
0.11-3
C. Submittal Transmittal: Package each submittal appropriately for transmittal and handling. Transmit each submittal from Contractor to Engineer using a transmittal form. Submittals received from sources other than the Contractor will be returned without action.
1. On the transmittal, record relevant information and requests for data.
On the form, or separate sheet, record deviations from Contract Document requirements, including minor variations and limitations.
Include Contractor's certification that information complies with Contract Document requirements.
1.4 CONTRACTOR'S CONSTRUCTION SCHEDULE
A. Bar-Chart Schedule: Prepare a fully developed, horizontal bar-chart type Contractor's construction schedule. The Construction Schedule shall be submitted to the Engineer at the Pre-Construction meeting. The Bar-Chart shall be maintained in the temporary construction office or when no onsite office is used, the construction foreman shall maintain the Bar-Chart onsite.
1. Provide a separate time bar for each significant construction activity.
Provide a continuous vertical line to identify the first working day of each week. Use the same breakdown of units of the Work as indicated in the "Schedule of Values".
2. Within each time bar indicate estimated completion percentage in 10 percent (10%) increments. As Work progresses, place a contrasting mark in each bar to indicate Actual Completion.
3. Prepare the schedule on a sheet, or series of sheets, of stable transparency, or other reproducible media, of sufficient width to show data for the entire construction period.
4. Secure time commitments for performing critical elements of the Work from parties involved. Coordinate each element on the schedule with other construction activities; include minor elements involved in the sequence of the Work. Show each activity in proper sequence.
Indicate graphically sequences necessary for completion of related portions of the Work.
5. Coordinate the Contractor's construction schedule with the schedule of values, list of subcontracts, submittal schedule, progress reports, payment requests and other schedules.
6. Indicate completion date for project.
B. Work Stages: Indicate important stages of construction for each major portion of the Work, including testing and installation.
C. Distribution: Following response to the initial submittal, print and distribute copies to the Engineer, subcontractors, and other parties required to comply with scheduled dates. Post copies in the Project meeting room and
0.11-4 temporary field office.
1. When revisions are made, distribute to the same parties and post in the same locations. Delete party(s) from distribution when the party(s) has completed assigned portions of the Work and are no longer involved in construction activities.
C. Schedule Updating: Revise the schedule after each meeting or activity, where revisions have been recognized or made. Issue the updated schedule concurrently with report of each meeting.
D. The submission of the Construction Schedule shall be a condition of approval for the first submitted invoice of the contract.
1.5 SCHEDULE OF VALUES
Refer to Special Provisions Section 0-1 Schedule of Values.
1.6 WEEKLY CONSTRUCTION REPORTS
A. Prepare a weekly construction report, recording the following information concerning events at the site; and submit a copy to the Engineer at weekly intervals:
1. List of subcontractors at the site.
2. Approximate count of personnel at the site.
3. High and low temperatures, general weather conditions.
4. Accidents and unusual events.
5. Meetings and significant decisions.
6. Stoppages, delays, shortages, losses.
7. Meter readings and similar recordings.
8. Emergency procedures.
9. Orders and requests of governing authorities.
10. Change Orders received, implemented.
11. Services connected, disconnected.
12. Equipment or system tests and start-ups.
13. Partial Completions, occupancies.
B. The submission of the Weekly Construction Reports shall be a condition of approval for submitted invoices during the period invoiced.
1.7 SHOP DRAWINGS
A. Submit newly prepared information, drawn to accurate scale. Highlight, encircle, or otherwise indicate deviations from the Contract Documents. Do not reproduce Contract Documents or copy standard information as the basis
0.11-5 of Shop Drawings. Standard information prepared without specific reference to the Project is not considered Shop Drawings.
B. Shop Drawings include fabrication and installation drawings, setting diagrams, schedules, patterns, templates and similar drawings. Include the following information:
1. Dimensions.
2. Identification of products and materials included.
3. Compliance with specified standards.
4. Notation of coordination requirements.
5. Notation of dimensions established by field measurement.
6. Sheet Size: Except for templates, patterns and similar full- size
Drawings, submit Shop Drawings on sheets at least 8-1/2" x 11" but no larger than 36" x 48".
7. Submittal: Submit three (3) blue- or black-line prints; two (2) prints will be retained; and one (1) will be returned marked with action taken and corrections or modifications required.
8. Do not use Shop Drawings without an appropriate final stamp indicating action taken in connection with construction.
C. Coordination drawings are a special type of Shop Drawing that show the relationship and integration of different construction elements that require careful coordination during fabrication or installation to fit in the space provided or function as intended.
1. Submit coordination Drawings for integration of different construction elements. Show sequences and relationships of separate components to avoid conflicts in use of space.
1.8 PRODUCT DATA
A. Collect Product Data into a single submittal for each element of construction or system. Product Data includes printed information such as manufacturer's installation instructions, catalog cuts, standard color charts, roughing-in diagrams and templates, standard wiring diagrams and performance curves.
Where Product Data must be specially prepared because standard printed data is not suitable for use, submit as "Shop Drawings."
1. Mark each copy to show applicable choices and options. Where printed Product Data includes information on several products, some of which are not required, mark copies to indicate the applicable information. Include the following information:
a. Manufacturer's printed recommendations.
b. Compliance with recognized trade association standards.
c. Compliance with recognized testing agency standards.
0.11-6
d. Application of testing agency labels and seals.
e. Notation of dimensions verified by field measurement.
f. Notation of coordination requirements.
2. Do not submit Product Data until compliance with requirements of the
Contract Documents has been confirmed.
3. Submittals: Submit three (3) copies of each required submittal; two
(2) will be retained and one (1) will be returned marked with action taken and corrections or modifications required.
4. Distribution: Furnish copies of final submittal to installers, subcontractors, suppliers, manufacturers, fabricators, and others required for performance of construction activities. Show distribution on transmittal forms.
a. Do not proceed with installation until an applicable copy of
Product Data is in the installer's possession.
b. Do not permit use of unmarked copies of Product Data in connection with construction.
1.9 SAMPLES
A. Submit full-size, fully fabricated Samples cured and finished as specified and physically identical with the material or product proposed. Samples include partial sections of manufactured or fabricated components, cuts or containers of materials, color range sets, and swatches showing color, texture and pattern.
1. Mount, display, or package Samples in the manner specified to facilitate review of qualities indicated. Prepare Samples to match the Engineer's Sample. Include the following:
a. Generic description of the Sample.
b. Sample source.
c. Product name or name of manufacturer.
d. Compliance with recognized standards.
e. Availability and delivery time.
2. Submit Samples for review of kind, color, pattern, and texture, for a final check of these characteristics with other elements, and for a comparison of these characteristics between the final submittal and the actual component as delivered and installed.
a. Where variation in color, pattern, texture or other characteristics are inherent in the material or product represented, submit multiple units (not less than three (3)), that show approximate limits of the variations.
0.11-7
b. Refer to other Specification Sections for requirements for Samples that illustrate workmanship, fabrication techniques, details of assembly, connections, operation and similar construction characteristics.
3. Submittals: Except for Samples…
This is the start of the file's text. The full file is on GovTribe.