ARFQ 0608 DCR2500000046 - Exhibit B2 - Existing Chiller Drawings.pdf

PDF 18 MB Posted

Attached to
Chiller Replacement Project
Solicitation number
ARFQ-0608-DCR2500000046-1
Issued by
Calhoun County, West Virginia

About this file

The document is a set of technical drawings for a chiller system replacement project at the Mount Olive Correctional Complex, prepared by Johnson Controls. The drawings include detailed specifications for air-cooled screw chillers, with multiple diagrams showing product configurations, piping schematics, control wiring, and system layouts. The project involves removing existing system pump packages and chillers, and installing new York YVAA air-cooled chillers with associated infrastructure modifications.

The technical drawings outline a comprehensive retrofit of the facility's chilled water system, with a basic sequence of operations that includes removing existing system components, installing new pumps and chillers, routing local piping, and implementing new control systems. The drawings cover multiple aspects of the system, including primary and secondary chilled water pumps, exterior piping, supply and return tie-in points, and detailed wiring diagrams. Additional documentation includes specifications for drain valves, replacement parts lists, and installation guidelines for the new equipment.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Chiller Drawing 1

Chiller Drawing 2
Chilled Water Diagram
Chilled Water P & ID
Secondary Return Tie-in Points
Secondary Supply Tie-in Points
Exterior Piping
Primary Supply Tie-in Points
Chilled Water Pump Suction Risers
Chilled Water Pump Discharge Risers
Control Wiring
Drain Master