ARFQ 0608 DCR2500000034 - Exhibit B1 - Contract Drawings.pdf

PDF 12 MB Posted

Attached to
HVAC Equipment Replacement Project
Solicitation number
ARFQ-0608-DCR2500000034-2
Issued by
Mineral County, West Virginia

About this file

This file is a comprehensive set of contract drawings for an HVAC Equipment Replacement Project for the Lakin Correctional Center and Jail in West Columbia, West Virginia, involving the West Virginia Department of Homeland Security and the West Virginia Division of Corrections and Rehabilitation. The project, identified as ARFQ 0608 DCR2500000034, encompasses mechanical and electrical system upgrades across multiple building areas, with detailed demolition and new work plans for rooftop mechanical systems. The drawings, dated February 21, 2025, cover mechanical demolition, new HVAC work, electrical plans, and system details for Areas A through J, including replacement of rooftop units, exhaust fans, condensing units, and associated electrical infrastructure.

The project involves systematic replacement of existing HVAC equipment while maintaining operational continuity, with specific requirements to keep existing systems functional during phased construction. Key considerations include coordinating work to minimize disruption, maintaining building pressurization, connecting new equipment to a new Direct Digital Control (DDC) system, and ensuring compatibility with existing fire alarm and building automation systems. The drawings specify technical details such as curb adaptations, power reconnections, smoke detector replacements, and integration of new control systems, with particular attention to safety protocols, including installing guardrails on rooftop equipment and ensuring OSHA compliance. The comprehensive documentation suggests a thorough, methodical approach to upgrading the facility's mechanical and electrical systems with minimal operational interruption.

View the file

Other files

File Type Posted
ARFQ 0608 DCR2500000034 - Addendum No. 1.pdf PDF
ARFQ 0608 DCR2500000034 - Exhibit B2 - Contract Drawings for Reference Drawings - Part 12 of 13.pdf PDF
ARFQ 0608 DCR2500000034 - Exhibit A - Project Manual.pdf PDF
ARFQ 0608 DCR2500000034 - Exhibit B2 - Contract Drawings for Reference Drawings - Part 11 of 13.pdf PDF
ARFQ 0608 DCR2500000034 - Exhibit B2 - Contract Drawings for Reference Drawings - Part 2 of 13.pdf PDF
ARFQ 0608 DCR2500000034 - Exhibit B2 - Contract Drawings for Reference Drawings - Part 3 of 13.pdf PDF
ARFQ 0608 DCR2500000034 - Exhibit B2 - Contract Drawings for Reference Drawings - Part 6 of 13.pdf PDF
ARFQ 0608 DCR2500000034 - Exhibit B2 - Contract Drawings for Reference Drawings - Part 8 of 13.pdf PDF
ARFQ 0608 DCR2500000034 - Exhibit B2 - Contract Drawings for Reference Drawings - Part 9 of 13.pdf PDF
Final_ARFQ_0608_DCR2500000034_2_WV_ARFQ_FORM.PDF PDF
ARFQ 0608 DCR2500000034 - Exhibit B2 - Contract Drawings for Reference Drawings - Part 13 of 13.pdf PDF
ARFQ 0608 DCR2500000034 - Exhibit B2 - Contract Drawings for Reference Drawings - Part 1 of 13.pdf PDF
ARFQ 0608 DCR2500000034 - Exhibit B2 - Contract Drawings for Reference Drawings - Part 10 of 13.pdf PDF
ARFQ 0608 DCR2500000034 - Exhibit B2 - Contract Drawings for Reference Drawings - Part 4 of 13.pdf PDF
ARFQ 0608 DCR2500000034 - Exhibit B2 - Contract Drawings for Reference Drawings - Part 5 of 13.pdf PDF
ARFQ 0608 DCR2500000034 - Exhibit B2 - Contract Drawings for Reference Drawings - Part 7 of 13.pdf PDF
ARFQ 0608 DCR2500000034 - HVAC Equipment Replacement Project.pdf PDF
Final_ARFQ_0608_DCR2500000034_1_WV_ARFQ_FORM.PDF PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HVAC EQUIPMENT REPLACEMENT PROJECT

WEST COLUMBIA, WEST VIRGINIA

FEBRUARY 2025

GRW PROJECT NO. 5232-01

INDEX OF DRAWINGS DWG. No.

ARFQ 0608 DCR2500000034

engineering architecture geospatial www.grwinc.com

LAKIN CORRECTIONAL CENTER AND JAIL

MASON COUNTY

WEST

COLUMBIA

PATRICK MORRISEY: GOVERNOR

ROB CUNNINGHAM: CABINET SECRETARY - W.V. DEPARTMENT OF

HOMELAND SECURITY

WILLIAM MARSHALL, III: COMMISSIONER - W.V. DIVISION OF CORRECTIONS

AND REHABILITATION

LANCE YARDLEY: DEPUTY COMMISSIONER - W.V. DIVISION OF

CORRECTIONS AND REHABILITATION

SCOTT PATTERSON: ASSISTANT COMMISSIONER - W.V. DIVISION OF

CORRECTIONS AND REHABILITATION

PHILIP FARLEY, II: DIRECTOR OF ENGINEERING, CONSTRUCTION, AND

MAINTENANCE - W.V. DIVISION OF CORRECTIONS

AND REHABILITATION

11264 OHIO RIVER ROAD

PENNSYLVANIA

VIRGINIA

OHIO

KENTUCKY

BID SET

COVER SHEET

M-001 MECHANICAL LEGEND AND GENERAL NOTES

MD101 MECHANICAL HVAC DEMOLITION PLAN - AREA "A"

MD102 MECHANICAL HVAC DEMOLITION PLAN - AREA "B"

MD103 FIRST FLOOR MECHANICAL HVAC DEMOLITION PLAN - AREA "C"

MD104 FIRST FLOOR MECHANICAL HVAC DEMOLITION PLAN - AREA "D"

MD105 FIRST FLOOR MECHANICAL HVAC DEMOLITION PLAN - AREA "E"

MD106 FIRST FLOOR MECHANICAL HVAC DEMOLITION PLAN - AREA "F & H"

MD107 FIRST FLOOR MECHANICAL HVAC DEMOLITION PLAN - AREA "J"

MD108 ROOFTOP MECHANICAL HVAC DEMOLITION PLAN - AREA "A"

MD109 ROOFTOP MECHANICAL HVAC DEMOLITION PLAN - AREA "B"

MD110 ROOFTOP MECHANICAL HVAC DEMOLITION PLAN - AREA "C"

MD111 ROOFTOP MECHANICAL HVAC DEMOLITION PLAN - AREA "D"

MD112 ROOFTOP MECHANICAL HVAC DEMOLITION PLAN - AREA "E"

MD113 ROOFTOP MECHANICAL HVAC DEMOLITION PLAN - AREA "F & H"

MD114 ROOFTOP MECHANICAL HVAC DEMOLITION PLAN - AREA "J"

M-101 MECHANICAL HVAC NEW WORK PLAN - AREA "A"

M-102 MECHANICAL HVAC NEW WORK PLAN - AREA "B"

M-103 FIRST FLOOR MECHANICAL HVAC NEW WORK PLAN - AREA "C"

M-104 FIRST FLOOR MECHANICAL HVAC NEW WORK PLAN - AREA "D"

M-105 FIRST FLOOR MECHANICAL HVAC NEW WORK PLAN - AREA "E"

M-106 FIRST FLOOR MECHANICAL HVAC NEW WORK PLAN - AREA "F & H"

M-107 FIRST FLOOR MECHANICAL HVAC NEW WORK PLAN - AREA "J"

M-108 ROOFTOP MECHANICAL HVAC NEW WORK PLAN - AREA "A"

M-109 ROOFTOP MECHANICAL HVAC NEW WORK PLAN - AREA "B"

M-110 ROOFTOP MECHANICAL HVAC NEW WORK PLAN - AREA "C"

M-111 ROOFTOP MECHANICAL HVAC NEW WORK PLAN - AREA "D"

M-112 ROOFTOP MECHANICAL HVAC NEW WORK PLAN - AREA "E"

M-113 ROOFTOP MECHANICAL HVAC NEW WORK PLAN - AREA "F & H"

M-114 ROOFTOP MECHANICAL HVAC NEW WORK PLAN - AREA "J"

M-500 MECHANICAL DETAILS

M-600 MECHANICAL SCHEDULES

M-601 MECHANICAL SCHEDULES

M-700 HVAC CONTROLS SEQUENCE OF OPERATION

E-001 STANDARD ELECTRICAL SYMBOLS AND GENERAL NOTES

E-101 ELECTRICAL PLAN - AREA "A"

E-102 ELECTRICAL PLAN - AREA "B"

E-103 FIRST FLOOR ELECTRICAL PLAN - AREA "C"

E-104 FIRST FLOOR ELECTRICAL PLAN - AREA "D"

E-105 FIRST FLOOR ELECTRICAL PLAN - AREA "E"

E-106 FIRST FLOOR ELECTRICAL PLAN - AREA "F & H"

E-107 FIRST FLOOR ELECTRICAL PLAN - AREA "J"

E-108 ROOFTOP ELECTRICAL PLAN - AREA "A"

E-109 ROOFTOP ELECTRICAL PLAN - AREA "B"

E-110 ROOFTOP ELECTRICAL PLAN - AREA "C"

E-111 ROOFTOP ELECTRICAL PLAN - AREA "D"

E-112 ROOFTOP ELECTRICAL PLAN - AREA "E"

E-113 ROOFTOP ELECTRICAL PLAN - AREA "F & H"

E-114 ROOFTOP ELECTRICAL PLAN - AREA "J"

SUPPLY OR OUTSIDE AIR DUCTWORK; PLAN, UP & DOWN

SA

OA

RA

EA

TA

M M

S-2

RETURN OR EXHAUST DUCTWORK

DROP AND RISE IN DIRECTION OF FLOW

ACOUSTIC LINED DUCTWORK; PLAN

SUPPLY AIR DUCT

OUTSIDE AIR DUCT

RETURN AIR DUCT

EXHAUST AIR DUCT

TRANSFER AIR DUCT

LOW PRESSURE FLEXIBLE DUCT

ROUND DUCTWORK; PLAN, UP AND DOWN

AIR FLOW; DIRECTION

MANUAL VOLUME DAMPER; PLAN, ONE LINE DIAGRAM

MOTOR OPERATED DAMPER; PLAN, ONE LINE DIAGRAM

FIRE DAMPER

DUCT BRANCH TAKE OFF WITH RAKE OFF DAMPER;

PLAN, ONE DIAGRAM

DUCT TRANSITION; PLAN, ONE LINE DIAGRAM

SUPPLY DIFFUSER; ONE, TWO, THREE AND FOUR WAY

RETURN, EXHAUST OR TRANSFER GRILLE

AIR DEVICE DESIGNATION.

(S) SUPPLY, (R) RETURN, (E) EXHAUST, (T) TRANSFER,

(L) LOUVER; I.E. SUPPLY TYPE 2, 200 C.F.M.

FLEXIBLE DUCT CONNECTOR; PLAN, ONE LINE DIAGRAM

HWS

HWR

CWS

CWR

MU

HMU

HOT WATER SUPPLY PIPING

HOT WATER RETURN PIPING

CONDENSER WATER SUPPLY PIPING

CONDENSER WATER RETURN PIPING

MAKE-UP(NON-POTABLE)

MAKE-UP(NON-POTABLE)HOT

RS

RL

D

R

CD

G

T

REFRIGERANT SUCTION PIPING

REFRIGERANT LIQUID PIPING

EQUIPMENT OR SYSTEM DRAIN PIPING

SAFETY OR RELIEF VALVE DISCHARGE PIPING

CONDENSATE DRAIN PIPING

NATURAL GAS PIPING

BALL VALVES (BV)

PLUG COCKS, BALANCING COCKS

BUTTERFLY VALVES (BFV)

CONTROL VALVE; TWO WAY, THREE WAY

RELIEF VALVE; PLAN, ELEVATION

PRESSURE REDUCING VALVE (PRV)

TRI-FUNCTION VALVE (TDV)

STRAINER; STRAINER WITH BLOW DOWN.

FLOW SWITCH

A DIRECTION OF PIPE FLOW

MANUAL AIR VENT

AUTOMATIC AIR VENT

APPEARS ON THE SHEET WHERE SECTION IS DRAWN

S

SS

S

SS

RL

FD

EXISTING SANITARY SEWER PIPING (SITE)

EXISTING STORM SEWER PIPING (SITE)

SANITARY SEWER PIPING (SITE)

STORM SEWER PIPING (SITE)

SOIL & WASTE PIPING

ROOF LEADER PIPING

FOUNDATION DRAIN PIPING

DWV VENT PIPING

WALL HYDRANT

HOSE BIBB

OPEN RECEPTACLE

FD

WATER SOURCE HEAT PUMP RETURN

WATER SOURCE HEAT PUMP SUPPLY

HPWR

HPWS

DIRECTION OF PIPE PITCH

H

VACUUM AND COMPOUND GAUGES

PRESSURE/TEMPERATURE TEST PLUG

MAV

AAV

M-4

B

CONNECTION OF NEW WORK TO EXISTING

WH

HB

OR

OSD

GENERAL LEGEND

SHEET WHERE WASTE & WATER RISERS APPEAR

RISER SYMBOL ON PLAN SHEET

RETURN GRILLE WITH ACOUSTIC BAFFLE

F/O FLAT OVAL DUCT

V C

P/T

FD

EXPANSION LINEE

FLOW CONTROL VALVE

FLEXIBLE CONNECTOR

J

M1.4

PLAN MATCH LINE SYMBOLA

HIGH PRESSURE FLEXIBLE DUCT

SLOT TYPE LINEAR RETURN GRILLE

SLOT TYPE LINEAR SUPPLY DIFFUSER

HIGH VELOCITY SUPPLY DUCT (MEDIUM PRESSURE)HVD

CHILLED WATER RETURN PIPING

CHILLED WATER SUPPLY PIPING

CHWR

CHWS

HOT/CHILLED WATER RETURN PIPING

HOT/CHILLED WATER SUPPLY PIPING

HCWR

HCWS

HEAT RECOVERY RETURN PIPING

FUEL OIL VENT PIPING

FUEL OIL RETURN PIPING

FUEL OIL SUPPLY PIPING

HEAT RECOVERY SUPPLY PIPING

FOV

FOR

FOS

HRR

HRS

SELF REGULATING

FLOAT AND THERMOSTATIC TRAP, TRAP SET

INVERTED BUCKET TRAP, TRAP SET

AAE

AUTOMATIC AIR ELIMINATOR

LINE OR EQUIPMENT TO BE REMOVED

HVAC & PLUMBING

MECHANICAL LEGEND

REHEAT COIL IN DUCT

BDD

BACKDRAFT DAMPER

ACCESS DOOR, VERTICAL OR HORIZONTAL

EXHAUST OR RETURN TOP WALL REGISTER OR GRILLE

EXHAUST OR RETURN BOTTOM WALL REGISTER OR GRILLE

DOOR GRILLE

S SILENT CHECK VALVE

FLOW MEASURING DEVICE

M

MOTOR OPERATED VALVE

SOLENOID OR QUICK-OPENING VALVE

TEE OUTLET DOWN

TEE OUTLET UP

TEE OR SIDE CONNECTION

45° ELBOW

90° ELBOW TURNED DOWN

90° ELBOW TURNED UP

90° ELBOW

PLUG

CAP

COUPLING, JOINT

REDUCING BUSHING

(STRAINER NOT SHOWN) (BFP - RPZ)

BACKFLOW PREVENTER, REDUCED PRESSURE

FLOAT VALVE

F

M METER: WATER, CONDENSATE OR GAS

POT OR SHOT FEEDER

F FLOAT, STEAM OR AIR TRAP

EMD MAIN OR END OF MAIN DRIP TRAP SET

ACCESS DOOR, VERTICAL OR HORIZONTAL

CEILING DIFFUSERS

DUCT OR PIPE SECTION

C CONDUCTIVITY CONTROLLER

PRESSURE CONTROLLERP

H

T THERMOSTAT, OR TEMP. CONTROLLER

HUMIDISTAT, OR HUM. CONTROLLER

M-4

B

B

E3.1

E3.1

B

FS

VACUUM BREAKER

B

M1.2

M2.1

SECTION SYMBOL ON SHEET WHERE CUT

SHEET WHERE SECTION IS CUT

SHEET WHERE SECTION IS DRAWN

ORIFICE FLOW METER

P2.1

A RISER SYMBOL ON PLAN SHEET

SHEET WHERE WASTE RISER APPEARS

P2.2 SHEET WHERE WATER RISER APPEARS

AND WATER ON RISER SHEET

RISER SYMBOLS FOR WASTE (SANITARY)A

S W

A

B

M2.1

M1.2

SHEET WHERE DRAWN

SHEET WHERE INDICATED

ELEVATION SYMBOL ON SHEET WHERE INDICATED

H2.2

H1.1

D

C H1.1

H2.2

B

P3.2

(ON SHEET WHERE INDICATED AND SHEET WHERE DRAWN)

IDENTIFICATION LETTER

SHEET WHERE DRAWN

ENLARGED AREA OR PARTIAL PLAN SYMBOL

SECTION OR DETAIL IDENTIFICATION LETTER

SHEET WHERE DRAWN

SHEET WHERE SECTION IS DRAWN

SECTION IDENTIFICATION LETTER

APPEARS ON SHEET WHERE SECTION IS CUT

B M1.2

M2.1

SECTION, ELEVATION OR DETAIL IDENTIFICATION

SHEET WHERE INDICATED OR CUT

SHEET WHERE DRAWN

ON SHEET WHERE DRAWN

NEW DUCT - 1ST FIGURE IS DIMENSION SHOWN20x16

DOUBLE CK. VALVE ASSEMBLY (DCA)

123 ROOM NUMBER

CEILING HEIGHT9'-6"

AFF ABOVE FINISHED FLOOR

TOS, BOS TOP OF STEEL, BOTTOM

TOB, BOB TOP OF BEAM, BOTTOM

TOJ, BOJ TOP OF JOIST, BOTTOM

TOC, BOC TOP OF CONCRETE, BOTTOM

TOP, BOP TOP OF PIPE, BOTTOM

BOD BOTTOM OF DUCT

D R

SD

SMOKE DAMPER; PLAN, ONE LINE DIAGRAM

SPLITTER DAMPER: SD; SHOWN IN TEE WITH

TURNING VANES.

AIR TURNING VANES; PLAN, ONE LINE DIAGRAM

SD

(FIRE/SMOKE - FSD)

GATE VALVES (GV)

GLOBE VALVES

CHECK VALVE

BALANCING VALVE (WITH READ OUT)

A

V

W

DOMESTIC COLD WATER PIPING

DOMESTIC HOT WATER (140 F) PIPING

DOMESTIC HOT WATER (105 F) PIPING

HOT WATER PIPING (FOR EXAMPLE) HEAT TRACED

DOMESTIC RECIRCULATING HOT WATER PIPING

WATER SERVICE PIPING (EXTERIOR)

VENT PIPING

COMPRESSED AIR PIPING

DCW

DHW

DRW

VALVE (IN GENERAL - SEE SPECS)

HOSE CONNECTION, BOILER DRAIN

BALANCING COCK ONLY (NON-SHUTOFF)

ACID VENT

ACID WASTE

AV

AW

UNION

STRUCTURAL PIPE ANCHOR

PIPE GUIDE

EXPANSION JOINT

WALL SLEEVE

CONCENTRIC REDUCER

ECCENTRIC REDUCER

THERMOMETERS

THERMOMETER WELL

T

PRESSURE GAUGES

P

RISER IN SLEEVE

TOP CONNECTION TO LINE

BOTTOM CONNECTION TO LINE

RISE OR DROP IN PIPE

BOT.TOP

CROSS

UNCONNECTED CROSSING PIPES

VTR

THROUGH FLOOR

VTR

THROUGH ROOF

VENT THROUGH ROOF, PLAN & RISER

THROUGH WALL

BUILDING ENTRANCE PIPE ANCHOR

THRUST BLOCK

HORIZONTAL UNIT HEATER

PUMPP

ROOF EXHAUST HOOD, EXHAUST FAN

ROOF INTAKE HOOD, SUPPLY FAN

GENERAL NOTES:

FD

1. FURNISH ALL LABOR, MATERIAL, AND EQUIPMENT REQUIRED FOR THE COMPLETION &

OPERATION OF ALL SYSTEMS IN THIS SECTION OF WORK IN ACCORDANCE WITH ALL

APPLICABLE CODES, ASHRAE, SMACNA, NFPA, EPA, ETC.

2. REFER TO ALL PROJECT DRAWINGS FOR DETAILS OF CONSTRUCTION AND INSTALLATION

REQUIREMENTS.

3. CONTRACTOR SHALL BECOME, PRIOR TO BID, THOROUGHLY FAMILIAR WITH THE

REQUIREMENTS OF THESE NOTES AS WELL AS OTHER NOTES SHOWN ON THE

CONTRACT DOCUMENTS.

4. THESE DRAWINGS REFLECT A SYSTEM DESIGNED AROUND SPECIFIC REFERENCE

PRODUCTS (SEE SCHEDULES). THE SELECTION OF WHICH HAS INFLUENCED THE

DESIGNS OF OTHER TRADES (ELECTRICAL, STRUCTURAL, ETC.). IF SUBSTITUTE

MANUFACTURERS, SIZES, OR MODEL NUMBERS ARE BID, SUBMITTED OR INSTALLED, IT IS

THE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR AND ALL HIS

SUBCONTRACTORS TO COORDINATE ALL DIFFERENCES PRIOR TO BID. ALL COSTS OF

ALL TRADES ASSOCIATED WITH THE SUBSTITUTION SHALL BE INCLUDED IN THE BID.

5. COORDINATION OF ALL MODIFICATIONS TO EACH DISCIPLINE WHICH RESULT FROM

SUBSTITUTION OF EQUIPMENT OR MATERIALS SHALL BE THE RESPONSIBILITY OF THE

CONTRACTOR. SUBSTITUTIONS WHICH ARE INSTALLED AND SUBSEQUENTLY ARE

PROVEN UNSATISFACTORY BY OWNER AND/OR ENGINEER, WITHIN THE WARRANTY

PERIOD, SHALL BE REMOVED COMPLETELY BY THE CONTRACTOR AND REPLACED WITH

THE ORIGINAL DESIGN OR CORRECTED AS DIRECTED BY THE ENGINEER WITHOUT

ADDITIONAL COST TO THE OWNER.

6. ALL DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL ARRANGEMENTS OR

GEOMETRICAL RELATIONSHIPS OF EQUIPMENT AND SERVICES. THEY ARE NOT

INTENDED TO SPECIFY OR SHOW EVERY OFFSET, SEQUENCE, DEVICE, OPTION, FITTING,

VALVE, OR COMPONENT.

7. INFORMATION AND COMPONENTS SHOWN ON RISER DIAGRAMS OR DETAILS, BUT NOT

SHOWN ON PLANS, AND VICE VERSA, SHALL BE PROVIDED AS IF EXPRESSLY REQUIRED

BY BOTH.

8. CONTRACTOR SHALL NOT SCALE DRAWINGS. DRAWINGS SPECIFIC TO THIS DISCIPLINE

DO NOT LIMIT THE RESPONSIBILITY OF WORK REQUIRED BY THE CONTRACT

DOCUMENTS.

9. EXACT LOCATIONS OF ALL EQUIPMENT, DUCTS, DIFFUSERS, ETC. SHALL BE

COORDINATED WITH OTHER TRADES. CEILING MOUNTED LIGHTING, AND ELECTRICAL

REQUIREMENTS TAKE PRECEDENCE OVER CEILING MOUNTED MECHANICAL

REQUIREMENTS.

10. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL WORK WITH THAT OF

OTHER TRADES. REFER TO ELECTRICAL AND OTHER DRAWINGS FOR COMPLETE

INFORMATION PRIOR TO BID.

11. ALL MECHANICAL CONSTRUCTION DETAILS SHALL BE AS SHOWN AND AS REQUIRED TO

MAINTAIN "UL" ASSEMBLY RATINGS. SEAL AROUND ALL PENETRATIONS THROUGH ALL

"UL" RATED ASSEMBLIES, FIRE, AND SMOKE WALLS. COORDINATE WITH GENERAL

CONTRACTOR.

12. NO OTHER TRADES, I.E., ELECTRICAL, CEILING, PLUMBING, ETC., SHALL BE SUSPENDED, HUNG, OR SUPPORTED FROM DUCTWORK OR PIPING.

13. ALL BUILDING PENETRATIONS MUST BE COORDINATED WITH ENGINEER AND SHALL BE

FLASHED AND SEALED WEATHERTIGHT. ALL MATERIALS AND COLORS MUST BE

PRE-APPROVED BY ENGINEER.

14. ROUTE DUCTWORK AS HIGH AS POSSIBLE TO FACILITATE ACCESS TO ABOVE CEILING

SPACE. COORDINATE ROUTING WITH OTHER SERVICES AND TRADES.

15. ALL DUCTWORK AND PIPING SHALL BE SUPPORTED FROM STRUCTURE.

16. ALL DUCTWORK SHALL BE CONSTRUCTED AND INSTALLED PER SMACNA HVAC DUCT

CONSTRUCTION STANDARDS.

17. MAXIMUM FLEXIBLE DUCT LENGTH SHALL BE 5'-0". ALL FLEXIBLE DUCT SHALL CONFORM

TO THE REQUIREMENTS OF U.L. 181 FOR CLASS 1 FLEXIBLE AIR DUCTS. SUPPORT TO

ELIMINATE SAGGING & KINKING.

18. ALL HVAC EQUIPMENT TO BE INSTALLED PER MANUFACTURER'S REQUIREMENTS AS

SHOWN. UTILIZE FACTORY FILTERS DURING CONSTRUCTION.

19. ALL PIPING, DUCTS, VENTS, ETC., EXTENDING THROUGH WALLS SHALL BE FLASHED,

COUNTER FLASHED IN WATERPROOF MANNER W/LEAD ROOF JACK.

20. CONTRACTOR TO COORDINATE DUCTWORK WITH OTHER TRADES, OFF-SET AS

REQUIRED, RUN DUCTWORK BETWEEN JOIST WHERE POSSIBLE.

21. CONTRACTOR SHALL VISIT THE JOB SITE & BE FAMILIAR WITH ALL PROJECT CONDITIONS

PRIOR TO FABRICATING ANY EQUIPMENT, DUCTWORK, ETC. NO ALLOWANCES WILL BE

MADE FOR CONTRACTOR UNFAMILIARITY WITH PROJECT CONDITIONS.

22. MECHANICAL CONTRACTOR SHALL BALANCE SYSTEM TO AIR QUANTITIES INDICATED ON

PLANS AND PROVIDE OWNERS REPRESENTATIVES WITH COMPLETE NEBB/AABC

BALANCE REPORT.

23. ALL SQUARE ELBOWS SHALL HAVE TURNING VANES.

24. PROVIDE A MANUAL VOLUME DAMPER AT ALL BRANCH TAKE-OFFS.

25. ALL DUCT DIMENSIONS SHOWN ARE INTERIOR DUCT DIMENSIONS.

26. ALL CONTROL WIRING & CONDUIT SHALL COMPLY WITH NEC.

27. PIPE AND DUCT ROUTING SHOWN IS SCHEMATIC. HVAC CONTRACTOR SHALL PROVIDE

ANY ADDITIONAL OFFSETS AND FITTINGS, INCLUDING DIVIDED DUCTS, REQUIRED FOR

PROPER INSTALLATION AND TO MAINTAIN CLEARANCES AS ENCOUNTERED IN THE FIELD.

28. MECHANICAL CONTRACTOR SHALL COORDINATE WITH ELECTRICAL CONTRACTOR AND

DRAWINGS FOR CONNECTIONS AND LOCATION OF ALL EQUIPMENT.

DATE:

SCALE:

SHEET NO.

D

ES

IG

N

ED

D R

AW

N

R

EV

IE

W

ED

AP

PR

O

VE

D

D

AT

E

BY

D

ES

C R

IP

TI

O N

N O

R

EV

IS

IO

N S

SC

AL

E C

H

EC

K:

TH

IS

M

AR

K

SH

O

U

LD

M

EA

SU

R

E

EX

AC

TL

Y 1"

W H

EN

P

LO

TT

ED

BI

D

S

ET

C

LI

EN

T

PR

O

JE

C

T N

O

G R

W P

R O

JE

C

T N

O . 5

2-

AL

L

R

IG

H

TS

R

ES

ER

VE

D

TH

IS

D O

C U

M

EN

T

IS

T H

E

PR

O

PE

R

TY

O F

G R

W E

N G

IN

EE

R S, IN

C

. A N

D S

H

AL

L N

O T

BE

R

EP

R

O D

U C

ED

IN

W H

O

LE

O R

IN

P

AR

T

O R

U

SE

D F

O R

C O

N

ST

R U

C

TI

O N

O F

O

TH

ER

T

H

AN

T H

IS

S

PE

C

IF

IC

P R

O

JE

C T

W

IT

H O

U T

W R

IT

TE

N P

ER

M

IS

SI

O N en gi ne er in g ar ch ite ct ur e ge os pa tia l w w w .g rw in c.

co m

LA

KI

N C

O R

R

EC

TI

O

N

AL

C

EN

TE

R

A N

D J

AI

L

H

VA

C E

Q U

IP

M

EN

T

R

EP

LA

C

EM

EN

T W

ES

T

C O

LU

M

BI

A, W

ES

T

VI

R G

IN

IA

M-001

FEBRUARY 21, 2025

NOT TO SCALE

C

VS

SP

B

C

VS

C

VS

M

EC

H

AN

IC

AL

L

EG

EN

D

AN

D

G

EN

ER

AL

N O

TE

S

MATCH LINE MATCH LINE

SEE MD104 SEE MD104

T 1

TT

T

T 1

T 1

T

T T

T

DEMOLITION GENERAL NOTES:

A. DEMOLITION PLAN HAS BEEN DEVELOPED FROM EXISTING PLANS AND

VISITING SITE. SOME MECHANICAL EQUIPMENT, DUCTWORK, REGISTERS

AND PIPING SIZES MAY NOT BE INDICATED.

B. IT SHALL BE THE RESPONSIBILITY OF ALL CONTRACTORS WHO SUBMIT BIDS

FOR THIS PROJECT TO VISIT THE JOB PREMISES PRIOR TO BIDDING IN

ORDER THAT THEY MAY DETERMINE THE TYPE, QUANTITY, LOCATIONS AND

ANY HARDSHIPS INVOLVED WITH THE REMOVAL OF EQUIPMENT.

C. CONTRACTOR UNDER THIS DIVISION IS FINANCIALLY RESPONSIBLE TO

REPAIR AND PATCH FLOORS, WALLS, CEILING AND ROOF TO MATCH

EXISTING CONDITION WHERE DEMOLITION WORK HAS BEEN DONE.

COORDINATE ALL WORK WITH OWNER/ENGINEER.

D. THE EXISTING HVAC SYSTEM SHALL REMAIN FULLY FUNCTIONAL

THROUGHOUT PHASED CONSTRUCTION.

E. IF THE EXISTING HVAC SYSTEM SHALL EVER REQUIRE SHUTTING DOWN

TEMPORARILY IN OCCUPIED AREAS DURING CONSTRUCTION THE

CONTRACTOR SHALL COORDINATE THE TIMING OF THE SHUT DOWN PERIOD

WITH THE OWNER AND ARCHITECT PRIOR TO DISABLING THE EXISTING

SYSTEM. THE EXISTING HVAC SYSTEM SHALL REMAIN FUNCTIONAL IN ALL

OCCUPIED AREAS DURING NORMAL OPERATION PERIODS.

F. ALL EXISTING THERMOSTATS AND EXISTING CONTROL WIRING SHALL BE

REMOVED FROM ALL EQUIPMENT THAT IS BEING REMOVED IN THE BUILDING

IN DEMOLISHED AREAS UNLESS OTHERWISE NOTED.

SHEET KEYNOTES:

1. EXISTING THERMOSTAT TO BE REMOVED AND

REPLACED WITH NEW THERMOSTAT IN SAME

LOCATION. SEE NEW WORK PLANS FOR MORE

INFORMATION. TYPICAL OF ALL.

SPECIAL NOTES

1. ALL EXISTING HVAC SYSTEMS SHALL REMAIN OPERATIONAL

DURING THIS PROJECT. EXISTING EQUIPMENT SHALL BE

DISABLED ONLY WHEN NEW EQUIPMENT IS ONSITE AND READY

TO BE INSTALLED.

2. AS UNITS ARE INSTALLED, THERMOSTATS SHALL BE INSTALLED

AND PLACED IN STAND ALONE OPERATION MODE.

3. ALL NEW AND EXISTING EQUIPMENT SHALL CONNECT TO NEW

DDC CONTROL SYSTEM TIED INTO THE CONTROL NETWORK.

ALL NEW AND EXISTING EQUIPMENT SHALL RECEIVE NEW DDC

CONTROLLERS FOR COMMUNICATION WITH NEW CONTROL

SYSTEM. REFER TO CONTROLS DRAWINGS FOR FURTHER

DETAILS.

DATE:

SCALE:

SHEET NO.

D

ES

IG

N

ED

D R

AW

N

R

EV

IE

W

ED

AP

PR

O

VE

D

D

AT

E

BY

D

ES

C R

IP

TI

O N

N O

R

EV

IS

IO

N S

SC

AL

E C

H

EC

K:

TH

IS

M

AR

K

SH

O

U

LD

M

EA

SU

R

E

EX

AC

TL

Y 1"

W H

EN

P

LO

TT

ED

BI

D

S

ET

C

LI

EN

T

PR

O

JE

C

T N

O

G R

W P

R O

JE

C

T N

O . 5

2-

AL

L

R

IG

H

TS

R

ES

ER

VE

D

TH

IS

D O

C U

M

EN

T

IS

T H

E

PR

O

PE

R

TY

O F

G R

W E

N G

IN

EE

R S, IN

C

. A N

D S

H

AL

L N

O T

BE

R

EP

R

O D

U C

ED

IN

W H

O

LE

O R

IN

P

AR

T

O R

U

SE

D F

O R

C O

N

ST

R U

C

TI

O N

O F

O

TH

ER

T

H

AN

T H

IS

S

PE

C

IF

IC

P R

O

JE

C T

W

IT

H O

U T

W R

IT

TE

N P

ER

M

IS

SI

O N en gi ne er in g ar ch ite ct ur e ge os pa tia l w w w .g rw in c.

co m

LA

KI

N C

O R

R

EC

TI

O

N

AL

C

EN

TE

R

A N

D J

AI

L

H

VA

C E

Q U

IP

M

EN

T

R

EP

LA

C

EM

EN

T W

ES

T

C O

LU

M

BI

A, W

ES

T

VI

R G

IN

IA

MD101

FEBRUARY 21, 2025

KEY PLAN

A

J

H

F

E D

C

B

M

EC

H

AN

IC

AL

H

VA

C D

EM

O

LI

TI

O N

PL

AN

AR

EA

"A

C

VS

SP

B

C

VS

C

VS

1/16" - 1'0"

SCALE: 1/16"=1'-0" 0 16' 32'8'1 FIRST FLOOR MECHANICAL HVAC DEMOLITION PLAN - AREA "A" SCALE: 1/16"=1'-0" 0 16' 32'8'2 SECOND FLOOR MECHANICAL HVAC DEMOLITION PLAN - AREA "A"

M

AT

C H

L

IN

E M

AT

C

H L

IN

E

SE

E

M D

SE

E

M D

MATCH LINE MATCH LINE

SEE MD104 SEE MD104

T 1

TT

T

M

AT

C H

L

IN

E M

AT

C

H L

IN

E

SE

E

M D

SE

E

M D

MATCH LINE MATCH LINE

SEE MD104 SEE MD104

T 1

T

T

DEMOLITION GENERAL NOTES:

SHEET KEYNOTES:

1. EXISTING THERMOSTAT TO BE REMOVED AND

REPLACED WITH NEW THERMOSTAT IN SAME

LOCATION. SEE NEW WORK PLANS FOR MORE

INFORMATION. TYPICAL OF ALL.

SPECIAL NOTES

1. ALL EXISTING HVAC SYSTEMS SHALL REMAIN OPERATIONAL

DURING THIS PROJECT. EXISTING EQUIPMENT SHALL BE

DISABLED ONLY WHEN NEW EQUIPMENT IS ONSITE AND READY

TO BE INSTALLED.

2. AS UNITS ARE INSTALLED, THERMOSTATS SHALL BE INSTALLED

AND PLACED IN STAND ALONE OPERATION MODE.

3. ALL NEW AND EXISTING EQUIPMENT SHALL CONNECT TO NEW

DDC CONTROL SYSTEM TIED INTO THE CONTROL NETWORK.

ALL NEW AND EXISTING EQUIPMENT SHALL RECEIVE NEW DDC

CONTROLLERS FOR COMMUNICATION WITH NEW CONTROL

SYSTEM. REFER TO CONTROLS DRAWINGS FOR FURTHER

DETAILS.

A. DEMOLITION PLAN HAS BEEN DEVELOPED FROM EXISTING PLANS AND

VISITING SITE. SOME MECHANICAL EQUIPMENT, DUCTWORK, REGISTERS

AND PIPING SIZES MAY NOT BE INDICATED.

B. IT SHALL BE THE RESPONSIBILITY OF ALL CONTRACTORS WHO SUBMIT BIDS

FOR THIS PROJECT TO VISIT THE JOB PREMISES PRIOR TO BIDDING IN

ORDER THAT THEY MAY DETERMINE THE TYPE, QUANTITY, LOCATIONS AND

ANY HARDSHIPS INVOLVED WITH THE REMOVAL OF EQUIPMENT.

C. CONTRACTOR UNDER THIS DIVISION IS FINANCIALLY RESPONSIBLE TO

REPAIR AND PATCH FLOORS, WALLS, CEILING AND ROOF TO MATCH

EXISTING CONDITION WHERE DEMOLITION WORK HAS BEEN DONE.

COORDINATE ALL WORK WITH OWNER/ENGINEER.

D. THE EXISTING HVAC SYSTEM SHALL REMAIN FULLY FUNCTIONAL

THROUGHOUT PHASED CONSTRUCTION.

E. IF THE EXISTING HVAC SYSTEM SHALL EVER REQUIRE SHUTTING DOWN

TEMPORARILY IN OCCUPIED AREAS DURING CONSTRUCTION THE

CONTRACTOR SHALL COORDINATE THE TIMING OF THE SHUT DOWN PERIOD

WITH THE OWNER AND ARCHITECT PRIOR TO DISABLING THE EXISTING

SYSTEM. THE EXISTING HVAC SYSTEM SHALL REMAIN FUNCTIONAL IN ALL

OCCUPIED AREAS DURING NORMAL OPERATION PERIODS.

F. ALL EXISTING THERMOSTATS AND EXISTING CONTROL WIRING SHALL BE

REMOVED FROM ALL EQUIPMENT THAT IS BEING REMOVED IN THE BUILDING

IN DEMOLISHED AREAS UNLESS OTHERWISE NOTED.

DATE:

SCALE:

SHEET NO.

D

ES

IG

N

ED

D R

AW

N

R

EV

IE

W

ED

AP

PR

O

VE

D

D

AT

E

BY

D

ES

C R

IP

TI

O N

N O

R

EV

IS

IO

N S

SC

AL

E C

H

EC

K:

TH

IS

M

AR

K

SH

O

U

LD

M

EA

SU

R

E

EX

AC

TL

Y 1"

W H

EN

P

LO

TT

ED

BI

D

S

ET

C

LI

EN

T

PR

O

JE

C

T N

O

G R

W P

R O

JE

C

T N

O . 5

2-

AL

L

R

IG

H

TS

R

ES

ER

VE

D

TH

IS

D O

C U

M

EN

T

IS

T H

E

PR

O

PE

R

TY

O F

G R

W E

N G

IN

EE

R S, IN

C

. A N

D S

H

AL

L N

O T

BE

R

EP

R

O D

U C

ED

IN

W H

O

LE

O R

IN

P

AR

T

O R

U

SE

D F

O R

C O

N

ST

R U

C

TI

O N

O F

O

TH

ER

T

H

AN

T H

IS

S

PE

C

IF

IC

P R

O

JE

C T

W

IT

H O

U T

W R

IT

TE

N P

ER

M

IS

SI

O N en gi ne er in g ar ch ite ct ur e ge os pa tia l w w w .g rw in c.

co m

LA

KI

N C

O R

R

EC

TI

O

N

AL

C

EN

TE

R

A N

D J

AI

L

H

VA

C E

Q U

IP

M

EN

T

R

EP

LA

C

EM

EN

T W

ES

T

C O

LU

M

BI

A, W

ES

T

VI

R G

IN

IA

MD102

FEBRUARY 21, 2025

KEY PLAN

A

J

H

F

E D

C

B

M

EC

H

AN

IC

AL

H

VA

C D

EM

O

LI

TI

O N

PL

AN

AR

EA

"B

C

VS

SP

B

C

VS

C

VS

1/8" - 1'0" SCALE: 1/8"=1'-0" 0 8' 16'4'1 FIRST FLOOR MECHANICAL HVAC DEMOLITION PLAN - AREA "B"

SCALE: 1/8"=1'-0" 0 8' 16'4'2 SECOND FLOOR MECHANICAL HVAC DEMOLITION PLAN - AREA "B"

C H

L

IN

E M

AT

C

H L

IN

E

SE

E

M D

SE

E

M D

MATCH LINE MATCH LINE

SEE MD104 SEE MD104

M

AT

C H

L

IN

E M

AT

C

H L

IN

E

SE

E

M D

SE

E

M D

T 1

T 1

T 1 T

T

T

TT

T

T

T

T

T

T

T

T T

T

DEMOLITION GENERAL NOTES:

SHEET KEYNOTES:

1. EXISTING THERMOSTAT TO BE REMOVED AND

REPLACED WITH NEW THERMOSTAT IN SAME

LOCATION. SEE NEW WORK PLANS FOR MORE

INFORMATION. TYPICAL OF ALL.

A. DEMOLITION PLAN HAS BEEN DEVELOPED FROM EXISTING PLANS AND

VISITING SITE. SOME MECHANICAL EQUIPMENT, DUCTWORK, REGISTERS

AND PIPING SIZES MAY NOT BE INDICATED.

B. IT SHALL BE THE RESPONSIBILITY OF ALL CONTRACTORS WHO SUBMIT BIDS

FOR THIS PROJECT TO VISIT THE JOB PREMISES PRIOR TO BIDDING IN

ORDER THAT THEY MAY DETERMINE THE TYPE, QUANTITY, LOCATIONS AND

ANY HARDSHIPS INVOLVED WITH THE REMOVAL OF EQUIPMENT.

C. CONTRACTOR UNDER THIS DIVISION IS FINANCIALLY RESPONSIBLE TO

REPAIR AND PATCH FLOORS, WALLS, CEILING AND ROOF TO MATCH

EXISTING CONDITION WHERE DEMOLITION WORK HAS BEEN DONE.

COORDINATE ALL WORK WITH OWNER/ENGINEER.

D. THE EXISTING HVAC SYSTEM SHALL REMAIN FULLY FUNCTIONAL

THROUGHOUT PHASED CONSTRUCTION.

E. IF THE EXISTING HVAC SYSTEM SHALL EVER REQUIRE SHUTTING DOWN

TEMPORARILY IN OCCUPIED AREAS DURING CONSTRUCTION THE

CONTRACTOR SHALL COORDINATE THE TIMING OF THE SHUT DOWN PERIOD

WITH THE OWNER AND ARCHITECT PRIOR TO DISABLING THE EXISTING

SYSTEM. THE EXISTING HVAC SYSTEM SHALL REMAIN FUNCTIONAL IN ALL

OCCUPIED AREAS DURING NORMAL OPERATION PERIODS.

F. ALL EXISTING THERMOSTATS AND EXISTING CONTROL WIRING SHALL BE

REMOVED FROM ALL EQUIPMENT THAT IS BEING REMOVED IN THE BUILDING

IN DEMOLISHED AREAS UNLESS OTHERWISE NOTED.

SPECIAL NOTES

1. ALL EXISTING HVAC SYSTEMS SHALL REMAIN OPERATIONAL

DURING THIS PROJECT. EXISTING EQUIPMENT SHALL BE

DISABLED ONLY WHEN NEW EQUIPMENT IS ONSITE AND READY

TO BE INSTALLED.

2. AS UNITS ARE INSTALLED, THERMOSTATS SHALL BE INSTALLED

AND PLACED IN STAND ALONE OPERATION MODE.

3. ALL NEW AND EXISTING EQUIPMENT SHALL CONNECT TO NEW

DDC CONTROL SYSTEM TIED INTO THE CONTROL NETWORK.

ALL NEW AND EXISTING EQUIPMENT SHALL RECEIVE NEW DDC

CONTROLLERS FOR COMMUNICATION WITH NEW CONTROL

SYSTEM. REFER TO CONTROLS DRAWINGS FOR FURTHER

DETAILS.

DATE:

SCALE:

SHEET NO.

D

ES

IG

N

ED

D R

AW

N

R

EV

IE

W

ED

AP

PR

O

VE

D

D

AT

E

BY

D

ES

C R

IP

TI

O N

N O

R

EV

IS

IO

N S

SC

AL

E C

H

EC

K:

TH

IS

M

AR

K

SH

O

U

LD

M

EA

SU

R

E

EX

AC

TL

Y 1"

W H

EN

P

LO

TT

ED

BI

D

S

ET

C

LI

EN

T

PR

O

JE

C

T N

O

G R

W P

R O

JE

C

T N

O . 5

2-

AL

L

R

IG

H

TS

R

ES

ER

VE

D

TH

IS

D O

C U

M

EN

T

IS

T H

E

PR

O

PE

R

TY

O F

G R

W E

N G

IN

EE

R S, IN

C

. A N

D S

H

AL

L N

O T

BE

R

EP

R

O D

U C

ED

IN

W H

O

LE

O R

IN

P

AR

T

O R

U

SE

D F

O R

C O

N

ST

R U

C

TI

O N

O F

O

TH

ER

T

H

AN

T H

IS

S

PE

C

IF

IC

P R

O

JE

C T

W

IT

H O

U T

W R

IT

TE

N P

ER

M

IS

SI

O N en gi ne er in g ar ch ite ct ur e ge os pa tia l w w w .g rw in c.

co m

LA

KI

N C

O R

R

EC

TI

O

N

AL

C

EN

TE

R

A N

D J

AI

L

H

VA

C E

Q U

IP

M

EN

T

R

EP

LA

C

EM

EN

T W

ES

T

C O

LU

M

BI

A, W

ES

T

VI

R G

IN

IA

MD103

FEBRUARY 21, 2025

KEY PLAN

A

J

H

F

E D

C

B

FI

R

ST

F

LO

O

R M

EC

H

AN

IC

AL

H

VA

C

D

EM

O

LI

TI

O

N

PL

AN

AR

EA

"C

C

VS

SP

B

C

VS

C

VS

1/16" - 1'0"

SCALE: 1/8"=1'-0" 0 8' 16'4'

FIRST FLOOR MECHANICAL HVAC DEMOLITION PLAN - AREA "C"

SEE MD101 SEE MD101

M

AT

C H

L

IN

E M

AT

C

H L

IN

E

SE

E

M D

SE

E

M D

MATCH LINE MATCH LINE

SEE MD102 SEE MD102

M

AT

C H

L

IN

E M

AT

C

H L

IN

E

SE

E

M D

SE

E

M D

MATCH LINE MATCH LINE

SEE MD103 SEE MD103

M

AT

C H

L

IN

E M

AT

C

H L

IN

E

SE

E

M D

SE

E

M D

M

AT

C H

L

IN

E M

AT

C

H L

IN

E

SE

E

M D

SE

E

M D

T 1

T 1

T 1

T

T

T

T

T T

T

T T

T

T

TT

T

T

T

DEMOLITION GENERAL NOTES:

SHEET KEYNOTES:

1. EXISTING THERMOSTAT TO BE REMOVED AND

REPLACED WITH NEW THERMOSTAT IN SAME

LOCATION. SEE NEW WORK PLANS FOR MORE

INFORMATION. TYPICAL OF ALL.

A. DEMOLITION PLAN HAS BEEN DEVELOPED FROM EXISTING PLANS AND

VISITING SITE. SOME MECHANICAL EQUIPMENT, DUCTWORK, REGISTERS

AND PIPING SIZES MAY NOT BE INDICATED.

B. IT SHALL BE THE RESPONSIBILITY OF ALL CONTRACTORS WHO SUBMIT BIDS

FOR THIS PROJECT TO VISIT THE JOB PREMISES PRIOR TO BIDDING IN

ORDER THAT THEY MAY DETERMINE THE TYPE, QUANTITY, LOCATIONS AND

ANY HARDSHIPS INVOLVED WITH THE REMOVAL OF EQUIPMENT.

C. CONTRACTOR UNDER THIS DIVISION IS FINANCIALLY RESPONSIBLE TO

REPAIR AND PATCH FLOORS, WALLS, CEILING AND ROOF TO MATCH

EXISTING CONDITION WHERE DEMOLITION WORK HAS BEEN DONE.

COORDINATE ALL WORK WITH OWNER/ENGINEER.

D. THE EXISTING HVAC SYSTEM SHALL REMAIN FULLY FUNCTIONAL

THROUGHOUT PHASED CONSTRUCTION.

E. IF THE EXISTING HVAC SYSTEM SHALL EVER REQUIRE SHUTTING DOWN

TEMPORARILY IN OCCUPIED AREAS DURING CONSTRUCTION THE

CONTRACTOR SHALL COORDINATE THE TIMING OF THE SHUT DOWN PERIOD

WITH THE OWNER AND ARCHITECT PRIOR TO DISABLING THE EXISTING

SYSTEM. THE EXISTING HVAC SYSTEM SHALL REMAIN FUNCTIONAL IN ALL

OCCUPIED AREAS DURING NORMAL OPERATION PERIODS.

F. ALL EXISTING THERMOSTATS AND EXISTING CONTROL WIRING SHALL BE

REMOVED FROM ALL EQUIPMENT THAT IS BEING REMOVED IN THE BUILDING

IN DEMOLISHED AREAS UNLESS OTHERWISE NOTED.

SPECIAL NOTES

1. ALL EXISTING HVAC SYSTEMS SHALL REMAIN OPERATIONAL

DURING THIS PROJECT. EXISTING EQUIPMENT SHALL BE

DISABLED ONLY WHEN NEW EQUIPMENT IS ONSITE AND READY

TO BE INSTALLED.

2. AS UNITS ARE INSTALLED, THERMOSTATS SHALL BE INSTALLED

AND PLACED IN STAND ALONE OPERATION MODE.

3. ALL NEW AND EXISTING EQUIPMENT SHALL CONNECT TO NEW

DDC CONTROL SYSTEM TIED INTO THE CONTROL NETWORK.

ALL NEW AND EXISTING EQUIPMENT SHALL RECEIVE NEW DDC

CONTROLLERS FOR COMMUNICATION WITH NEW CONTROL

SYSTEM. REFER TO CONTROLS DRAWINGS FOR FURTHER

DETAILS.

DATE:

SCALE:

SHEET NO.

D

ES

IG

N

ED

D R

AW

N

R

EV

IE

W

ED

AP

PR

O

VE

D

D

AT

E

BY

D

ES

C R

IP

TI

O N

N O

R

EV

IS

IO

N S

SC

AL

E C

H

EC

K:

TH

IS

M

AR

K

SH

O

U

LD

M

EA

SU

R

E

EX

AC

TL

Y 1"

W H

EN

P

LO

TT

ED

BI

D

S

ET

C

LI

EN

T

PR

O

JE

C

T N

O

G R

W P

R O

JE

C

T N

O . 5

2-

AL

L

R

IG

H

TS

R

ES

ER

VE

D

TH

IS

D O

C U

M

EN

T

IS

T H

E

PR

O

PE

R

TY

O F

G R

W E

N G

IN

EE

R S, IN

C

. A N

D S

H

AL

L N

O T

BE

R

EP

R

O D

U C

ED

IN

W H

O

LE

O R

IN

P

AR

T

O R

U

SE

D F

O R

C O

N

ST

R U

C

TI

O N

O F

O

TH

ER

T

H

AN

T H

IS

S

PE

C

IF

IC

P R

O

JE

C T

W

IT

H O

U T

W R

IT

TE

N P

ER

M

IS

SI

O N en gi ne er in g ar ch ite ct ur e ge os pa tia l w w w .g rw in c.

co m

LA

KI

N C

O R

R

EC

TI

O

N

AL

C

EN

TE

R

A N

D J

AI

L

H

VA

C E

Q U

IP

M

EN

T

R

EP

LA

C

EM

EN

T W

ES

T

C O

LU

M

BI

A, W

ES

T

VI

R G

IN

IA

MD104

FEBRUARY 21, 2025

KEY PLAN

A

J

H

F

E D

C

B

FI

R

ST

F

LO

O

R M

EC

H

AN

IC

AL

H

VA

C

D

EM

O

LI

TI

O

N

PL

AN

AR

EA

"D

C

VS

SP

B

C

VS

C

VS

1/16" - 1'0"

SCALE: 1/16"=1'-0" 0 16' 32'8'

FIRST FLOOR MECHANICAL HVAC DEMOLITION PLAN - AREA "D"

C H

L

IN

E M

AT

C

H L

IN

E

SE

E

M D

SE

E

M D

T 1 T

T

T

DEMOLITION GENERAL NOTES:

SHEET KEYNOTES:

1. EXISTING THERMOSTAT TO BE REMOVED AND

REPLACED WITH NEW THERMOSTAT IN SAME

LOCATION. SEE NEW WORK PLANS FOR MORE

INFORMATION. TYPICAL OF ALL.

A. DEMOLITION PLAN HAS BEEN DEVELOPED FROM EXISTING PLANS AND

VISITING SITE. SOME MECHANICAL EQUIPMENT, DUCTWORK, REGISTERS

AND PIPING SIZES MAY NOT BE INDICATED.

B. IT SHALL BE THE RESPONSIBILITY OF ALL CONTRACTORS WHO SUBMIT BIDS

FOR THIS PROJECT TO VISIT THE JOB PREMISES PRIOR TO BIDDING IN

ORDER THAT THEY MAY DETERMINE THE TYPE, QUANTITY, LOCATIONS AND

ANY HARDSHIPS INVOLVED WITH THE REMOVAL OF EQUIPMENT.

C. CONTRACTOR UNDER THIS DIVISION IS FINANCIALLY RESPONSIBLE TO

REPAIR AND PATCH FLOORS, WALLS, CEILING AND ROOF TO MATCH

EXISTING CONDITION WHERE DEMOLITION WORK HAS BEEN DONE.

COORDINATE ALL WORK WITH OWNER/ENGINEER.

D. THE EXISTING HVAC SYSTEM SHALL REMAIN FULLY FUNCTIONAL

THROUGHOUT PHASED CONSTRUCTION.

E. IF THE EXISTING HVAC SYSTEM SHALL EVER REQUIRE SHUTTING DOWN

TEMPORARILY IN OCCUPIED AREAS DURING CONSTRUCTION THE

CONTRACTOR SHALL COORDINATE THE TIMING OF THE SHUT DOWN PERIOD

WITH THE OWNER AND ARCHITECT PRIOR TO DISABLING THE EXISTING

SYSTEM. THE EXISTING HVAC SYSTEM SHALL REMAIN FUNCTIONAL IN ALL

OCCUPIED AREAS DURING NORMAL OPERATION PERIODS.

F. ALL EXISTING THERMOSTATS AND EXISTING CONTROL WIRING SHALL BE

REMOVED FROM ALL EQUIPMENT THAT IS BEING REMOVED IN THE BUILDING

IN DEMOLISHED AREAS UNLESS OTHERWISE NOTED.

SPECIAL NOTES

1. ALL EXISTING HVAC SYSTEMS SHALL REMAIN OPERATIONAL

DURING THIS PROJECT. EXISTING EQUIPMENT SHALL BE

DISABLED ONLY WHEN NEW EQUIPMENT IS ONSITE AND READY

TO BE INSTALLED.

2. AS UNITS ARE INSTALLED, THERMOSTATS SHALL BE INSTALLED

AND PLACED IN STAND ALONE OPERATION MODE.

3. ALL NEW AND EXISTING EQUIPMENT SHALL CONNECT TO NEW

DDC CONTROL SYSTEM TIED INTO THE CONTROL NETWORK.

ALL NEW AND EXISTING EQUIPMENT SHALL RECEIVE NEW DDC

CONTROLLERS FOR COMMUNICATION WITH NEW CONTROL

SYSTEM. REFER TO CONTROLS DRAWINGS FOR FURTHER

DETAILS.

DATE:

SCALE:

SHEET NO.

D

ES

IG

N

ED

D R

AW

N

R

EV

IE

W

ED

AP

PR

O

VE

D

D

AT

E

BY

D

ES

C R

IP

TI

O N

N O

R

EV

IS

IO

N S

SC

AL

E C

H

EC

K:

TH

IS

M

AR

K

SH

O

U

LD

M

EA

SU

R

E

EX

AC

TL

Y 1"

W H

EN

P

LO

TT

ED

BI

D

S

ET

C

LI

EN

T

PR

O

JE

C

T N

O

G R

W P

R O

JE

C

T N

O . 5

2-

AL

L

R

IG

H

TS

R

ES

ER

VE

D

TH

IS

D O

C U

M

EN

T

IS

T H

E

PR

O

PE

R

TY

O F

G R

W E

N G

IN

EE

R S, IN

C

. A N

D S

H

AL

L N

O T

BE

R

EP

R

O D

U C

ED

IN

W H

O

LE

O R

IN

P

AR

T

O R

U

SE

D F

O R

C O

N

ST

R U

C

TI

O N

O F

O

TH

ER

T

H

AN

T H

IS

S

PE

C

IF

IC

P R

O

JE

C T

W

IT

H O

U T

W R

IT

TE

N P

ER

M

IS

SI

O N en gi ne er in g ar ch ite ct ur e ge os pa tia l w w w .g rw in c.

co m

LA

KI

N C

O R

R

EC

TI

O

N

AL

C

EN

TE

R

A N

D J

AI

L

H

VA

C E

Q U

IP

M

EN

T

R

EP

LA

C

EM

EN

T W

ES

T

C O

LU

M

BI

A, W

ES

T

VI

R G

IN

IA

MD105

FEBRUARY 21, 2025

KEY PLAN

A

J

H

F

E D

C

B

FI

R

ST

F

LO

O

R M

EC

H

AN

IC

AL

H

VA

C

D

EM

O

LI

TI

O

N

PL

AN

AR

EA

"E

C

VS

SP

B

C

VS

C

VS

1/8" - 1'0"

FIRST FLOOR MECHANICAL HVAC DEMOLITION PLAN - AREA "E"

T1

DEMOLITION GENERAL NOTES:

SHEET KEYNOTES:

1. EXISTING THERMOSTAT TO BE REMOVED AND

REPLACED WITH NEW THERMOSTAT IN SAME

LOCATION. SEE NEW WORK PLANS FOR MORE

INFORMATION. TYPICAL OF ALL.

A. DEMOLITION PLAN HAS BEEN DEVELOPED FROM EXISTING PLANS AND

VISITING SITE. SOME MECHANICAL EQUIPMENT, DUCTWORK, REGISTERS

AND PIPING SIZES MAY NOT BE INDICATED.

B. IT SHALL BE THE RESPONSIBILITY OF ALL CONTRACTORS WHO SUBMIT BIDS

FOR THIS PROJECT TO VISIT THE JOB PREMISES PRIOR TO BIDDING IN

ORDER THAT THEY MAY DETERMINE THE TYPE, QUANTITY, LOCATIONS AND

ANY HARDSHIPS INVOLVED WITH THE REMOVAL OF EQUIPMENT.

C. CONTRACTOR UNDER THIS DIVISION IS FINANCIALLY RESPONSIBLE TO

REPAIR AND PATCH FLOORS, WALLS, CEILING AND ROOF TO MATCH

EXISTING CONDITION WHERE DEMOLITION WORK HAS BEEN DONE.

COORDINATE ALL WORK WITH OWNER/ENGINEER.

D. THE EXISTING HVAC SYSTEM SHALL REMAIN FULLY FUNCTIONAL

THROUGHOUT PHASED CONSTRUCTION.

E. IF THE EXISTING HVAC SYSTEM SHALL EVER REQUIRE SHUTTING DOWN

TEMPORARILY IN OCCUPIED AREAS DURING CONSTRUCTION THE

CONTRACTOR SHALL COORDINATE THE TIMING OF THE SHUT DOWN PERIOD

WITH THE OWNER AND ARCHITECT PRIOR TO DISABLING THE EXISTING

SYSTEM. THE EXISTING HVAC SYSTEM SHALL REMAIN FUNCTIONAL IN ALL

OCCUPIED AREAS DURING NORMAL OPERATION PERIODS.

F. ALL EXISTING THERMOSTATS AND EXISTING CONTROL WIRING SHALL BE

REMOVED FROM ALL EQUIPMENT THAT IS BEING REMOVED IN THE BUILDING

IN DEMOLISHED AREAS UNLESS OTHERWISE NOTED.

SPECIAL NOTES

1. ALL EXISTING HVAC SYSTEMS SHALL REMAIN OPERATIONAL

DURING THIS PROJECT. EXISTING EQUIPMENT SHALL BE

DISABLED ONLY WHEN NEW EQUIPMENT IS ONSITE AND READY

TO BE INSTALLED.

2. AS UNITS ARE INSTALLED, THERMOSTATS SHALL BE INSTALLED

AND PLACED IN STAND ALONE OPERATION MODE.

3. ALL NEW AND EXISTING EQUIPMENT SHALL CONNECT TO NEW

DDC CONTROL SYSTEM TIED INTO THE CONTROL NETWORK.

ALL NEW AND EXISTING EQUIPMENT SHALL RECEIVE NEW DDC

CONTROLLERS FOR COMMUNICATION WITH NEW CONTROL

SYSTEM. REFER TO CONTROLS DRAWINGS FOR FURTHER

DETAILS.

FI

R

ST

F

LO

O

R M

EC

H

AN

IC

AL

H

VA

C

D

EM

O

LI

TI

O

N

PL

AN

AR

EA

"F

H

C

VS

SP

B

C

VS

C

VS

1/8" - 1'0"

DATE:

SCALE:

SHEET NO.

D

ES

IG

N

ED

D R

AW

N

R

EV

IE

W

ED

AP

PR

O

VE

D

D

AT

E

BY

D

ES

C R

IP

TI

O N

N O

R

EV

IS

IO

N S

SC

AL

E C

H

EC

K:

TH

IS

M

AR

K

SH

O

U

LD

M

EA

SU

R

E

EX

AC

TL

Y 1"

W H

EN

P

LO

TT

ED

BI

D

S

ET

C

LI

EN

T

PR

O

JE

C

T N

O

G R

W P

R O

JE

C

T N

O . 5

2-

AL

L

R

IG

H

TS

R

ES

ER

VE

D

TH

IS

D O

C U

M

EN

T

IS

T H

E

PR

O

PE

R

TY

O F

G R

W E

N G

IN

EE

R S, IN

C

. A N

D S

H

AL

L N

O T

BE

R

EP

R

O D

U C

ED

IN

W H

O

LE

O R

IN

P

AR

T

O R

U

SE

D F

O R

C O

N

ST

R U

C

TI

O N

O F

O

TH

ER

T

H

AN

T H

IS

S

PE

C

IF

IC

P R

O

JE

C T

W

IT

H O

U T

W R

IT

TE

N P

ER

M

IS

SI

O N en gi ne er in g ar ch ite ct ur e ge os pa tia l w w w .g rw in c.

co m

LA

KI

N C

O R

R

EC

TI

O

N

AL

C

EN

TE

R

A N

D J

AI

L

H

VA

C E

Q U

IP

M

EN

T

R

EP

LA

C

EM

EN

T W

ES

T

C O

LU

M

BI

A, W

ES

T

VI

R G

IN

IA

MD106

FEBRUARY 21, 2025

KEY PLAN

A

J

H

F

E D

C

B

SCALE: 1/8"=1'-0" 0 8' 16'4'1 FIRST FLOOR MECHANICAL HVAC DEMOLITION PLAN - AREA "H" SCALE: 1/8"=1'-0" 0 8' 16'4'2 FIRST FLOOR MECHANICAL HVAC DEMOLITION PLAN - AREA "F"

SHEET KEYNOTES:

1. EXISTING THERMOSTAT TO BE REMOVED AND

REPLACED WITH NEW THERMOSTAT IN SAME

LOCATION. SEE NEW WORK PLANS FOR MORE

INFORMATION. TYPICAL OF ALL.

A. DEMOLITION PLAN HAS BEEN DEVELOPED FROM EXISTING PLANS AND

VISITING SITE. SOME MECHANICAL EQUIPMENT, DUCTWORK, REGISTERS

AND PIPING SIZES MAY NOT BE INDICATED.

B. IT SHALL BE THE RESPONSIBILITY OF ALL CONTRACTORS WHO SUBMIT BIDS

FOR THIS PROJECT TO VISIT THE JOB PREMISES PRIOR TO BIDDING IN

ORDER THAT THEY MAY DETERMINE THE TYPE, QUANTITY, LOCATIONS AND

ANY HARDSHIPS INVOLVED WITH THE REMOVAL OF EQUIPMENT.

C. CONTRACTOR UNDER THIS DIVISION IS FINANCIALLY RESPONSIBLE TO

REPAIR AND PATCH FLOORS, WALLS, CEILING AND ROOF TO MATCH

EXISTING CONDITION WHERE DEMOLITION WORK HAS BEEN DONE.

COORDINATE ALL WORK WITH OWNER/ENGINEER.

D. THE EXISTING HVAC SYSTEM SHALL REMAIN FULLY FUNCTIONAL

THROUGHOUT PHASED CONSTRUCTION.

E. IF THE EXISTING HVAC SYSTEM SHALL EVER REQUIRE SHUTTING DOWN

TEMPORARILY IN OCCUPIED AREAS DURING CONSTRUCTION THE

CONTRACTOR SHALL COORDINATE THE TIMING OF THE SHUT DOWN PERIOD

WITH THE OWNER AND ARCHITECT PRIOR TO DISABLING THE EXISTING

SYSTEM. THE EXISTING HVAC SYSTEM SHALL REMAIN FUNCTIONAL IN ALL

OCCUPIED AREAS DURING NORMAL OPERATION PERIODS.

F. ALL EXISTING THERMOSTATS AND EXISTING CONTROL WIRING SHALL BE

REMOVED FROM ALL EQUIPMENT THAT IS BEING REMOVED IN THE BUILDING

IN DEMOLISHED AREAS UNLESS OTHERWISE NOTED.

SPECIAL NOTES

1. ALL EXISTING HVAC SYSTEMS SHALL REMAIN OPERATIONAL

DURING THIS PROJECT. EXISTING EQUIPMENT SHALL BE

DISABLED ONLY WHEN NEW EQUIPMENT IS ONSITE AND READY

TO BE INSTALLED.

2. AS UNITS ARE INSTALLED, THERMOSTATS SHALL BE INSTALLED

AND PLACED IN STAND ALONE OPERATION MODE.

3. ALL NEW AND EXISTING EQUIPMENT SHALL CONNECT TO NEW

DDC CONTROL SYSTEM TIED INTO THE CONTROL NETWORK.

ALL NEW AND EXISTING EQUIPMENT SHALL RECEIVE NEW DDC

CONTROLLERS FOR COMMUNICATION WITH NEW CONTROL

SYSTEM. REFER TO CONTROLS DRAWINGS FOR FURTHER

DETAILS.

DATE:

SCALE:

SHEET NO.

D

ES

IG

N

ED

D R

AW

N

R

EV

IE

W

ED

AP

PR

O

VE

D

D

AT

E

BY

D

ES

C R

IP

TI

O N

N O

R

EV

IS

IO

N S

SC

AL

E C

H

EC

K:

TH

IS

M

AR

K

SH

O

U

LD

M

EA

SU

R

E

EX

AC

TL

Y 1"

W H

EN

P

LO

TT

ED

BI

D

S

ET

C

LI

EN

T

PR

O

JE

C

T N

O

G R

W P

R O

JE

C

T N

O . 5

2-

AL

L

R

IG

H

TS

R

ES

ER

VE

D

TH

IS

D O

C U

M

EN

T

IS

T H

E

PR

O

PE

R

TY

O F

G R

W E

N G

IN

EE

R S, IN

C

. A N

D S

H

AL

L N

O T

BE

R

EP

R

O D

U C

ED

IN

W H

O

LE

O R

IN

P

AR

T

O R

U

SE

D F

O R

C O

N

ST

R U

C

TI

O N

O F

O

TH

ER

T

H

AN

T H

IS

S

PE

C

IF

IC

P R

O

JE

C T

W

IT

H O

U T

W R

IT

TE

N P

ER

M

IS

SI

O N en gi ne er in g ar ch ite ct ur e ge os pa tia l w w w .g rw in c.

co m

LA

KI

N C

O R

R

EC

TI

O

N

AL

C

EN

TE

R

A N

D J

AI

L

H

VA

C E

Q U

IP

M

EN

T

R

EP

LA

C

EM

EN

T W

ES

T

C O

LU

M

BI

A, W

ES

T

VI

R G

IN

IA

MD107

FEBRUARY 21, 2025

KEY PLAN

A

J

H

F

E D

C

B

FI

R

ST

F

LO

O

R M

EC

H

AN

IC

AL

H

VA

C

D

EM

O

LI

TI

O

N

PL

AN

AR

EA

"J

C

VS

SP

B

C

VS

C

VS

1/8" - 1'0"

FIRST FLOOR MECHANICAL HVAC DEMOLITION PLAN - AREA "J"

SEE MD111 SEE MD111

EF-A10

EF-A9

EF-A1

EF-A2

SEF-A2

SF-A1SF-A8

SEF-A5

RTU-A1RTU-A8

SEF-A4

RTU-A7

SF-A7

EF-A8

SEF-A1

RTU-A9

SF-A2

EF-A3

SF-A3

RTU-A3

RTU-A2

RTU-A4

RTU-A5

SF-A6

RTU-A6

EF-A7

SEF-A3

SF-A5 SF-A4

SEF-A1

EF-A4

EF-A5EF-A6

CU-A1

CU-A2

1 1

2 2

DEMOLITION GENERAL NOTES:

A. DEMOLITION PLAN HAS BEEN DEVELOPED FROM EXISTING PLANS AND

VISITING SITE. SOME MECHANICAL EQUIPMENT, DUCTWORK, REGISTERS

AND PIPING SIZES MAY NOT BE INDICATED.

B. IT SHALL BE THE RESPONSIBILITY OF ALL CONTRACTORS WHO SUBMIT BIDS

FOR THIS PROJECT TO VISIT THE JOB PREMISES PRIOR TO BIDDING IN

ORDER THAT THEY MAY DETERMINE THE TYPE, QUANTITY, LOCATIONS AND

ANY HARDSHIPS INVOLVED WITH THE REMOVAL OF EQUIPMENT.

C. CONTRACTOR UNDER THIS DIVISION IS FINANCIALLY RESPONSIBLE TO

REPAIR AND PATCH FLOORS, WALLS, CEILING AND ROOF TO MATCH

EXISTING CONDITION WHERE DEMOLITION WORK HAS BEEN DONE.

COORDINATE ALL WORK WITH OWNER/ENGINEER.

D. THE EXISTING HVAC SYSTEM SHALL REMAIN FULLY FUNCTIONAL

THROUGHOUT PHASED CONSTRUCTION.

E. IF THE EXISTING HVAC SYSTEM SHALL EVER REQUIRE SHUTTING DOWN

TEMPORARILY IN OCCUPIED AREAS DURING CONSTRUCTION, THE

CONTRACTOR SHALL COORDINATE THE TIMING OF THE SHUT DOWN PERIOD

WITH THE OWNER AND ARCHITECT PRIOR TO DISABLING THE EXISTING

SYSTEM. THE EXISTING HVAC SYSTEM SHALL REMAIN FUNCTIONAL IN ALL

OCCUPIED AREAS DURING NORMAL OPERATION PERIODS.

F. ALL EXISTING THERMOSTATS AND EXISTING CONTROL WIRING SHALL BE

REMOVED FROM ALL EQUIPMENT THAT IS BEING REMOVED IN THE BUILDING

IN DEMOLISHED AREAS UNLESS OTHERWISE NOTED.

SHEET KEYNOTES:

1. EXISTING ROOFTOP UNIT SHALL BE REMOVED AND

REPLACED IN THE SAME LOCATION. EXISTING

ROOF CURB SHALL REMAIN IN PLACE AND A NEW

CURB ADAPTOR SHALL BE INSTALLED AS

NECESSARY FOR INSTALLATION OF NEW UNIT.

DISCONNECT EXISTING DUCTWORK, ELECTRICAL

CONNECTIONS, NATURAL GAS AND BUILDING

AUTOMATION CONTROLS SYSTEM AND

RECONNECT TO NEW UNIT. SEE NEW WORK PLAN

FOR MORE INFORMATION.

2. EXISTING EXHAUST FAN SHALL BE REMOVED AND

REPLACE IN THE SAME LOCATION. EXISTING ROOF

CURB SHALL REMAIN AND BE REUSED. PROVIDE

CURB ADAPTER AS NECESSARY FOR INSTALLATION

OF NEW FAN. DISCONNECT EXISTING DUCTWORK

AND ELECTRICAL CONNECTIONS AND RECONNECT

TO NEW FAN. SEE NEW WORK SHEETS FOR MORE

INFORMATION.

3. EXISTING CONDENSING UNIT SHALL BE REMOVED

AND REPLACED WITH NEW IN SAME LOCATION.

EXISTING EQUIPMENT RAILS SHALL REMAIN.

PROVIDE ADDITIONAL EQUIPMENT RAILS AS

NECESSARY FOR INSTALLATION OF NEW UNITS.

ALL EXISTING REFRIGERANT PIPING AND

ELECTRICAL CONNECTIONS SHALL BE REMOVED

AND REPLACED WITH NEW.

4. EXISTING SMOKE EXHAUST FAN SHALL REMAIN.

5. EXISTING SMOKE SYSTEM SUPPLY FAN SHALL

REMAIN.

SPECIAL NOTES

1. EXISTING ROOF IS UNDER WARRANTY THROUGH VERSICO

ROOFING SYSTEMS. ALL ROOFING WORK SHALL BE

COORDINATED WITH VERSICO ROOFING SYSTEMS AS TO NOT

VOID ANY EXISTING ROOF WARRANTY. VERIFY CONTACT

INFORMATION FOR VERSICO ROOFING WITH OWNER.

2. ALL EXISTING HVAC SYSTEMS SHALL REMAIN OPERATIONAL

DURING THIS PROJECT. EXISTING EQUIPMENT SHALL BE

DISABLED ONLY WHEN NEW EQUIPMENT IS ONSITE AND READY

TO BE INSTALLED.

3. AS UNITS ARE INSTALLED, THERMOSTATS SHALL BE INSTALLED

AND PLACED IN STAND ALONE OPERATION MODE.

4. ALL NEW AND EXISTING EQUIPMENT SHALL CONNECT TO NEW

DDC CONTROL SYSTEM TIED INTO THE CONTROL NETWORK.

ALL NEW AND EXISTING EQUIPMENT SHALL RECEIVE NEW DDC

CONTROLLERS FOR COMMUNICATION WITH NEW CONTROL

SYSTEM. REFER TO CONTROLS DRAWINGS FOR FURTHER

DETAILS.

DATE:

SCALE:

SHEET NO.

D

ES

IG

N

ED

D R

AW

N

R

EV

IE

W

ED

AP

PR

O

VE

D

D

AT

E

BY

D

ES

C R

IP

TI

O N

N O

R

EV

IS

IO

N S

SC

AL

E C

H

EC

K:

TH

IS

M

AR

K

SH

O

U

LD

M

EA

SU

R

E

EX

AC

TL

Y 1"

W H

EN

P

LO

TT

ED

BI

D

S

ET

C

LI

EN

T

PR

O

JE

C

T N

O

G R

W P

R O

JE

C

T N

O . 5

2-

AL

L

R

IG

H

TS

R

ES

ER

VE

D

TH

IS

D O

C U

M

EN

T

IS

T H

E

PR

O

PE

R

TY

O F

G R

W E

N G

IN

EE

R S, IN

C

. A N

D S

H

AL

L N

O T

BE

R

EP

R

O D

U C

ED

IN

W H

O

LE

O R

IN

P

AR

T

O R

U

SE

D F

O R

C O

N

ST

R U

C

TI

O N

O F

O

TH

ER

T

H

AN

T H

IS

S

PE

C

IF

IC

P R

O

JE

C T

W

IT

H O

U T

W R

IT

TE

N P

ER

M

IS

SI

O N en gi ne er in g ar ch ite ct ur e ge os pa tia l w w w .g rw in c.

co m

LA

KI

N C

O R

R

EC

TI

O

N

AL

C

EN

TE

R

A N

D J

AI

L

H

VA

C E

Q U

IP

M

EN

T

R

EP

LA

C

EM

EN

T W

ES

T

C O

LU

M

BI

A, W

ES

T

VI

R G

IN

IA

MD108

FEBRUARY 21, 2025

KEY PLAN

A

J

H

F

E D

C

B

SCALE: 1/16"=1'-0" 0 16' 32'8'

ROOFTOP MECHANICAL HVAC DEMOLITION PLAN - AREA "A"

R O

O

FT

O P

M

EC

H

AN

IC

AL

H

VA

C D

EM

O

LI

TI

O N

PL

AN

AR

EA

"A

C

VS

SP

B

C

VS

C

VS

1/16" - 1'0"

C H

L

IN

E M

AT

C

H L

IN

E

SE

E

M D

SE

E

M D

MATCH LINE MATCH LINE

SEE MD111 SEE MD111

EF-B2 EF-B3

EF-B1

SF-B1

SF-B2

SEF-B1

RTU-B1

RTU-B4

RTU-B3

RTU-B2

SEF-B3

EF-B9

SF-B4

SF-B3

EF-B7EF-B8

EF-B10

SEF-B2

EF-B4

EF-B5

EF-B6

DEMOLITION GENERAL NOTES:

A. DEMOLITION PLAN HAS BEEN DEVELOPED FROM EXISTING PLANS AND

VISITING SITE. SOME MECHANICAL EQUIPMENT, DUCTWORK, REGISTERS

AND PIPING SIZES MAY NOT BE INDICATED.

B. IT SHALL BE THE RESPONSIBILITY OF ALL CONTRACTORS WHO SUBMIT BIDS

FOR THIS PROJECT TO VISIT THE JOB PREMISES PRIOR TO BIDDING IN

ORDER THAT THEY MAY DETERMINE THE TYPE, QUANTITY, LOCATIONS AND

ANY HARDSHIPS INVOLVED WITH THE REMOVAL OF EQUIPMENT.

C. CONTRACTOR UNDER THIS DIVISION IS FINANCIALLY RESPONSIBLE TO

REPAIR AND PATCH FLOORS, WALLS, CEILING AND ROOF TO MATCH

EXISTING CONDITION WHERE DEMOLITION WORK HAS BEEN DONE.

COORDINATE ALL WORK WITH OWNER/ENGINEER.

D. THE EXISTING HVAC SYSTEM SHALL REMAIN FULLY FUNCTIONAL

THROUGHOUT PHASED CONSTRUCTION.

E. IF THE EXISTING HVAC SYSTEM SHALL EVER REQUIRE SHUTTING DOWN

TEMPORARILY IN OCCUPIED AREAS DURING CONSTRUCTION, THE

CONTRACTOR SHALL COORDINATE THE TIMING OF THE SHUT DOWN PERIOD

WITH THE OWNER AND ARCHITECT PRIOR TO DISABLING THE EXISTING

SYSTEM. THE EXISTING HVAC SYSTEM SHALL REMAIN FUNCTIONAL IN ALL

OCCUPIED AREAS DURING NORMAL OPERATION PERIODS.

F. ALL EXISTING THERMOSTATS AND EXISTING CONTROL WIRING SHALL BE

REMOVED FROM ALL EQUIPMENT THAT IS BEING REMOVED IN THE BUILDING

IN DEMOLISHED AREAS UNLESS OTHERWISE NOTED.

SHEET KEYNOTES:

1. EXISTING ROOFTOP UNIT SHALL BE REMOVED AND

REPLACED IN THE SAME LOCATION. EXISTING

ROOF CURB SHALL REMAIN IN PLACE AND A NEW

CURB ADAPTOR SHALL BE INSTALLED AS

NECESSARY FOR INSTALLATION OF NEW UNIT.

DISCONNECT EXISTING DUCTWORK, ELECTRICAL

CONNECTIONS, NATURAL GAS AND BUILDING

AUTOMATION CONTROLS SYSTEM AND

RECONNECT TO NEW UNIT. SEE NEW WORK PLAN

FOR MORE INFORMATION.

2. EXISTING EXHAUST FAN SHALL BE REMOVED AND

REPLACE IN THE SAME LOCATION. EXISTING ROOF

CURB SHALL REMAIN AND BE REUSED. PROVIDE

CURB ADAPTER AS NECESSARY FOR INSTALLATION

OF NEW FAN. DISCONNECT EXISTING DUCTWORK

AND ELECTRICAL CONNECTIONS AND RECONNECT

TO NEW FAN. SEE NEW WORK SHEETS FOR MORE

INFORMATION.

3. EXISTING SMOKE EXHAUST FAN SHALL REMAIN.

4. EXISTING SMOKE SYSTEM SUPPLY FAN SHALL

REMAIN.

SPECIAL NOTES

1. EXISTING ROOF IS UNDER WARRANTY THROUGH VERSICO

ROOFING SYSTEMS. ALL ROOFING WORK SHALL BE

COORDINATED WITH VERSICO ROOFING SYSTEMS AS TO NOT

VOID ANY EXISTING ROOF WARRANTY. VERIFY CONTACT

INFORMATION FOR VERSICO ROOFING WITH OWNER.

2. ALL EXISTING HVAC SYSTEMS SHALL REMAIN OPERATIONAL

DURING THIS PROJECT. EXISTING EQUIPMENT SHALL BE

DISABLED ONLY WHEN NEW EQUIPMENT IS ONSITE AND READY

TO BE INSTALLED.

3. AS UNITS ARE INSTALLED, THERMOSTATS SHALL BE INSTALLED

AND PLACED IN STAND ALONE OPERATION MODE.

4. ALL NEW AND EXISTING EQUIPMENT SHALL CONNECT TO NEW

DDC CONTROL SYSTEM TIED INTO THE CONTROL NETWORK.

ALL NEW AND EXISTING EQUIPMENT SHALL RECEIVE NEW DDC

CONTROLLERS FOR COMMUNICATION WITH NEW CONTROL

SYSTEM. REFER TO CONTROLS DRAWINGS FOR FURTHER

DETAILS.

DATE:

SCALE:

SHEET NO.

D

ES

IG

N

ED

D R

AW

N

R

EV

IE

W

ED

AP

PR

O

VE

D

D

AT

E

BY

D

ES

C R

IP

TI

O N

N O

R

EV

IS

IO

N S

SC

AL

E C

H

EC

K:

TH

IS

M

AR

K

SH

O

U

LD

M

EA

SU

R

E

EX

AC

TL

Y 1"

W H

EN

P

LO

TT

ED

BI

D

S

ET

C

LI

EN

T

PR

O

JE

C

T N

O

G R

W P

R O

JE

C

T N

O . 5

2-

AL

L

R

IG

H

TS

R

ES

ER

VE

D

TH

IS

D O

C U

M

EN

T

IS

T H

E

PR

O

PE

R

TY

O F

G R

W E

N G

IN

EE

R S, IN

C

. A N

D S

H

AL

L N

O T

BE

R

EP

R

O D

U C

ED

IN

W H

O

LE

O R

IN

P

AR

T

O R

U

SE

D F

O R

C O

N

ST

R U

C

TI

O N

O F

O

TH

ER

T

H

AN

T H

IS

S

PE

C

IF

IC

P R

O

JE

C T

W

IT

H O

U T

W R

IT

TE

N P

ER

M

IS

SI

O N en gi ne er in g ar ch ite ct ur e ge os pa tia l w w w .g rw in c.

co m

LA

KI

N C

O R

R

EC

TI

O

N

AL

C

EN

TE

R

A N

D J

AI

L

H

VA

C E

Q U

IP

M

EN

T

R

EP

LA

C

EM

EN

T W

ES

T

C O

LU

M

BI

A, W

ES

T

VI

R G

IN

IA

MD109

FEBRUARY 21, 2025

KEY PLAN

A

J

H

F

E D

C

B

SCALE: 1/8"=1'-0" 0 8' 16'4'

ROOFTOP MECHANICAL HVAC DEMOLITION PLAN - AREA "B"

R O

O

FT

O P

M

EC

H

AN

IC

AL

H

VA

C D

EM

O

LI

TI

O N

PL

AN

AR

EA

"B

C

VS

SP

B

C

VS

C

1/8" - 1'0"

SEE MD109

AT

C H

L

IN

E M

AT

C

H L

IN

E

SE

E

M D

SE

E

M D

MATCH LINE MATCH LINE

SEE MD111 SEE MD111

M

AT

C H

L

IN

E M

AT

C

H L

IN

E

SE

E

M D

SE

E

M D

EF-C4

RTU-C1

EF-C5

CU-C2CU-C1

EF-C3

EF-C2

SEF-C1

EF-C1

EF-C6

SEF-C1

EF-C7

RTU-C2

RTU-C5

RTU-C3

RTU-C4

RTU-C6

EF-C8

DEMOLITION GENERAL NOTES:

A. DEMOLITION PLAN HAS BEEN DEVELOPED FROM EXISTING PLANS AND

VISITING SITE. SOME MECHANICAL EQUIPMENT, DUCTWORK, REGISTERS

AND PIPING SIZES MAY NOT BE INDICATED.

B. IT SHALL BE THE RESPONSIBILITY OF ALL CONTRACTORS WHO SUBMIT BIDS

FOR THIS PROJECT TO VISIT THE JOB PREMISES PRIOR TO BIDDING IN

ORDER THAT THEY MAY DETERMINE THE TYPE, QUANTITY, LOCATIONS AND

ANY HARDSHIPS INVOLVED WITH THE REMOVAL OF EQUIPMENT.

C. CONTRACTOR UNDER THIS DIVISION IS FINANCIALLY RESPONSIBLE TO

REPAIR AND PATCH FLOORS, WALLS, CEILING AND ROOF TO MATCH

EXISTING CONDITION WHERE DEMOLITION WORK HAS BEEN DONE.

COORDINATE ALL WORK WITH OWNER/ENGINEER.

D. THE EXISTING HVAC SYSTEM SHALL REMAIN FULLY FUNCTIONAL

THROUGHOUT PHASED CONSTRUCTION.

E. IF THE EXISTING HVAC SYSTEM SHALL EVER REQUIRE SHUTTING DOWN

TEMPORARILY IN OCCUPIED AREAS DURING CONSTRUCTION, THE

CONTRACTOR SHALL COORDINATE THE TIMING OF THE SHUT DOWN PERIOD

WITH THE OWNER AND ARCHITECT PRIOR TO DISABLING THE EXISTING

SYSTEM. THE EXISTING HVAC SYSTEM SHALL REMAIN FUNCTIONAL IN ALL

OCCUPIED AREAS DURING NORMAL OPERATION PERIODS.

F. ALL EXISTING THERMOSTATS AND EXISTING CONTROL WIRING SHALL BE

REMOVED FROM ALL EQUIPMENT THAT IS BEING REMOVED IN THE BUILDING

IN DEMOLISHED AREAS UNLESS OTHERWISE NOTED.

SHEET KEYNOTES:

1. EXISTING ROOFTOP UNIT SHALL BE REMOVED AND

REPLACED IN THE SAME LOCATION. EXISTING

ROOF CURB SHALL REMAIN IN PLACE AND A NEW

CURB ADAPTOR SHALL BE INSTALLED AS

NECESSARY FOR INSTALLATION OF NEW UNIT.

DISCONNECT EXISTING DUCTWORK, ELECTRICAL

CONNECTIONS, NATURAL GAS AND BUILDING

AUTOMATION CONTROLS SYSTEM AND

RECONNECT TO NEW UNIT. SEE NEW WORK PLAN

FOR MORE INFORMATION.

2. EXISTING EXHAUST FAN SHALL BE REMOVED AND

REPLACE IN THE SAME LOCATION. EXISTING ROOF

CURB SHALL REMAIN AND BE REUSED. PROVIDE

CURB ADAPTER AS NECESSARY FOR INSTALLATION

OF NEW FAN. DISCONNECT EXISTING DUCTWORK

AND ELECTRICAL CONNECTIONS AND RECONNECT

TO NEW FAN. SEE NEW WORK SHEETS FOR MORE

INFORMATION.

3. EXISTING CONDENSING UNIT SHALL BE REMOVED

AND REPLACED WITH NEW IN SAME LOCATION.

EXISTING EQUIPMENT RAILS SHALL REMAIN.

PROVIDE ADDITIONAL EQUIPMENT RAILS AS

NECESSARY FOR INSTALLATION OF NEW UNITS.

ALL EXISTING REFRIGERANT PIPING AND

ELECTRICAL CONNECTIONS SHALL BE REMOVED

AND REPLACED WITH NEW.

4. EXISTING SMOKE EXHAUST FAN SHALL REMAIN.

SPECIAL NOTES

1. EXISTING ROOF IS UNDER WARRANTY THROUGH VERSICO

ROOFING SYSTEMS. ALL ROOFING WORK SHALL BE

COORDINATED WITH VERSICO ROOFING SYSTEMS AS TO NOT

VOID ANY EXISTING ROOF WARRANTY. VERIFY CONTACT

INFORMATION FOR VERSICO ROOFING WITH OWNER.

2. ALL EXISTING HVAC SYSTEMS SHALL REMAIN OPERATIONAL

DURING THIS PROJECT. EXISTING EQUIPMENT SHALL BE

DISABLED ONLY WHEN NEW EQUIPMENT IS ONSITE AND READY

TO BE INSTALLED.

3. AS UNITS ARE INSTALLED, THERMOSTATS SHALL BE INSTALLED

AND PLACED IN STAND ALONE OPERATION MODE.

4. ALL NEW AND EXISTING EQUIPMENT SHALL CONNECT TO NEW

DDC CONTROL SYSTEM TIED INTO THE CONTROL NETWORK.

ALL NEW AND EXISTING EQUIPMENT SHALL RECEIVE NEW DDC

CONTROLLERS FOR COMMUNICATION WITH NEW CONTROL

SYSTEM. REFER TO CONTROLS DRAWINGS FOR FURTHER

DETAILS.

DATE:

SCALE:

SHEET NO.

D

ES

IG

N

ED

D R

AW

N

R

EV

IE

W

ED

AP

PR

O

VE

D

D

AT

E

BY

D

ES

C R

IP

TI

O N

N O

R

EV

IS

IO

N S

SC

AL

E C

H

EC

K:

TH

IS

M

AR

K

SH

O

U

LD

M

EA

SU

R

E

EX

AC

TL

Y 1"

W H

EN

P

LO

TT

ED

BI

D

S

ET

C

LI

EN

T

PR

O

JE

C

T N

O

G R

W P

R O

JE

C

T N

O . 5

2-

AL

L

R

IG

H

TS

R

ES

ER

VE

D

TH

IS

D O

C U

M

EN

T

IS

T H

E

PR

O

PE

R

TY

O F

G R

W E

N G

IN

EE

R S, IN

C

. A N

D S

H

AL

L N

O T

BE

R

EP

R

O D

U C

ED

IN

W H

O

LE

O R

IN

P

AR

T

O R

U

SE

D F

O R

C O

N

ST

R U

C

TI

O N

O F

O

TH

ER

T

H

AN

T H

IS

S

PE

C

IF

IC

P R

O

JE

C T

W

IT

H O

U T

W R

IT

TE

N P

ER

M

IS

SI

O N en gi ne er in g ar ch ite ct ur e ge os pa tia l w w w .g rw in c.

co m

LA

KI

N C

O R

R

EC

TI

O

N

AL

C

EN

TE

R

A N

D J

AI

L

H

VA

C E

Q U

IP

M

EN

T

R

EP

LA

C

EM

EN

T W

ES

T

C O

LU

M

BI

A, W

ES

T

VI

R G

IN

IA

MD110

FEBRUARY 21, 2025

KEY PLAN

A

J

H

F

E D

C

B

R O

O

FT

O P

M

EC

H

AN

IC

AL

H

VA

C D

EM

O

LI

TI

O N

PL

AN

AR

EA

"C

C

VS

SP

B

C

VS

C

VS

1/16" - 1'0"

ROOFTOP MECHANICAL HVAC DEMOLITION PLAN - AREA "C"

SEE MD108 SEE MD108

M

AT

C H

L

IN

E M

AT

C

H L

IN

E

SE

E

M D

SE

E

M D

MATCH LINE MATCH LINE

SEE MD109 SEE MD109

M

AT

C H

L

IN

E M

AT

C

H L

IN

E

SE

E

M D

SE

E

M D

MATCH LINE MATCH LINE

SEE MD110 SEE MD110

M

AT

C H

L

IN

E M

AT

C

H L

IN

E

SE

E

M D

SE

E

M D

M

AT

C H

L

IN

E M

AT

C

H L

IN

E

SE

E

M D

SE

E

M D

RTU-D9

RTU-D15

RTU-D8

RTU-D1

RTU-D10

RTU-D7

VF-D1

EF-D8

RTU-D12

OAI-D1

EF-D5

RTU-D14

RU-D1

RU-D2

RU-D3

RTU-D6

EF-D9

EF-D4

RTU-D4

RTU-D3

RTU-D16

RTU-D2

EF-D2

RTU-D1

EF-D1

EF-D6

EF-D3

RTU-D13

MU-D1

EF-D10

EF-D7

RTU-D8

VF-D2

RTU-D17

EF-D11

MU-D2

DEMOLITION GENERAL NOTES:

A. DEMOLITION PLAN HAS BEEN DEVELOPED FROM EXISTING PLANS AND

VISITING SITE. SOME MECHANICAL EQUIPMENT, DUCTWORK, REGISTERS

AND PIPING SIZES MAY NOT BE INDICATED.

B. IT SHALL BE THE RESPONSIBILITY OF ALL CONTRACTORS WHO SUBMIT BIDS

FOR THIS PROJECT TO VISIT THE JOB PREMISES PRIOR TO BIDDING IN

ORDER THAT THEY MAY DETERMINE THE TYPE, QUANTITY, LOCATIONS AND

ANY HARDSHIPS INVOLVED WITH THE REMOVAL OF EQUIPMENT.

C. CONTRACTOR UNDER THIS DIVISION IS FINANCIALLY RESPONSIBLE TO

REPAIR AND PATCH FLOORS, WALLS, CEILING AND ROOF TO MATCH

EXISTING CONDITION WHERE DEMOLITION WORK HAS BEEN DONE.

COORDINATE ALL WORK WITH OWNER/ENGINEER.

D. THE EXISTING HVAC SYSTEM SHALL REMAIN FULLY FUNCTIONAL

THROUGHOUT PHASED CONSTRUCTION.

E. IF THE EXISTING HVAC SYSTEM SHALL EVER REQUIRE SHUTTING DOWN

TEMPORARILY IN OCCUPIED AREAS DURING CONSTRUCTION, THE

CONTRACTOR SHALL COORDINATE THE TIMING OF THE SHUT DOWN PERIOD

WITH THE OWNER AND ARCHITECT PRIOR TO DISABLING THE EXISTING

SYSTEM. THE EXISTING HVAC SYSTEM SHALL REMAIN FUNCTIONAL IN ALL

OCCUPIED AREAS DURING NORMAL OPERATION PERIODS.

F. ALL EXISTING THERMOSTATS AND EXISTING CONTROL WIRING SHALL BE

REMOVED FROM ALL EQUIPMENT THAT IS BEING REMOVED IN THE BUILDING

IN DEMOLISHED AREAS UNLESS OTHERWISE NOTED.

SHEET KEYNOTES:

1. EXISTING ROOFTOP UNIT SHALL BE REMOVED AND

REPLACED IN THE SAME LOCATION. EXISTING

ROOF CURB SHALL REMAIN IN PLACE AND A NEW

CURB ADAPTOR SHALL BE INSTALLED AS

NECESSARY FOR INSTALLATION OF NEW UNIT.

DISCONNECT EXISTING DUCTWORK, ELECTRICAL

CONNECTIONS, NATURAL GAS AND BUILDING

AUTOMATION CONTROLS SYSTEM AND

RECONNECT TO NEW UNIT. SEE NEW WORK PLAN

FOR MORE INFORMATION.

2. EXISTING EXHAUST FAN SHALL BE REMOVED AND

REPLACE IN THE SAME LOCATION. EXISTING ROOF

CURB SHALL REMAIN AND BE REUSED. PROVIDE

CURB ADAPTER AS NECESSARY FOR INSTALLATION

OF NEW FAN. DISCONNECT EXISTING DUCTWORK

AND ELECTRICAL CONNECTIONS AND RECONNECT

TO NEW FAN. SEE NEW WORK SHEETS FOR MORE

INFORMATION.

3. EXISTING KITCHEN MAKEUP AIR UNIT AND RANGE

HOOD EXHAUST FAN SHALL BE REMOVED AND

REPLACED WITH NEW IN SAME LOCATIONS.

EXISTING ROOF CURBS AND EQUIPMENT RAILS

SHALL REMAIN. PROVIDE NEW CURB ADAPTERS AS

NECESSARY FOR INSTALLATION OF NEW

EQUIPMENT. DISCONNECT EXISTING DUCTWORK,

ELECTRICAL CONNECTIONS, AND GAS

CONNECTIONS AND RECONNECT TO NEW

EQUIPMENT.

4. EXISTING VENTILATION FAN SHALL REMAIN.

5. EXISTING FREEZER/COOLER CONDENSING UNIT

SHALL BE REMOVED AND REPLACED WITH NEW IN

SAME LOCATION. EXISTING EQUIPMENT RAILS

SHALL REMAIN. PROVIDE ADDITIONAL EQUIPMENT

RAILS AS NECESSARY FOR INSTALLATION OF NEW

UNITS. ALL EXISTING REFRIGERANT PIPING AND

ELECTRICAL CONNECTION SHALL BE REMOVED

AND REPLACED WITH NEW. INDOOR UNIT SHALL

REMAIN.

6. EXISTING OUTSIDE AIR INTAKE SHALL REMAIN.

SPECIAL NOTES

1. EXISTING ROOF IS UNDER WARRANTY THROUGH VERSICO

ROOFING SYSTEMS. ALL ROOFING WORK SHALL BE

COORDINATED WITH VERSICO ROOFING SYSTEMS AS TO NOT

VOID ANY EXISTING ROOF WARRANTY. VERIFY CONTACT

INFORMATION FOR VERSICO ROOFING WITH OWNER.

2. ALL EXISTING HVAC SYSTEMS SHALL REMAIN OPERATIONAL

DURING THIS PROJECT. EXISTING EQUIPMENT SHALL BE

DISABLED ONLY WHEN NEW EQUIPMENT IS ONSITE AND READY

TO BE INSTALLED.

3. AS UNITS ARE INSTALLED, THERMOSTATS SHALL BE INSTALLED

AND PLACED IN STAND ALONE OPERATION MODE.

4. ALL NEW AND EXISTING EQUIPMENT SHALL CONNECT TO NEW

DDC CONTROL SYSTEM TIED INTO THE CONTROL NETWORK.

ALL NEW AND EXISTING EQUIPMENT SHALL RECEIVE NEW DDC

CONTROLLERS FOR COMMUNICATION WITH NEW CONTROL

SYSTEM. REFER TO CONTROLS DRAWINGS FOR FURTHER

DETAILS.

DATE:

SCALE:

SHEET NO.

D

ES

IG

N

ED

D R

AW

N

R

EV

IE

W

ED

AP

PR

O

VE

D

D

AT

E

BY

D

ES

C R

IP

TI

O N

N O

R

EV

IS

IO

N S

SC

AL

E C

H

EC

K:

TH

IS

M

AR

K

SH

O

U

LD

M

EA

SU

R

E

EX

AC

TL

Y 1"

W H

EN

P

LO

TT

ED

BI

D

S

ET

C

LI

EN

T

PR

O

JE

C

T N

O

G R

W P

R O

JE

C

T N

O . 5

2-

AL

L

R

IG

H

TS

R

ES

ER

VE

D

TH

IS

D O

C U

M

EN

T

IS

T H

E

PR

O

PE

R

TY

O F

G R

W E

N G

IN

EE

R S, IN

C

. A N

D S

H

AL

L N

O T

BE

R

EP

R

O D

U C

ED

IN

W H

O

LE

O R

IN

P

AR

T

O R

U

SE

D F

O R

C O

N

ST

R U

C

TI

O N

O F

O

TH

ER

T

H

AN

T H

IS

S

PE

C

IF

IC

P R

O

JE

C T

W

IT

H O

U T

W R

IT

TE

N P

ER

M

IS

SI

O N en gi ne er in g ar ch ite ct ur e ge os pa tia l w w w .g rw in c.

co m

LA

KI

N C

O R

R

EC

TI

O

N

AL

C

EN

TE

R

A N

D J

AI

L

H

VA

C E

Q U

IP

M

EN

T

R

EP

LA

C

EM

EN

T W

ES

T

C O

LU

M

BI

A, W

ES

T

VI

R G

IN

IA

MD111

FEBRUARY 21, 2025

KEY PLAN

A

J

H

F

E D

C

B

R O

O

FT

O P

M

EC

H

AN

IC

AL

H

VA

C D

EM

O

LI

TI

O N

PL

AN

AR

EA

"D

C

VS

SP

B

C

VS

C

VS

1/16" - 1'0"

ROOFTOP MECHANICAL HVAC DEMOLITION PLAN - AREA "D"

C H

L

IN

E M

AT

C

H L

IN

E

SE

E

M D

SE

E

M D

2EF-E1

RTU-E4

RTU-E1

RTU-E2

EF-E2

EF-E3KMU-E1

KMU-E2

EF-E4

GV-E1

RTU-E3 1

DEMOLITION GENERAL NOTES:

A…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .