ApprovedforConstruction_LarueCharles20261013.pdf
PDF 2 MB Posted
- Attached to
- LaRue IRA - Bathroom Floor Replacement
- Solicitation number
- 2140323
- Issued by
- Queens County, New York
About this file
This document is an approval for construction related to the Finger Lakes Developmental Disabilities Services Office (DDSO), a New York State agency operating under the Office for People with Developmental Disabilities (OPWDD). The project involves bathroom floor replacement at the LaRue Intermediate Residential Facility (IRA) located at 105 Charles Street, Wayland, New York. A mandatory site visit was scheduled for Thursday, November 12, 2026, at 10:00 a.m., with vendors required to attend in their entirety to verify knowledge of the work area prior to bid submission. Bids were not to be accepted from vendors who did not attend the site visit or who arrived late. The project is classified as a New York State public works project subject to prevailing wage requirements.
Bidders were required to provide valid New York State Department of Labor (NYSDOL) registration numbers and submit Certificates of Registration at the time of bid submission, with failure to do so resulting in automatic disqualification. Prospective bidders could request bid invitations by contacting Franchesca Sagen via fax at 585-461-8811 or via email at FL.Purchasing@opwdd.ny.gov, referencing the project location and title on company letterhead and providing contact information. The NYSDOL indicated that registration applications typically require approximately three to four weeks for review and certificate issuance, and applicants were advised to register promptly to avoid scheduling disruptions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CP-FL-H2312-20261013_Replace_Bathroom_Epoxy_Flooring_with_Tile_LARUE.pdf | ||
| RFQ.pdf | ||
| SOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REVISION TAG
ELEVATION
DETAIL/SECTION
WINDOW TAG
WALL TAG
ROOM TAG
DOOR TAG
A
A101
W1
A
ROOM
101B
COLUMN GRID
CL
A101
INTERIOR ELEVATION 2
+2'-0"
AX.X
X
GENERAL DEMOLITION NOTES
1. THE OWNER WILL REMOVE LOOSE ITEMS AND FURNISHING FROM THE
BATHROOM
2. PROVIDE A DUST ENCLOSURE OF FIRE-RETARDANT POLYETHYLENE, SEALED
WITH TAPE AT PERIMETER AND AT ALL JOINTS AT AREA OF WORK. PROVIDE
DOUBLE OVERLAPPING POLYETHYLENE ENTRIES INTO THE DUST ENCLOSURES.
3. DEMOLITION DRAWINGS AND NOTES DEMONSTRATE INTENT OF DEMOLITION.
CONTRACTOR SHALL SURVEY THE WORK SITE PRIOR TO SUBMITTING A
PROPOSAL AND DETERMINE THE FULL EXTENT IF REMOVALS, THE WORK
INCLUDES ALL REMOVALS REQUIRED TO PROPERLY INSTALL THE NEW WORK,
INCLUDING REMOVALS REQUIRED FOR NEW MECHANICAL, PLUMBING, AND
ELECTRICAL SCOPE.
4. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY PROTECTION FOR THE
EXISTING FIRE ALARM AND SPRINKLER SYSTEM AS REQUIRED DURING THE
COURSE OF DEMOLITION AND CONSTRUCTION ACTIVITIES. IF THE FIRE ALARM
AND/OR SPRINKLER SYSTEM IS REQUIRED TO BE DISABLED FOR ANY REASON,
THE CONTRACTOR SHALL PROVIDE A WRITTEN NOTICE TO THE OPWDD FIELD
REPRESENTATIVES SEVENTY-TWO (72) HOURS PRIOR TO SHUTDOWN. SHOULD
ANY DAMAGE TO THE FIRE ALARM AND SPRINKLER SYSTEM OCCUR AS A
RESULT OF DEMOLITION OR CONSTRUCTION ACTIVITIES, THE DAMAGE TO THESE
SYSTEMS SHALL BE REPAIRED IMMEDIATELY BY THE CONTRACTOR AT NO
EXPENSE TO THE OWNER.
OCCUPANCY: R-3, 2025 NYSBC 310.4.1
CONSTRUCTION CLASSIFICATION: VB
CODE COMPLIANCE: 2025 EXISTING BUILDING CODE
2025 NYS RESIDENTIAL BUILDING CODE
ALTERATION LEVEL: ALTERATION LEVEL 1, 130 SFT
TOTAL BUILDING SFT: APPROX. 5400 SFT
GENERAL NOTES
CODE INFORMATION
GENERAL CONSTRUCTION NOTES
1. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS
PRIOR TO COMMENCING WORK. NOTIFY THE ARCHITECT OF ANY
DISCREPANCIES FROM THESE DOCUMENTS, OF CONDITIONS THAT REQUIRE
DEVIATIONS FROM THE DOCUMENTS, AND OF CONDITIONS THAT REQUIRE WORK
ADDITIONAL TO THE WORK IN THESE DOCUMENTS.
2. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING DAMAGE TO EXISTING
MATERIALS THAT REMAIN WHEN THAT DAMAGE RESULTS FROM THE EXECUTION
OF THE WORK. THE CONTRACTOR SHALL PROVIDE RECORD PHOTOGRAPHS OF
PRE-EXISTING DAMAGE PRIOR TO COMMENCING WORK.
3. THE BUILDING WILL BE OCCUPIED CONTINUOUSLY DURING THE COURSE OF
WORK. SECURE AND PROTECT ALL AREAS, INTERIOR AND EXTERIOR, DURING
THE DURATION OF WORK. MAINTAIN EXITS AND FIRE SUPPRESSION SYSTEMS AT
ALL TIMES.
4. PHASE THE WORK AS REQUIRED FOR THE OWNER TO CONTINUE OPERATIONS.
5. WHERE EXISTING MATERIALS THAT REMAIN ARE PARTIALLY REMOVED FOR THE
PLACEMENT OF THE NEW WORK, THE CONTRACTOR SHALL PATCH THE
REMOVALS WITH MATERIALS MATCHING THE EXISTING MATERIALS IN MAKEUP
AND FINISH PLANE. EXTEND THE NEW FINISH OVER THE EXISTING MATERIALS TO
A NATURAL BREAK POINT OF THE SURFACE (E.G. PAINT FROM FLOOR TO
CEILING, PAINT FROM INSIDE CORNER OF WALL TO INSIDE CORNER OF WALL,
ETC.).
6. ALL COLOR SELECTIONS INCLUDING, BUT NOT LIMITED TO, AGGREGATE COLORS
TO BE MADE BY THE OWNER.
7. CONTRACTOR SHALL COMPLY WITH OPWDD SAFETY PLAN AND COORDINATE
ALL WORK WITH OPWDD FIELD STAFF.
NORTH
A P
P R
O V
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
P D
C P
R O
JE
C
T N
U M
B E
R
C L
IE
N T P
R O
JE
C
T N
U M
B E
R
IS
S
U E
D A
T E
P A
T R
IO
T D
E S
IG
N
C
O N
S U
L T
IN
G P
L L C
C
A N
A L V
IE
W
B L V
D S
U
IT
E
R
O C
H E
S T E
R N
Y
.4
.0
W
W W
.P A
T R
IO
T -D
C .C
O M
REGISTRATION CURRENT THROUGH
FEBRUARY 28, 2029
NOTE: UNAUTHORIZED ALTERATION OR
ADDITION TO THIS DRAWING IS A VIOLATION
OF THE NEW YORK STATE EDUCATION LAW
ARTICLE 145, SECTION 7209.
/9 /2
:3
:4
P
M
B A
T H
R O
O M
R E
N O
V A
T
IO
N
C
H A
R L
E S
S T R
E E
T
W A
Y L
A N
D
N Y
C O
V E
R S
H E
E T
K M
G
C R
B
F S
W
O P
W D
CS
C M
M F
L
O
C T
FOR PERMIT
LOCATION MAP
N
BATHROOM RENOVATION
105 CHARLES STREET
WAYLAND, NY 14572
620 WESTFALL ROAD
ROCHESTER, NY 14620
SYMBOLS DRAWING LIST
CS COVER SHEET
A1 FLOOR PLANS AND ELEVATIONS
A2 SPECIFICATIONS
ABBREVIATIONS
AB ANCHOR BOLT
AC AIR CONDITIONING
ACT ACOUSTIC TILE
ADJT ADJUSTABLE
AFF ABOVE FINISHED FLOOR
AL ALUMINUM
ALUM ALUMINUM
ANOD ANODIZED
ARCH ARCHITECTURAL
BD BOARD
BLK BLOCK
BLKG BLOCKING
BO BOTTOM OF
BOT BOTTOM
BTM BOTTOM
CER CERAMIC
CIRC CIRCUMFERENCE
CJ CONTROL JOINT
CK CAULKING
CL CENTER LINE
^^C CENTER LINE
CLG CEILING
CLR CLEARANCE
CMT CERAMIC MOSAIC TILE
CMU CONCRETE MASONRY UNIT
CO CLEAN OUT
CONT CONTINUOUS
COL COLUMN
CONC CONCRETE
CPT CARPET
CT CERAMIC TILE
DF DRINKING FOUNTAIN
DIA DIAMETER
DIM DIMENSION
DS DOWNSPOUT
DWG DRAWING
EA EACH
EB EXPANSION BOLT
HM HOLLOW METAL
HORIZ HORIZONTAL
HT HEIGHT
HVAC HEATING/VENTILATION
AIR CONDITIONING
HWH HOT WATER HEATER
ID INSIDE DIAMETER
INSUL INSULATION
INT INTERIOR
INV INVERT
JC JANITOR'S CLOSET
JT JOINT
JNT JOINT
L ANGLE
LAM LAMINATE
LAV LAVATORY
LBL LABEL
LT LIGHT
LTL LINTEL
LVR LOUVER
MAX MAXIMUM
MECH MECHANICAL
MEMB MEMBRANE
MIN MINIMUM
MFR MANUFACTURER
MH MANHOLE
MO MASONRY OPENING
MTL METAL
NIC NOT IN CONTRACT
NTS NOT TO SCALE
O OVER
OC ON CENTER
OP OPAQUE
OPNG OPENING
OPP OPPOSITE
PCC PRE CAST CONCRETE
PCF POUNDS PER CUBIC FOOT
PLF POUNDS PER LINEAR FOOT
PSF POUNDS PER SQUARE FOOT
PL PLATE
PL PROPERTY LINE
PLAM PLASTIC LAMINATE
PNL PANEL
PSF PER SQUARE FOOT
PT PAINT
PT PRESSURE TREATED
PTD PAINTED
PWD PLYWOOD
PLYWD PLYWOOD
QT QUARRY TILE
R RISER
RD ROOF DRAIN
REINF REINFORCING
REF REFER/REFERENCE
RES RESILIENT
RFG ROOFING
RFH ROOF HATCH
RL RAILING
RM ROOM
RO ROUGH OPENING
SC SOLID CORE
SCH SCHEDULE
SHTG SHEATHING
SIM SIMILAR
SNT SEALANT
SS STAINLESS STEEL
STD STANDARD
STL STEEL
STR STRUCTURAL
SUSP SUSPENDED
SYS SYSTEM
EIFS EXTERIOR INSULATION
FINISHING SYSTEM
ELEC ELECTRICAL
EL ELEVATION
ELEV ELEVATION
ETC ETCETERA
ETR EXISTING TO REMAIN
EWC ELECTRIC WATER COOLER
EXIST EXISTING
EXP EXPANSION
EXT EXTERIOR
EXTG EXISTING
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FFE FINISHED FLOOR ELEVATION
FLG FLASHING
FLR FLOOR
FLCO FLOOR CLEANOUT
FLUR FLUORESCENT
FND FOUNDATION
FOIC FURNISHED BY OWNER,
INSTALLED BY CONTRACTOR
FV FIELD VERIFY
FR FRAMING
FTG FOOTING
GA GAUGE
GALV GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACTOR
GL GLASS
GLZ GLAZING
GR GUARDRAIL
GYP GYPSUM
H HIGH
HB HOSE BIBB
HC HOLLOW CORE
HDR HEADER
HDWR HARDWARE
TD TRAVEL DISTANCE
TEL TELEPHONE
T TREAD
TO TOP OF
TOC TOP OF CONCRETE
TOP TOP OF PAVEMENT
TOS TOP OF STEEL
TYP TYPICAL
UNF UNFINISHED
UON UNLESS OTHERWISE NOTED
VB VAPOR BARRIER
VB VINYL BASE
VCT VINLYL COMPOSITION TILE
VERT VERTICAL
VIF VERIFY IN FIELD
VIN VINYL
VWC VINYL WALL COVERING
VT VINYL TILE
W/ WITH
W WIDE
WB WOOD BASE
WP WATERPROOFING
WD WOOD
WWF WELDED WIRE FABRIC
WT WALL TILE
PROJECT LOCATION
KEY PLAN
KEY PLAN
R E V N
U M
B E R
D A
TE
D
E S
C R
IP
TI
O N wardanj Accepted For Construction
G F
I
GFI
GFI
G F
I
GFI
GFI
LEGEND
GFI
CONSTRUCTION KEYNOTE
EXISITNG GFCI WALL RECEPTACLE TO REMAIN
EXISTING LIGHT SWITCH TO REMAIN
EXISTING SPRINKLER TO REMAIN
EXISTING DOOR TO REMAIN
TO BE REMOVED
EXISTING TO REMAIN
130 SF
BATHROOM
SLOPE
S L O
P E
SLOPE
S L O
P E
SLOPE
SLOPE
S L O
P E
S L O
P E
13' - 9" VIF
/2
V
IF
EXISTING REDUCER STRIP/TRANSITION
THRESHOLD TO BE REUSED/REMAIN
/4
M
A X
/2
M
A X
EXISTING FINISH FLOOR & EXISTING SUBFLOOR
OUTSIDE OF BATHROOM TO REMAIN
NEW BATHROOM FLOORING, SEE FLOOR PLAN
1/2" MIN.
(1) LAYER 5/8" THICK
CEMENTITIOUS BACKER BOARD
EXISTING FLOOR
STRUCTURE
PROVIDE 2x BLOCKING UNDER THRESHOLD
TO BE 3/4" LESS THAN THE DEPTH OF THE
EXISTING FLOOR ASSEMBLY AS SHOWN
UNDER THRESHOLD;
SEE NOTE ABOVE WITHIN THIS DETAIL.
EXISTING FLOOR STRUCTURE TO REMAIN.
MODIFY JOISTS AS REQUIRED TO
ACCOMMODATE DEPTH OF TILE AND
ASSOCIATED SLOPED MORTAR BED.
NOTE: VERIFY FRAMING SIZE & SPACING IN FIELD
AFTER SUBFLOOR, FASTENERS & ADHESIVES ARE
REMOVED. REPORT FINDINGS TO OWNER'S
REPRESENTATIVE & ENGINEER PRIOR TO CUTTING
ANY EXISTING FLOOR FRAMING.
(1) LAYER 3/4" THICK MARINE-GRADE
PLYWOOD WITH EXTERIOR GLUE, SCREW
FASTENED AT 6" O.C. TO SUBFLOOR
PROVIDE THINSET MORTAR BED TO RECEIVE TILE
OVER MAPEI MAPELASTIC AQUADEFENSE
WATERPROOFING MEMBRANE
EXISTING SOLID SURFACE
PANELS TO REMAIN
EXISTING GYPSUM PANEL
SYSTEM OVER EXISTING
FRAMING TO REMAIN
CONT. SCHLUTER PROFILE
"RONDEC-DB" SATIN ANODIZED
ALUMINUM STRIP
6" PORCELAIN TILE COVE BASE
PORCELAIN TILE FLOORING,
REFER TO SPECS AND FLOOR
PLAN FOR FORMAT/EXTENTS
PROVIDE THINSET MORTAR BED TO RECEIVE
TILE OVER MAPEI MAPELASTIC
AQUADEFENSE WATERPROOFING MEMBRANE
EXISTING WOOD FRAME
FLOOR ASSEMBLY
(1) LAYER 5/8" THICK
CEMENTITIOUS BACKER BOARD
(1) LAYER 3/4" THICK MARINE-GRADE
PLYWOOD WITH EXTERIOR GLUE, SCREW
FASTENED AT 6" O.C. TO SUBFLOOR
EPOXY BASE TO REMAIN
NORTH
A P
P R
O V
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
P D
C P
R O
JE
C
T N
U M
B E
R
C L
IE
N T P
R O
JE
C
T N
U M
B E
R
IS
S
U E
D A
T E
P A
T R
IO
T D
E S
IG
N
C
O N
S U
L T
IN
G P
L L C
C
A N
A L V
IE
W
B L V
D S
U
IT
E
R
O C
H E
S T E
R N
Y
.4
.0
W
W W
.P A
T R
IO
T -D
C .C
O M
REGISTRATION CURRENT THROUGH
FEBRUARY 28, 2029
NOTE: UNAUTHORIZED ALTERATION OR
ADDITION TO THIS DRAWING IS A VIOLATION
OF THE NEW YORK STATE EDUCATION LAW
ARTICLE 145, SECTION 7209.
/9 /2
:3
:4
P
M
B A
T H
R O
O M
R E
N O
V A
T
IO
N
C
H A
R L
E S
S T R
E E
T
W A
Y L
A N
D
N Y
F L O
O R
P L A
N S
A N
D E
L E
V A
T
IO
N S
C R
B
K M
G
F S
W
O P
W D
A1
C M
M F
L
O
C T
FOR PERMIT
1/2" = 1'-0"
FLOOR PLAN - NEW CONSTRCUTION
1/2" = 1'-0"
FLOOR PLAN/REFLECTED CEILING PLAN - DEMOLITION
NEW WORK KEYNOTES
12 PROVIDE FLOOR TILE FULL AREA OF ROOM: DALTILE "KEYSTONES" COLORBODY PORCELAIN MOSAIC
TILE, OVER (1) LAYER OF CEMENTITIOUS BACKER BOARD OVER (1) LAYER OF MARINE-GRADE
PLYWOOD. PROVIDE TILE BASE FULL PERIMETER OF ROOM TO MATCH FLOOR TILE. REFER TO PLANS
FOR TILE FORMAT/SIZE. REFER TO DETAIL FOR BASE INFORMATION.
13 REUSE EXISTING TRANSITION STRIP AT THRESHOLD. SEE DETAIL.
DEMOLITION KEYNOTES
1 REMOVE EXISTING FLOOR FINISH SYSTEM AND SUB FLOORING ASSEMBLY IN THEIR ENTIRETY.
EXISTING BASE AND DOOR THRESHOLD TRANSITION TO REMAIN.
2 EXISTING FLOOR DRAIN TO REMAIN, PROTECT DURING COURSE OF CONSTRUCTION.
3 EXISTING FLOOR DRAIN TO REMAIN. REMOVE AND REINSTALL STRAINER/ADJUSTABLE TOP AS
REQUIRED FOR NEW TILE ASSEMBLY. INTEGRATE BONDED WATERPROOFING MEMBRANE WITH
EXISTING DRAIN BODY USING MANUFACTURER-APPROVED CONNECTION. VERIFY EXISTING DRAIN
CONFIGURATION IN FIELD PRIOR TO INSTALLATION.
4 EXISTING LINEAR SHOWER DRAIN TO REMAIN. REMOVE AND REINSTALL GRATE/FRAME AS
REQUIRED. INTEGRATE NEW BONDED WATERPROOFING MEMBRANE WITH EXISTING DRAIN
MEMBRANE FLANGE/CLAMPING ASSEMBLY IN ACCORDANCE WITH DRAIN MANUFACTURER'S AND
WATERPROOFING MANUFACTURER'S REQUIREMENTS. FIELD VERIFY EXISTING DRAIN MODEL AND
CONFIGURATION.
5 EXISTING SPRINKLERS TO REMAIN. PROTECT FROM DUST. SPRINKLERS TO REMAIN FUNCTIONAL
THROUGHOUT CONSTRUCTION.
6 EXISTING SMOKE DETECTOR TO REMAIN. PROTECT DURING COURSE OF CONSTRUCTION.
7 EXISTING FREE STANDING SHELVING/CABINETRY TO BE REMOVED BY OWNER.
8 SHOWER GURNEY TO BE REMOVED BY OWNER.
9 EXISTING 1/4" THICK SOLID SURFACE WALL PANEL TO REMAIN OVER EXISTING FINSHED WALL.
10 EXISTING WATER CLOSET TO REMAIN.
11 EXISTING DOOR & DOOR FRAME TO REMAIN.
NOTE:
PREPARE FLOOR SUBSTRATES TO PROVIDE POSITIVE DRAINAGE TO FLOOR DRAINS. SLOPE
GENERAL BATHROOM FLOOR A MINIMUM OF 1/8 INCH PER FOOT TOWARD FLOOR DRAINS.
WITHIN SHOWER BED AREA, SLOPE FLOOR A MINIMUM OF 1/4 INCH PER FOOT TOWARD SHOWER
DRAIN. COORDINATE ELEVATIONS TO MAINTAIN EXISTING THRESHOLD AND PROVIDE FLUSH,
ACCESSIBLE TRANSITION AS INDICATED.
6" = 1'-0"
DOOR THRESHOLD
3" = 1'-0"
TYPICAL WALL SECTION
R E V N
U M
B E R
D A
TE
D
E S
C R
IP
TI
O N
1.1 Project Overview
The Bathroom Renovation project consists of the following general scope
(refer to specifications and drawings for more detail):
1. Remove existing epoxy flooring and associated subflooring, down to floor framing. Provide new subflooring assembly to support new floor finish.
2. Existing epoxy wall base to remain. Provide new ceramic tile wall base over existing wall base.
3. Contractor is responsible to Field Measure all existing conditions and coordinate with new work.
1.2 General
1. General Contractor will perform the work. This is a NYS Public Works Project which requires a Prevailing Wage.
2. The General Contractor will work with and cooperate with OPWDD Project
Manager for the coordination and installation of the work described herein.
Contractor shall familiarize themselves with the work pertaining to each trade. Contractor shall verify existing conditions and measurements including demolition work. Contractor shall inspect all drawings and immediately report any discrepancies to the OPWDD Project Manager and Architect.
3. Prior to commencement of any Work, Contractor shall notify the OPWDD
Project Manager. Contractor shall keep the grounds clear of all debris, dust and any other hazardous conditions throughout the project each day. Take all necessary steps to keep all areas clean.
4. All General Construction, Electrical, Plumbing, and Mechanical Work shall be provided in accordance with New York State Building Code and all other agencies having jurisdiction.
5. Contractor shall review OPWDD requirements and coordinate work of their various trades for compliance. Contractor shall notify the OPWDD Project
Manager at each stage of completion of the project.
PROJECT DESCRIPTION
DALTILE "KEYSTONES" COLORBODY PORCELAIN MOSAIC TILE
PART 1 GENERAL
1.1 SUMMARY
A. Section Includes:
1. ColorBody Porcelain mosaic floor tile.
2. Porcelain tile cove base and trim
3. Tile backing panels.
4. Waterproofing membrane
5. Metal edge strips.
1.2 ACTION SUBMITTALS
A. Product Data: For each type of product.
B. Samples:
1. Each type and composition of tile and for each color and finish required.
1.3 INFORMATIONAL SUBMITTALS
A. Qualification Data: For Installer.
SECTION 093013 - CERAMIC TILING
1.4 MAINTENANCE MATERIAL SUBMITTALS
A. Furnish extra materials that match and are from same production runs as products installed and that are packaged with protective covering for storage and identified with labels describing contents.
1. Tile and Trim Units: Furnish quantity of full-size units equal to 5 percent of amount installed for each type, composition, color, pattern, and size indicated.
A. 2” x 2” Field & Cove Base Tile
PART 1 GENERAL
1.1 Project Conditions
A. Existing Conditions: Do not disturb existing structures, construction, materials, or equipment unless required by the contract.
1. Do not cut, drill, or remove structural members such as joists, beams, and columns which support construction which is scheduled to remain unless expressly required by the Contract Documents.
2. Remove all demolished materials from the premises and dispose of on a daily basis.
B. Items to remain the property of OPWDD: The following items shall remain the property of OPWDD and shall be stored at the site where directed by the OPWDD project manager.
This includes excess wood trim and existing windows if requested.
Coordinate with OPWDD Project Manager.
1. Construction Work Contract. Remove and salvage existing building materials or other accessories as designated by OPWDD.
2. Store all items at a location as directed by OPWDD.
3. Properly dispose of all remaining scrap items and remove from the site each day.
4. Shower gurney.
PART 2 PRODUCTS
2.1 Materials
A. Match the appearance and performance of existing corresponding materials as closely as possible.
PART 3 EXECUTION
3.1 Examination
A. Prior to cutting, drilling, or removal investigate both sides of the surface involved with the Work. Determine the exact location of all structural members.
B. If unforeseen obstructions are encountered., take necessary precautions to prevent damage and obtain instruction from the
OPWDD Project Manager before proceeding with the Work.
3.2 Preparation
A. Prepare existing surfaces properly to receive, and where required, bond with the new Work.
3.3 Patching
A. Patch existing construction and finishes which are disturbed, damaged, or left incomplete due to alterations and removals.
Patching: except as otherwise indicated, shall be limited to the areas which have been cut or altered with this Work. Finish patched surfaces to match existing adjacent surfaces as closely as possible.
B. Perform patching around items in a manner which will maintain the water and fire resistance capabilities of the existing construction.
C. Paint patched areas and cover plates to match existing adjacent surfaces as closely as possible using the same type of paint. Painting, except as otherwise indicated, shall be limited to areas which have been patched.
D. Where surfaces exposed by removals are to remain as exposed surfaces, paint these areas to match existing surfaces as closely as possible using the same type of paint.
REMOVALS, CUTTING, AND PATCHING
SECTION 061053 - MISCELLANEOUS ROUGH CARPENTRY
PART 1 GENERAL
1.1 Related Documents
A. Drawings and general provisions of the Contract, including General and
Supplementary Conditions and Division 1 Specification Sections, apply to this Section.
1.2 Summary
A. This section includes the following:
1. Framing with dimension lumber.
2. Wood blocking with nailers.
3. Subflooring
PART 3 - EXECUTION
2.6 GROUT MATERIALS
A. Water-Cleanable Epoxy Grout: ANSI A118.3.
1. Products: Subject to compliance with requirements, provide one of the following or comparable equivalent:
a. Boiardi Products Corporation; a QEP company; Elastiment 1026 Epoxy
Tile Grout.
b. Custom Building Products; CEG-Lite.
c. MAPEI Corporation; Kerapoxy CQ.
d. North American Adhesives; NA 4650 Ever Color Q.
2.7 MISCELLANEOUS MATERIALS
A. Trowelable Underlayments and Patching Compounds: Latex-modified, Portland cement-based formulation provided or approved by manufacturer of tile-setting materials for installations indicated.
1. Products: Subject to compliance with requirements, provide one of the following or comparable equivalent:
a. Ardex Engineered cements; Ardex MRF.
b. Custom Building Products; Skim Coat and Patch.
c. MAPEI Corp; Mapecem Quickpatch.
d. North American Adhesives; NA 600 Multi Patch.
B. Metal Transition Strips: Angle or L-shape or as otherwise indicated on drawings, height to match tile and setting-bed thickness, metallic or combination of metal and PVC or neoprene base, designed specifically for flooring or wall applications; anodized aluminum exposed-edge material.
1. Basis of Design: Schluter Systems “RONDEC-DB” decorative profile.
2. Products: Subject to compliance with requirements, provide products by one of the following:
a. Blanke Corporation.
b. Ceramic Tool Company, Inc.
c. Profilitec.
d. Schluter Systems L.P.
3.1 EXAMINATION
A. Examine substrates, areas, and conditions where tile will be installed, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance of the Work.
1. Verify that substrates for setting tile are firm; dry; clean; free of coatings that are incompatible with tile-setting materials, including curing compounds and other substances that contain soap, wax, oil, or silicone; and comply with flatness tolerances required by ANSI A108.01 for installations indicated.
2. Verify that concrete substrates for tile floors installed with bonded mortar bed or thinset mortar comply with surface finish requirements in ANSI A108.01 for installations indicated.
B. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 PREPARATION
A. Fill cracks, holes, and depressions in concrete substrates for tile floors installed with thinset mortar with trowelable leveling and patching compound specifically recommended by tile-setting material manufacturer.
B. Where indicated, prepare substrates to receive waterproofing by applying a reinforced mortar bed that complies with ANSI A108.1A and is sloped 1:50 (1/4 inch per foot) toward drains in area of shower bed and is sloped 1:100 (1/8 inch per foot) at main field as indicated on drawings.
C. Blending: For tile exhibiting color variations, verify that tile has been factory blended and packaged so tile units taken from one package show same range of colors as those taken from other packages and match approved Samples. If not, factory blended, either return to manufacturer or blend tiles at Project site before installing.
3.3 CERAMIC TILE INSTALLATION
A. Comply with TCNA's "Handbook for Ceramic, Glass, and Stone Tile Installation" for TCNA installation methods specified in tile installation schedules. Comply with parts of the
ANSI A108 series "Specifications for Installation of Ceramic Tile" that are referenced in
TCNA installation methods, specified in tile installation schedules, and apply to types of setting and grouting materials used.
1. For the following installations, follow procedures in the ANSI A108 series of tile installation standards for providing 95 percent mortar coverage:
A. Tile floors in wet areas.
B. Tile floors consisting of tiles 200 by 200 mm (8 by 8 inches) or larger.
B. Extend tile work into recesses and under or behind equipment and fixtures to form complete covering without interruptions unless otherwise indicated. Terminate work neatly at obstructions, edges, and corners without disrupting pattern or joint alignments.
C. Accurately form intersections and returns. Perform cutting and drilling of tile without marring visible surfaces. Carefully grind cut edges of tile abutting trim, finish, or built-in items for straight aligned joints. Fit tile closely to electrical outlets, piping, fixtures, and other penetrations so plates, collars, or covers overlap tile.
D. Provide manufacturer's standard trim shapes where necessary to eliminate exposed tile edges.
E. Joint Pattern: Lay tile in grid pattern unless otherwise indicated. Lay out tile work and center tile fields in both directions in each space or on each wall area. Lay out tile work to minimize the use of pieces that are less than half of a tile. Provide uniform joint widths unless otherwise indicated.
F. Joint Widths: Install porcelain mosaic tile with 1/8-inch joints, consistent with manufacturer's factory-mounted sheet spacing.
3.4 INTERIOR CERAMIC TILE INSTALLATION SCHEDULE
A. Interior Floor Installations, Wood Subfloor:
1. Ceramic Tile Installation PCT-1: TCNA F144; thinset mortar over cementitious backer units or fiber-cement backer board.
a. Ceramic Tile Type: PCT-1
b. Thinset Mortar: Latex-modified cement mortar.
c. Grout: Water-cleanable epoxy grout.
B. Interior Wall Installation, Wood or Metal Studs or Furring:
1. Ceramic Tile Installation PCT-1: TCNA W243; thinset mortar on gypsum board.
A. Ceramic Tile Type: PCT-1
B. Thinset Mortar: Latex-modified cement mortar.
C. Grout: Water-cleanable epoxy grout.
END OF SECTION 093013
PART 2 PRODUCTS
2.1 PRODUCTS, GENERAL
A. ANSI Ceramic Tile Standard: Provide Standard-grade tile that complies with ANSI A137.1 for types, compositions, and other characteristics indicated.
B. ANSI Standards for Tile Installation Materials: Provide materials complying with ANSI
A108.02, ANSI standards referenced in other Part 2 articles, ANSI standards referenced by TCNA installation methods specified in tile installation schedules, and other requirements specified.
2.2 TILE PRODUCTS
A. Porcelain Mosaic Tile Type PCT-1: ColorBody porcelain mosaic tile.
1. Basis-of-Design Product: Subject to compliance with requirements, provide
Daltile "Keystones" ColorBody Porcelain Mosaic.
2. Size: 2 x 2 inch nominal mosaic tile, dot-mounted on 12 x 24 inch sheets.
3. Thickness: 1/4 inch
4. Finish: Matte
5. Water Absorption: Less than 0.5 percent when tested in accordance with
ASTM C373.
6. Dynamic Coefficient of Friction: Not less than 0.42 wet for level interior wet areas.
7. Grout Joint Width: 1/8 inch, manufacturer's recommended width.
8. Tile Color: As selected by Architect from manufacturer's full range.
9. Grout Color: As selected by Architect from manufacturer's full range.
10. Trim Units: Provide manufacturer's standard trim units matching or coordinating with adjoining tile where indicated. Provide shapes as follows, selected from manufacturer's standard shapes:
a. Cove Base: Cove base, 2” x 2".
2.3 TILE BACKING PANELS
A. Cementitious Backer Units: ANSI A118.9 or ASTM C 1325, Type A.
1. Products: Subject to compliance with requirements, provide one of the following:
a. C-Cure; C-Cure Board 990.
b. Custom Building Products; Wonderboard.
c. FinPan, Inc.; ProTEC Concrete Backer Board.
d. USG Corporation; DUROCK Cement Board.
2. Thickness: 15.9 mm (5/8 inch).
2.4 WATERPROOFING MEMBRANE
A. Waterproofing Membrane: ANSI A118.10, load-bearing, bonded waterproof membrane suitable for use beneath ceramic and porcelain tile.
1. Basis-of-Design Product: MAPEI Corporation; Mapelastic AquaDefense, or approved equal.
B. Provide complete waterproofing system including reinforcing fabric, corners, accessories, and drain connections recommended by membrane manufacturer.
C. Install membrane continuously over floor areas indicated and integrate with existing floor drains in accordance with manufacturer's written instructions.
2.5 SETTING MATERIALS
A. Portland Cement Mortar (Thickset) Installation Materials: ANSI A108.02.
B. Latex-Portland Cement Mortar (Thinset): ANSI A118.4.
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following or comparable equivalent:
a. Boiardi Products Corporation; a QEP company; Elastiment Porcelain
Set.
b. Custom Building Products; VersaBond LFT.
c. MAPEI Corporation; Keraflex Plus.
d. North American Adhesives; NA 3785 Magna Flex Pro.
2. Provide prepackaged, dry-mortar mix combined with liquid-latex additive at project site.
3. For wall applications, provide non-sagging mortar.
PART 2 PRODUCTS
2.1 Materials
A. General: Match existing construction. Verify and remove all damaged and rotten floor joists, floor sheathing and miscellaneous damaged items from designed work area. All building materials and debris shall be removed from the premises at the end of each work day.
B. Lumber
1. Framing Lumber: AWPA HEM-FIR #2 grade or better.
2. Dimensioning: As shown on drawings.
3. Piece in trim and wallboard in a craftsman like manner to match surrounding work.
4. Plywood
A P
P R
O V
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
P D
C P
R O
JE
C
T N
U M
B E
R
C L
IE
N T P
R O
JE
C
T N
U M
B E
R
IS
S
U E
D A
T E
P A
T R
IO
T D
E S
IG
N
C
O N
S U
L T
IN
G
P L L C
C
A N
A L V
IE
W
B L V
D S
U
IT
E
R
O C
H E
S T E
R N
Y
.4
.0
W
W W
.P A
T R
IO
T -D
C .C
O M
REGISTRATION CURRENT THROUGH
FEBRUARY 28, 2029
NOTE: UNAUTHORIZED ALTERATION OR
ADDITION TO THIS DRAWING IS A VIOLATION
OF THE NEW YORK STATE EDUCATION LAW
ARTICLE 145, SECTION 7209.
/9 /2
:4
:0
B A
T H
R O
O M
R E
N O
V A
T
IO
N
C
H A
R L
E S
S T R
E E
T
W A
Y L
A N
D
N Y
S P
E C
IF
IC
A T
IO
N S
C R
B
K M
G
F S
W
O P
W D
A2
C M
M F
L
O
C T
FOR PERMIT
R E V N
U M
B E R
D A
TE
D
E S
C R
IP
TI
O N
File details come from the government source that posted it. Updated .