ARFQ 0608 DCR2600000066 - Addendum No. 1.pdf

PDF 144 KB Posted

Attached to
Elevator Maintenance and Repairs Contract
Solicitation number
ARFQ 0608 DCR2600000066 2
Issued by
Mineral County, West Virginia

About this file

This is an Addendum No. 1 to Request for Quotation (ARFQ 0608 DCR2600000066) issued by the state agency for elevator maintenance and repairs services at Stevens Correctional Center and Jail. The addendum provides six clarifications to the original RFQ specifications and pricing requirements. The contract requires contractors to perform quarterly preventive maintenance on a mutually agreed-upon schedule and to maintain detailed preventive maintenance logs including service dates, personnel names, and time spent. Invoices may be submitted with each work order or combined on a quarterly basis and must be directed to the facility where work was completed. The bid submission deadline has been established as 10:30 AM Eastern Standard Time on November 19, 2025.

The pricing structure requires bidders to complete Exhibit D (Revision No. 1) with preventive maintenance unit pricing on a quarterly basis, hourly labor rates for corrective maintenance (including regular, overtime, holiday, and emergency labor categories), and a percentage markup on parts and new equipment based on actual contractor costs. The pricing page specifies 100 estimated annual hours for regular corrective maintenance labor, 16 hours for overtime, 8 hours for holiday labor, and 8 hours for emergency labor, with an estimated parts cost of $5,000.00 for bid evaluation purposes only. Bidders must complete the pricing page in its entirety, including all calculations; failure to do so will result in bid disqualification. The estimated labor hours and parts costs are provided solely for bid evaluation and do not guarantee future contract utilization or individual line item usage.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ARFQ 0608 DCR2600000066

REQUEST FOR QUOTATION

ELEVATOR MAINTENANCE AND REPAIRS CONTRACT

STEVENS CORRECTIONAL CENTER AND JAIL

ELEVATOR MAINTENANCE 1 ADDENDUM

AND REPAIRS CONTRACT

ADDENDUM NO. 1:

Clarifications:

C1: In specifications section 1.04(B), subsection 1, has changed to the following, “Contractor shall perform Preventive Maintenance on a quarterly basis in accordance with a schedule mutually agreed upon by the Contractor and Agency.”

C2: In specifications section 1.07(M), subsection 1, has changed to the following, “Invoices can be submitted with each work order or can be combined and submitted on a per quarterly basis. Invoices must be submitted to the facility that the work was completed at for payment.”

C3: In specifications section 1.09(M), subsection 2, a new paragraph has been added.

Specifications section 1.09(M) subsection 2 now states the following:

“Contractor must complete the Pricing Pages in Exhibit D by inserting the requested information in the appropriate spaces and performing the calculations necessary to arrive at an overall cost. The requested information includes, preventative maintenance;

hourly labor rates for corrective maintenance, repairs, installation of replacement parts, and new installation; a percentage markup on parts from the actual price the Contractor paid and the total labor cost; to all be added up to calculate the overall cost. Contractor must complete the Pricing Page in full, as failure to complete the Pricing Page in its entirety will result in Contractor’s bid being disqualified.

For the preventative maintenance cost, the Preventative Maintenance Unit Price Per Each Time includes all the equipment listed in Exhibit A – Elevator Equipment List.

For the parts markup percentage quote, the contractor must do the calculation correctly.

Below is an example:

a. The contractor bids five (5%) percent markup on parts. The contractor must take the estimated cost and multiply it by 1.05.

The pricing page contains an estimated number of labor hours and an estimated cost for parts. The estimates for labor and parts represent amounts for bid evaluation purposes only. No future use of the Contract or any individual item is guaranteed or implied.”

ARFQ 0608 DCR2600000066

REQUEST FOR QUOTATION

ELEVATOR MAINTENANCE AND REPAIRS CONTRACT

STEVENS CORRECTIONAL CENTER AND JAIL

ELEVATOR MAINTENANCE 2 ADDENDUM

AND REPAIRS CONTRACT

C4: In specifications section 1.13(A), subsection 1, is changed to the following, “Contractor shall provide and update a Preventive Maintenance log in the form of a chart for the equipment. The Preventive Maintenance log must include a listing of all Preventive Maintenance performed, the name of the individual performing the Preventive Maintenance, the date it was performed, and the time spent performing the Preventive Maintenance. Contractor shall also maintain a duplicate maintenance log that Contractor must submit to Agency on a quarterly basis.”

C5: On the Exhibit D – Pricing Page, in the column under the Preventative Maintenance Unit of Measure, has been changed to “Quarterly”. Please see the attached Exhibit D- Revision No. 1 Pricing Page. The contractor must use the revised pricing page.

C6: The bid time and date have changed: 10:30 AM E.S.T. on November 19, 2025.

E X

H

IB

IT

D

R

E V

IS

IO

N N

O . 1

Pr ev en ta tiv e

M ai nt en an ce

Pr ev en ta tiv e

M ai nt en an ce

U ni t o f

M ea su re

Pr ev en ta tiv e

M ai nt en an ce

N um be r of

T im es P er Y ea r

Pr ev en ta tiv e

M ai nt en an ce

U ni t P ri ce

P er

E ac h T im e

P re ve nt at iv e M ai nt en xt en de d A m ou nt

E le va to r El ev at or Q ua rte rly

Su bt ot al

A

C or re ct io n

M ai nt en an ce

H ou rl y

R at es C or re ct iv e M ai nt en t o f M ea su re

C or re ct iv e

M ai nt en st im at ed

A nn ua l H ou rs

C or re ct iv e

M ai nt en t P ri ce

C or re ct iv e

M ai nt en xt en de d

A m nt

R eg ul ar

L ab or R at e

H ou r

O ve rti m e

La bo r R at e H ou r

H ol id ay L ab or

R at e H ou r

Em er ge nc y

La bo r R at e H ou r

Su bt ot al

B

N ew

E qu ip m en t, D ev ic es

, a nd

P ar ts

M ku p

Pe rc en ta ge Q uo te

N ew

E qu ip m en t, D ev ic es an d Pa rt s M ar ku p Pe rc en ta ge

N ew

E qu ip m en t, D ev ic es an d Pa rt s M ar ku p Pe rc en ta ge

E xt en de d A m nt

Pa rt s

Su bt ot al

C

O V

E R

A L

L C

O

ST

(b y ad di ng su bt ot al s A

, B , a nd C

B id de r/

V en do r

In fo rm at io n:

N am e:

A dd re ss

Ph on e N o.

Fa x

N o.

Em ai l A dd re ss

A ut ho riz ed S ig na tu re

N O

T E

S:

Q ua nt iti es a re e st im at ed fo r b id e va lu at io n pu rp os es o nl y.

E st im at ed c os t f or b id e va lu at io n pu rp os es o nl y.

$5 ,0

.0

E st im at ed N ew E qu ip m en t, D ev ic es , a nd P ts

M ku p Pe rc en ta ge

C os t *

A R

FQ

D C

R

E le va to r

M ai nt en an ce a nd

R ep ai rs

C on tr ac t P ri ci ng

P ag e

St ev en s C or re ct io na l C en te r an d Ja il

ARFQ 0608 DCR2600000066 - Exhibit D - Pricing Page - R1.pdf
Pricing Page

File details come from the government source that posted it. Updated .