ARFQ 0608 DCR2500000097 - Addendum No. 1.pdf

PDF 406 KB Posted

Attached to
Wastewater Treatment Plant Operation Management Contract
Solicitation number
ARFQ 0608 DCR2500000097 2
Issued by
Taylor County, West Virginia

About this file

This is Addendum No. 1 to a Request for Quotation (RFQ) issued by the West Virginia Division of Corrections and Rehabilitation for wastewater treatment plant operation and management services at Huttonsville Correctional Center and Jail. The contractor will provide seven days per week operational management of the facility's wastewater treatment plant, including monitoring, sampling, and compliance with National Pollutant Discharge Elimination System (NPDES) permit requirements. The contractor must conduct phosphorous sampling twice monthly, maintain continuous flow monitoring, prepare and submit Discharge Monitoring Reports (DMRs), and provide eight-hour composite sampling using contractor-supplied equipment. The sealed bid submission deadline is 10:30 AM Eastern Standard Time on April 15, 2025, with contract award anticipated within several weeks to one month following the bid submission process and required review by the Attorney General's office.

The contract does not include a per-year value limitation, as specification section 1.13 regarding contract value was removed. The contractor must provide all labor, materials, and associated expenses, including treatment chemicals (specifically lime for the UV disinfection system), permit renewal costs, and regulatory filing fees. The contractor bears responsibility for emergency notifications to the Department of Environmental Protection and must assist facility management with compliance recommendations; however, the agency retains responsibility for purchasing replacement parts and equipment outside emergency situations. The facility's wastewater treatment plant operates on emergency backup power and experiences periodic overflow events during heavy or long-term rain. No current infrastructure development projects are anticipated to impact operations during the contract term.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ARFQ 0608 DCR2500000097

REQUEST FOR QUOTATION

WASTEWATER TREATMENT PLANT OPERATION MANAGEMENT CONTRACT

HUTTONSVILLE CORRECTIONAL CENTER AND JAIL

Addendum No. 1

Questions:

Q1: I Just wanted to get some clarity on the contract price which indicates a not to exceed price of 500k including all extensions as it appears to read. This is a 500k per year operation to run. I may be reading this wrong, does section 1.13 contract value mean per year?

A1: Because the contractor will not be performing any corrective maintenance or repairs, specification section 1.13 is removed from the contract.

Q2: Contract states monthly visits. NPDES Permit requires phosphorous be sampled twice/month and flow must be monitored continuously. Is there a continuous monitoring system and will a second monthly visit be required?

A2: The contractor is responsible for the facility wastewater treatment plant seven (7) days a week.

Q3: Should bidders include provisions for DMR Preparation/Submittal in the estimated cost?

A3: Yes

Q4: Sampling requires 8-Hour Composite. Will Agency supply composite sampler, or should provisions be included in the estimated cost?

A4: The contractor must include in their price.

Q5: The RFQ indicates that Contractor shall provide all labor, materials, and bear expenses necessary to include treatment chemicals that will be used at the wastewater treatment plant. The subject system utilizes UV Disinfection. What additional chemicals would be necessary?

A5: Lime

Q6: Are there any recurring, or outstanding regulatory issues from previous inspections that the contractor should be aware of? (i.e. rain overflow/spill events, notice of violations which need returned to compliance with DEP, etc.)

A6: When there is overflow occurring due to long term or heavy rains.

Q7: Will the awarded contractor be responsible for the cost of permit renewals or other regulatory filings?

ARFQ 0608 DCR2500000097

REQUEST FOR QUOTATION

WASTEWATER TREATMENT PLANT OPERATION MANAGEMENT CONTRACT

HUTTONSVILLE CORRECTIONAL CENTER AND JAIL

A7: Yes

Q8: Is there a current infrastructure development plan or any anticipated projects for the wastewater treatment plant and/or collection system which may impact operations during the term of the contract?

A8: No

Q9: Will the contractor be responsible for purchasing replacement parts or equipment for the wastewater treatment plant outside of those needed under emergency situations?

A9: No, the agency will be responsible for purchasing replacement parts and equipment.

Q10: How will the contractor be notified of after-hours or weekend issues at the wastewater treatment plant?

A10: The contractor is responsible for monitoring the facility wastewater treatment plant seven

(7) days a week. If the contractor is not at the facility wastewater treatment plant and the facility notices an issues, the facility will contact the contractor.

Q11: What are the emergency response expectations from the contractor for operational failures or compliance issues?

A11: The contractor must notify the DEP and assist the facility in recommendations to correct the operational failures or compliance issues.

Q12: Does the wastewater treatment plant have a current emergency response plan in place?

A12: The facility wastewater treatment plant is on emergency backup power.

Q13: What is the expected timeline for contract award and project start date?

A13: Once the sealed bids are submitted, there is a process that the DCR must go through in encumbering a contract, including, but not limited to submitting the contract documents to the Attorney General’s office to review and approve to form. The timeframe could range from a few weeks to a month before the contract can be encumbered.

Clarifications:

C1: Please see attached mandatory pre-bid sign-in sheet.

C2: The bid time and date has changed: 10:30 AM E.S.T. on April 15, 2025